Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

IMT in Philipine

Download as pdf or txt
Download as pdf or txt
You are on page 1of 151

REVISITING IRRIGATION MANAGEMENT TRANSFER:

A CASE STUDY OF A PHILIPPINE MUNICIPALITY’S EXPERIENCE IN


TRANSFERRING IRRIGATION MANAGEMENT TO FARMER
ASSOCATIONS

by

Jennifer Lauren Bedore

B.A., McGill University, 2008

A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF


THE REQUIREMENTS FOR THE DEGREE OF

MASTER OF ARTS IN PLANNING

in

The Faculty of Graduate Studies

THE UNIVERSITY OF BRITISH COLUMBIA

(Vancouver)

April 2011

 Jennifer Lauren Bedore, 2011


Abstract

There is a lack of data and analysis relating to implementation processes and impacts for
Irrigation Management Transfer (IMT), particularly at the community level. This is
despite the fact that IMT has become one of the most popular trends in irrigation
management worldwide.

This research fills key gaps in knowledge about IMT in practice, specifically with respect
to: (1) the different approaches being used, the constraints to implementation, the impacts
on all stakeholders; and (2) the suitability of IMT in different social, political and
economic settings, through a case study analysis of the municipality of Plaridel, Bulacan,
Philippines.

Based on a review of literature focused on the works of the leading experts in IMT, seven
'best practices', with respect to the implementation of IMT, are formulated. Through
semi-structured interviews and data collection, the implementation of IMT in Plaridel is
then evaluated against these seven 'best practices'.

It is found that all seven of the 'best practices' are not currently operational in the
municipality and that as a result, there is an extremely high likelihood that Plaridel's
farms and Irrigation Associations (IAs) will not be viable in the near future. The main
reasons for this being the absence of clearly recognized and sustainable water rights and
service and insufficient financial resources provided by the implementing irrigation
agency, the National Irrigation Administration (NIA). This study argues that this scenario
is likely because NIA is implementing IMT solely to reduce its own financial costs in
operating and maintaining Plaridel's irrigation systems and not to improve productivity or
the livelihoods of Plaridel's farmers.

Plaridel is a cautionary tale to any government that is planning to implement IMT, as it


shows how IMT is no quick fix to a financially unviable Irrigation Agency or agricultural
sector. Rather it is a difficult, painstaking process that requires substantial financing and
commitment.

ii
Preface

This research was approved by The University of British Columbia’s Behavioral


Research Ethics Board, the Certificate Number of the Ethics Certificate is H10-00567. I,
Jennifer Lauren Bedore, conducted all of the research for this thesis as well as wrote it in
its entirety.

iii
Table of Contents

Abstract………………………………………………………….…………………….....ii

Preface………………………………………………………….………………………..iii

Table of Contents………………………………………………….…………………….iv

List of Tables…………………………………………………………………………....vii

List of Figures……………………………………………………………………….…viii

List of Acronyms………………………………………………………………………...ix

Acknowledgments………………………………………………………………………..x

Dedication……………………………………………………….……….………………xi

Chapter One: Introduction………………………………………………..…………….1

Definition of Key Concepts and Terms: Comparing Irrigation Management Transfer and
Participatory Irrigation Management.……….....….....................……………..…..………3

Why IMT is Being Implemented Worldwide……………...…………………………...…6

Worldwide Results of Irrigation Management


Transfer…..………………………………………………………………………………10

Relevance and Rationale………………...…………………………………………...…..12

Research Methodology…………...………………...……………………………………14

Organization of the Study……………………...………..………………………….……20

Chapter Two: Rice Self-Sufficiency in the Philippines: The Historical, Institutional


and Political Contexts……………………………………………..……………………21

History of Rice Self-Sufficiency in the Philippines…………………….…………..……23

Main Obstacles to Rice Self-Sufficiency in the Philippines…………..…………………25

History of the National Irrigation Administration, PIM and IMT in the Philippines …...30

iv
Chapter Three: Case Study of Plaridel, Bulacan: Irrigation Opportunities and
Challenges……………………………………………………………………….………38

The Role of Agriculture and Rice in Plaridel……………………..……………………..39

Reasons for the Implementation of IMT in Plaridel……………………………………..43

Rice Self-Sufficiency in Plaridel and Bulacan…………….…………………………..…44

Financial Viability of NIA…………………………………….…………………………49

The Implementation of IMT in Plaridel………………………………………………….50

Chapter Four: Measuring Plaridel’s Success: Management…………………….…..54

Best Practice #1: The Roles, Responsibilities, Power and Authority, of Both the Irrigation
Associations and the Irrigation Agency, Needed to Successfully Implement IMT Must Be
Clearly Defined in a Legally Binding Contract……………………………………...…..55

Best Practice #2: IAs Must be ‘Strong’ Enough to Mobilize Farmer Members to
Undertake the Roles and Responsibilities That Will be Delegated to Them Under IMT.64

Best Practice #3: The Irrigation Agency Staff is 'Streamlined' in a Manner That:
a. Ensures a Sufficient Number of the Irrigation Agency Staff Remains in Order
to Properly Implement IMT
b. Does not Incentivize the Remaining Irrigation Agency Staff to 'Block' the
IMT Process from Successfully Completing…………………...……..70

Chapter Five: Measuring Plaridel’s Success: Financial Viability………….………..79

The Vicious Cycle of Irrigation Management………………………………………...…80

Best Practice #4: IAs Must Have the Capacity to Collect Irrigation Service Fees (ISFs)
From Their Members on a Sustained Basis and to Properly Manage their Financial
Resources ..……………….…………...…………………………...…………………….82

Best Practice #5: Financial Resources Must be Available to Farmers and IAs Who Are
Unable to Profitably Sustain the Operation of Their Farm or Irrigation System
Independent of the Irrigation Agency……………………………………...............…….96

v
Chapter Six: Measuring Plaridel’s Success: Operations and Maintenance and
Water Availability…….………………………………………………...……………..104

Best Practice #6: IAs Must Have the Capacity to Perform All Operations and
Maintenance Related Roles and Responsibilities Delegated to Them Under IMT….…105

Best Practice #7: IAs Must Have a Clearly Recognized and Sustainable Water Right and
Service………………………………………………………………………..…………114

Chapter Seven: Conclusions…………………………………………….……………121

Limitations and Directions for Further Research ………………………………...…….129

Works Cited……………………………………………………………………………130

Appendix: List of Interviewees and Their Respective Roles/Affiliations…...……...139

vi
List of Tables

Table 1.1: Number of interview respondents by category………………………….……16

Table 1.2: Barangays interviewed and corresponding IAs………………………………17

Table 1.3: Agricultural area, irrigated palay area and no. of farmers by barangay…..….18

Table 2.1. National irrigation policy history in the Philippines…………………….....…37

Table 3.1: NISs by region…………………………………………………………..……42

Table 3.2: Population density, change, estimated doubling time and growth category by
barangay……...…………………………………….…………………………........47

Table 4.1: Levels of cooperation within Plaridel's IAs, as stated by IA representatives and
general members……….………………………………………………..…………65

Table 4.2: Levels of trust that exists within Plaridel's IAs, as stated by IA representatives
and general members……...…………………………………...……………….….67

Table 4.3: Selected problems implementing IMT, worldwide and in Asia…………..….71

Table 5.1: Average farmer response to the question: will the members of your IA trust a
fellow farmer member(s) to collect ISFs once IMT commences, by IA……….….87

Table 6.1: Percent of NISs in need of rehabilitation, by type, in 2002……………...….111

vii
List of Figures

Figure 2.1: The Philippines by region…………………………………………..…..……21

Figure 2.2: Level of risk to typhoons in the Philippines…………………………………26

Figure 3.1: Region III, Philippines………………………………………………………39

Figure 3.2: Map of Plaridel in Bulacan……………………………….………………….40

Figures 3.3 and 3.4: 'Built-up Areas’ in Bulacan province, 1997 & 2007……….………45

Figure 3.5: Existing land use map of Bulacan………………………………...…………46

Figure 3.6: Roles and responsibilities of both the IA and NIA pictorially represented for
Stage I of the IMT contract……………………………………………...…………50

Figure 3.7: Roles and responsibilities of both the IA and NIA pictorially represented for
Stage II of the IMT contract…………………………………..……………...……51

Figure 3.8: Roles and responsibilities of both the IA and NIA pictorially represented for
Stage III of the IMT contract………………………………….……………...……52

Figure 4.1: Pictorial description of Plaridel's, to be, areas of responsibility under their
'Combined Stage I & II' contract with NIA…………..…………….……...………57

Figure 4.2: Results of streamlining in NIA's Bulacan office………………..…...………72

Figure 4.3: NIA's reliance on non-tenured staff by region as of 2002….....…..………... 78

Figure 5.1: The vicious cycle of irrigation management……………………………...…80

Figure 5.2: Total costs and profits from a 1ha farm in Plaridel for one cropping season..97

Figure 6.1: Broken gate that makes it impossible for the IA to properly
regulate the flow of water…………………………………………………...……111

Figure 6.2: Unmaintained canal in Lagundi, which is said to have occurred due to a lack
of necessary equipment……………………………………………………..……112

viii
List of Acronyms

AFMA Agriculture and Fisheries Modernization Act


AMRIS Angat-Maasim River Irrigation System
BANE Bulacan-Aurora-Nueva-Ecije
CARP Comprehensive Agrarian Reform Program
CIS Communal Irrigation System
DA Department of Agriculture
DENR Department of Environment and Natural Resources
FAO Food and Agriculture Organization
GDP Gross Domestic Product
IA Irrigation Association
IDD Institutional Development Department
IDO Irrigator Development Officers
IMT Irrigation Management Transfer
INPIM International Network on Participatory Irrigation Management
IOSP Irrigation Operation Support Program
ISF Irrigation Service Fee
IWMI International Water Management Institute
IWRM Integrated Water Resources Management
MAO Municipal Agricultural Office
MWSS Metropolitan Waterworks and Sewerage System
NGO Non-Governmental Organization
NIA National Irrigation Administration
NIS National Irrigation System
NPC National Power Corporation
NWRB National Water Resources Board
O&M Operations and Maintenance
PENRO Provincial Environment and Natural Resources Officer
PHP Philippine Peso
PIM Participatory Irrigation Management
PPDO Provincial Planning and Development Office (of Bulacan)
PSALM Power Sector Assets and Liabilities Management Corp.
SAPRIN Structural Adjustment Participatory Review International Network
SWMT Supervising Water Master Technician

ix
Acknowledgements

Firstly, I would like to thank my supervisor, Dr. Leonora Angeles, whose sound advice
and guidance was invaluable to me throughout this process.

For their efforts and assistance, I would like to extend a very special thank you to Father
Dennis Espejo and all those at St. James Parish church for their gracious hospitality,
Yanna Castro my research assistant, for her tireless efforts and cheerful disposition, and
Mr. Herminio Frias Jr., Larzy and the rest of the MAO staff for their directions, both
literal and figurative.

Finally, I owe an immense debt of gratitude to my partner, Adam, who throughout this
entire process has been my guiding light.

To each, I extend my deepest appreciation.

x
Dedication

For the farmers, NIA and Municipal staff of Plaridel who welcomed me into their homes,
hearts and minds and made me feel at home in a foreign land and way of life.

xi
Chapter One: Introduction

Many irrigation experts have found that Irrigation Management Transfer (IMT) has been
moving away from its original objectives of reaching rice self-sufficiency and improving
the livelihoods of farmers, to simply reducing the state's financial burdens (Zialcita, 1984,
p. 277). One critic of the implementation of IMT in the Philippines, Joost Oorthuizen
(2003), summed up the reality behind the implementation of IMT in the Philippines “It is
almost as if there are two different realities. The reality of international irrigation policy
discourse, which tells positive stories about farmer empowerment and system efficiency
due to turnover and the fine results of the NIA’s financially autonomous status… then
there is the real world of harsh realities” (p. 5).

This research explores the extent to which the implementation of IMT in Plaridel exists in
the 'reality' of the 'international irrigation policy discourse' or in 'the real world of harsh
realities'. This research aims to utilize the existing research on Irrigation Management
Transfer, which focuses primarily on macro scale dynamics, to determine what experts of
Irrigation Management Transfer (IMT) specify as 'best practices' for the implementation
of IMT. This research will then appraise the degree to which Plaridel is currently
adhering to these standards.

The primary research question this thesis addresses is:

Are the 'best practices' with respect to the implementation of IMT currently being
adhered to in Plaridel?

The subsidiary research questions are:

1. What have irrigation management experts cited as being 'best practices' for the
implementation of IMT?

1
2. Given the present course of IMT implementation in Plaridel, what degree of
success, in terms of productivity, profitability and sustainability, are Plaridel's
Irrigation Associations (IAs) likely to achieve post-IMT?

3. What are the main impediments, if any, to adhering to the 'best practices' for IMT
implementation in the municipality?

4. How can the study inform the implementation of IMT in other areas of the
Philippines and worldwide?

To address these questions, this research conducted a literature review to determine the
requirements of best practices in IMT that could be used to assess the IMT experience in
Plaridel. Using various research methods – content analysis of documents, participant
observation of meetings, semi-structured interviews and focus groups - data was collected
on the on-going process of IMT in Plaridel and then assessed against these requirements.
A more in-depth discussion of the research methods and procedures used is provided in
the Research Methodology Section on page 19.

2
Definition of Key Concepts and Terms: Comparing Irrigation Management
Transfer and Participatory Irrigation Management

This section will first describe and contrast the concepts of Irrigation Management
Transfer and Participatory Irrigation Management. It will then discuss why IMT has
increasingly been implemented worldwide. Lastly, the worldwide results of IMT will be
discussed and how the dearth of data and academic research on the topic may be
problematic for countries that are adopting IMT.

In its broadest sense, Irrigation Management Transfer (IMT) is “the partial or complete
transfer of irrigation management rights and responsibilities for an irrigation (sub) system
from government to [either] farmer organizations, water user associations, other non-
governmental agencies (including the private sector), or local government agencies”
(Giordano, Samud & Namara, 2006, p. 1). However, it is important to note that IMT does
not necessarily entail the complete withdrawal of the government from these systems, nor
the complete transfer of ownership of these irrigation systems’ assets to the new entities
(Johnson, Vermillion & Sagardoy, 1995, p. 19).

IMT is often formalized by a Transfer Agreement, which specifies “the basic long-term
roles, decision-making authority and obligations that water users associations and
government agencies have relative to irrigation systems” (FAO & INPIM, 2001). Key
elements typically included in IMT Agreements are: role and jurisdiction of the Irrigation
Association (IA); rights, authority and obligations of the IA; and the rights, authority and
obligations of the government toward the IA (FAO & INPIM, 2001). Apart from these
basic parameters, the nature of the implemented IMT programs can vary greatly from
country to country and region to region (Johnson, Vermillion & Sagardoy, 1995, p. 20).

One way in which IMT programs often differ is with respect to implementation
strategies. For example, as is common in the Philippines, programs proceed in a “gradual,
incremental way” where “the government negotiates on a case-by-case basis and systems
are only transferred if water users agree” (FAO & INPIM, 2001). Conversely, in some

3
countries IMT is “implemented rapidly, for many thousands or even millions of
hectares”, as in Mexico and Turkey, where the “government mandates transfer of all
targeted systems” at once (FAO & INPIM, 2001).

The implementation of IMT is also commonly adapted to include “strategic planning for
the irrigation sector and restructuring of the irrigation agency” (FAO & INPIM, 2001).
Aspects of this may include: “downsizing, adoption of new mandates, redeployment of
personnel, and a change from a centrally-financed line agency to a financially
autonomous authority or corporation”. The Philippines is a prime example of a location
that has benefitted by assuming these distinctive adaptive traits.

Lastly, the implementation of IMT may differ in that some IMT programs mandate full
transfer of responsibilities from the irrigation agency to smaller community based entities
while others mandate only partial transfer, or joint management. In the Philippines, for
example, full responsibility is transferred to the Communal Irrigation Systems (CISs),
meaning that in the post-transfer phase, the IAs assume responsibility of the Operations
and Management (O&M), Irrigation Service Fees (ISF) collection, and management of
the entire irrigation system. Whereas, the National Irrigation Systems (NISs) are only
partially transferred, meaning that post-transfer the NISs are only responsible for the
O&M and ISF collection for a sub-section of the irrigation system (such as tertiary or
secondary canals).

IMT and Participatory Irrigation Management (PIM) are often used interchangeably and
are therefore commonly interpreted as being one and the same. However, it is of critical
importance to understand the differences between these programs and their respective
policy implications.

The Economic Development Institute of the World Bank defines PIM as "the
involvement of irrigation users in all aspects of irrigation management at all levels"
(World Bank, 1990, p. 12). All aspects include the initial planning and design of new
irrigation projects and improvements, as well as the construction, supervision, financing,

4
decision rules, O&M, monitoring and evaluation of the system (Gupta & Srivastava,
1999, p. 11), as well as "the roles they would like to perform and the roles that they want
the government to perform" (Raby, n.d., p. 2). The main purpose of PIM is therefore that
“farmers… make important decisions about irrigation system development themselves, or
strongly influence the outcomes of decisions made through a process of discussion and
negotiation with government agencies" (Bruns, 1993, p. 1838).

The main distinction between the two terms is therefore that where “the IMT concept
intends to replace [to a certain degree] the role of the government, PIM seeks to
strengthen the relationship between water users and government by adding farmer
participation to government management” (International Water Management Institute,
2007, p. 11). In addition, PIM can be used in conjunction with IMT, at the last stage of
the IMT process “where, before a final transfer takes place, the government agency and
the recipient organization agree to share responsibilities" (International Water
Management Institute, 2007, p. 19). Lastly, PIM can also be implemented in irrigation
systems without IMT, in irrigation systems “that have not been formally transferred” but
whose irrigation agencies still wish to “enjoy real participation in management decisions”
(Groenfeldt, 2004).

5
Why IMT is Being Implemented Worldwide

Experts indicate that over the past three decades “governments in developing countries
worldwide have been transferring in varying degrees rights and responsibilities [of
natural resources] to communities” including water resources, and “ in particular
irrigation” (Araral, 2009, p. 687). This is due in large part to the “rise of the structural
adjustment policies of the mid 1980s” (Johnson, Vermillion & Sagardoy, 1995, p. 11)
and the failed "earlier approaches to irrigation development [which] were based on the
assumption that a combination of 'correct technology', 'efficient markets', and 'capable
agency' would yield optimal performance” (Gupta & Srivastava, 1999, p. 37).

Consequently, these countries are looking to a more decentralized approach to irrigation


management that will produce “the desired improvement in efficiency and equity in
operation” (Gupta & Srivastava, 1999, p. 37) that they are looking for. Accordingly,
international interest in the IMT process has been steadily growing worldwide (Johnson,
Vermillion & Sagardoy, 1995, p. 10). The following are the three principal reasons why
IMT is believed to be the best available option for achieving the objectives these
countries gave set out for themselves.

1. Advantages of Devolution: IMT is being championed principally because of the


observed advantages that occur when managerial responsibility for irrigation systems is
passed from the state to small community based organizations, such as farmers
associations. Irrigation experts have consistently appraised these associations as being
better suited to manage irrigation systems than centrally financed government agencies
(Johnson, Vermillion & Sagardoy, 1995, p. 10). The main arguments supporting this
claim are first, that farmers have a greater motivation than salaried bureaucrats to manage
irrigation systems efficiently and productively, given the direct relationship between the
system’s operation and their personal livelihood (Araral, 2009, p. 687). The second
argument is that they have a comparative advantage over the bureaucracy to solve
collective action problems as they have better access to the necessary information (i.e.
local knowledge) (Wijayaratna, 2004, p. 53) and more available manpower than remote

6
government officials (Araral, 2009, p. 687). Lastly, through their increased participation
in system management, they force both themselves and the state to become more
accountable and transparent, resulting in an increase in overall efficiency and
productivity (Thompson, 1995, p. 1521).

In addition, during the IMT process, farmers are individually empowered


(Bandyopadhyay, Shyamsundar & Xie, 2007, p. 9) and the social capital of the farmers
associations is built up (FAO & INPIM, 2001), resulting in the enhancement of their
capacity for “self-management and resource mobilization...[as well as] mechanism[s] to
articulate local needs and interests to the government sector and other external
institutions" (FAO & INPIM, 2001). Accordingly, their ability to be heard and affect
their own lives outside of just the irrigation management sphere is increased, thus
furthering the democratization of the country (Wijayaratna, 2004, p. 35).

2. Cost Reduction: The second main reason governments worldwide are turning to IMT is
to reduce the extremely high costs associated with irrigation systems (operation,
management, maintenance and rehabilitation) (Attia, n.d.), enabling them to either
reallocate government revenues to other sectors (NIA “Irrigation Management Transfer”,
n.d.) or to stop expending scarce financial resources (Araral, 2006, p. 20). In addition,
critics have argued that, “highly subsidized financing of irrigation development
encourages and perpetuates top-down, wasteful, unaccountable patterns of government
activity in irrigation" (Bruns, 1993, p. 1837). Accordingly, it is understood that
transferring management to farmer associations will lead to an increased willingness, on
the part of farmers, to pay ISFs. Worldwide, ISF collection rates pre-IMT have been so
consistently low they often fail to cover even basic system costs (NIA “Irrigation
Management Transfer”, n.d.). Experts believe that collection rates can be improved when
farmers make decisions on fee spending as they are more likely to understand and support
the necessity of paying ISFs (Wijayaratna & Vermillion, 1996, p. 3).

