Construction of Overhead Water Tank -A Cost Effective Approach

Article · February 2017

CITATIONS READS

0 2,296

1 author:

Mainak Mallik
National Institute ofTechnology,Yupia, India
1 PUBLICATION   0 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Bamboo as a reinforcing material View project

All content following this page was uploaded by Mainak Mallik on 09 February 2017.

The user has requested enhancement of the downloaded file.


IJSRD - International Journal for Scientific Research & Development| Vol. 4, Issue 12, 2017 | ISSN (online): 2321-0613

Construction of Overhead Water Tank - A Cost Effective Approach


Dr. Mainak Mallik
Assistant Professor
Department of Civil Engineering
National Institute of Technology - Arunachal Pradesh Yupia, Arunachal Pradesh, India
Abstract— An overhead water tank had been constructed to the present scenario, any project is time bound and we have
cater the water supply needs of Steel Melt Shop and Rolling to modify our scheme in order to suit the requirements. To
Mill Furnace. The tank has the total capacity of 275cu.m at a overcome this problem, a method has been adopted which
height of 36.75 meter above ground level. The overhead tank involved construction of Tank by Slip forming and Heavy
consists of twin chambers, each having capacity of 75cu.m Lifting Technique. In this method, after the construction of
and 200cu.m supported on a circular shaft. Generally, foundation the shaft is constructed by Slip forming
extensive scaffolding and formwork for the full height is Technique. Later the tank bowl is cast encircling the shaft at
done which is an uneconomical and time consuming ground level and then it is lifted along the shaft. Finally the
solution. In the present scenario, any project is time bound tank bowl is placed on the shaft. In order to implement this
and we have to modify our scheme in order to suit the method, the original diameter inside the tank bowl has been
requirements. To arrive at an economical solution as well as increased so that it can be lifted along the shaft and at the
to complete construction quicker, a method has been adopted same time the capacity requirement of tank is satisfied. The
using “Slip forming and Heavy Lifting Technique”. In this client and the architect accepted these changes without
method, after the construction of foundation the shaft is reservation in view of the method, which is not only cost-
constructed by “Slip forming Technique”. Later the tank effective but also time saving.
bowl is cast encircling the shaft at ground level and then it is
lifted along the shaft. Finally the tank bowl is placed on the II. CONSTRUCTION METHODOLOGY
shaft. In order to implement this method, the original The total construction has been divided into six stages, First
diameter inside the tank bowl has been increased so that it stage starts with the construction of the raft foundation.
can be lifted along the shaft and at the same time the capacity After that construction of shaft wall has been carried out
requirement of tank is satisfied. It is found that this with SLIP forming technique invented in 1942 by the
combination is not only cost-effective but also time saving. Swedish company Byggförbättring [2] [3]. This technique is
Key words: Overhead Water Tank, Slip Forming, Heavy based on a system of mechanical lock nut hydraulic jacks
Lifting connected to a hydraulic power unit, which allows all the
vertical walls of large-scale structures to be built
I. INTRODUCTION simultaneously. This process means that no scaffolding is
Water is as important commodity as food and air for the required. In this method steps involved are - positioning a
existence of life. The overhead tanks which have been the formwork, pouring concrete into the formwork, and then,
inevitable part of water supply system are important public while the concrete is setting, moving the same formwork
utility structures and industrial structure by the help of upwardly to pour freshly mixed concrete on top of the first
which the required water head can easily be achieved and concrete. This procedure is repeated until the desired height
water can be made available to all by the mere action of is attained. The repetition may be continuous from start to
gravity. In the water distribution system, overhead tanks finish or intermittently continuous such as may be
generally account for 10 to 20 percent of total cost of accomplished during day shifts only. Known slip-forming
project, which is quite substantial. This necessitates the apparatus uses a self-climbing formwork, and reinforcing
overhead tanks to be designed safe to the required degree steel is placed as the forms move upwardly. During
against all possible forces expected to be encountered during construction, the formwork is slid upwards at a rate of of 15
its life time economically. This can easily be achieved when to 25 cm per hour, in conjunction with continuous
designer is efficient in redesigning the oversized members concreting. The movement is provided by hydraulic jacks.
and finally ending up with the best design. An overhead The forms, which are generally 1.20 m high, travel 4 m in
water tank had been constructed to cater the water supply 24 hours, so that the concrete emerging at the bottom is 4 to
needs of Steel Melt Shop and Rolling Mill Furnace for 6 hours old. It is firm enough to be able to hold without
ARAB COMPANY FOR SPECIAL STEEL in Sadat City, forms but must not have set sufficiently to stick to the
Egypt. The tank has capacity of 275cu.m at a height of formwork, which would then pull off bits of concrete as it
36.75 meter above ground level. The original profile of the rose.
tank was designed by the Architect. The overhead tank This technique has been successfully utilized in
consists of twin chambers, each having capacity of 75cu.m construction of buildings, water towers, bridge piers,
and 200cu.m supported on a circular shaft. In usual practice, chimneys. Construction of Shaft wall has been continued till
we adopt conventional practice of construction for this type the staging height has been reached. Pre-fabricated steel
of tank, which consists of construction of foundation and staircase, meant for access to the top of the tank, was placed
circular shaft and construction of tank bowl at top with on the R.C bracket (projected from the circular shaft) with
formwork either from bottom or shaft wall. This results in the help of a crane through the opening at the top of the
not only extensive scaffolding and formwork for the full central shaft.
height but it is also uneconomical and time consuming. In

All rights reserved by www.ijsrd.com 12


Construction of Overhead Water Tank - A Cost Effective Approach
(IJSRD/Vol. 4/Issue 12/2017/004)

In stage five after that tank bowl has been placed at


its position with the construction of knee beam which
connects the tank bowl with the circular shaft.
In the final stage the lifting system has been
removed followed by erection of pipes and cables. After
completion of service lines casting of top slab has been done
to complete the construction.

