User Manual: (BSNL - PM - UM - 01 - Preventive - Maintenance - V2.0
User Manual: (BSNL - PM - UM - 01 - Preventive - Maintenance - V2.0
User Manual: (BSNL - PM - UM - 01 - Preventive - Maintenance - V2.0
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 1
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 2
Contents
Overview.....................................................................................................................................................3
Maintain Packages.................................................................................................................................14
Deadline Monitoring..............................................................................................................................24
Process Notification...............................................................................................................................27
Complete Notification........................................................................................................................63
Report for the Equipment for scheduled maintenance have not been done within the schedule.....71
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 3
Overview
Business Process Description Overview
Preventive Maintenance is used to avoid system breakdowns or the breakdown of other
objects, which - in addition to the repair costs - often result in much higher costs
subsequently owing to production breakdown.
There are many benefits in using preventive maintenance within your company. It is the
generic term for inspections, preventive maintenance and planned repairs, for which the
time and scope of the work can be planned in advance.
You can use maintenance plans to describe dates and the extent of preventive and
inspection maintenance tasks which can be planned for technical objects. You can
ensure that your technical objects are always maintained on time and in this way,
ensure that they function optimally.
Integration
The Maintenance Planning component is integrated with the following components and
sub-components of the SAP System:
Plant Maintenance application component
· Maintenance task lists
· Maintenance orders
· Maintenance notifications
Materials Management application component
· Service procurement
· Service entry sheets
Quality Management application component
· Inspection characteristics
· Inspection lots
Generation of Maintenance Call Objects
The system generates maintenance call objects during the scheduling process. The
following maintenance call objects are available in the overview:
For rough planning of tasks
PM notification
For detailed planning of tasks
PM order
For detailed planning of tasks and history for the damage processed in the notification:
Maintenance notification and maintenance order
For Quality Management using the link to QM inspection characteristics:
Inspection lots
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 4
Purpose
Use this procedure to create Preventive Maintenance Plan
1. Single Cycle Plan
2. Strategy Plan
3. Multiple Counter plan
Trigger
Perform this procedure when there is a need for scheduled maintenance for the
technical objects.
Prerequisites
Helpful Hints
For scheduled maintenance at a single frequency; create Single Cycle Plan. For
example: maintenance at 3Month only.
For scheduled maintenance at more than one frequency; create Strategy plan. For
example: maintenance at 1Month, 3Month, 6Month, 1 Year etc.
For scheduled maintenance with a combination of time-based and counter-based
maintenance; create multiple counter plans for example maintenance at 1Month and/or
200 running hours
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 5
Create Single Cycle Plan
User Menu Select corresponding Node for IP41 / Single Cycle Plan
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 6
Click on to select task list / Gen. Task list
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 7
Click on or press F8 key on the keyboard
After execution you will find the list of task lists as below
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 8
From the above list first select the suitable Task list and click on enter button or Double
click on the suitable task list system will automatically update the task list
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 9
Once the task list was selected, System will prompt a message at
the bottom left of the screen as “A task list was selected”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 10
Click on the “Maintenance plan scheduling parameters” tab and maintain the relevant data
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 11
Click on the “Maintenance plan additional data” tab and maintain the relevant data
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 12
System will prompt for a message at the bottom left like
“Maintenance plan XXXXXXXXXXXXXXXX created”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 13
Create Strategy Plan
Create Maintenance Strategy
SAP Menu SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance---
Maintenance Planning---Maintenance Strategies---Change
Click on
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 14
Maintain Packages
Double Click on Packages Folder
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 15
Click on Save
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 16
Double click on the suitable strategy it will copied in the Field of Strategy
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 17
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 18
Click on “Maintenance Plan Scheduling Parameters” Tab and maintain the relevant data
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 19
Click on “Maintenance Plan Additional data” Tab and maintain the relevant data
Click on Save
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 20
System will prompt a message as “Maintenance plan XXXXXXXXXXXX created”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 21
Schedule Maintenance Plan
SAP Menu SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance---
Maintenance Planning---Scheduling for Maintenance plans---Schedule
User Menu Select corresponding Node for IP10 / Single Cycle Plan
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 22
Enter the cycle start date
and press enter
Click on Continue (Enter)
Click on Save
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 23
System will prompt a message that “Maintenance plan XXXXXXX
scheduled”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 24
Deadline Monitoring
SAP Menu SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance---
Maintenance Planning---Scheduling for Maintenance plans---Deadline
Monitoring
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 25
Display list of Equipment for which Scheduled Maintenance is Due
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 26
List of Call Objects
SAP Menu SAP Menu---Logistics---Plant Maintenance---Preventive Maintenance---
Maintenance Planning---Scheduling for Maintenance plans---Scheduling
Overview---List Display
Click on Execute
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 27
Process Notification
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 28
In the above screen the system status is OSNO (Out standing Notification) to change the status from
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 29
Click on Save
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 30
System will prompt a message as “Notification XXXXXXXXXX Saved”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 31
After the above step Decide on the requirement of Maintenance order, based on
material to be consumed from stores or need based services to be used.