In addition, governments are able to cut costs by reducing the staff needed to maintain
and manage irrigation systems by passing most of their responsibilities over to the farmer
associations. This is often referred to as “streamlining”. Streamlining not only reduces

7
salary costs but reduces the potential for rent-seeking behavior among poorly paid
developing-world bureaucracies (Araral, 2009, p. 687).

3. Infrastructure Improvement: The last main reason governments worldwide are turning
to IMT is to improve the declining state of irrigation infrastructure, which is “often
characterized by chronic underinvestment in maintenance [and] rapid deterioration”(FAO
& INPIM, 2001). This has resulted in “persistently inefficient, unreliable, and inequitable
water service” and a “reduction in service areas… [which impacts] agricultural
productivity [and] economic and financial rates of return” (Araral, 2006, p.67). Experts
believe that because IMT can potentially “significantly increase the amount of funds
available (FAO & INPIM, 2001) [to the IA]”s and because IAs are more accountable to
the needs of the irrigations system, they will be more responsive in undertaking necessary
maintenance and repairs than would governmental bureaucracies (Wijayaratna, 2004, p.
3). This results in increased “reliability and predictability of adequate and timely water
flows” (Uphoff, Ramamurthy & Steiner, 1991, p. 18) and thus a corresponding increase
in "area irrigated, cropping intensities and/or crop diversity, yields and economic returns"
(International Water Management Institute, 2007, p. 36). These linkages are becoming
increasingly important given that "the central challenge facing irrigated agriculture today
and in the foreseeable future is how to produce more food and farmer income with less
water” (FAO & INPIM, 2001).

As IMT programs are producing the results these countries are striving for while
demanding fewer financial resources over the long-term, (which is of prime concern to
struggling agricultural departments of developing countries), it is understandable that
more than sixty countries have used IMT as a tool for irrigation sector reform
(International Water Management Institute, 2007, p. 5), with more than 25 other Asian,
African and Latin American countries currently working towards IMT (Asian
Development Bank, 2008, p. 8). Despite this enthusiasm, many of the countries
implementing IMT are lax in addressing the paucity of reliable data and research on the
IMT process, at the cost of an improved understanding of, and adherence to, ‘best
practices’ for IMT (Bandyopadhyay, Shyamsundar & Xie, 2007; Vermillion, n.d.;
Giordano, Samud & Namara, 2006; Mansuri & Rao, 2004; Oorthuizen, 2003; Shivakoti,

8
Vermillion, Lam, Ostrom & Pradhan, 2005; Vermillion, 1997).

9
Worldwide Results of Irrigation Management Transfer

Ideally, IMT could produce results that many countries are seeking while demanding
fewer financial resources than other irrigation management strategies. However, many of
the countries implementing IMT fail to address the severe lack of reliable data and
information collected on the impacts of IMT worldwide (Bandyopadhyay, Shyamsundar
& Xie, 2007; Mansuri & Rao, 2004; Giordano, Samud & Namara, 2006; Oorthuizen,
2003; Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005; Vermillion, n.d.;
Vermillion, 1997).

The studies that have been conducted on IMT to date have mainly focused on the impacts
of IMT with respect to the following outcomes:

• Crop yields
• Agricultural productivity
• Cropping intensities
• ISF Collection rates
• Total amount of government subsidies channeled to IAs
• Efficiency, reliability and equitability of water use and distribution
• Level of maintenance conducted on irrigation infrastructure
• Amount of O&M activities undertaken by IAs
• Change in the income level of farmers

What may be surprising to countries implementing IMT is that the results coming from
the IMT field, with respect to these outcomes, are mixed at best. While conducting the
literature review for this research, it was at times challenging to find results that were not
contradicted in other research (one example being: Bandyopadhyay, Sushenjit, Priya
Shyamsundar & Mei Xie, 2007, and Panella, 2004). As well, many studies (NIA
“Impacts of Irrigation Management Transfer”, 2010; International Water Management
Institute, 2007; Vermillion, 1997) specified that the purported benefits of IMT could
potentially be the byproduct of other unrelated factors, such as previous physical

10
rehabilitation of the irrigation infrastructure or the introduction of higher-yielding
cropping varieties into the study area. Furthermore, many of the outcomes cited, with
respect to the above factors, were determined to lack sufficient data to support the given
claims (Johnson, Vermillion & Sagardoy, 1995, p. 258).

The Philippines is experiencing the same types of problems. Although studies have been
conducted on IMT in the Philippines, appraisals of its effects vary greatly, with causal
relationships between practices and outcomes being difficult to assess (Raby, n.d., p. 1).
Therefore, it can be said that there is insufficient data and information with respect to the
effects of IMT on the above outcomes to justify implementing it on large scales prior to a
more careful analysis of the effects of IMT in pilot projects.

Of particular concern is that IMT has, and continues to be, implemented throughout the
Philippines with only minimal and seemingly inconclusive data on its effects and
absolutely no studies on its long-term impacts with respect to the affected IAs, the
agricultural sector, or the nation’s goal of rice self-sufficiency. Accordingly, this research
was conducted, to better understand the effects of IMT in the Philippines, at the IA level,
so that informed decisions on the implementation of IMT in the Philippines, and perhaps
worldwide, can be made.

11
Relevance and Rationale

As of today, more than sixty countries have used IMT as a tool for irrigation sector
reform (International Water Management Institute, 2007, p. 5) and there are currently
more than 25 Asian, African and Latin American countries working towards IMT (Asian
Development Bank, 2008, p. 8). However, despite the fact that IMT has become one of
the most popular trends in irrigation management worldwide, there has been a persistent
lack of data and information collected on the process of its implementation and its
impacts, particularly at the community level (Bandyopadhyay, Shyamsundar & Xie,
2007; Giordano, Samud and Namara, 2006; Oorthuizen, 2003; Mansuri & Rao, 2004;
Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005; Vermillion, n.d.; Vermillion,
1997).

IMT experts worldwide have therefore been calling for more research to be conducted at
the community level, which focuses on the different approaches being used, the
constraints to implementation, the impacts on all stakeholders and the suitability of IMT
in different social, political and economic settings. This research needs to provide a more
detailed and contextualized understanding of an IMT process (Bandyopadhyay,
Shyamsundar & Xie, 2007; Giordano, Samud and Namara, 2006; Oorthuizen, 2003;
Mansuri & Rao, 2004; Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005;
Vermillion, n.d.; Vermillion, 1997).

Indeed, Irrigation Agencies, policy makers and development agencies from all over the
world are looking for viable irrigation management options but are either unable to
choose IMT as they are constrained by a lack of information on the above issues, or are
implementing IMT in spite of the lack of available information.

In the Philippines, IMT has been implemented for decades, however, only a handful of
studies (Araral, 2006; Bandyopadhyay, Shyamsundar & Xie, 2007; Oorthuizen, 2003;
Panella, 2004; Svendsen, 1992) have been conducted on its implementation and effects at
the local level. Therefore, although most of the country’s IAs have completed, or are in

12
the process of completing, the implementation of IMT, very little is known about the
various practices employed or the outcomes of them. This inexpert application of IMT is
belied by the fact that in the 1980s “people from other nations were flocking to the
Philippines to observe the NIA's participatory methods” (Bruns, 1993, p. 5), resulting in
unproven beliefs in their successful implementation and positive outcomes and inspiring
similar efforts in countries throughout Asia and worldwide (Bruns, 1993, p. 5).

Accordingly, this case study on the municipality of Plaridel is being conducted to help fill
the knowledge gaps surrounding IMT with respect to: the different approaches being
used, the constraints to implementation, the impacts on all stakeholders, and the
suitability of IMT in different social, political and economic settings, so that a more
detailed and contextualized understanding of IMT can be achieved both in the Philippines
and worldwide.

13
Research Methodology

This study is exploratory in nature, employing a qualitative research paradigm shaped as


a case study. Two methods were used to collect data and information. The first method
was a literature review, which was used to inform and shape the research questions and
best practices1. The second method was semi-structured interviews of relevant
stakeholders (n=64) of the IMT process in Plaridel. In addition, some interview
respondents provided supplementary data and information intended to support their
statements. These two methods enabled me to gain the best understanding possible of the
implementation process of IMT in Plaridel. The 64 semi-structured interviews were
important to this study as they ensured that all relevant stakeholders had a voice,
including stakeholders who are rarely heard or included in planning and decision making
processes.

This study took place in Plaridel, Philippines during the months of June and July of 2010.
Plaridel was chosen, firstly, because it is currently in the process of implementing IMT in
all of its IAs. Secondly, because it is located in close proximity to Metro Manila (and
commonly referred to as a ‘bedroom community’ of Metro Manila) and therefore it is
already feeling the effects of resource constraints and overpopulation, which are
commonly cited impediments to the implementation of IMT and issues many agricultural
areas across the world are currently facing. Lastly, Plaridel was the first municipality in
the Philippines to be declared an agrarian reform town, in the early 1960s, and was one of
the first municipalities to adopt the new Green Revolution technology, which included
improved irrigation infrastructure and irrigation management techniques. Therefore, the
history of farming and irrigation in the municipality is rich and strong.

1
It is important to note that these best practices were generated from secondary literature largely written by
agricultural development practitioners and irrigation experts, based on their independent research and
evaluation, and not by participatory research with farmers, which could have privileged their indigenous
knowledge.

14
The fieldwork was conducted throughout Plaridel, as well as at NIA’s regional office,
which oversees Plaridel, located in, San Rafael, Bulacan. The research was facilitated
through Hermanio A. Frias, Jr., Head Municipal Agriculturalist at Plaridel’s Municipal
Agricultural Office, who is well connected in Plaridel’s agricultural sector. This was
important to the research as I, the researcher, am a Canadian national and as a first time
visitor to the country would have otherwise been viewed as more of an ‘outsider’ by the
Plaridel community due to differences in class, race and physical appearance. Therefore,
having Mr. Frias introduce me to all of the interview respondents and providing me with
the contact information for those he could not introduce to me directly played a large role
in the respondents’ willingness to tell me their stories and welcoming me into their
country, community and homes.

I do not speak the native language of the region, Tagalog. However, English is the second
language of most Plaridel residents and for the most part those working in professional
capacities could be interviewed in English. However, all farmer interviews, as well as
some others who preferred not to be interviewed in English, were conducted in Tagalog
with the help of my translator, Yanna Castro, a recent university graduate in business
administration. Yanna’s mother and uncles own an engineering firm established by her
late grandfather who had worked with NIA as an engineering contractor. She
accompanied me on all of my interviews and also helped me gain insight into local
cultural subtleties that I was unable to perceive or understand on my own.

Prior to the commencement of this research, an approval certificate was obtained from
the University of British Columbia Ethics Review Committee with all procedures
outlined therein being strictly followed. All interviews were recorded with a voice
recorder and all recordings were transcribed verbatim and translated by Yanna who was
present during all of the interviews.

In selecting participants for the study, care was taken to ensure that a balanced insight
into the issue was gained, meaning that all stakeholders of Plaridel’s IMT process were
represented. All of the interview respondents can be classified as either ‘community

15
participants’ or ‘expert participants’. Community participants are those who have a direct
stake in the successful implementation of IMT in Plaridel. These include:
• Farmers belonging to one of Plaridel’s seven IAs (n=36)
• NIA field level staff (n=3)
• Other (a private financier of Plaridel’s farmers)

Expert participants are those who have a direct or indirect stake in the successful
implementation of IMT in Plaridel and/or have insight into the IMT process in Plaridel or
factors affecting its implementation. These include:
• NIA regional level staff (n=9)
• Municipal and provincial officials (n=12)
• Other (barangay captains and councilors and a municipal bank official) (n=5)

Table 1.1, below, lists the number of interview respondents by classification and type. In
total there were 64 interview respondents. However, there were only 37 interviews
conducted in total as most of the farmers interviewed were interviewed in groups, by
their respective Irrigation Association.

Table 1.1: Number of interview respondents by category

Community(44) Experts (20)


NIA Field NIA Reg. Mun & Prov
Farmers Staff Other Staff Officials Other
36 3 1 9 12 5

As not all farmers in the municipality could be interviewed, due to time and resource
constraints, it was decided that only one barangay for each of the seven IAs that exist in
Plaridel would be chosen for interviews2. In order to choose the 'best' barangay for each
IA it was decided that the barangays with the largest amount of agricultural and irrigated
rice land compared to the total area of the barangay and the largest number of farmers

2
It is important to note that IAs are based on lateral canals and therefore one IA can exist in more then one
barangay, or even municipality or province (Municipal Government Official Interview 1). For example IA
Plagui is composed of three barangays from Plaridel and three from Guiguinto, a neighboring municipality
(Farmer Group Interview 8).

16
would be chosen. Based on these requirements the following barangays were chosen for
interviews:
Table 1.2: Barangays interviewed and corresponding IAs.

Barangay IA
Bagong-Silang Plagui
Bulihan BSJB
Culianin BPB
Lagundi Lagum
Lalangan Plaridel-Malolos
Parulan Parulan-Halang
Sipat Lucidar
Source: Plaridel's Municipal Agricultural Office

Additionally, Mr. Frias, Plaridel’s head Municipal Agriculturalist, confirmed that these
seven barangays would be the most representative of Plaridel’s barangays for this
purpose.

The following table, 1.3, shows the barangays chosen for interviews (highlighted)
compared to the other barangays of Plaridel with respect to the amount of agricultural and
irrigated palay land they possess relative to their total land area and their total number of
farmers. With respect to both requirements the chosen barangays are comprised
predominantly of those that have larger amounts of agricultural and irrigated palay land
as well as a larger number of farmers when compared to the other barangays.

17
Table 1.3: Agricultural area, irrigated palay area and no. of rice farmers by barangay

Total Land Agricultural Area Irrigated Palay No. of


Barangay Area Area Farmers
Agnaya 66 14 8 5
Bagong Silang 226 200 165 121
Banga I 124 55 0 0
Banga II 160 39 0 0
Bintog 201 158 110 78
Bulihan 493 450 287 191
Culianin 306 237 129 127
Dampol 76 29 3 1
Lagundi 212 197 213 113
Lalangan 197 66 60 52
Lumang bayan 166 57 36 15
Parulan 418 168 140 92
Poblacion 49 0 0 0
Rueda 77 63 65 40
San Jose 376 244 165 133
Sana Ines 69 0 0 1
Santo Nino 334 194 126 82
Sipat 398 254 122 82
Tabang 302 146 36 27
TOTAL 4,250 2570 1665 1160
Source: Municipality of Plaridel, 2007

Although I am confident that this research data would be similarly reiterated in other
barangays with similar land allocations, it would have been useful to gain greater insight
into any potential contrast in opinion among farmers in those barangays with a high
proportion of agricultural land and those closer to the municipal center who are
experiencing higher rates of agricultural land conversion and social fragmentation.

While conducting and analyzing the interviews, I sought at all times to be self-critical and
reflective, constantly assessing the ways in which my personal views might interfere with
the collection of information and its analysis. I also attempted to remain aware of the fact
that those being interviewed could potentially, perhaps intentionally, neglect to tell me
part(s) of their story, as they may want to present themselves, or their government, in a
certain light to their ‘guest’. Therefore, efforts were made to gain second or third

18
opinions on statements that didn’t fit the larger picture. It is also important to note that
one limitation of this research is that the farmer members interviewed did not engage in a
consultation process with their fellow IA members to strongly justify their answers. Nor
were their responses validated or triangulated with other research methods, such as
surveys or interviews with other members from within their IAs. This is especially
important to take into consideration with respect to the data presented in Tables 4.1, 4.2
and 5.1 as the answers recorded by each IA may not be representative of all of the IA's
farmer members.

It is also important to note that I conducted this research under unusual national
circumstances. Benigno S. Aquino, the current Filipino president, was just being brought
to power while I was undertaking this research. Among others, he promised to all
Filipinos to cut down on government corruption and to improve infrastructure and health
care. Aquino also made explicit promises to farmers, promising to improve their security
through greater access to irrigation, extension services, markets and the elimination of
middlemen (philSTAR, n.d). I was cognizant of the fact that this event might influence
the opinions of those employed in the agricultural sector with respect to their future
livelihoods, and therefore IMT, as many were caught up in the potential power of Aquino
to change the future of the agricultural sector in the Philippines.

19
Organization of the Study

This study is organized into seven chapters. The first chapter introduces the reader to the
focus, intent, scope and methodology of the research. The second chapter discusses the
history and politics of rice self-sufficiency in the Philippines and the institutional
consequences these efforts have had at the national, regional and local levels of the
agricultural sector, namely the implementation of both PIM and IMT nationwide. The
third chapter introduces the Municipality of Plaridel, the chosen location for this case
study research, by discussing the history and current role of agriculture in the
municipality, the main reasons behind NIA’s decision to implement IMT in Plaridel and,
lastly, how it will be implemented. The fourth, fifth and sixth chapters analyze whether
the management, financial viability and O&M related 'best practices' for the
implementation of IMT are currently being adhered to in Plaridel. The last chapter
attempts to answer the primary and subsidiary research questions of this thesis.

20
CHAPTER 2. Rice Self-Sufficiency in the Philippines: The Historical, Institutional
and Political Contexts

The Philippines, an archipelago in South-East Asia, located between the Philippine and
the South China Sea (Central Intelligence Agency, 2010) consists of three main regions,
which from north to south are: Luzon, where this research was conducted, the Visayas,
and Mindanao (see Figure 2.1 below).

Figure 2.1: The Philippines by region

Source: Philippines Maps, n.d.

Of the total land area of the country, 300,000 square kilometers (Araral, 2006, p. 33),
approximately 38 percent is devoted to agriculture (The World Bank, 2010) and
approximately half of that is comprised of permanent cropland, the majority of which is
irrigated palay land (Manaytay, 2008). Palay is by far the largest agricultural commodity
produced in the Philippines (Manaytay, 2008). This should be of no surprise as rice is the
staple food of 85 percent of the Filipino population, with each Filipino family spending
an average of 11 percent of its annual budget on rice (Provincial Agriculture Office, n.d.).

The agricultural sector is a crucial component of the Philippine economy, representing


the largest contribution to both income and employment in the country (Teruel & Kuroda,
2004, p. 327). In 2009, the agricultural sector employed 34 percent of the total population

21
aged 15 to 65 (Central Intelligence Agency, 2010) and was the primary source of
livelihood for most of the rural population (Manaytay, 2008).

However, despite the importance of the agricultural sector, and thus palay production, to
the Philippines' social and economic well-being, it has been a struggle for the Philippines
to maintain rice self-sufficiency for the better part of the past century. This chapter will
therefore discuss the history and politics of rice self-sufficiency in the Philippines and the
institutional consequences these efforts have had at the national, regional and local levels
of the agricultural sector, namely the implementation of both PIM and IMT nationwide.

22
History of Rice Self-Sufficiency in the Philippines

This section will outline the history of rice self-sufficiency in the country, which has been
a primary goal of the Philippine national government since the 1940s, and the current
state of efforts in reaching this goal.

After the Second World War the Philippines had “some of the lowest rice yields in the
world” (NIA, 1990, p. 10). This necessitated a first ever, critical effort to import large
quantities of rice, and marked the “starting point of the country's rice importation"
(Bagadion, 1989, p. 5). In the 1960s, the Philippine national government finally decided
to take a more aggressive stance towards its irrigation development program in order to
solve the rice self-sufficiency problem. This resulted in the creation of the National
Irrigation Administration (NIA) in 1964 (Bagadion, 1989, p. 3) whose purpose was to
solve national rice shortage problems. In the first few years of its life, NIA deployed a
number of initiatives that resulted in the Philippines achieving rice self-sufficiency in
1968, thus ending over twenty years of rice importation (NIA, 1990, p. 13).

Then, almost as soon as it had begun, rice self-sufficiency was gone as rice production
was not able to keep pace with a rapidly growing population (SAPRIN, 2002). This
resulted in the Philippines becoming increasingly dependent on rice imports, whose
prices were subject to volatile world markets, creating an increasingly unstable national
economy. This lasted until 1974, when the Green Revolution dramatically increased the
productivity level of rice production in the country (NIA, 1990, p. 14).

Thanks to the Green Revolution, the country enjoyed rice self-sufficiency and produced
huge surpluses (NIA, 1990, p. 16). In 1977, the country even began exporting for the
“first time since the end of World War II" (NIA, 1990, p. 16). However, throughout the
1980s and 1990s there was a significant decrease in productivity due to a variety of
factors, including unsustainable intense cropping systems, climatic factors (NIA, 1990, p.
19), lack of financial resources, and political turmoil and corruption (Teruel & Kuroda,
2004, p. 325).