Fig. 1: Sectional Elevation Showing Stage-I.


In the stage two the circular deck slab and its
supporting columns, required for placing Lifting jacks (each
having maximum capacity of 70T), was constructed by the Fig. 3: Sectional Elevation Showing Stage-III
conventional method. The deck slab was provided with
twenty-four embedded steel pipes of 150 mm in diameter at
equal intervals.

Fig. 4: Sectional Elevation Showing Stage-IV

Fig. 2: Sectional Elevation Showing Stage-II Fig. 5: Sectional Elevation Showing Stage-V
In the third stage the tank bowl was cast on ground
level encircling the circular shaft supported on twelve
columns resting on a ring beam constructed above the
foundation. The lifting beam was provided with twenty-four
embedded steel pipes of 150 mm in diameter. The tank was
suspended by means of tie rods, two for each jack, anchored
at the top of circular deck and anchored at the bottom with
lifting beam through these pipes.
In stage four the tank was lifted by twelve jacks,
which were connected to a common manifold and were
operated upto its final level.
Fig. 6: Sectional Elevation Showing Stage-VI

All rights reserved by www.ijsrd.com 13


Construction of Overhead Water Tank - A Cost Effective Approach
(IJSRD/Vol. 4/Issue 12/2017/004)

III. DESIGN METHODOLOGY S= Soil coefficient which depends on the type of


soil below foundation = 1.15 for medium density soil
A. Geometrical Properties
W= Total weight of structure
1) Details of Outer Chamber Design of jack supporting deck slab and jacking
 Capacity: 200 cu.m system.
 Top diameter : 15.0 m Checking of lifting beams for high concentration of
 Bottom diameter: 6.2 m stresses during lifting operation of tank bowl.
 Height: 5.35 m Checking of effect of concentrated load on circular
2) Details of Inner Chamber deck slab at +38.2m level and supporting columns during
 Capacity: 75 cu.m lifting operation of tank bowl.
 Top diameter: 10.0 m Detailing of the structure to match the requirements
 Bottom diameter: 5.9 m of construction and erection.
 Height: 2.765 m Design and detailing of the tank has been carried
out based on the clauses as stipulated in [1].
B. Analysis
1) The tank has been modeled in two stages with STAAD IV. TIME SCHEDULE
Pro [4] The time required for construction was considerably reduced
a) The annular shaft upto the staging height as against conventional approaches to construction. Table 1
b) Full tank with the tank bowl placed at the top under shows savings in time required for construction of the tank
operating condition as against conventional construction methods.
The design and detailing of the tank bowl, central shaft, Methodology of construction Saving in time
deck slab and other supporting facilities of the tank were Slip Form method of shaft construction
made to suit the construction and erection mechanism of the & conventional method of tank bowl 20%
whole structure. Apart from design of the tank against water construction.
load, the structure was also checked against wind load and
Slip Form method of shaft construction
seismic load as prevalent at Sadat City site in Egypt. The 50%
& heavy lifting of tank bowl
various factors for design against wind load and seismic
constructed at bottom.
load was considered from the Egyptian code [1]. The salient
Table 2: Wind Pressure at Different Height
features of design calculations are as follows:
c) M30 grade concrete along with high yield
V. CONCLUSION
deformed bars of grade St 36/52 having yield stress of 360
N/mm2 and ultimate stress of 520 N/mm2 was used in the In view of the above it is concluded that with the
design. combination of slip form and heavy lifting techniques,
d) The conical tanks were designed mainly for considerable time can be saved for construction of overhead
membrane forces due to self-weight and hydrostatic water tanks in order to commission the project early.
pressure. The effect of hydro-dynamic pressure on the tank Design and detailing of the structure needs to be
wall also been considered for seismic load condition. modified to suit the requirements of expeditious
e) The walls were designed as un-cracked sections by construction without hampering the aesthetics of the
limiting tensile stress of concrete to 2.0 N/mm2 and reduced structure.
stress in steel, as generally adopted for water retaining
structures. ACKNOWLEDGMENT
f) The structure was checked against Wind Load and Author would like to thank Dr. Abhijit Dasgupta, Director,
Seismic Load. M. N. Dastur & Company (P) Ltd for his constant
Height (M) Intensity of wind pressure (kN /sq. m) inspiration and guidance for this work.
0-10 0.75
10-20 0.825 REFERENCES
20-30 0.975
[1] The Egyptian Code for the Design and Construction of
30-50 1.125
Concrete Structures
Table 1: Wind Pressure At Different Height [2] http://www.royam.ch/slipform/watertower
For Seismic Load [3] http://www.vslin.com/service-heavy-lifting.html
The formula adopted for calculating the Base Shear (V) due [4] STAAD Pro. V8i, Structural Analysis and Design
to seismic load is as follows: programming.
V=Z.I.K.C.S.W (1) [5] R.D. Anchor, “Design of Liquid-retaining Concrete
Where, Structures”. Second Edition. London. Edward Arnold,
Z= Seismic intensity factor = 0.2 (Zone 2 map for 1992.
Sadat City) [6] W. S. Gray and G. P. Manning, G. P. “Water Towers,
I= Importance factor= 1.25 for emergency services Bunkers, Silos and Other Elevated Structures”. London.
K= Structural system and ductility co-efficient = Concrete Publications Limited, 1964.
1.33 for cores, shear walls or braced frame system [7] E. Reynolds and J. C. Steedman, J. C. “Reinforced
C= Structure co-efficient = T 1/2/15 Concrete Designer‟s Handbook”. Tenth Edition.