Follow the below steps to Create the Maintenance order from Notification and for further
processing.
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 32
Click on Icon to create the order
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 33
Check all the details and click on Continue
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 34
Click on Save
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 35
System will prompt a message as “Order XXXXXXXXXXX saved with notification XXXXXXXXXXXX”
Maintenance Order of Order Type “BM01” created and linked to the Notification.
Status of Notification will be updated to “ORAS” (Order Assigned)
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 36
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 37
Material Planning Against Maintenance Order
User Menu Select corresponding Node for IW22 / Change or IW32 / Change
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 38
Click on change Icon
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 39
Click on “Components”
Tab
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 40
Click on Structure list System will prompt pop-up window
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 41
Double click on the Item which you want to input, the selected material will be updated in the
“Components” Tab against Item number “0010” as below
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 42
If you want to assign the components other than from the BOM, Place the cursor in “Component” filed
and click on or press F4 key (Possible entries) on the keyboard, system will prompt a pop-up window
as below
You will get the list of all the materials which are available in the plant 5303
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 43
Choose the right material and double click on it, the system will automatically update this material as
below
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 44
Press Enter key on the keyboard system will prompt pop-up window
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 45
Now Release the order by clicking on the Green Flag
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 46
System will prompt a message as Order XXXXXXXX will be released after update
Click on Save
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 47
Material Issue against Reservation
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 48
Click on Line item 1 and input the storage location from which you want to issue the material and select
Item Ok
Same as above select the Line item 2 and input the storage location and click on Item Ok
Note: If you want to know in which storage location the material is stored click on
You will find the green traffic lights if the input data is correct and then click on Post
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 49
System will prompt a message as “Document XXXXXXXX posted”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 50
Display material Document
SAP Menu SAP Menu---Logistics---Materials Management---Inventory Management---
Goods Movement---Goods Movement
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 51
Click on Doc.Ino Tab and then click on
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 52
For Example if you double click on the “Accounting Document” screen appears as below
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 53
Maintenance Order Confirmation
User Menu Select corresponding Node for IW41 / Individual Time Confirmation
Input the Order number which you want to confirm and click on continue or
press the enter key on keyboard
Below screen you will get the list of operation which are yet to be confirmed
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 54
Double click on the operation system will prompt for pop-up screen as below
Enter all the details like Work Centre, Personnel number, Actual work, Actual duration, Work starts on,
Work Ends on, Reason, and Confirmation Text
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 55
System prompts a message as “Number of confirmations saved for order
XXXXXXXXXXXXXXXXXXX
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 56
Order status “CNF” is updated
To see the status go to order change (IW32) mode and input the order number and click on continue
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 57
Click on “Complete (Technically)”
Deselect by clicking on
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 58
Select the Cause code from possible
entries (F4)
Click on continue
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 59
System will prompt a message as “Order XXXXXXXXXXXX saved with notification
XXXXXXXXXXXXX
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 60
Now again to order change mode through T code IW32
The entire screen will be grayed out (no input is possible) and system will update the status with “TECO”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 61
Complete Notification
SAP Menu SAP Menu---Logistics---Plant Maintenance---Maintenance Processing---
Notification---Change
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 62
Input the Details and click on “Causes” Tab
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 63
Input the details and click on “Notification” Tab
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 64
Click on Maintenance notification
System will prompt a warning message at the bottom left of the above screen as below
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 65
Check the dates and press the “Enter Key” on the keyboard to ignore the above warning message
System will prompt a pop-up window and a message at the bottom left of the screen
Click on
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 66
System will prompt a message as “Notification XXXXXXXXXX completed”
and system will update the status as “NOCO” for this notification
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 67
To see the “NOCO” status access the Notification change mode screen through T code IW22
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 68
Maintenance Order Settlement
At the month end, finance department will open the orders which are technically completed and
Settle them, after the settlement the actual cost of the order will be transferred to the cost centre,
And actual cost of the order will become zero. After this activity the order will be Business
Completed
Click on “Order”
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 69
Report for the Equipment for scheduled maintenance have not been done
within the schedule
SAP Menu SAP Menu---Logistics---Plant Maintenance---Maintenance Processing---
Notification---List Editing---Display
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 70
BSNL_PM_UM_01_Preventive_Maintenance_V2.0.doc Page 71