23
Since the mid-1980s the Philippine national government has attempted to reverse this
situation through a number of agricultural policy reforms. These reforms included
dismantling trade monopolies; the importation of major agricultural inputs, such as
fertilizers, seeds and machinery, the 1988 Comprehensive Agrarian Reform Program
(CARP) program (which as of 2001 had redistributed approximately 3.14 million
hectares to, previously, landless farmers) (Teruel & Kuroda, 2004, p. 320) and the 1997
Agriculture and Fisheries Modernization Act (AFMA), which aimed to modernize the
sector, through measures such as “production and marketing support services, human
resources development, research and development, extension, and trade and fiscal
incentives”, as well as ensuring budget allocation for agricultural research and
development projects, extension, irrigation and other infrastructure (Teruel & Kuroda,
2004, p. 320).

However, these policy reforms have only been moderately successful as they were unable
to overcome the effects of other larger negative influences on growth and productivity,
namely population growth (Resurreccion, 2010). Therefore, despite increasing rice yields
over the past decade the Philippines is still importing rice to this day (Resurreccion,
2010).

The national government, however, still has high hopes. Its newest target is to attain rice
self-sufficiency by the year 2017 (Balea, 2010). However, In order to reach this goal they
will have to overcome a series of obstacles that have stood in their way for decades. The
following section speaks to these and how the national government plans to overcome
them with new vigor.

24
Main Obstacles to Rice Self-Sufficiency in the Philippines

This section will look at four of the five main reasons (as poor agricultural productivity
was already discussed) why the Philippines has not been able to achieve their goal of rice
self-sufficiency. These are: high population growth rates, political corruption resulting in
insufficient funding of the agricultural sector, erratic weather conditions, and the political
economy.

1. Population Growth: The first and arguably largest obstacle to achieving rice self-
sufficiency in the Philippines is the inability of rice production to keep pace with rapid
population growth, despite the fact that “the growth of rice production [in the Philippines]
has been remarkable” (Kikuchi, Maruyama & Hayami, 2001, p. 109). For example, rice
production in the Philippines grew by “an average of 3.68% from 2002 to 2007” (Balea,
2010), which is an exceptional rate for any nation. However, it would have needed to
grow by an average of 4.7% in order to keep pace with the population increase during the
same period (Balea, 2010).

Population increases will continue to be an obstacle for the Philippines as, firstly,
although growth rates have been slowly declining in the country over time the population
is still growing at an unsustainable rate (Panella, 2004, p. 49), with the current population
of 100 million projected to grow to 111 million by 2025 (Panella, 2004, p. 50). Secondly,
there has been an increasing trend of rural to urban migration, the largest number of rural
migrants settling in Manila and the surrounding areas of Central Luzon (Kelly, 1998, p.
35). This has resulted in the Philippines' "rice bowl" and other agricultural areas in close
proximity to urban areas, being converted from prime agricultural, mainly palay, land to a
"variety of urban and industrial uses" (Kelly, 1998, p. 35). With the country's current rate
of urbanization at three percent (Panella, 2004, p. 50) it can be expected that land
conversion will continue to rise. Therefore, it can be seen why rapid population growth
has been a persistent obstacle for the Philippines to overcome in attempting to reach its
goal of rice self-sufficiency.

2. Corruption and Underfunding: The second main obstacle the Philippines has attempted
to overcome to achieve their goal of rice self-sufficiency is political corruption within the

25
agricultural sector. Corruption in the Philippines is thought to be prevalent and results in
the frequent misappropriation of financial resources intended to fund agricultural projects
(Business Mirror, 2010). One well known example of this occurring in the agricultural
sector was in 2004 when three billion Pesos allocated to the Department of Agriculture
(DA) was allegedly siphoned off to the presidential campaign of Gloria Arroyo, with the
money “mysteriously end[ing] up in the hands of obscure private foundations and
companies… congressmen, mayors and governors” (Rimban, 2005). This resulted in the
failure of numerous programs and policies, such as AFMA, due to low budgetary support
(Business Mirror, 2010). Until political corruption is curbed, the agricultural sector will
undoubtedly remain seriously under-funded. The recently inaugurated Aquino has vowed
to “fight corruption within the bureaucracy” (philSTAR, n.d) but success in the matter
has yet to be seen.

3. Weather: The last main obstacle the Philippines needs to overcome to achieve rice self-
sufficiency is erratic weather conditions. The Philippines is hit by 20 to 22 typhoons a
year, the level of risk to typhoons by region can be seen in Figure 2.2, below, as well as
both El Nino and La Nina, which result in both flooding and drought (Rincon & Virtucio,
n.d., p. 19).

Figure 2.2: Level of risk to typhoons in the Philippines

Source: Rincon & Virtucio, n.d., p. 19.

26
These events frequently result in drastically reduced rice yields and farmers’ incomes
(Oryza, 2010), many of which already fall below the poverty line (Raby, 1997). Some
recent examples are:

• “From 2000 to 2005, typhoons robbed approximately one million tonnes of our
rice. Loss due to drought was about 400 thousand tonnes during the same period”
(Agriculture Business Week, 2008).
• “In 2009, rice production fell by 3.31% due to back-to-back killer typhoons Ondoy
and Pepeng” (Balea, 2010). Combined they “destroyed US$4.3 billion in crops,
property and infrastructure" (Office of the President Adviser on Global Warming
and Climate Change, 2009).
• "The 1997-1998 El Nino resulted in a 6.6 percent GDP contraction in agricultural
production... [a] combined loss of 1.8 million tons in rice and maize" (Rincon &
Virtucio, n.d., p. 18).

These costs are expected to increase in the future as the Philippines is "highly vulnerable
to the adverse impacts of climate change” (Rincon & Virtucio, n.d., p.2). Based on
predictions from the Hadley Center’s global climate model PRECIS, the Philippine's
Climate Change Commission stated that “significant warming will occur in the
Philippines by the middle of the current century,” the “average mean temperature is
projected to increase by 0.9C-1.2C by 2020 and 1.7C-3.0C by 2050” (World Bank, 2005,
p. 16). It is expected that this will result in more typhoons, heavy flooding (Yap, 2009),
drastic changes in rainfall patterns (Climate Change Commission Office of the President,
2009, p. 12), sea-level rising, droughts, (Resurreccion, 2010) and other extreme weather
events (Yap, 2009). “The Philippines also ranks among the top 10 countries whose
economic activity is at risk from an intensification of storm surges” caused by climate
change (Sering, 2009).

The impacts of these climate change induced events on the agricultural sector hold
catastrophic potential. In 2007, the IPCC identified that the water and agricultural sectors
were those “most sensitive to climate change-induced impacts in Asia” (Godilano, 2009).

27
The Philippines will experience events such as, increased incidence of pests (Rincon &
Virtucio, n.d., p. 16), altered quantity and quality of available fresh water (Godilano,
2009), changes in timing of growing season (Rincon & Virtucio, n.d., p. 16), the drier
season becoming dryer and the wet season becoming wetter (Rincon & Virtucio, n.d., p.
15), and generally “more unpredictable farming conditions” (Godilano, 2009). If current
trends persist the 2050 yield of irrigated rice crops in the Philippines will decrease by
approximately 10 percent (Godilano, 2009) as approximately 84 percent of rice lands in
the Philippines will be affected by climate change. In numerical terms, 1 degree Celsius
increase equates to a 1 million tonne increase of rice imports for the Philippines
(Godilano, 2009). It can therefore be seen how the Philippines' unfortunate susceptibility
to erratic weather conditions has, and will continue to be, an obstacle to reaching their
goal of rice self-sufficiency.

4. Political Economy: The last main obstacle the Philippines has had to address to
achieve rice self-sufficiency has been to overcome government policies of the 1960s that
subverted the viability of the agricultural sector in their preference for the development of
the manufacturing sector, resulting in the agricultural sector’s staggering decline.
Whereas the Philippines was one of the most productive in Asia in the 1960s, from the
1980s onward it has consistently been among the most poorly performing (Asian
Development Bank, 1994; Balisacan, 2000).

The economic policies, surrounding the import substitution industrialization strategy (e.g.
overvaluing domestic currency, increasing tariffs and quantitative restrictions on
agricultural trade) resulted in the depression of relative prices of agricultural products and
encouraged capital-intensive patterns of industrialization (Balisacan, 2000, p. 26). This
negative effect on the agricultural sector was exacerbated by additional policies that
depended on the acquisition of foreign loans that required repayments, further
exacerbating the country’s fiscal deficits. Financial constraints led to lack of investments
in rural infrastructure such as farm-to-market roads and irrigation that constrained “the
responses of rural areas to the stimulus provided by agricultural growth [during the Green
Revolution], thereby further stifling economic development [in the sector]” (Balisacan,

28
2000, p. 2). Furthermore, this motivated those working in the agricultural sector to seek
employment opportunities in the expanding and more lucrative non-farming economic
areas (Balisacan, 2000, p. 10). The effects of these policies on the agricultural sector were
severe and the attempts in the 1990s to reverse their impact have been insufficient to help
achieve rice self-sufficiency in the country (Asian Development Bank, 1994, p. 4).

Now that it has been established how and why the Philippines has been unable to reach
their goal of rice self-sufficiency it will be discussed how the national government
created the National Irrigation Administration (NIA) specifically to overcome these
obstacles. It will also be discussed how NIA has attempted to do so by fundamentally
reshaping the irrigation sector through the nationwide implementation of PIM and IMT.

29
History of the National Irrigation Administration, PIM and IMT in the Philippines

In order to achieve their goals, with respect to rice self-sufficiency, the Philippine
national government, under President Ferdinand E. Marcos, established the National
Irrigation Administration (NIA) through the Republic Act No. 3601 (Philippine National
Government, 1963) in I964. This act not only created NIA but also allocated funds from
the national treasury to implement the following objectives through them (Raby, 1997):
to study, improve, construct, and administer all irrigation systems in the Philippines; to
investigate all available and possible water resources in the country for the purpose of
utilizing the same for irrigation; to collect ISF from the users of the irrigation systems
constructed by it; to undertake all other activities directly or indirectly necessary for the
attainment of its above objectives (such as R&D and land reform)

During its first decade of operation NIA believed that by emphasizing the design and
construction of irrigation systems, with special focus on “the technical aspects of water
distribution, system maintenance and physical rehabilitation” they would best be able to
reach their goals (Bagadion, 1989, p. 10). They also believed that “institutional matters,
especially the development of farmer's organizations” were relatively inconsequential to
the proper management of irrigation systems and that such “minor activities [were] better
left to lower level staff and other government agencies” (Bagadion, 1989, p. 12).
However, NIA soon started to encounter problems with the IAs, such as: inequitable
distribution of water; low irrigation fee collection rates; rapid deterioration of
infrastructure due to poor maintenance; and far lower than expected production levels.
These problems resulted in NIA becoming an enormous financial burden on the state and
created a clear understanding that policies needed to be changed (Bagadion, 1989, p. 4).

To fix these problems, and to redouble efforts at achieving their preliminary goals, NIA’s
charter was amended in 1974 under Presidential Decree 552, thus transforming NIA from
a government bureau to a semi-autonomous public corporation (Bagadion, 1989, p. 5).
This amendment increased their decision-making and financial capacities (National
Irrigation Administration, 2009), however, it also required NIA to “recover all [of] its
expenses in construction, rehabilitation, operations and maintenance from beneficiaries”

30
(Sangupta, 1991, p. 255), thus ending NIA's tradition of paternalistic support. The
subsidies NIA received from the national government declined from 10 billion pesos in
1964 (NIA, 1990, p. 27), when NIA was established, to 25 million in 1976 and would
continue to decrease to zero by 1982 (Vermillion, 1997, p. 5). Although this presented
hardships for the agency, it created a strong incentive for NIA to become financially
solvent (Groenfeldt, 2004).

To ensure financial viability as well as to increase rice yields NIA decided to adopt the
new Participatory Irrigation Management (PIM) model, which promoted the gradual
transference of responsibilities of irrigation management of Communal Irrigation
Systems (CISs) in the Philippines to individual farmer’s organizations (Bagadion, 1989,
p. 2), also known as Irrigation Associations (IAs). The basic premise of PIM is that when
farmer beneficiaries participate in project planning and execution, the degree of
dependency on the government after program completion, both administratively and
financially, is significantly reduced. This is because the IAs become empowered to
manage their own systems, resulting in an increased sense of personal and community
level responsibility for the financial and productive success of their irrigation systems
(Korten & Siy, 1989). This increases production levels given farmers’ greater knowledge
of the system and because they tend to be more responsive than government workers as
they have more invested in the system’s success (Bagadion, 1989, p. 9). Therefore,
NIA's hope in implementing PIM was that it would provide both reductions in the
financial costs incurred in these systems as well as an increase in agricultural yields, thus
helping NIA to reach their main goal of rice self-sufficiency (Attia, n.d.).

In 1976, NIA “initiated its first two [PIM] pilot projects, funded by the Ford foundation
in conjunction with the Philippine national government, in Laur, Nueva Ecija”
(Bagadion, 1989, p. 4). To ensure the success of its new PIM program, throughout the
implementation phase, NIA sought to include the farmers in every aspect of their
respective projects. Thus, they assumed more of an “enabler role, in order to develop the
farmer's own capacity to carry out important development functions" (Bagadion, 1989, p.
6). NIA included the farmers in such activities as: decision making within the irrigators’

31
associations, planning the improvements and expansion of the irrigation system, securing
the water rights, obtaining rights-of-way for canals and other facilities, constructing the
irrigator's facilities, and controlling construction costs. NIA also conducted a variety of
trainings on such aspects as financial and operational management (Korten & Siy, 1989,
p. 146) so that when the initial phases of the project were completed, the agency could
hand over full responsibility and authority of the system to the farmers’ organizations as
they would be empowered and educated enough to rise to the challenge (Korten & Siy,
1989). The only way NIA planned to be involved after the handover would be to provide
minimal technical assistance and to collect the interest-free loans they had provided to the
irrigators associations (Bagadion, 1989, p. 15).

The pilot projects were facilitated by adding a ‘working group’, named the Communal
Irrigation Committee, whose members included the Institute of Philippine Culture at
Manila University, the Asian Institute of Management, the International Rice Research
Institute, NIA, and the Ford Foundation (Bagadion, 1989, p. 4). They implemented a
‘learning-by-doing’ approach, which meant that they constantly reviewed field level
experiences, systematically extracted lessons learned, developed new methodologies
when needed, amended agency procedures and policies when required and contextualized
each pilot project in the cultural, historical, economic context of the subject communities.
In addition, “Community Organizers” (COs) were hired by NIA to live in the farming
communities and to act as brokers between the farmers, “helping them vocalize their
needs, problems, and ideas regarding the irrigation system expansion, maintenance, and
operation, while informing them of the kind of assistance they could obtain from NIA”
(Raby, 1997). These additions to the pilot projects, which were said to have made a world
of difference in the outcomes of these projects (World Bank, 2005, p. 42), were made
possible by a large grant from the Ford Foundation and a flexible subsidy from the
national government who “recogniz[ed] that NIA's revenues from fee collections would
not immediately be enough to cover the costs of O&M" (Bagadion, 1989, p. 4).

All of these measures combined resulted in an overall improvement in the “functioning


and financial feasibility of the systems”, as well as “the empowerment of farmers through

32
their newly acquired administrative and technical skills” (Bagadion, 1989, p. 7). More
specifically, improvements were realized in: areas irrigated; productivity; absolute rice
yields; equity of water access; farmers’ ability to keep financial records, collect ISFs and
repay loans; and farmers’ ability to coordinate with NIA staff (de los Reyes, Romana &
Jopillo, 1989, p. 92). In other words, they were an unprecedented success with respect to
both of NIA's goals for the project, increased levels of palay production and a reduced
long-term financial burden to NIA. In addition, PIM systems cost only 3 percent per
hectare more than implementing non-participatory systems, therefore, “from NIA's
standpoint, the financial benefits of making the investment in the institutional activities
were substantial" (de los Reyes, Romana & Jopillo, 1989, p. 95).

In 1979, due to the pilot projects’ success NIA started to expand its Philippines adapted
participatory method to other areas of the country (Tapay, Greg & Hammond, 1987, p.
129). This expansion went so well that in 1981 the “World Bank team recommended the
adoption of the participatory approach in all of NIA’s communal irrigation projects
(Bagadion, 1989, p. 3) and by 1983 the PIM approach was “standard procedure in all
communal irrigation projects of the agency” (Sangupta, 1991, p. 252). As a consequence
of their exceptional results with PIM “Amnon Golan of the World Bank classified the
NIA as 'the finest irrigation agency in the whole of Asia and in any developing country
in the World’” (Oorthuizen, 2003, p. 28). It should therefore be of no surprise that
"participatory management and development has become a cornerstone, a foundation of
irrigation programs in the Philippines" (Ofrecio, 2006, p. 1) or that the Filipino
experience has "provided ideas and models for participatory irrigation development in
other Asian countries like…Sri Lanka, Indonesia, Thailand, Nepal, India, and
Bangladesh” (Bagadion, 1989, p. 19).

Until 1980, PIM was carried out exclusively on communal irrigation systems. However,
it was the NISs that represented the majority of NIA's long-term financial problems as
“NIA continued to incur a deficit in its operations and maintenance expenditures [for
NISs], which it had previously promised [to the national government] to eliminate"
(Araral, 2006, p. 61). A specific example of the severity of NIAs deficits from NISs is

33
that, "from 1991 to 2000, on average, NIA's operating income was 73 percent below its
operating expenses", as NIS ISF collection rates "hovered just under 50% of billings"
(Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005, p. 292) throughout the 1990s. In
2000 alone, NIA "registered a net operating loss of nearly 1 billion pesos" (Shivakoti,
Vermillion, Lam, Ostrom & Pradhan, 2005, p. 292).

Therefore, to resolve their financial issues NIA launched its Irrigation Operations Support
Program (IOSP) for NISs in 1980, which was modeled after the PIM approach
implemented in the communal systems (Thompson, 1995, p. 1522). However, PIM in
NISs proved to be far too expensive for the cash strapped NIA to administer.
Consequently, NIA was relegated to turning to the Irrigation Management Transfer
(IMT) model in 1984, which, for NIA, did not include most of the participatory
characteristics that had made their PIM model so successful (FAO, 2003, p. 36)

In 1980, the IMT Pilot Project was launched in Buhi-Lalo in Camarines Sur. Its relative
success prompted NIA to expand IMT to several other NISs across the country. By 1986,
approximately 35,000 hectares, or thirty-seven NISs, were either fully turned over to the
irrigation associations or jointly managed with NIA at the secondary canal level (Korten
& Siy, 1989, p. 156). However, the results of these first rounds of IMT transfers left
much to be desired. The majority of IAs, apart from those that were exceptionally strong
before IMT, experienced enormous difficulties managing their irrigation systems. Most
were financially unsustainable, neglected their O&M, and had significant difficulty with
management efforts due to insufficient institutional development prior to turnover (Raby,
1997). As a result, in 1991 NIA implemented Irrigation Operations Support Program II
(IOSP II), funded by the Ford Foundation. IOSP II aimed to: strengthen the institutional,
technical, and O&M capabilities of IAs; improve performance through minor
rehabilitation and works; and provide financial support to NIA which would hopefully
result in a larger number of financially viable and managerially competent IAs post IMT
(Panella, 2004, p. 122).

34
However, in the same year that IOSP II was launched, in line with the decentralization
push of 1991, the Philippine National Government, in accordance with the Agriculture
and Fisheries Modernization Act (AFMA) (Republic Act No. 8435) of 1997, called for
“further devolution in the irrigation sector" (Bandyopadhyay, Shyamsundar & Xie, 2007,
p. 22) in order to achieve “greater farmer participation in irrigation management"
(Panella, 2004, p. 125). However, it has been argued that the real reason behind this move
was to achieve the greater financial viability of NIA (NIA Interview 10). To achieve this
objective the national government required NIA to turn over all IAs to the secondary
canal level, despite the difficulties they were then having with the IMT program. After
this was completed, NIA’s principal roles and responsibilities would be to operate and
maintain only major irrigation structures (i.e., headworks and main canals of NISs only)
and to provide technical assistance to local government units (for CISs) and IAs (for
NISs) to complement the devolution of the planning, design, and management (Panella,
2004, p. 137).

In the Philippines, very few studies have been conducted to assess the impact of NIA’s
rushed turnover of irrigation systems management, on the country’s long-term ability to
become rice self-sufficient. Those few that have been conducted, especially by
independent observers, have shown that it has had devastating consequences on the
ability of the agricultural sector to reach rice self-sufficiency as well as on the livelihoods
of the affected farmers. With one study specifying that “in more recent years, the NIA
and its national systems were – and still are – in serious trouble” (Oorthuizen, 2003, p.
29). It is therefore of critical importance to gain further insight into why IMT in the
Philippines has been unable to provide the results that NIA, and the rest of the
Philippines, desperately wants and needs. Due to the financial situation of NIA, IMT
remains the main hope for achieving rice self-sufficiency in the country. Some insight
into this question can be gained from looking at the implementation of IMT in the case
study of Plaridel, who is one of the last NISs to implement IMT in the Philippines.

However, before the case study of Plaridel is introduced it is first important to note that,
although it is beyond the scope of this research to study in depth, multi-lateral agencies’

35
development strategies and policy recommendations have to a large degree dictated
irrigation and agricultural policy in the Philippines, particularly since the 1970s
(Balisacan, 2000).

Throughout the 1960s and 1970s agricultural sector management was highly centralized;
in fact, these decades were characterized by unprecedented government intervention
(Balisacan, 2000, p.16). However, once the substantial growth of the sector began to
wane (due to the effects of the Green Revolution, the slowdown of new lands being
brought into production, and the drop in the world commodity prices affecting the
country’s traditional export crops (Balisacan, 2000, p.16)) the Philippine agricultural
sector opened its doors to multi-lateral organizations who promised answers to the
productivity problems of the sector and the funds to solve its financial woes (Balisacan,
2000, p. 2). The main multi-lateral organizations who have been involved are the Asian
Development Bank (ADB), The Overseas Economic Cooperation Fund (OECF), USAID,
The World Bank (Asian Development Bank, 1994, p. 6), The Ford Foundation
(Bagadion, 1989, p. 4), and the International Rice Research Institute (IRRI) (Bagadion,
1989, p. 4), among others.

However, by opening their doors to these organizations, at a time when they were highly
dependent on foreign debt for funding, the Philippines became subject to highly onerous
conditions associated with structural adjustment policies’ conditionalities attached to the
provided loans and/or grants. This ultimately resulted in the massive decentralization,
deregulation, streamlining, and privatization of the agricultural and irrigation sector
(Balisacan, 2000; Asian Development Bank, 1994). The commencement of these results
was marked by NIA’s charter being amended, transforming it from a government bureau
to a semi-autonomous public corporation, responsible for its own financial viability
(Bagadion, 1989, p. 5). The other main policies resulting from the influence these
organizations had on the agricultural sector are enumerated in Table 2.1.

Regrettably, the effects of these policies were largely negative, resulting in a sharp
decline in much needed public and private investments (Balisacan, 2000, p. 8), the

36
decline of public participation and support (Balisacan, 2000, p. 8) the demise of private
markets for agricultural land, lower agricultural production rates (Balisacan, 2000, p. 18),
massive debts in the agricultural sector to these multi-lateral organizations as well as their
increased dependence upon them (Nemenzo, 2008, p. 9) and ultimately the Philippines to
this day being unable to achieve rice self-sufficiency (Resurreccion, 2010).

Table 2.1. National irrigation policy history in the Philippines

• Late 1940s: Starting point of the Philippine's rice importations (Bagadion, 1989, p.
5).
• 1964: NIA created and charged with solving national rice shortages (Bagadion,
1989, p. 3)
• 1960s-70s: Green Revolution dramatically increases productivity level of rice
production in the country (NIA, 1990, p. 14).
• 1970s-80s: Rise of the structural adjustment policies promoting the transfer of
rights and responsibilities of irrigation to local communities (Araral, 2009, p.
687).
• 1974: NIA’s charter amended, transforming it from a government bureau to a semi-
autonomous public corporation (Bagadion, 1989, p. 5).
• 1976: PIM model implemented, transferring responsibilities of irrigation
management of Communal Irrigation Systems to individual farmer’s
organizations (Bagadion, 1989, p. 2).
• 1980: IMT model implemented, transferring responsibilities of irrigation
management of National Irrigation Systems to individual farmer’s organizations
(Korten & Siy, 1989, p. 156).
• 1986: Start of the deregulation of the agricultural sector, which included: abolition
of monopsonistic agencies and arrangements; lifting of export bans; liberalization
of distribution and importation; opening of import trade; removal of price
controls, among others (Balisacan, 2000, p. 16).
• 1988: Comprehensive Agrarian Reform Program (CARP), redistributed
approximately 3.14 million hectares to, previously, landless farmers (Teruel &
Kuroda, 2004, p. 320).
• 1991: Local Government Code, aimed to achieve greater decentralization of
government operations across all sectors (Asian Development Bank, 1994, p. 5).
• 1991: NIA implements Irrigation Operations Support Program II (IOSP II), aimed
at building capacities of farmer organizations to better implement IMT (Panella,
2004, p. 122).
• 1997: Agriculture and Fisheries Modernization Act (AFMA), aimed to modernize
and devolve the sector (Bandyopadhyay, Shyamsundar & Xie, 2007, p. 22) and
enhance the competitiveness of domestic agriculture in the global marketplace
(Balisacan, 2000, p. 19).

37
Chapter Three: Case Study of Plaridel, Bulacan: Irrigation Opportunities and
Challenges

This chapter will introduce the Municipality of Plaridel, the chosen location for this case
study research. It will first discuss the history and current role of agriculture in the
municipality and where it fits into NIA's larger national irrigation structure. It will then
discuss the two main reasons behind NIA’s decision to implement IMT in Plaridel: to
help achieve rice self-sufficiency and for NIA to become financially viable. Lastly, this
chapter will discuss when and how IMT will be implemented in Plaridel.

38
The Role of Agriculture and Rice in Plaridel

Plaridel is a municipality in the province of Bulacan, located on the island of Luzon and
is one of the seven provinces that make up the Central Luzon Region, or Region III, of
the Philippines (Province of Bulacan, 2009, p. 10). Its geographic location can be seen
below in Figure 3.1.

Figure 3.1: Region III, Philippines

Source Bulacan Province, 1997, p. 22

Plaridel is located in the mid-west of Bulacan, which can be seen in Figure 3.2.

39
Figure 3.2: Map of Plaridel in Bulacan

Source: Benzidane, Blond & Mazur, 2008, p. 26

Plaridel has a long and robust history of agriculture. It was one of the first towns in the
country to experiment with ‘Agrarian Reform’ in the 1960s, and was one of the first
municipalities to adopt Green Revolution technology, which included improved irrigation
infrastructure and irrigation management techniques (Municipality of Plaridel, 2002, p.
16). This strong history of agriculture can be attributed in large part to the fact that
Plaridel sits on prime agricultural lands in the ‘rice bowl’ of the Philippines (Provincial
Planning and Development Office, 2010, p. 38).

According to the most recent data available from the Department of Agriculture (DA), in
March 2000 there were 1,159 palay farmers in Plaridel, each tilling approximately 1.38
hectares. The DA “estimates that 5 percent are owner-cultivators, 5 percent are shared-
tenants, and 90 percent are land reform beneficiaries with CARP certificates. This means
that most farmers in Plaridel at present are landowners by themselves” (Municipality of

40
Plaridel, 2002 15).

Of Plaridel’s total land area of 4,250 has., approximately 62 percent or 2,630 has. are
used for agricultural purposes. Of the municipality’s total agricultural land approximately
two-thirds or 1,665 has., consist of fully irrigated palay land (Frias, 2010), with water
provided by NIA from the Angat Dam through a “run-of-the river gravity system”
(Municipality of Plaridel, 2002, p. 14). This provides Plaridel's farmers a great advantage
as they have historically been assured two cropping seasons per year (Municipality of
Plaridel, 2002, p. 16).

Plaridel falls under the Angat-Maasim River Irrigation System (AMRIS) of NIA (Raby,
1997). AMRIS has been operational since 1972 (NIA, 2008) and is the second largest
district, or region, in the country with respect to both service area and number of farmer
beneficiaries (see Table 3.1 below).

41
Table 3.1: NISs by region

Region Service Area No. of


(District) (Has) Beneficiaries
CAR 22,622 15,946
1 55,967 56,293
2 52,589 42,327
AMRIS 88,370 64,513
3 72,665 53,869
UPRIIS 120,221 88,127
4 53,146 37,036
5 22,376 28,401
6 52,216 43,480
7 10,040 11,996
8 19,144 21,794
9 15,162 8,671
10 26,411 14,120
10AR 2,500 3,056
11 33,971 23,331
12 59,460 44,124
ARMM 13,488 8,640
13 28,019 19,791
Source: (NIA “Irrigation Delivery”, n.d.)

Although much of the land in Plaridel is devoted to agriculture, the chief driver of
Plaridel's economy is the service sector. Although agriculture still plays a large role in
supporting Plaridel's economy, this role has been declining over time (Provincial
Planning and Development Office, 2010, p. 43). For example, the number of persons
employed in the agricultural sector has been declining dramatically (Municipal
Government Official Interview 3)3, to the point where this once predominantly farming
based community now employs five times more citizens in the service sector than in the
agricultural sector (Municipality of Plaridel, 2002, p. 38). This has mainly been a result
of migration and consequent land conversion in the municipality, all of which will be
discussed in the following section.

3
First interview reference. Interviews are cited by occupation and are numerically ordered within their
occupation category, which is determined by the date interviewed. A complete list of interviews can be
found in the Appendix.

42
Reasons for the Implementation of IMT in Plaridel

This section will discuss the two main reasons behind NIAs decision to implement IMT
in Plaridel: to help achieve rice self-sufficiency and secure NIA's financially viability.

43
Rice Self-Sufficiency in Plaridel and Bulacan

The first main reasons NIA gives for implementing IMT in Plaridel is that it will result in
higher rice yields, thus helping to achieve rice self-sufficiency, which the Philippines has
been striving to achieve ever since the Second World War (NIA, 1990, p. 10).

Bulacan, although historically producing large surpluses of palay, has seen declining rice
self-sufficiency rates, especially over the last ten years. Between 2002 and 2008, Bulacan
managed to satisfy only 96 percent of its palay requirements, which made it the only
province in Central Luzon that was not rice self-sufficient for this period (Provincial
Planning and Development Office, 2010, p. 27). In contrast, the other provinces of
Central Luzon achieved between 128 and 567 percent rice self-sufficiency during the
same time period. Bulacan’s inability to be rice self-sufficient has been despite an
“upward trend in palay production” in the province (PPDO Research, Monitoring, and
Evaluation Division). This seemingly paradoxical trend has been a result of the
overwhelming rate of population growth in the province (which is a result of the
combined effect of the natural birth rate and heavy in-migration from other provinces)
(Provincial Planning and Development Office, 2010, p. 28).

Although no data is available on Plaridel's rice self-sufficiency rates, their rapidly


growing population portends a path of rice self-sufficiency problems similar to those
experienced in the rest of Bulacan. As of the most recent census, in 2007, Plaridel had a
population growth rate of 3.26% between 1995 and 2007, which was comparable to that
of the rest of the province. This will remain a problem for Plaridel far into the future as
its current population of 97,225 (Provincial Planning and Development Office, 2010, p.
10) is set to double by 2028 (Municipal Planning and Development Coordinator, 2008).

There are two main obstacles standing in the way of Plaridel, and Bulacan, meeting the
palay production needs of their rapidly growing population. The first is the slow adoption
of new rice technologies, leading to low rice productivity. Palay production in Bulacan
averages only around 70 to 80 cavans per hectare (one cavan equaling approximately 75

44
Litres (Bureau of Insular Affairs, 1903)), whereas, in some areas of the Philippines,
“palay production can reach up to 150 to 180 cavans per hectare” (Bulacan Province,
1997). Although no long-term data is available for Plaridel's average palay production
levels, in 2008 they were just under 90 cavans per hectare (Municipal Government
Official Interview 3), which although higher than Bulacan’s average often fluctuates
dramatically due to erratic weather events (Provincial Planning and Development Office,
2010, p. 33).

The second main obstacle standing in the way of Plaridel, and Bulacan, meeting the palay
production needs of their rapidly growing population is the “irrational and indiscriminate
conversion of agricultural land to other uses” (Provincial Planning and Development
Office, 2010, p. 25). One of the main reasons for Bulacan's and Plaridel's high rates of
agricultural land conversion is its proximity to Manila, located just 41 kilometers away
(Benzidane, Blond & Mazur, 2008, p. 26). This has resulted in large inflows of migrants
from Manila, who are either turning Plaridel's agricultural lands into 'bedroom
communities' for wealthy professionals or informal settlements for poor migrants
(Provincial Planning and Development Office, 2010, p. 25). The dramatic increase of
'built up' areas across Bulacan, resulting from these two types of migrants along with the
'natural' population growth of the province, is depicted in Figures 3.3 and 3.4 below.

Figures 3.3 and 3.4: 'Built-up Areas’ in Bulacan province, 1997 & 2007

Source: Provincial Government Official Interview 1

45
When these main built up areas (yellow) are transposed onto the existing land use map of
Bulacan, Figure 3.5, it can be seen how they are sitting on Bulacan's prime agricultural
land (lightest green: 'Agricultural Areas') which surrounds Plaridel.

Figure 3.5: Existing land use map of Bulacan

Source: Bulacan Province, 1997

When looking at population growth rates of Plaridel's barangays chosen for this study,
(see Table 3.2), it can be seen that Bagong-Silang, Bulihan, Culianin, Lalangan and
Parulan are all considered to be ‘fast-growing’ barangays (Municipal Planning and
Development Coordinator, 2008) with Bagong-Silang, and Lalangan experiencing “a
phenomenal increase in population density” over the past decade (Municipality of
Plaridel, 1998, p. 38). As well, even the ‘slow-growing’ municipalities, Lagundi and
Sipat, are experiencing rapid growth relative to past trends. Sipat for example is expected
to double its 2007 population by 2017 (Municipal Planning and Development
Coordinator, 2008). All of this puts at risk the prime agricultural lands on which they are
located.

46
Table 3.2: Population density, change, estimated doubling time and growth category by
barangay

2007 Change Double


BARANGAY Density 2000* Time Category
Agnaya 44.37 11.81 2025 fast-growing/high density
Bagong-Silang 12.97 5.64 2019 fast-growing/low density
Banga I 59.36 15.97 2025 fast-growing/high density
Banga II 61.73 13.63 2030 slow-growing/high density
Bintog 17.48 1.8 2079 slow-growing/low density
Bulihan 11. 51 2.79 2026 fast-growing/low density
Culianin 16.24 4.73 2021 fast-growing/low density
Dampol 43.17 10.69 2024 fast-growing/high density
Lagundi 14.94 2.97 2050 slow-growing/low density
Lalangan 9.2 2.17 2028 fast-growing/low density
Lumang bayan 25.72 0.67 2089 slow-growing/high density
Parulan 17.98 3.65 2024 fast-growing/low density
Poblacion 86.52 12.48 2043 slow-growing/high density
Rueda 26.37 6.54 2026 fast-growing/high density
San Jose 11.39 3.3 2022 fast-growing/low density
Sana Ines 6.35 1.9 2022 fast-growing/low density
Santo Nino 130.81 17.08 2038 slow-growing/high density
Sipat 14.51 2.24 2017 slow-growing/low density
Tabang 54.71 7.81 2025 fast-growing/high density
TOTAL 23.71 4.78 2028
Source: Municipal Planning and Development Coordinator, 2008
*Percent population change by barangay from 2000 to 2007

These trends are expected to continue in the future as population growth is expected to
continue in Manila (Provincial Planning and Development Office, 2010, p. 26).
Furthermore, national policies recently implemented to protect prime agricultural land
across the country, have proven unenforceable with land conversion continuing to occur
unabated (Municipality of Plaridel, 2007, p. 52). Many farmers in Plaridel anticipate that
land conversion will continue, as a result of the upcoming Plaridel Bypass Road
construction project, which aims to facilitate traffic flow to and from Metro Manila
(Provincial Planning and Development Office, 2010, p. 26), which will encourage people
to move to Plaridel and thus make it more profitable for farmers to sell their land (Farmer
Interview 1).

47
Therefore, as rice self-sufficiency in Plaridel and Bulacan is expected to become
increasingly difficult to achieve, proper management of the remaining irrigated palay
land will be of critical importance. Each remaining hectare will also have to become
more productive than before. It is for this first main reason that IMT is being
implemented in Plaridel.

48
Financial Viability of NIA

The second main reason NIA provides for supporting IMT in Plaridel is that it will aid
NIA in becoming financially viable at the regional and national levels.

Plaridel’s ISF collection rates have historically been relatively low, ranging between 60-
70 percent (Farmer Group Interview 2, 5-8; NIA Interview 1, 4, 6 and 10). In addition,
NIA staff indicated that ISF collection rates in the municipality have been on the decline
in the past several years (NIA Interview 4). These low collection rates make it almost
impossible for NIA's regional office to undertake the O&M responsibilities assigned to
them. Therefore, as the IMT process will delegate the roles and responsibilities for
irrigation system O&M to Plaridel's IAs, the related financial burden imposed by the IAs
low collection rates will be eliminated and make NIA significantly more financially
viable (NIA Interview 4).

In addition, as collection rates typically increase post-IMT (International Water


Management Institute, 2007, p. 23), NIA believes that the IAs will then have sufficient
funds to undertake the delegated O&M roles and responsibilities (NIA “Review of
Irrigation Management Transfer Program”, n.d.).

In summary, NIA is implementing IMT in Plaridel to help achieve rice self-sufficiency


and for NIA to become financially viable, at the regional and national levels. The next
section will discuss when and how IMT will be implemented in Plaridel.

49
The Implementation of IMT in Plaridel

This section outlines how and when IMT will be implemented in Plaridel. However,
before this is done it is important to provide an understanding of how IMT is being
implemented in the Philippines.

In the Philippines there are four stages of IMT for NISs. In order for an NIS to complete
IMT each stage must be completed. Each stage requires that the IAs take on
progressively larger roles and responsibilities and the terms are agreed to in legally
binding contracts prior to the commencement of each new stage (NIA “Review of
Irrigation Management Transfer Program”, n.d.). The first of these four stages of IMT
delegates only a portion of the roles and responsibilities of O&M to the IA, which among
others include: canal maintenance, discharge monitoring and the preparing a list of areas
to be irrigated and planted. These areas are represented in Figure 3.6.

Figure 3.6: Roles and responsibilities of both the IA and NIA pictorially represented for
Stage I of the IMT contract

Source: NIA “Review of Irrigation Management Transfer Program”, n.d.

The second of the four stages of IMT devolves the responsibility for management of the
irrigation system’s lateral and sub-lateral canals (see Figure 3.7) from NIA to the IAs as
well as the collection of all ISFs from its members. The IA is then compensated for

50
taking on these new roles and responsibilities by gaining a portion of the ISFs they
collect (both current and back accounts), the proportion they gain is based on how much
they collect, which can be negotiated with NIA before the contract is signed (NIA
“Review of Irrigation Management Transfer Program”, n.d.).

Figure 3.7: Roles and responsibilities of both the IA and NIA pictorially represented for
Stage II of the IMT contract

Source: NIA “Review of Irrigation Management Transfer Program”, n.d.

The third and fourth stages of IMT delegate the management of the entire irrigation
system to the IA. The only difference between these stages is that in the third stage NIA
does not yet transfer the dam and a portion of the main canal to the IA (see Figure 3.8)
(NIA “Review of Irrigation Management Transfer Program”, n.d.). The decision to
terminate IMT at stage three versus stage four depends wholly on the size and the
capacity of the IA (NIA “Review of Irrigation Management Transfer Program”, n.d.). For
both, however, the IA becomes wholly responsible for the financial management of the
irrigation system. NIA also allows them to control all of the ISF fees they collect and
amortize any investment and rehabilitation costs to the facilities turned over to them
through NIA (for a period not exceeding 50 years) (NIA “Institutional Development”,

51
n.d.).

Figure 3.8: Roles and responsibilities of both the IA and NIA pictorially represented for
Stage III of the IMT contract

Source: NIA “Review of Irrigation Management Transfer Program”, n.d.

Now that an outline of IMT implementation in the Philippines has been provided, how
and when IMT will be implemented in Plaridel will be addressed.

AMRIS, which is the irrigation system that encompasses Plaridel, signed the
Memorandum of Agreement for Operation and Maintenance, in December 2003 (NIA,
2008). This specified that all NISs in the AMRIS system were to enter into Stage I of the
IMT program beginning in 2004. As of 2010, Plaridel had yet to enter into the first stage
of the IMT process due to NIA’s financial shortfalls, which caused them to fall behind
their IMT implementation schedule for the AMRIS system (NIA Interview 6).
Consequently, to expedite the IMT process in Plaridel, IAs are preparing to sign a
contract with NIA that combines the roles and responsibilities for both stage I and stage
II of IMT (hereafter referred to as the 'Combined Stage I & II' contract), (Farmer
Interview 1). This contract is set to finish near the end of 2012, when the final stage of
the IMT contract will be implemented (NIA Interview 4 and 6). Thus, NIA has planned

52
for Plaridel's IAs to take over full responsibility of their irrigation system by 2012.

As stated in the second chapter, there are very few studies that appraise the impacts of
NIA’s rapid turnover of responsibility of irrigation systems to IAs, on the long-term
ability of the Philippines to become rice self-sufficient and/or financially viable. Those
few that have been conducted, especially by independent observers, have shown that it
has had devastating consequences on the agricultural sector’s ability to achieve rice self-
sufficiency and financial viability, as well as on the livelihoods of the affected farmers. It
is therefore of the utmost importance to gain further insight into why IMT in the
Philippines has not been able to provide the analytical results that NIA, and the rest of the
Philippines, so desperately wants and needs. This is especially important, as due to the
financial situation of NIA, IMT remains the most promising means for rice self-
sufficiency in the country. Some insight can be gained from looking at the
implementation of IMT in the case study of Plaridel, which is one of the last NISs to
implement IMT in the Philippines.

Therefore the next three chapters will evaluate if the 'best practices' for the
implementation of IMT are currently being adhered to in the case of Plaridel’s
experience.

53
Chapter Four: Measuring Plaridel’s Success: Management

This chapter will analyze whether the management-related 'best practices' for the
implementation of IMT are currently being followed in Plaridel. These being, firstly, that
the roles, responsibilities and authority needed to successfully implement IMT, with
respect to both the IA(s) and the Irrigation Agency, must be clearly defined in a legally
binding contract. Secondly, that IA(s) must be ‘strong’ enough to mobilize farmer
members to undertake the roles and responsibilities that will be delegated to them under
IMT. Lastly, that the Irrigation Agency staff is 'streamlined' in a manner that ensures a
sufficient number of the irrigation agency staff remains in order to properly implement
IMT and does not create incentives within the remaining irrigation agency staff to 'block'
the IMT process from successfully completing.

54
Best Practice #1: The Roles, Responsibilities, Power and Authority, of Both the
Irrigation Associations and the Irrigation Agency, Needed to Successfully
Implement IMT Must Be Clearly Defined in a Legally Binding Contract

If the roles, responsibilities and authority necessary to successfully implement IMT, with
respect to both the IA(s) and the Irrigation Agency, have not been clearly defined in a
legally binding contract, successful IMT implementation is not possible. This view has
been validated and reiterated by leading experts in the field through analyses of IMT
outcomes in the Philippines and around the world (e.g., Attia, n.d.; Douglas; International
Water Management Institute, 2007; Vermillion, 1997; Vermillion & Sagardoy, 1999;
Wijayaratna, 2004).

Vermillion and Sagardoy state that for IAs to be effective post-IMT they must at least
have the following, globally established, powers delegated to them under IMT (1999, p.
47)
• to extract water from the specified source;
• to use and maintain (and perhaps own) the irrigation and drainage infrastructure;
• rights of way for existing and future infrastructure;
• to raise funds or call out labour from its members to pay for the irrigation service;
• to apply sanctions against its members for non-compliance with rules;
• to delegate powers (such as to a water service provider);
• to hire and release staff;
• to enter into contracts;
• to purchase, own and sell property.

However, these powers are only the minimum required. In the case of Plaridel, in order
for NIA to successfully complete IMT, the IAs must take on all of the roles and
responsibilities that NIA will no longer undertake post-IMT, in addition to these
minimum requirements. This is because it will enable both the irrigation system and the
IA to continue to function as successfully as they did before IMT. Therefore, to ensure
that the IA will take on all of these necessary roles and responsibilities, it must first be

55
ensured that NIA can force the IA to assume those roles if necessary. Thus, the only way
that this can be ensured is by clearly defining the new roles and responsibilities of both
parties in a binding contract that is legally enforceable.

Secondly, if the new roles and responsibilities are delegated to the IAs without sufficient
authority to successfully undertake them, the IA will be incapable of completing them
(Uphoff, Ramamurthy & Steiner, 1991, p. 42). Therefore, for the IA to ensure that they
will be delegated the necessary authority to fulfill their new roles and responsibilities,
their authority must be clearly defined in a legally binding contract. This will ensure that
they can oblige NIA to abide by the specified terms of the delegated authority.

Although the delegation of this requisite authoritative capacity is repeatedly cited as


being essential to the successful implementation of IMT, there are innumerable cases
where this standard is not being met, within the Philippines and worldwide (Food and
Agriculture Organization, 2003; Panella, 2004; Raby, 1997; Uphoff, Ramamurthy &
Steiner, 1991; Vermillion, n.d.). Outcomes commonly resulting from this oversight
include the constriction of IAs decision making options, the limitation of their
enforcement powers, and an overall undermining of their publically held status and
legitimacy (Uphoff, Ramamurthy & Steiner, 1991, p. 47).

To establish whether the current program for IMT implementation in Plaridel


successfully meets this requirement, one must first determine whether or not the roles and
responsibilities that NIA will relegate post-IMT are explicitly delegated to the IA in a
legally binding contract.

AMRIS, which is the irrigation system that encompasses Plaridel, signed the
Memorandum of Agreement for Operation and Maintenance, in December, 2003 (NIA,
2008). This specified that all NISs in the AMRIS system were to enter into stage I of the
IMT program beginning in 2004. As of 2010, Plaridel had yet to enter into the first stage
of the IMT process due to NIA’s current financial shortfalls (discussed further in section
2.3), which resulted in NIA falling behind their IMT implementation schedule for the

56
AMRIS system (NIA Interview 6). Consequently, to expedite the IMT process in
Plaridel, IAs are preparing to sign a contract with NIA that combines the roles and
responsibilities for both stage I and stage II of IMT (Farmer Interview 1), which from this
point on will be called the 'Combined Stage I & II' contract.

In their 'Combined Stage I & II' contract the IAs in Plaridel will be responsible for both
the lateral and sub-lateral canals (illustrated in Figure 4.1) of their respective irrigation
systems (NIA “IMT Contract”, n.d.). NIA will only be responsible for (NIA “IMT
Contract”, n.d.):
1. The main canal and headworks of the irrigation system.
2. Ensuring that there is an appropriate flow of water to the lateral canals.
3. Ensuring that the IAs are adequately trained to implement their new roles and
responsibilities.
4. Assist and supervise the IAs in undertaking their new roles and responsibilities.
5. Monitor and evaluate the IAs progress and success rates.
Figure 4.1: Pictorial description of Plaridel's, to be, areas of responsibility under their
'Combined Stage I & II' contract with NIA.

Source: NIA “Review of Irrigation Management Transfer Program”, n.d.


Therefore, all other roles and responsibilities necessary to maintain the same level of

57
functionality, of both the irrigation system and the IA, must be delegated to the IAs.

These are:
1. The management of the IA.
2. All O&M that affects the lateral and sub-lateral canals of the system.
3. The financial management of the IA.

With respect to the management of the IA, this combined stage I and II contract will
delegate to the IA the following main responsibility: Plan, implement and supervise all
activities related to the management of the IA’s newly defined area (NIA “IMT
Contract”, n.d.). Specifically, this includes:

• Creating policies and procedures for implementing the responsibilities stated in


the contract through rightful and equal distribution of tasks amongst IA members.
• Creating and submitting reports to NIA regarding the condition of the land
including reports concerning farming activities, irrigation and the total benefited
area records.
• Creating and implementing rules and regulations for irrigation management
including enforcing penalties and fines for all violators.
• Managing the resolution of disputes among members.

With respect to all O&M concerns that affect the IA's newly defined area, the combined
stage I and II contract delegates to the IAs the following main responsibility: Plan,
implement and supervise all activities related to the operations and maintenance for the
IA's newly defined area (NIA “IMT Contract”, n.d.). Specifically this includes:

• Preparing yearly operations and maintenance plans for all infrastructure covered
by the IA and implementing the tasks outlined within.
• Prepare irrigation management plans and cropping calendars for the area covered
by the IA (with the assistance of NIA).
• Arrange the master list of all those who use irrigation water in the IA.
• Creating and implementing rules and regulations for the O&M of the irrigation

58
system including enforcing penalties and fines for all violators.
• Undertaking all minor construction and repairs of the infrastructure administered
by the IA.
• Communicating and cooperating with NIA in all major repairs of the
infrastructure administered by the IA. (ex. NIA provides the heavy equipment and
materials, the IA provides the fuel and labor).
• Measuring, monitoring and recording water flows in the lateral and sub-lateral
canals.
• Monitoring and distributing water equally to all the sub-lateral canals at turnouts
and upholding at all times the farmer’s right to water access.

With respect to financial management of the IA, the combined stage I and II contract will
delegate to the IAs the following main responsibility: Plan, implement and supervise all
activities related to the financing of the operations and maintenance for the IA's newly
defined area (NIA “IMT Contract”, n.d.). Specifically this includes:

• Creating, implementing and monitoring a regular financial plan and budget based
on the operations and management plan which prioritizes the IA’s responsibility
in operations and maintenance.
• Accepting the calculated ISF bills from NIA, preparing a computation of each
farmer's individual ISF bill, distributing ISF bills to each farmer member and
collecting the ISFs from them.
• Submitting all collected ISFs and collection reports regularly to NIA.
• Monitoring the amount of ISFs collected from each member.
• Informing all farmer members of their collection status and campaigning to
farmers to pay their current and back ISF fees.
• Creating and implementing all necessary rules regarding good financial
management of the irrigation system and enforcing penalties to all those who
violate the rules.
• Allocating a Repair and Maintenance fund from the yearly income of the
organization to fund all minor repair works and to help NIA in paying for major

59
repairs.

NIA has herein created a contract delegating all of the roles and responsibilities that they
will relinquish to the IAs post-IMT implementation. If Plaridel signs the contract, this
portion of the requirement will have been met. However, to determine whether the
current program for IMT implementation in Plaridel successfully meets the entire
requirement, it must also be determined that the authority necessary to implement these
new roles and responsibilities has been delegated to the IAs from NIA in the legally
binding contract.

NIA has successfully delegated to the IAs of Plaridel the authority to: create their own
plans; implement their own plans; monitor their own plans and enforce their own plans,
with respect to all three of the necessary roles and responsibilities that NIA has delegated
to them; the management of the IA, all O&M concerns that effect the IAs newly defined
area, and the financial management of the IA. However, there are three areas where the
necessary authority to implement the IAs new roles and responsibilities have not been
delegated to the IAs in a legally binding contract. Although all three lie outside of the
roles and responsibilities delegated to the IAs they still, however, inhibit the IAs capacity
to undertake the roles and responsibilities delegated to them.

The first instance where the necessary authority to implement the IAs new roles and
responsibilities has not been contractually delegated is with respect to the responsibility
of the IAs to: enforce penalties on those who violate the rules created and implemented
by the IA. This is problematic due to the absence of an effective penalty enforcement
mechanism. Although the IA can attempt to enforce financial and social penalties on rule
violating farmers, the only penalty that a farmer in violation of the rules of the IA can be
obliged to respond to, is the suspension of their water rights (NIA Interview 2). However,
as Plaridel is a part of a gravity irrigation system, it is effectively impossible for the IA to
cut service to any one farmer as all water is controlled at the headworks, which is the
responsibility of NIA to control. As a single turn-out gate is all that separates a farmer
from water access, all he or she has to do to obtain it is to open the gate when no one is

60
there, usually at night. One NIA fieldworker stationed in Plaridel spoke of his frustration
in trying to get the IA's to pay their ISFs. He said that it’s almost impossible for him to
enforce the rules, as the farmers know that "they will still be able to receive the water
anyway" (NIA Interview 2).

Similarly, one of the rights and responsibilities delegated to the IAs under the O&M
section of the contract is to uphold the farmer’s right to have access to water (NIA “IMT
Contract”, n.d.). Again, the IAs of Plaridel cannot control the flow of water for the
reasons stated above. Therefore, in truth the IAs have not been delegated the necessary
authority to enforce this role delegated to them in the legally binding contract.

The third and last instance where the necessary authority to implement the IAs new roles
and responsibilities have not been delegated in a legally binding contract is with respect
to the fact that NIA "retains ownership of the irrigation facilities" it ‘turns over’ under
IMT (Ofrecio, 2006, p. 3). This restricts the authority of the IA's in their ability to plan,
with respect to both O&M management and financial management. In addition, IAs have
been deemed to be the most effective in implementing IMT when they have the legal
powers to purchase, own and sell property (FAO & INPIM, 2001; Sander, 1979;
Vermillion & Sagardoy, 1999). For example, if the IA had ownership of the irrigation
facility they would be able to leverage those as collateral to obtain loans from financial
institutions.

Therefore, it has been determined that although a significant majority of the necessary
authority needed for the IAs to implement the roles and responsibilities delegated to them
by NIA have been included in their legally binding contract not all have. Therefore, only
the necessary roles and responsibilities, and not the authority, necessary to successfully
implement IMT with respect to both the IA(s) and the Irrigation Agency, have been
clearly defined in a legally binding contract. Therefore the first accepted 'best practice' to
be evaluated in Plaridel, with respect to IMT implementation, has not been met.

It has also been cited in the literature that, although not essential to the successful

61
implementation of IMT, the chances of IMT implementation being successful are
improved by the inclusion of a negotiation between the water users and the government,
where the new division of responsibilities and authority for irrigation system
management is decided in a participatory manner (FAO & INPIM, 2001; Raby, 1997;
Turral, 1995). This additional 'step' has been shown to result in "considerable opportunity
for improving farmer participation and accountability" (Turral, 1995) in the IMT
implementation process, which has resulted in: a reduction in the number of unilateral
changes in the IMT contract imposed upon the IAs by the government agency later in the
implementation stages and improved compliance by IAs to the IMT contract (Raby,
1997).

Can it be said that Plaridel meets this additional requirement? This research suggests that
Plaridel does not meet this precondition because, even as the IAs of Plaridel are
participating in a negotiation with NIA for IMT, they do not adequately address the
division of responsibilities and authority for irrigation system management in the
contract. Rather, the focus centers on what NIA must complete before the IA will agree
to sign the contract.

Currently, all of the IAs in Plaridel are refusing to sign the 'Combined Stage I & II'
contract until NIA: rehabilitates all broken infrastructure (including: gates, farm roads,
and concrete lining) in all lateral and sub-lateral canals of their respective systems (NIA
Interview 2); relocates all squatters from the lateral and sub-lateral canals (NIA Interview
2), primarily to prevent the squatters’ from contaminating the canals with household
waste; and reassesses how the percentage of ISFs collected will be allocated between the
IAs and NIA in the ‘incentive scheme’ (NIA Interview 2), as financial projections
forwarded by the IAs indicate that this current scheme does not apportion sufficient funds
to run the allocated area of the irrigation system (Farmer Interview 1).

Therefore, as none of what is being negotiated addresses the actual division of


responsibilities and authorities for irrigation system management under IMT, the
contractual terms cannot be viewed as meeting this requirement. Furthermore, it should

62
be understood that the only reason NIA is negotiating with the IAs in these matters is
because it is the only way the IAs will agree to sign the IMT contract, and not because
NIA wants to take part in a participatory process (Farmer Interview 1; NIA Interview 2).

This research further suggests that farmers’ lack of policy awareness is another reason
IMT in Plaridel does not meet this requirement. At least one, and sometimes up to half, of
the farmers interviewed from each of Plaridel’s IAs were unaware that IMT was going to
be implemented in their IA and of those farmers that were aware, many could not speak
to what IMT would entail as they “had not been well informed of the [IMT] process”
(Farmer Group Interview 2-8). Therefore, if not all farmers understand that IMT will be
taking place in their IA, or if they do not know what it will entail, they will be unable to
competently engage in negotiations with NIA over the new division of responsibilities
and authority for irrigation system management. Therefore, again, it is seen that the NIA
has failed to meet the requirement.

63
Best Practice #2: IAs Must be ‘Strong’ Enough to Mobilize Farmer Members to
Undertake the Roles and Responsibilities That Will be Delegated to Them Under
IMT

It has been shown by numerous leading experts in irrigation management that in order for
an IA to be successful in implementing IMT, it must be ‘strong’ enough to mobilize its
farmers members to undertake the roles and responsibilities that have been delegated to
them, under IMT (Araral, 2006; FAO & INPIM, 2001; International Water Management
Institute, 2007; Korten & Siy, 1989; Panella, 2004; Raby, n.d.; Sampath & Young, 1990;
Sangupta, 1991; Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005; Thompson, 1995;
Uphoff, 1986; Vermillion, 1997; Vermillion & Sagardoy, 1999; Wijayaratna, 2004)

“Strength” here refers to this institutional and organization capacity of IA to undertake its
roles and responsibilities. Notably, in 2002, it was found that one of the "most common
issues and constraints effecting the management of irrigation systems world-wide" was
the "lack of institutional capacity or initiative to organize farmers into viable groups"
(Wijayaratna, 2004, p. 9). How then can a formal determination of IA 'strength' be made?
Some studies have measured IA strength in terms of a lack of "social divisions" within
the IA (Vermillion & Sagardoy, 1999, p. 17), some according to the "existence of a
culture of cooperation amongst the farmers" (Sangupta, 1991, p. 253), and others through
the "farmers' capacity to make group decisions" (Wijayaratna, 2004, p. 108).
Irrespective of the specific measure used in each study they were all attempting to
measure strength according to the same basic consideration: what are the levels of trust
and cooperation between farmer members in an IA. Therefore, to determine the degree to
which Plaridel's IAs meet this requirement it must first be determined whether: sufficient
cooperation exists between the farmer members of each IA and, secondly, if farmer
members trust their fellow members enough to manage the IA on their behalf.

It had long been thought that the Philippines was an ideal country for PIM and IMT as
there already existed a high level of social capital (Bankoff, 2007, p. 327). Specifically,
these conceptions stem from the existence of a 'bayanihan spirit', where group members

64
or neighbors "give their help freely" to each other (Raby, n.d., p. 12), and 'pakikisama'
which emphasizes the importance of "maintaining smooth interpersonal relationships"
that "connote consideration, fairness and camaraderie" (Raby, 1997). However, it has also
been found that these three traits do not exist uniformly across the country (World Bank,
2005, p. 27). It has been shown that, generally, the CISs have fared far better than NISs in
implementing PIM and IMT in the Philippines mostly because they have "greater social
cohesiveness" (Sampath & Young, 1990).

Therefore, it must first be determined if sufficient cooperation exists, between the farmer
members of each of Plaridel's IAs, to undertake the roles and responsibilities that have
been delegated to them, under IMT. Table 4.1 shows the range of responses received
from representatives and general members of each IA. Each response was categorized
into four categories: all, many, some, or none. This means, for example, if an IA is
categorized as 'all', then the farmer representatives and general members interviewed
from this IA believed that all of the members of their IA cooperate and will continue to
cooperate under IMT. In all instances where general members were interviewed their
opinions were inline with those articulated by their representatives.

Table 4.1: Levels of cooperation within Plaridel's IAs, as stated by IA representatives and
general members

Barangay IA Level of Cooperation


Bagong-Silang Plagui All
Bulihan BSJB All-Many
Lagundi Lagum All-Many
Culianin BPB Many-Some
Lalangan Plaridel-Malolos Many-Some
Parulan Parulan-Halang Many-Some
Sipat Lucidar Many-Some
Source: Farmer Group Interview 2-8

From Table 4.1, it can be seen that some IAs made self-assessments inline with this
portion of the requirement more often than others. One IA believed that “all” IA
members cooperate with each other, two believed that “all” to “many” cooperate, and
four believe that only “many” to “some” cooperate. NIA staff had very similar responses
with respect to each IA when asked the same question (NIA Interview 7 and 10).

65
Farmers from two of these IAs, Bagong-Silang and Parulan, spoke of how the level of
cooperation that exists within their IAs affects their ability to mobilize farmers to
undertake the IAs responsibilities. The farmers of Bagong-Silang, for example, stated that
they have no problem mobilizing farmer members to clean the canals when necessary as
they still have the “bayanihan spirit” (Farmer Group Interview 8). In contrast, although
'some' to 'many' of the farmers of Parulan are willing to cooperate with one another, the
farmers who are not willing to cooperate greatly affect the IA’s ability to undertake its
responsibilities. For example, they are currently having trouble maintaining water flow in
many of their lateral and sub-lateral canals as not all members are willing to clean the
canal for free and NIA does not have enough money to adequately pay them to do the
work (Farmer Group Interview 5).

Therefore, it can be said that currently, there exists a sufficient level of cooperation
between farmer members only in some of Plaridel's IAs to undertake the roles and
responsibilities that will be delegated to them under IMT.

Secondly, it must be determined if there exists sufficient trust between farmers within
each IA, such that members will agree to impart the authority to manage the IA to an
elected minority and thereby fulfill the roles and responsibilities delegated to them under
IMT. Table 4.2 shows the range of responses received from representatives and general
members of each IA. Each response was again categorized into the same four options: all,
many, some, or none. For example, choosing the 'some' category meant that the farmer
representatives and general members interviewed believed that only some of their IA
farmer members trust the other members sufficiently to allow them to manage the IA on
their behalf. In all instances where general members were interviewed, their opinions
were in line with those articulated by their representatives.

66
Table 4.2: Levels of trust that exists within Plaridel's IAs, as stated by IA representatives
and general members

Barangay IA Trust
Bagong-Silang Plagui Many-Some
Bulihan BSJB Many-Some
Culianin BPB Many-Some
Parulan Parulan-Halang Many-Some
Sipat Lucidar Many-Some
Lalangan Plaridel-Malolos Some
Lagundi Lagum Some-None
Source: Farmer Group Interview 1-8.

Therefore, it can be seen that five of the seven IAs trust ‘some’ to ‘most’ of their fellow
farmer members enough to impart the authority to manage the IA to an elected minority,
one trusts only ‘some’, and one IA trusts ‘none’ to ‘some’. Some of the IA
representatives and general members interviewed spoke of how this general lack of trust
might affect their ability to mobilize farmers to undertake the role and responsibilities
delegated to them under IMT. One IA representative stated that it might result in low ISF
collections, as the farmers do not trust the IA member who collects ISF to safely deliver
it to NIA (Farmer Group Interview 4). Similar concerns were cited in many of the other
IAs (Farmer Group Interview 5, 6, 10). Similarly, a farmer member voiced concern that
this might result in the IA having difficulties mobilizing members for meetings and
completing the tasks assigned to the IA under IMT, as they do not trust their fellow
farmers to make decisions in the collective’s best interest (Farmer Group Interview 5).
IAs across the Philippines that have similar trust issues within their IAs have commonly
experienced post-IMT problems such as low collection efficiencies and irrigated areas
(Merrey, 1997, p. 79).

Therefore, it can be said that if the current levels of trust within Plaridel's IAs persists,
they will have significant difficulty mobilizing farmer members to undertake the roles
and responsibilities that have been delegated to them, under IMT.

In addition to the above best practice, it has been shown that the likelihood of an IA being
‘strong’ enough to mobilize their members to undertake the roles and responsibilities that

67
have been delegated to them under IMT, improves significantly if there exists a high
sense of ownership over the irrigation system by all farmer members (Asian
Development Bank, 2008; Groenfeldt, 1997; Gupta & Srivastava, 1999; NIA, “Irrigation
Management Transfer”, n.d.; Korten & Siy, 1989; Panella, 2004; Raby, 1997; Sampath &
Young, 1990; Thompson, 1995). A higher sense of ownership over the irrigation system
by all farmer members usually results in a higher sense of responsibility for its proper
functioning and general success, thus necessitating a higher level of cooperation and trust
within the IA (Bagadion, 1989, p. 7). Indeed, the success of the communal systems in the
Philippines was partially attributed to the fact that there existed a sense of ownership over
the irrigation systems by the IAs (Bagadion, 1989, p. 7). As well, those IAs within
Filipino NISs who have been found to lack such a sense of ownership experienced poor
IMT results (Gupta & Srivastava, 1999; Panella, 2004; Raby, 1997)

Therefore, it must be determined whether Plaridel’s IAs have a high sense of ownership
over their respective irrigation systems. In interviewing representatives and general
members of Plaridel's IAs and various NIA staff members working in Plaridel, it is
evidenced that Plaridel's IAs have a very low sense of ownership over their respective
irrigation systems (Farmer Group Interview 2, 4, 5; NIA Interview 4, 6). This is due to
the fact that NIA has been in charge of irrigation management for all of Plaridel’s
irrigation systems since the creation of the IAs. Therefore, the farmers believe that it
should remain NIAs responsibility to maintain the irrigation systems and not their own
(Farmer Group Interview 2, 4, 5; NIA Interview 4, 6). In addition, the farmers either do
not believe that IMT will happen, or, if they do, that NIA will remain indefinitely to help
them if they fail. This is largely attributable to the fact that NIA has threatened IMT in
the past, but has never actually implemented it until now (Farmer Group Interview 5, 8
and NIA Interview 4, 6, 8, 10).

Therefore, it can be argued that there exists a relatively low sense of ownership among
Plaridel's IAs. This insight points to the diminished capacity of the IAs to mobilize their
members to undertake the roles and responsibilities that have been delegated to them
under IMT.

68
This dysfunctional dynamic is not uncommon across NIS systems both in the Philippines,
and worldwide (Asian Development Bank, 2008; International Water Management
Institute, 2007; Raby, 1997, N.; Wijayaratna, 2004). In the Philippines there are
numerous cases where "dependency relationships...have arisen between some
associations and NIA organizers, and, more generally, between IAs and NIA" (Raby,
n.d., p. 115). This dependency has resulted in those IAs having difficulty, or being less
willing, to take on the roles and responsibilities delegated to them under IMT (Asian
Development Bank, 2008; International Water Management Institute, 2007; Raby, n.d.;
Wijayaratna, 2004). This has been especially true of IAs that live in "upstream portions
of the water system" (Lauraya, Sala & Wijayaratna, 1996, p. 18), as Plaridel does, as
those systems are usually better maintained by the irrigation agency than the downstream
portions (Lauraya, Sala & Wijayaratna, 1996, p. 18).

Therefore, as it has been determined that there exists a low sense of ownership and that
generally there is an insufficient amount of cooperation and trust between farmer
members of Plaridel’s IA. It can be concluded that when strong member cohesion is
absent, the IA will not be ‘strong’ enough to mobilize their farmer members to undertake
the roles and responsibilities that have been delegated to them under IMT. Therefore, it
can be said that this best practice of IMT implementation is currently not happening in
Plaridel, Bulacan.

69
Best Practice #3: The Irrigation Agency Staff is 'Streamlined' in a Manner That:
a. Ensures a Sufficient Number of the Irrigation Agency Staff Remains in
Order to Properly Implement IMT.
b. Does not Incentivize the Remaining Irrigation Agency Staff to 'Block' the
IMT Process from Successfully Completing.
It has been observed that when a government or agency's resources are spread thinly, one
way for them to strengthen their financial base is to remove all redundancies and overlaps
from their system, thus improving the efficiency of its operations (NIA “A Primer on the
Program on Rationalizing and Improving Public Service Delivery”, n.d., p. 2).
Accordingly, in 1974 when NIA was transformed into a semi-autonomous public
corporation and suddenly found itself unable to maintain responsibility for its own
financial viability (Bagadion, 1989, p. 4), NIA decided to implement PIM and IMT. This
effort would enable NIA to train farmers to run their own irrigation systems, and thus
eliminate the corresponding paid positions. This allowed NIA to significantly reduce the
number of salaried staff, this process being called streamlining, which was the most
burdensome element of their annual budget at the time (Araral, 2006, p. 47).

Various studies have shown that there are two main problems associated with
streamlining under the IMT process. Firstly, that it may result in an insufficient number
of irrigation agency staff remaining to properly turn over the system to the IAs, and
secondly, that the irrigation agency incentivizes the remaining agency staff to 'block' the
IMT process from successfully completing so that they may maintain their employment
in one form or another (Araral, 2006; Gupta & Srivastava, 1999; International Water
Management Institute, 2007; NIA “Irrigation Management Transfer”, n.d.; Merrey, 1997;
Raby, 1997; Uphoff, Ramamurthy & Steiner, 1991; Wijayaratna, 2004). Therefore, in
order to determine whether implementation of IMT in Plaridel meets this 'best practice' it
must first be determined if a sufficient number NIA staff, both managerial and field level,
will remain in order to properly implement IMT.

This first requirement has been a common problem in implementing IMT, both

70
worldwide and in the Philippines. When irrigation agency staff is streamlined, there is not
only a loss of human resources to train the IAs, but also a great loss to the overall level of
experience and technical know-how, which is needed to adequately train the farmers
(Food and Agriculture Organization, 2003; International Water Management Institute,
2007; Raby, 1997; Svendsen, Trava & Johnson, 1997). In fact, in a current International
Water Management Institute (IWMI) study, selected results of which can be seen below
in Table 4.3, it was found that out of the 43 countries worldwide, 25 had inadequately
trained their IAs, 13 were found to have a weak capacity to train their IAs and 12 had IAs
that were, consequently, weak with respect to both their technical and management
capacities, which significantly lessens their viability post-IMT (IWMI). In the same study
it showed that Asia is having a much harder time properly training their farmers for IMT.
Out of the 21 countries studied it was shown that 18, or approximately 86 percent, had
inadequately trained their IAs, approximately half had a weak capacity to train their IAs
and again approximately half had IAs that were weak in respect to both their technical
and management capacities (IWMI). Therefore, there is much improvement to be made
across the globe, especially in Asian countries, with respect to the proper training of IAs
for IMT. IWMI suggests that for this to happen there needs to be substantial and long-
term improvement of existing methods of capacity development and training, which they
deem "too short and insufficient or non-existent" (IWMI).

Table 4.3: Selected problems implementing IMT, worldwide and in Asia

Problem in implementing IMT Worldwide (43) Asia (21)


Inadequate training of IA 25 18
Weak capacity to train IA 13 11
Weak tech. & management capacity of IA 12 10
Source: International Water Management Institute, 2007.

So where does Plaridel stand? Streamlining of both the managerial and field staff
working for Plaridel's IAs started in 2004 under the Rationalization Program funded by
the World Bank (NIA “A Primer on the Program on Rationalizing and Improving Public
Service Delivery”, n.d., p. 6). At the regional, or management, level the Bulacan office
has been reduced from approximately 175 to just under 60 employees since the
Rationalization Program was first implemented (Sangupta, 1991, p. 253). Some of the

71
effect of this program can be seen in Figure 4.2 below. These staff cuts are set to continue
throughout the ongoing process of merging Plaridel with the Aurora and Nueva-Ecije
offices to form the new region of BANE (Farmer Interview 1). This will result in the
employees of these offices being reduced in number from over 200 to 66 by 2013 (NIA
Interview 7).

Figure 4.2: Results of streamlining in NIA's Bulacan office

Photo credits: Jennifer Bedore

What does this means for the implementation of IMT in Plaridel? NIA's Institutional
Development Department (IDD), the main department charged with implementing IMT,
has been spread extremely thin as a result of streamlining (NIA Interview 4 and 6). Some
of the effects of the streamlining process on this department can be seen on the right hand
side of Figure 4.2 above. They are currently working with more NIA departments and
covering many more tasks than before streamlining, with fewer staff, thus lessening their
ability to train the farmers for IMT (NIA Interview 4). For example, currently, there are
only five Irrigator Development Officers (IDOs) for the whole of AMRIS. This means
that each IDO is in charge of preparing 25 to 30 IAs for IMT (NIA Interview 6). Under
ideal circumstances, there would be one IDO for every IA, which was the case in the
world-renowned, extremely successful, CIS PIM pilot projects implemented in the

72
Philippines in the 1970s (Bagadion, 1989, p. 9).

For each IA, the IDO is currently supposed to attend IA meetings on a regular basis,
assist them in preparing documents, making resolutions and other preparatory paper
work, communicate their needs to NIA and other necessary governmental agencies like
the National Food Authority, as well as implementing all of the necessary training for
IMT (which include training on leadership, water and system management, financial
management, value formation, livelihood, gendering development as well as two
introductory trainings on IMT) (NIA Interview 6). This is obviously an impossible list of
tasks for one IDO to complete with 25-30 IAs to hand over in a time frame of just two to
three years. It is of no surprise, therefore, that most of Plaridel’s farmers either do not
know who their IDO is, or have not seen him in years, some saying as far back as 2006
(Farmer Group Interview 2-8).

Therefore, how feasible is it to believe that all of the trainings and support necessary for
the implementation of IMT will be available to a sufficient enough degree in Plaridel
such that the IAs will be capable of running their own irrigation systems, up to the lateral
canals, with very limited assistance from NIA by 2012? NIA’s streamlined staff is not
able to make this feasible, especially considering that they are already over a year behind
and none of the trainings have been conducted in any of the IAs to date (Farmer Group
Interview 2-8).

NIA’s management staff is concerned about the situation in Plaridel, as well as


throughout AMRIS. One staff member overseeing the trainings stated that they will have
a problem implementing all of the trainings necessary for IMT, especially as they were
caught unaware by a memorandum issued by NIA's national office stating that they must
be finished implementing their 'Combined Stage I & II' contract by 2012, whether the IAs
are ready or not (NIA Interview 1 and 4). They are aware that continued training and
coordination with the IAs is essential to the IAs success post-IMT but they simply do not
have a sufficient amount of time or money, and consequently staff, to do so (NIA
Interview 1).

73
In the field, the situation is similar, as NIA's field staff continues to be drastically cut.
The NIA working stations in Plaridel, numbers 3 and 5, have had their staff reduced by
more than half in just the past five years. This has required the remaining employees to
do the same number of tasks and cover the same geographical area with half of the staff
(Farmer Group Interview 3-5, 7 and 8; NIA Interview 2). For example, one field-level
NIA employee, a Supervising Water Master Technician (SWMT), formerly worked with
two ditch-tenders and three ISF collectors. Presently, all but one of these positions has
been eliminated, and the SWMT and his remaining co-worker have been obliged to
assume all of the streamlined staffs' responsibilities (NIA Interview 2). The streamlining
program will continue until the IMT process is completed, thereafter there will be only
one NIA staff member in the field per working station. Further compounding this
overburdening of NIA staff, existing plans intend to merge many of these working
stations (Farmer Group Interview 6).

Although the field level staff is not directly involved with the IMT training, they are still
integral to the IAs successful acquisition of the skills needed to run their irrigation
systems post-IMT. The field level staff has a wealth of technical and practical knowledge
of the irrigation systems that the NIA managerial staff knows nothing about. The staff
members are the people the IAs depend on to learn the day-to-day skills they will need to
run the irrigation system properly. The few field staff still left in Plaridel are fully
occupied with completing their daily tasks in order to properly maintain the system.
Consequently, they have little to no time to answer the farmers’ questions, let alone to
teach them how to maintain the systems on their own (Farmer Group Interview 3; NIA
Interview 2). In fact, they currently have so little manpower that canal maintenance and
water distribution, and consequently production levels, have been on the decline since
streamlining began (Farmer Group Interview 3-5 and 8; NIA Interview 2, 7 and 10). NIA
management staff stated that this could be remedied once IMT had commenced by hiring
additional contract workers (NIA Interview 4). However, it seems doubtful that this will
remedy the problem as they already have a number of contract workers in Plaridel. As
well, it is uncertain if they will have the financial resources to retain the ones they have

74
hired. It much less likely that they will be able to hire more once IMT has been
implemented.

Therefore it has been determined that there is a high likelihood that there will be an
insufficient number NIA staff, both managerial and field level, remaining in order to
properly implement IMT.

The second requirement that must be met in order for Plaridel to be judged to be properly
implementing this best practice is that the irrigation agency does not 'incentivize' the
remaining agency staff to 'block' the IMT process from being successfully implemented.
This practice of 'blocking' has been a problem both in the Philippines and worldwide
(Araral, 2006; Gupta & Srivastava, 1999; International Water Management Institute,
2007; NIA “Irrigation Management Transfer”, n.d.; Raby, 1997; Svendsen, Trava &
Johnson, 1997; Wijayaratna, 2004; Wijayaratna &Vermillion, 1996).

By 'incentivize' it is meant that the incentives the irrigation agency is offering to all
streamlined staff to leave their current position are insufficient, or attractive enough, for
them to accept being streamlined. A major impediment to successful IMT
implementation across the Philippines has indeed been a lack of "attractive retirement
packages" (Merrey, 1997; Sangupta, 1991; Wijayaratna, 2004). This, in combination with
a lack of "easy to find alternative employment opportunities" (Sangupta, 1991, p. 255),
has resulted in many of the staff scheduled for streamlining actively attempting to subvert
or 'block' the IMT process (Araral, 2006; Raby, 1997; Wijayaratna, 2004; Wijayaratna &
Vermillion, 1996). By 'blocking' it is meant that the irrigation agency staff, who face the
possibility of being streamlined, intentionally withhold necessary skills and knowledge
from those IAs that have been selected for IMT, the aim being to maintain the IAs
dependency relationship with the NIA staff and thus necessitate the retention of their jobs
(Raby, 1997).

It must then be assessed, if it is defensible to posit that incentives for staff slated for
streamlining are too low; and thus inadequate to prevent ‘blocking’? How streamlining
currently works in AMRIS is that when it is determined that a full-time position is no

75
longer needed, the affected personnel must choose from the following two options within
two months of being notified (NIA “A Primer on the Program on Rationalizing and
Improving Public Service Delivery”, n.d., p. 8):

1. "Remain in government service" (however, this means that NIA reserves the right
to transfer said personnel to other "functions/offices/units, with no change in
salary and benefits".)
2. "Avail of retirement/separation benefits" which includes:
a. Skills development
b. Livelihood/entrepreneurial seminar
c. Credit and investment management training
d. Job facilitation and counseling programs
e. Financial compensation based on the number of years worked for NIA

It has been much more common for staff members to choose the second option, both
within AMRIS and nationwide (NIA Interview 1). This stems from the fact that the
average age of NIA employees is near to the average retirement age; for example the
average age of AMRIS field staff is 55 (NIA Interview 10).

Therefore, it must be determined if the streamlined staff feel that the


“retirement/separation” benefits that NIA is offering are sufficient for them to live off of
in their retirement, or at least to ‘retire’ and to risk finding another job outside of NIA.
This can be determined by, firstly, determining if NIA staff that have been, or will soon
be, streamlined are willing to retire and secondly, by determining if ‘blocking’ is taking
place in Plaridel.

Although only a few current or retired staff under the purview of streamlining were
willing or able to conduct interviews, from the acquired information, it can be reasoned
that those NIA personnel who were willing to accept 'incentives' did so only when they
had previously planned to retire along a similar timeline, or if they believed they could
easily find another job (NIA Interview 1 and 4). Nonetheless, the majority of current and

76
ex-employees held negative views of streamlining, expressing sentiments such as “we
think it is not a good idea” (Farmer Group Interview 4), “they made me sign to leave”,
(Farmer Group Interview 2), and “I need to have a job” (Farmer Group Interview 2).
Indeed, the managerial staff concede that “there are many NIA employees… [who] still
want to continue working in NIA after [streamlining] ” (NIA Interview 4). Therefore, it
can be said that there are at least a few, if not many, NIA personnel who have been
streamlined, or who are at risk of being streamlined, who would prefer to have kept, or
keep, their job with NIA.

Secondly, it must be determined whether there is ‘blocking’ occurring in Plaridel.


Although NIA staff members were unable to determine the exact number, it is said that
“many” of the staff that NIA streamlined in Plaridel now work for NIA as ‘causal
employees’ (NIA Interview 8; Farmer Group Interview 2). They have hired back these
streamlined employees on a contract basis in order to keep up with the maintenance of
the system, as the existing staff could not keep up with the workload, and the IAs had not
yet been trained to take over the streamlined staff’s responsibilities (NIA Interview 8). In
addition, if the IAs cannot keep up with the tasks turned over to them under IMT, NIA
will attempt to hire on streamlined staff as ‘casual employees’ (NIA Interview 8), or the
IAs might hire them on either on a permanent or part-time basis (NIA Interview 1 and 4).
However, the ability of NIA or the IAs to hire streamlined NIA staff depends on their
ability to pay them, which can be challenging. Firstly, NIA’s funds for the
Rationalization Plan from the World Bank, which they are currently using to hire contract
workers has already been exhausted (NIA Interview 4 and 8). Secondly, the ability of the
IAs to collect sufficient ISFs to pay for workers is questionable, which will be addressed
further in the fourth 'best practice' (NIA Interview 1, 4, 8; Farmer Group Interview 5).
However, in the streamlined, or potentially streamlined, NIA’s staff minds some chance
of being rehired is better than no chance at all.

Plaridel is by no means an isolated case with respect to ‘blocking’ IMT. In fact, it is


known that the “dominant incentive [of NIA employees is] to protect their job security
and await their retirement" (Araral, 2006, p. 158). As well, since 1997, there has been

77
“more non-tenured staff at NIA compared with tenured ones” and until 2005 "change
only occurred in the composition of staff tenure but not staff size" (Araral, 2006, p. 158).
An example of this for the year 2002 can be seen in Figure 4.3 below.

Figure 4.3: NIA's reliance on non-tenured staff by region as of 2002

Source: Araral, 2006, p. 159

Therefore, the current process of IMT in Plaridel has been shown to retain insufficient
numbers of irrigation agency staff, at the field and managerial levels, to properly
implement IMT. Furthermore, it has been shown that streamlined NIA staff members are
motivated to purposefully ‘block’ the transfer of their skills to Plaridel’s IAs with the
intent of ensuring that the IMT process is not properly implemented, thus, fulfilling the
aim of necessitating their continued employment in those skilled irrigation management
positions. It can therefore be said that the process of IMT in Plaridel is not adhering to
this ‘best practice’.

78
Chapter Five: Measuring Plaridel’s Success: Financial Viability

This chapter will first introduce 'the vicious cycle of irrigation management', how it
affects the long-term viability of IAs and how it relates to the remaining four 'best
practices'. The financial viability related 'best practices' for the implementation of IMT
will then be analyzed to determine whether they are currently being adhered to in
Plaridel. First, IAs must have the capacity to collect Irrigation Service Fees (ISF) from
their members on a sustained basis and to properly manage their financial resources.
Second, financial resources must be available to farmers and IAs who are unable to
profitably sustain the operation of their farm or irrigation system independent of the
Irrigation Agency.

79
The Vicious Cycle of Irrigation Management

In their doctoral theses, "Irrigation Reform in the Philippines: Irrigation Management


Transfer and the Vicious Cycle of Irrigation Management" (Panella, 2004) and
"Decentralization Puzzles: A Political Economy Analysis of Irrigation Reform in the
Philippines" (Araral, 2006), Panella and Araral describe the ‘vicious cycle of irrigation
management’ (represented in Figure 5.1). This cycle may start with the chronic
underinvestment in maintenance, by either the irrigation agency or association, due to
inadequate resources for O&M. Ultimately this results in the unabated deterioration of
the irrigation facilities. This leads to the farmers experiencing poor water service, which
results in poor productivity and consequently low incomes for farmers. These
circumstances produce farmers who are commonly unwilling or unable to pay their
Irrigation Service Fees, in turn, the irrigation agencies or associations chronically under
invest in maintenance and the cycle continues in perpetuity (Panella, 2004, p. 9).

Figure 5.1: The vicious cycle of irrigation management

Source: Araral, 2006, p. 132

80
The former President of the Philippines, Gloria A. Arroyo, recognized the existence of
this 'vicious cycle' and how it needs to be addressed if the Philippines is to meet its goal
of rice self-sufficiency (President of the Philippines, 2007). This acknowledgement was a
crucial first step in addressing the cyclical problems associated with underfunding
irrigation maintenance.

It is important to note, however, that the ‘vicious cycle of irrigation management’ doesn’t
have to start at ‘step one’; rather, if any one of its components is present in an irrigation
system, there is a high likelihood that the cycle can take hold and lead the irrigation
system into its “downward spiral” (Araral, 2006, p. 132). Therefore, in the context of
IMT, it is important to ensure that none of the cycle’s components are present during its
implementation. As well, it is important to ensure that the IA slated for IMT are
adequately informed of the prevalence of the ‘vicious cycle of irrigation management’ to
prevent it from occurring under their management. Accordingly, the last four 'best
practices' pertain to the ‘vicious cycle of irrigation management’ and show how if one is
present in the irrigation system it affects all other aspects of the system.

81
Best Practice #4: IAs Must Have the Capacity to Collect Irrigation Service Fees
(ISFs) From Their Members on a Sustained Basis and to Properly Manage their
Financial Resources

For IAs to be successful throughout the entire IMT process, they must be financially
viable in order to be able to properly operate and maintain their irrigation systems. As
Irrigation Service Fees (ISFs) are IAs’ main source of income, the IAs must have the
capacity to collect ISFs from their members on a sustained basis and to properly manage
their financial resources (Araral, 2006; FAO & INPIM, 2001; International Water
Management Institute, 2007; Korten & Siy, 1989; Panella, 2004; President of the
Philippines, 2007; Sampath & Young, 1990; Wijayaratna, 2004)

The collection rates of ISFs post-IMT have varied significantly over time and throughout
the world. However, a recent study conducted by IWMI found that of the 43 IMT cases
studied worldwide, three quarters experienced an increased fee collection rate post-IMT
(International Water Management Institute, 2007, p. 23). Similar findings have been
found in the Philippines, however, no comprehensive study has ever been conducted on
the subject (Groenfeldt & Svendsen, 2000; NIA “Irrigation Management Transfer”, n.d.;
Panella, 2004).

Plaridel’s ISF collection rates generally range between 60-70 percent (Farmer Group
Interview 2, 5-8; NIA Interview 1, 4, 6 and 10) NIA staff who oversee IMT in Plaridel
have expressed the common concern that if collection rates do not increase post-IMT, it
may represent “a big problem” for the financial viabilities of IAs (NIA Interview 10). In
addition, they indicated that ISF collection rates have been on the decline over the past
few years (NIA Interview 4). Therefore, Plaridel’s IAs have to make significant progress
in their collection rates post-IMT in order for them to be financially viable and thus able
to properly run their respective irrigation systems.

To determine if Plaridel’s IAs have the capacity to collect ISFs from their members on a
sustained basis and to properly manage their financial resources, it must be determined if

82
the following four main requirements, identified by the irrigation management experts,
have been met:

i. The IAs have had sufficient capacity building performed by the Irrigation
Agency to ensure that the IAs have an adequate level of financial management
skills to collect ISFs on a sustained basis and to manage their financial
resources. (FAO & INPIM, 2001; FAO, 2003; Gupta & Srivastava, 1999;
International Water Management Institute, 2007; Raby, 1997; Svendsen,
Trava & Johnson, 1997; Wijayaratna, 2004; Yap, 2009).
ii. A sufficient level of trust exists between the members of each IA such that
they will pay their ISFs to the IA. (Korten & Siy, 1989; Raby, 1997;
Svendsen, Trava & Johnson, 1997; Wijayaratna, 2004).
iii. The farmer members of each IA engage in the repairs, rehabilitation, and
general O&M activities, run by either the Irrigation Agency or the Irrigation
Association, in order to gain a sense of ownership over their irrigation system,
thus increasing their willingness to pay for the system’s upkeep and
improvement. (Asian Development Bank, 2008; Attia, n.d.; Groenfeldt &
Svendsen, 2000; Gupta & Srivastava, 1999; International Water Management
Institute, 2007; NIA “Irrigation Management Transfer”, n.d.; Korten & Siy,
1989; Sampath & Young, 1990; Shivakoti, Vermillion, Lam, Ostrom &
Pradhan, 2005; Wijayaratna, 2004).
iv. All IAs have the capacity to influence those farmers who have not paid their
fees through both incentives and enforceable sanctions. (Attia, n.d.;
Groenfeldt & Svendsen, 2000; Gupta & Srivastava, 1999; International Water
Management Institute, 2007; Lauraya, Sala & Wijayaratna, 1996; Ofrecio,
2006; Small & Carruthers, 1991; Vermillion, 1997; Vermillion & Sagardoy,
1999; Wijayaratna, 2004).

To appraise Plaridel’s adherence to the first requirement, that all IAs have had sufficient
capacity building performed by the Irrigation Agency to ensure that they have an
adequate level of financial management skills to collect ISFs on a sustained basis and to

83
manage their financial resources, it must first be determined what financial management
roles and responsibilities will be delegated to Plaridel's IAs under IMT and, secondly,
what training will be provided by NIA to enable the IAs to perform each of these roles
and responsibilities.

Under the 'Combined Stage I & II' contract, which Plaridel’s IAs will be delegated the
following roles and responsibilities:

1. Creating, implementing and monitoring a regular, or yearly, financial plan and


budget, based on the operations and management plan.
2. Accepting the calculated ISF bills from NIA, preparing a computation of each
farmer's individual ISF bill, distribute ISF bills to each farmer member and collect
the ISFs from them.
3. Submitting all collected ISFs and collection reports regularly to NIA.
4. Monitoring the amount of ISFs collected from each member.
5. Informing all farmer members of their collection status and campaigning to
farmers to pay their current and back ISF fees.
6. Creating and implementing all necessary rules regarding good financial
management of the irrigation system and enforcing penalties on all those who
violate the rules.
7. Allocating a Repair and Maintenance fund from the yearly income of the
organization to fund all minor repair works and to help NIA in paying for major
repairs.

Also, under the Financial Management section of the 'Combined’ Stage I & II' contract
NIA is given the responsibility of providing financial management trainings to IA
members who will be undertaking the IAs new financial roles and responsibilities (NIA
“IMT Contract”, n.d.). The following financial management skills are required by NIA’s
central office to be included in all financial management trainings (NIA “Review of
Irrigation Management Transfer Program”, n.d.):

84
• Budgeting, budget implementation and monitoring.
• Preparation of ISF bills for individual farmers, distribution of ISF bills, collection
of ISF payments.
• Safeguarding and remitting ISF collections to NIA.
• Imposition of discipline and sanctions on settlement of members' obligations.

NIA’s head of personnel in charge of training Plaridel's IAs indicated that, although not
yet complete, NIA remains committed to conducting financial management training(s)
for all of Plaridel's IAs, which will include all of the above mandated skills, but no others
(NIA Interview 4). The following is a list of all of the roles and responsibilities that will
not be addressed:

1. Creating, implementing and monitoring a regular, or yearly, financial plan based


on the operations and management plan.
2. Collection reports that must be submitted regularly to NIA.
3. Monitoring the amount of ISFs collected from each member.
4. Informing all farmer members of their collection status and campaigning to farmers
to pay their current and back ISF fees.
5. Allocating a Repair and Maintenance fund from the yearly income of the
organization to fund all minor repair works and to help NIA in paying for major
repairs.

On top of NIA’s inability to deliver these necessary financial management skills training,
the agency has yet to complete the four training topics it set out to do for all Plaridel IAs.
Although the NIA management personnel in charge of IMT indicate that they are
committed to its implementation, they have been forced to wait until the necessary
financial resources are available (NIA Interview 8). These delays have been a common
problem across the Philippines (Raby, 1997). If the financial management training is
delayed until after the implementation of IMT has been initiated, there will be a higher
chance of creating additional and unnecessary resistance from the farmers to IMT. If the
farmers enter into IMT without the skills necessary to complete their delegated financial

85
roles and responsibilities, they will be less likely to properly undertake them, which will
result in decreased ISF collection rates and a decreased capacity to properly manage their
financial resources. With farmer members resultantly being less willing to forward ISFs
to members, whose abilities are proven inadequate, the IA will inevitably become
insolvent.

It should also be noted that these financial management responsibilities are no small task
and that their delegation to the IAs should not be taken lightly. Currently, NIA field staff
in Plaridel devote an average of 60 percent of their time to collecting ISFs (NIA
Interview 2). Although, the IAs are legally allowed to hire employees to complete these
tasks, they must first collect enough money to be able to do so (Municipal Government
Official Interview 1; Farmer Interview 1; Farmer Group Interview 5 and 6). Therefore,
the sheer time required to collecting these fees will be a huge challenge for already busy
farmers.

Although Plaridel IAs have not yet received a sufficient level of financial capacity
building from NIA, which has resulted in them having an inadequate level of financial
management skills to both collect ISFs, as well as to sustainably manage their financial
resources, they may at least receive some of the necessary training in the near future.
However, for the IAs to be able to successfully implement all of the necessary financial
roles and responsibilities delegated to them under IMT, a more comprehensive set of
skills must be included in NIA's financial management training plans.

The absence of a sufficient level of trust between IA members that they will pay their
ISFs to the IA (Korten & Siy, 1989; Raby, 1997; Svendsen, Trava & Johnson, 1997;
Wijayaratna, 2004), has been a pronounced impediment to IMT. Farmers who have
become accustomed to paying ISFs to Irrigation Agencies or other governmental bodies
are frequently hesitant and mistrustful when asked to pay fees to a fellow IA member.
This is generally because those members have not proven themselves capable and/or
trustworthy. Similar mistrust has been observed when strong procedures are not in place
to ensure accountability and transparency for all of the appropriate financial management
procedures (Wijayaratna, 2004; Raby, 1997). However, this mistrust has also been

86
specified as one of the main causes of low ISF collection rates by government, including
NIA (Svendsen, Trava & Johnson, 1997; Raby, 1997; NIA Interview 4).

All of the above statements of mistrust apply to the case of Plaridel. Currently, one of the
reasons given for low collection rates is a lack of transparency on the part of NIA
(Farmer Group Interview 5). A common complaint among Plaridel’s farmers is that there
is not always a direct correlation between the amount of ISFs paid by the farmer and the
services provided to them. Therefore, they argue, why should they have to pay their ISFs
if they are not adequately serviced (Farmer Group Interview 5)? However, mistrust of
their fellow IA members in handling the collection and management of those fees is also
quite prevalent, expressing fears that the ISFs may be misused, improperly managed or
simply disappear (Farmer Group Interview 2-8).

Table 5.1 shows the average of all responses received from representatives and general
members of each IA to the question: Will the members of your IA trust a fellow farmer
member(s) to collect ISFs once IMT commences? In all instances where general
members were interviewed, their opinions were in line with those articulated by their
representatives. As it can be seen, only one of Plaridel's IAs had an average response of
‘yes’, four of the seven IAs had an average response of ‘maybe’ and one IA had an
average response of ‘no’.

Table 5.1: Average farmer response to the question: will the members of your IA trust a
fellow farmer member(s) to collect ISFs once IMT commences, by IA

Barangay IA Levels of Trust


Bulihan BSJB Yes
Bagong-Silang Plagui Maybe
Parulan Parulan-Halang Maybe
Sipat Lucidar Maybe
Lalangan Plaridel-Malolos Maybe
Lagundi Lagum No
Culianin BPB No
Source: Farmer Group Interview 2-8

Accordingly, it would seem evident that IAs will experience significant difficulties
collecting ISFs if the current low levels of trust persist. Nonetheless, NIA management

87
staff in Plaridel indicate that this mistrust is not an insurmountable obstacle. It is their
common perception that the current lack of trust in Plaridel’s IAs, with respect to ISF
collection, is mainly due to a lack of information (NIA Interview 6, 8, 10). Numerous
staff indicate that once the financial management training has taken place, many of their
fears will disappear (NIA Interview 6, 10). This means that trust will emerge after NIA
has been able to inform all farmer members of Plaridel’s IAs that the “IA officials… will
be responsible for the collection of irrigation fees because [NIA] has no more personnel
to collect” (NIA Interview 10), inform them of the official ISF collection procedures,
including the issuance of an official receipt, and all of the safeguards that NIA has put in
place to ensure the IAs are properly managing their finances, such as monitoring,
evaluating, auditing etc… (NIA “IMT Contract”, n.d.) When asking a few farmer
members if these measures would calm their fears, and thereby increase their trust of
fellow farmer members, they confirmed that it would (Farmer Group Interview 6 and 7).

Therefore, it can be said that currently there does not exist a sufficient level of trust
between farmer members such that the members are willing to pay their ISFs to the IA.
However, this has the potential to be remedied if financial management training can be
executed before the implementation of IMT in Plaridel.

The third requirement that must be met is that farmer members participate in all repairs,
rehabilitation, general O&M activities, run by either the Irrigation Agency or the
Irrigation Association, in order to gain a sense of ownership and increase their
willingness to pay for the system’s upkeep and improvement (Asian Development Bank,
2008; Attia, n.d.; Groenfeldt & Svendsen, 2000; Gupta & Srivastava, 1999; International
Water Management Institute, 2007; NIA “Irrigation Management Transfer”, n.d.; Korten
& Siy, 1989; Sampath & Young, 1990; Shivakoti, Vermillion, Lam, Ostrom & Pradhan,
2005; Wijayaratna, 2004). The inability of farmer IAs to meet this requirement is also a
common impediment to successfully implementing IMT, in the Philippines and
worldwide.

Generally, rehabilitation of irrigation systems is completed just before IMT commences


and does not include any meaningful participation or investment by the IAs. This can

88
"reinforce a perception among farmers that the irrigation system belongs to the
government" (Gupta & Srivastava, 1999, p. 17). A suggested way to improve farmer
ownership over the irrigation system after turnover is to have "the farmers take the lead in
setting priorities for repairs and improvements, while investing a significant amount of
their own labour and material" (Gupta & Srivastava, 1999, p. 19). Indeed the more
farmers are involved in repairs, rehabilitation, and general O&M activities before the
system is turned over to them, the more likely they are to have a sense of ownership over
the system, and thus they will be more willing to pay their ISFs (Attia, n.d.; Groenfeldt &
Svendson, 2000; Gupta & Srivastava, 1999; International Water Management Institute,
2007; NIA “Irrigation Management Transfer”, n.d.; Korten & Siy, 1989; Asian
Development Bank, 2008; Sampath & Young, 1990; Shivakoti, Vermillion, Lam, Ostrom
& Pradhan, 2005; Wijayaratna, 2004).

In the Philippines, there have been various studies that have substantiated this ownership
paradigm (Korten & Siy, 1989; Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005;
Thompson, 1995). For example, a study comparing the implementation of IMT in CISs
and NISs showed that because NIA did not implement a "formal mechanism for user's
participation during the project implementation phase [for NISs or]...contribute to the
capital cost of construction, as they do in CISs" the NISs were not as willing to pay ISFs
or other construction costs post-IMT (Small & Carruthers, 1991, p. 294). Another, study
showed that "farmer's investment of materials and labor in the actual construction of their
system was also a crucial element which developed their commitment to its sustained
maintenance" (Bagadion, 1989, p. 12). The IA’s observed low sense of ownership over
Plaridel’s irrigation systems (see Best Practice #2) demonstrates poor adherence to this
requirement.

In view of the desirability of fostering an increased sense of ownership among IA


members, it must be determined whether farmer members of Plaridel's IAs have and will
continue to participate in all repairs, rehabilitation, general O&M activities, run by either
the Irrigation Agency or the Irrigation Association before turnover, to create a higher
sense of ownership over their irrigation system and thus increase their willingness to pay
for the system’s upkeep and improvement post- IMT.

89
In the IMT implementation process, mandated by NIAs national office, phases two to
four, of five, involve tasks that engage the IAs in repairs and rehabilitation that need to be
completed before turnover (NIA “Review of Irrigation Management Transfer Program”,
n.d.). These tasks and their expected outputs for each phase are (NIA “Review of
Irrigation Management Transfer Program”, n.d.):

Phase 2
• Tasks: Joint NIA-IA walk-through of the irrigation system and a consequent NIA-
IA workshop on the assessment of the 'IA performance-list of issues to be
addressed'.
• Expected outputs: Mobilize farmers to initiate system improvement and further
develop the IAs capacity for the O&M of the system.

Phase 3
• Tasks: NIA-IA Action Planning Workshops to formulate proposals for physical
improvement, improved system operation, improved maintenance, IA capacity
build-up plan, monitoring & evaluation scheme, and the draft IMT contract.
• Expected outputs: Mobilize farmers to engage in system planning, monitoring and
evaluation among other things.

Phase 4
• Tasks: undertake physical improvements drawn up in the various plans of phase
three ensuring that the IAs participate in construction and a NIA-IA Assessment
and Planning Meeting to establish accomplishments vs. targets.
• Expected outputs: Mobilize farmers to participate in system improvement and
planning.

Therefore, if this mandated process is indeed followed by NIA staff implementing IMT in
Plaridel, there is a strong likelihood of improving the IAs’ sense of ownership over their

90
respective irrigation systems, despite the lack of resources to finance the physical
improvements. In addition, in Plaridel’s ‘Combined Stage I & II" contract, there is a
provision that states that all minor repairs and construction, under 100,000 PHP, shall be
the responsibility of the IA and that all major repairs and construction, over 100,000
PHP, shall be the joint responsibility of the IAs and NIA, throughout the implementation
phases of IMT (NIA “IMT Contract”, n.d.). This will also increase the likelihood that
Plaridel’s farmer members will develop a sense of ownership over their irrigation
systems.

However, given the limited funds available to NIA’s regional office for the
implementation of IMT in Plaridel, there is concern among both NIA staff and Plaridel’s
farmers that there are currently insufficient resources available to undertake the physical
improvements needed (Farmer Group Interview 2-8; NIA Interview 10). Furthermore, as
Plaridel is currently so far behind in the IMT implementation process (NIA Interview 6)
NIA may not have the time to properly implement all of the IMT phases, meaning time
constraints may prohibit involving the IAs in the construction process, even if they do
find the funds to undertake the necessary physical improvements. Therefore, it can be
concluded that although there exists the potential to achieve this requirement, it cannot be
determined if there exists the available time and/or financial resources necessary to
engage farmer members in the O&M functions that would in turn foster an increased
sense of ownership of the irrigation system.

The last precondition or requirement that must be met is that IAs must have the capacity
to influence those farmers who have not paid their fees through both incentives and
enforceable sanctions (Attia, n.d.; Groenfeldt & Svendson, 2000; Gupta & Srivastava,
1999; International Water Management Institute, 2007; Lauraya, Sala & Wijayaratna,
1996; Ofrecio, 2006; Small & Carruthers, 1991; Vermillion, 1997; Vermillion &
Sagardoy, 1999; Wijayaratna, 2004)

Incentives have been proven a valuable and at times essential tool for prompt ISF
payments (Attia, n.d.; Gupta & Srivastava, 1999; Lauraya, Sala & Wijayaratna, 1996;
Vermillion, 1997; Vermillion & Sagardoy, 1999; Wijayaratna, 2004). Incentives for ISFs

91
come in a variety of forms, which can include financial incentives, such as discounts for
early payment, or social incentives, such as throwing a party for all farmers who are up to
date with their ISFs (Small & Carruthers, 1991, p. 188).

The Philippines’ NIA has used a variety of incentives to influence farmers to pay their
ISFs on time or to catch up on back payments. Generally, this has had positive effects on
collection rates, however, some of NIA's incentive schemes have been more successful
than others (Groenfeldt & Svendson, 2000; Oorthuizen, 2003; Small & Carruthers, 1991).
Those schemes that have failed to motivate farmers to pay their current and back
accounts have been connected to poorly performing IAs (Groenfeldt & Svendson, 2000;
Panella, 2004). In addition, many popular incentive schemes have also failed due to NIAs
failure to pay the incentives to the farmer beneficiaries on time, or at all, due to a lack of
financial resources (Groenfeldt & Svendson, 2000; International Water Management
Institute, 2007; Ofrecio, 2006; Raby, 1997).

Currently, NIA is in the process of implementing a new incentive scheme for Plaridel's
IAs. For the first year, 60 percent of all ISFs collected will go to NIA and 40 percent will
go to the IAs. In the second year, the proportion will be reversed, giving NIA 40 percent
and the IAs 60 percent. In the third year, when the IAs will have complete responsibility
over their respective irrigation systems, they will retain 100 percent of the ISFs collected.
However, for the first two years the IAs must reach an ISF collection rate of 70 percent to
be eligible to receive their specified portion of the fees (NIA Interview 8 and Farmer
Group Interview 1).

In addition to the above incentive scheme, if farmers opt to pay before their bill is due
they will receive a 10 percent discount. The scheme also provides a 30 percent reduction
off all back-account penalties (NIA Interview 7). NIA is implementing these incentives
in the hopes that they will help the IAs in motivating farmer members to pay their ISFs.
With ISF collection rates in Plaridel's IAs ranging from 60 to 70 percent, these incentives
are expected to provide a welcome help (NIA Interview 8 and Farmer Group Interview 1-
8).

92
However, all of Plaridel's IAs are currently in negotiations with NIA to change the
incentive scheme to a 50/50 split and to eliminate the minimum collection rate of 70
percent from the terms of the contract (Farmer Group Interview 4-6 and 8). Irrespective
of which incentive scheme is implemented, it can still be said that the first part
requirement that IAs must have the capacity to influence those farmers who have not paid
their fees through incentives, is currently being met. However, this is reliant on NIA
paying the IAs their incentives in a timely manner, which they have known to have
problems with in the past (Groenfeldt & Svendson, 2000; International Water
Management Institute, 2007; Ofrecio, 2006; Raby, 1997).

The second part of this requirement that must be appraised is: whether Plaridel's IAs have
the capacity to influence those farmers who have not paid their fees through enforceable
sanctions. Sanctions for the failure to make prompt payment of ISFs have been proven to
be an exceedingly successful collection tool, if properly implemented (International
Water Management Institute, 2007; Korten & Siy, 1989; Panella, 2004; Sangupta, 1991;
Small & Carruthers, 1991; Vermillion & Sagardoy, 1999). Properly implementation
means that the sanctions are of an appropriate magnitude relative to the value of water
and production (Small & Carruthers, 1991, p. 170). Sanctions can be financial (fines),
social (denied access to social events), legal (foreclosure on land), or in terms of denying
access to water for irrigation (Small & Carruthers, 1991, p. 170). As well, sanctions have
been shown to be most effective when they gradually become more serious, and when
they are administered by the farmer users themselves (Panella, 2004, p. 103).

From its inception, NIA has attempted to impose numerous different sanction methods on
delinquent farmers since its establishment, such as warning letters, fines and taking
delinquent farmers to court (NIA “Operation and Maintenance of National Irrigation
Systems”, n.d.). However, these have generally been unsuccessful, as they are usually not
adequately enforced, because the farmer is either poor (NIA “Operation and Maintenance
of National Irrigation Systems”, n.d.), or they are unenforceable, as with the physical
impossibility of cutting off farmer’s access to irrigation water (Araral, 2006; Raby, 1997;

93
Sampath & Young, 1990; Wijayaratna, 2002; Wijayaratna, Pintor, Valdez, Laitos &
Solis, 1996). This lack of enforcement power, or willingness to enforce, has created the
perception among farmers that "non-payment or partial payment [is] not considered as a
crime" (Oorthuizen, 2003, p. 28). This ineffectual dynamic has produced severe financial
difficulties for NIA. For example, in 2004, “NIA estimated that some 567,041 farmers
had outstanding balances with the agency totaling... $[US]125.9M" (Araral, 2006, p.
253). These events have also been occurring in AMRIS, usually to a greater degree. For
example, one study found that "the incidence of free riding (ISFs) in AMRIS ranges from
52 to as much as 79 percent against the 43 percent national average" (Araral, 2006, p.
253). This low payment rate has been attributed directly to the lack of credible
enforcement of sanctions by NIA (Araral, 2006, p. 239).

In Plaridel it has also been very challenging for NIA to enforce sanctions through their
‘synchronous system’. The nature of the ‘synchronous system’ is such that every farmer
receives water at the same time and that there are insufficient infrastructural barriers for
one farmer to be denied access to water (NIA Interview 1). NIA has tried to implement
various sanctions, sending out warning letters or attempting to take farmers to court in
some, rare and extreme, cases (NIA Interview 1). However, none have been successful,
as the farmers know that they will not be able to cut off their access to water, which is
largely the only thing that could ensure that they would pay their fees (NIA Interview 2).
Typically, NIA is only able to recuperate back-fees from delinquent farmers when the
farmers sell their land, as farmers are legally required to pay all outstanding ISFs before
they can sell (Farmer Interview 1).

Members of NIA and Plaridel’s IAs agree that the IAs will likely experience post-transfer
difficulties similar to those that NIA has endured in the past (Farmer Group Interview 2-8
and NIA Interview 2, 10). The only advantage that the IAs stated they might have over
NIA is with respect to the implementation of social sanctions. However, they believe, this
will only be effective if the farmers know one another well or live in close proximity to
each other, otherwise they too may have no effect (Farmer Group Interview 3, 5 and 6).
The IAs can resort to taking delinquent farmers to court, however this can be costly and

94
the delinquent farmers tend to be those farmers who truly cannot afford their fees;
therefore court decisions in these cases even when decided in favor of the IA are unlikely
to garner the IA any payment.

Thus, the IAs have inadequate means to enforce sanctions imposed on farmers who have
not paid their ISFs. Therefore, it can be said that there is a very low likelihood that
Plaridel’s IAs will have sufficient capacity to collect Irrigation Service Fees from their
members on a sustained basis. Nor is it likely that they will have the capacity to properly
manage their financial resources. Therefore, it can be said that this accepted ‘best
practice’ for IMT implementation is not currently being adhered to in Plaridel and that
there is a chance that they will fall into the ‘vicious cycle of irrigation management’.

95
Best Practice #5: Financial Resources Must be Available to Farmers and IAs Who
Are Unable to Profitably Sustain the Operation of Their Farm or Irrigation System
Independent of the Irrigation Agency

The next 'best practice' that the international irrigation community has set out for the
implementation of IMT is: sufficient financial resources must be available to farmers and
IAs who are unable to profitably sustain the operation of their farm or irrigation system
independent of the Irrigation Agency (Attia, n.d.; FAO & INPIM, 2001; FAO & INPIM,
n.d.; International Water Management Institute, 2007; NIA “Irrigation Management
Transfer”, n.d.; Panella, 2004; Sander, 1979; Svendsen, 1992; Svendsen, Trava &
Johnson, 1997; Thompson, 1995; Uphoff, Ramamurthy & Steiner, 1991; Vermillion,
n.d.; Vermillion & Sagardoy, 1999; Wijayaratna, 2004). The main reason why the above
has been deemed a ‘best practice’ is because it has been shown that if adequate resources
are not made available to the farmers and IAs during the implementation of IMT, there is
a far greater likelihood that they will be unable to implement all of the roles and
responsibilities delegated to them under IMT and therefore eventually fall into the
'vicious cycle of irrigation management'.

Therefore, for farmers and IAs to be successful independent of the irrigation agency, the
national government and irrigation agency must provide access, for both IAs and farmers,
to a sufficient level of temporary financial support to enable and encourage them to
assume their duties under IMT, if they are unable to do so on their own. However, if the
irrigation agency is unable to provide these temporary financial supports, the farmers and
IAs must have access to a sufficient amount of low-interest credit.

However, before these two requirements of this 'best practice' are determined to be
present in Plaridel, it must first be determined whether Plaridel's farmers and IAs are in
need of financial support and/or access to credit in order to profitably sustain their farm
and/or irrigation systems independently of NIA.

96
Firstly, with respect to Plaridel's farmers, as detailed in the fourth 'best practice', ISF
collection rates for all of Plaridel's IAs range from 60-70% (Farmer Group Interview 2-
8). Although there are a variety of reasons given for the low collection rates, the main
reason according to Plaridel's farmers is that some farms are simply not productive or
profitable enough to afford their ISFs, much less meet their families’ basic needs (NIA
Interview 1; Farmer Group Interview 1, 4 and 8)

Figure 5.2 shows a breakdown of the total costs and profits for an average, one-hectare,
palay farm in Plaridel, for the 2009-2010 dry season (6 months).

Figure 5.2: Total costs and profits from a 1 ha farm in Plaridel for one cropping season

Cost and Return Survey Form: Rice Production

Material Input Total Cost (PHP)


1. Seeds 2,900
2. Fertilizer 8,100
3. Pesticide 2,388
4. Ameliorants 756
Total Material Costs 14,144

Labor Input
1. Seedbed preparation, care and management 1,300
2. Cleaning/repairing dikes 1,000
3. Land preparation 4,000
4. Pulling and Hauling of seedlings 2,100
5. Planting 3,200
6. Application of fertilizers, pesticides etc. 1,500
7. Threshing 840

Other Fees and Expenses


8. Irrigation Service Fee 1,000*
9. Interest on loan 2,500**
10. Agricultural Land Tax 65
Total Labor Costs 17,505

Total Production Cost (Labor + Mat.) 31,649


Palay Net Profit 63,000 (126,000 per year)
Net Income 31,351 (62,702 per year)
*Did not pay full amount of approximately 2,500 PHP
**Private lender (with very high interest rates)
Source: Municipal Government Official Interview 3

97
As seen above, this farmer will make approximately 62,700 PHP per year profit, or
approximately 1,425 US$. Although this appears, on the surface, to provide enough profit
to pay the irrigation fees of approximately 2,500 PHP for the season (Farmer Group
Interview 2), the farmer was only able to pay 1,000 PHP due to household expenses, the
high cost of production, and the necessity of paying outstanding debts (Municipal
Government Official Interview 3).

The struggle of this farmer to pay his ISFs can be best understood when comparing his
income to that of Central Luzon. In 2009, the average income of a Central Luzon Filipino
family was 221,000 PHP and their annual average expenditure was 189,000 PHP. This
means that the average income of a farming family in Plaridel is more than 40 percent
less than the average income in Central Luzon and that after farm expenses less than one
third of that income remains for family expenses. (Number of Families, Total and
Average Annual Family Income and Expenditure by Region: 2009)

Therefore, although this farmer, whom a Municipal Government Official indicates as


being a fair representation of a majority of Plaridel’s farmers (Municipal Government
Official Interview 3), has made a profit this season, his inability to pay his ISFs will only
compound his debt load for future seasons. It is also important to keep in mind that
Figure 5.2 is representative of a successful cropping season and that a poor cropping
season would result in a higher likelihood that the farmer would be unable to pay any of
his fees.

In Plaridel, when a bad cropping season occurs, farmers usually turn to ‘loan sharks’ to
borrow the money they need as the banking system is inaccessible to them (discussed
later in this section). This is problematic for Plaridel’s farmers as the banks in Plaridel
charge an average of 18 percent per annum, whereas ‘loan sharks’ charge on average 10
percent per month (Farmer Group Interview 2-4, 6 and 8). This makes it challenging for
farmers to profitably sustain their farms as paying inflated debts to ‘loan sharks’ is
burdensome on their already meager earnings and always takes priority (Farmer Group
Interview 2,4 and 8) as loan sharks are more likely to put pressures on the farmers such as

98
“daily visits, threats of foreclosure, [and] put[ting] the honor of the farmer… on the line”
(Frias, 2010). This also greatly affects the IAs financial viability, as they are only likely
to receive their ISF payments after the farmers have paid their debts to the ‘loan shark,’
as well as paid for all of the necessary material and labor costs of their own farm (Farmer
Group Interview 2-8).

Owing largely to the above reasons, it is seen that many of Plaridel’s farmers are
currently unable to profitably sustain their farms. Therefore, for these farmers to be
successful, independent of NIA, NIA must provide access to temporary financial support
to encourage and enable Plaridel farmers to assume the duties assigned to them under
IMT. Secondly, if NIA is unable to provide sufficient temporary financial support and
incentives, the farmers must at least have access to sufficient low-interest credit sources.

Moreover, Plaridel’s IAs have also expressed concern over their ability to pay for specific
costs being delegated to them under IMT. Some of these concerns relate to the everyday
maintenance of their irrigation systems, such as hiring laborers. However, most pertain to
their ability to generate capital replacement funds and emergency funds (Farmer Group
Interview 2-8). Similar cost concerns have been problematic for IAs implementing IMT
worldwide (Gupta & Srivastava, 1999; NIA “Irrigation Management Transfer”, n.d.;
Svendsen, Trava & Johnson, 1997; Vermillion, n.d.). If as a result, Plaridel’s IAs are
unable to maintain their irrigation systems in both the short and long term, the
profitability and survivability of the IA will come under threat (NIA “Irrigation
Management Transfer”, n.d.).

For the above reasons, it can be anticipated that Plaridel’s IAs will have difficulties
obtaining sufficient funds to profitably sustain their IAs. For Plaridel’s IAs to be
successful, independent of NIA, NIA must provide Plaridel’s IAs with access to
temporary financial support to enable and encourage farmers and IAs to assume their
duties under IMT. Secondly, if NIA is unable to provide sufficient temporary financial
supports and incentives, the IAs must then at least have access to sufficient low-interest
credit sources.

99
Do these temporary financial support and/or low-interest credit sources exist in Plaridel?

Firstly, with respect to temporary financial support, NIA has ‘provided’ two forms of this
to Plaridel’s IAs under IMT. The first of these is the cost-sharing program for all ‘major’,
(10,000 PHP or more) construction projects, where NIA pays for all materials and
equipment and the IAs pay for all other costs, such as Labor (NIA “IMT Contract”, n.d.).
Although this is helpful to the IAs, they have identified two main problems with this
financial support. The first is that there is a stipulation that NIA will only share the cost
for these projects if the IAs reached a 70 percent collection rate (Farmer Group Interview
7), as discussed in the previous section, this may be challenging for the IAs to
accomplish. Secondly, even though NIA will carry the burden of the majority of the
costs, the ‘other’ costs may still be too much for the IAs to provide (Farmer Group
Interview 2-8). Therefore, this ‘temporary financial support’ that NIA is providing may
prove to be inaccessible to Plaridel’s IAs.

The second form of temporary financial support the IAs received under IMT relates to
emergency funds, which are actually provided by the national government, not NIA. In
the past, the national government has given subsidies to farmers after El Nino events or
other natural calamities and will continue to do so in the future as they have funds set
aside for such occasions (Farmer Group Interview 2). However, the amounts of these
emergency support funds are not guaranteed and Plaridel’s farmers, along with NIA, have
stated that these subsidies are never nearly enough to enable them to “get back on their
feet” (Farmer Group Interview 2; NIA Interview 8). Therefore, although some temporary
financial support is available to Plaridel’s farmers and IAs, they do not meet the needs of
Plaridel’s farmers and IAs to run profitable and sustainable farms and IAs, independent
of NIA. Moreover, Plaridel farmers do not have easy access to low-interest credit.
Although banks and co-operatives do technically provide loans to farmers in Plaridel,
with approximately 18 percent interest rates, the administrative and financial obstacles to
obtaining these loans are huge, if not insurmountable, for most of Plaridel’s farmers (NIA
Interview 8; Municipal Government Official Interview 3 and 4; Farmer Group Interview

100
1). To obtain a loan a farmer must usually meet the following main requirements
(Cooperative Rural Bank of Bulacan, 2010):

• Be 18 – 60 years old.
• Be physically fit.
• Own a profitable farm and can confirm he/she has a good and reliable cash flow,
which can provide a stable income for the client and his/her family.
• Have 2 co-signers.
• No past-due loan records from other banks, suppliers or creditors.
• Passed the ‘Credit and Background Investigation’.
• Have 1,000.00 PHP of personal savings.
• Provide post-dated checks to the Bank before the release of loan.
• Have 2 valid pieces of identification.
• Hold a ‘Residence Certificate’.
• Certification from the Land Bank of the Philippines stating that the applicant has
no past due loan records.
• Others…

Plaridel’s farmers have stated that these requirements exclude the vast majority of
farmers in the municipality from being able to obtain bank loans. Only the very
successful farmers of the municipality meet these requirements (Farmer Group Interview
3-7). In fact, many farmers and municipal officials stated that the fact that they must
obtain two pieces of valid identification is enough of an impediment for farmers to be
unwilling to obtain loans from a bank as the paper work and fees behind obtaining an ID
is time consuming and overwhelming (Municipal Government Official Interview 3;
Farmer Group Interview 3-6). In addition, one of Plaridel’s banks stated that usually they
cannot give loans to farmers as they do not have sufficient collateral or credit history
(Municipal Bank Official Interview 1).

Unfortunately, the agricultural cooperatives in Plaridel typically impose the same barriers
to entry as the banks (Municipal Government Official Interview 3). As well, over the past

101
decade, the number of agricultural cooperatives in Plaridel has been significantly
reduced, largely as a result of farmers defaulting on their loans (Municipal Government
Official Interview 3). Consequently, many farmers in Plaridel have been obligated, and
sometimes prefer, to borrow money from 'loan sharks' as there are no pre-requisites to
acquiring a loan. However, instead of the standard 18 percent per annum interest rate,
loan sharks charge on average 10 percent per month. The onerous terms of these, albeit
readily available, loans present a considerable obstacle to the farmer’s ability to sustain
profitability (Farmer Group Interview 2, 4 and 8).

Although Plaridel’s IAs have never before had to search out credit, as NIA had hitherto
assumed all IA debt, the IAs current obligation to achieve financial independence from
NIA will highlight the importance of access to low-interest loans. Plaridel’s IAs are
currently having trouble collecting ISFs, a problem that is predicted to persist in the near
future. Consequently, IA members have expressed concern that they will be unable to
meet the banks’ requirement of having a 'good, stable cash flow' (Cooperative Rural
Bank of Bulacan, 2010). In addition, IAs do not have sufficient collateral as under IMT
NIA will retain ownership of the irrigation system (Ofrecio, 2006, p. 1). Therefore, it is
observed that Plaridel’s IAs will likely encounter many of the same barriers to obtaining
low-interest credit that farmers have customarily faced, as although access to low-interest
credit sources is ostensibly available to all of Plaridel’s farmers and IAs, in real terms the
majority of farmers and many of Plaridel’s IAs, are incapable of overcoming barriers to
obtaining them.

Plaridel’s farmers and municipal officials have expressed concern that the lack of
temporary financial support or low-interest credit also impedes farmers and IAs from
accessing resources that would enable them to become financially self-sufficient over the
long-term (Farmer Group Interview 2, 4 and 8;). The most common example cited was
with respect to purchasing hybrid seeds. Hybrid seeds usually yield between 200-300
cavans per hectare, depending on the inputs and weather conditions of the farm
(Municipal Government Official Interview 3). Although this is significantly higher than
the average 110 cavans per hectare, Plaridel’s farms yield with ‘certified seeds’ hybrid

102
seeds typically cost approximately two times more (Municipal Government Official
Interview 3). Although there are subsidies available from the national and municipal
governments (Municipal Government Official Interview 3) without access to temporary
financial assistance or low-interest credit these improved varieties remain inaccessible to
Plaridel’s farmers.

What is likely to happen if financial resources do not become accessible to Plaridel’s


farmers and IAs through NIA, banks or cooperatives in the near future? Plaridel’s IAs
state that there is a chance they could turn to their Congressmen for funds for larger
infrastructure projects (Farmer Group Interview 2-8) and that some may be able to turn to
their barangay captains for smaller financial needs if they are experiencing major
financial difficulties (Farmer Group Interview 4, 7 and 8). However, these opportunities
are not guaranteed and if they do not present themselves it is likely that the IAs will fall
into the ‘vicious cycle of irrigation management’. The farmers on the other hand will
usually have no choice but to fall further into debt, with many of Plaridel’s farmers
having to sell their land as the only way to pull themselves out of debt (Farmer Group
Interview 2 and 8).

103
Chapter Six: Measuring Plaridel’s Success: Operations and Maintenance and
Water Availability

This chapter will analyze whether the operations and maintenance related 'best practices'
for the implementation of IMT are currently happening in Plaridel. These being, firstly,
that IAs must have the capacity to perform all operations and maintenance related roles
and responsibilities delegated to them under IMT. And secondly, that IAs must have a
clearly recognized and sustainable water right and service.

104
Best Practice #6: IAs Must Have the Capacity to Perform All Operations and
Maintenance Related Roles and Responsibilities Delegated to Them Under IMT

The next ‘best practice’ that must be determined to exist in the implementation of IMT in
Plaridel is: do IAs have the capacity to perform all operations and maintenance related
roles and responsibilities delegated to them under IMT (Araral, 2006; Bandyopadhyay,
Shyamsundar & Xie, 2007; Groenfeldt & Svendson, 2000; International Water
Management Institute, 2007; NIA “Irrigation Management Transfer”, n.d.; Lauraya, Sala
& Wijayaratna, 1996; Merrey, 1997; National Economic and Development Authority,
2004; Oorthuizen, 2003; Panella, 2004; Sampath & Young, 1990; Shivakoti, Vermillion,
Lam, Ostrom & Pradhan, 2005; Vermillion, 1997; Wijayaratna, 2004). In addition, it
must be determined if there exists a properly functioning irrigation system at the time of
turnover, as it increases the chances of the IAs being able to successfully perform these
roles and responsibilities (FAO & INPIM, 2001; International Water Management
Institute, 2007; Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005; Svendsen, Trava
& Johnson, 1997; Vermillion, n.d.; Vermillion, 1997; Wijayaratna, 2004).

Before these can be determined it must first be understood what is meant by both
‘operations’ and ‘maintenance’ in this context. NIA defines ‘operations’ under IMT as
“the activities involved in diverting water from the source and conveying and distributing
it to the point of application in the farmers’ fields” (NIA “Review of Irrigation
Management Transfer Program”, n.d.). In the case of Plaridel the source means the gates
of the lateral canals as it is NIA’s responsibility to deliver the water to that point under
the ‘Combined Stage I & II’ Contract. Secondly, NIA defines ‘maintenance’ under IMT
as “the activities undertaken related to keeping the irrigation system in good operating
condition at all times within the limitations of available resources to attain maximum use
and economic life of the system facilities” (NIA “Review of Irrigation Management
Transfer Program”, n.d.). Therefore, all of the operations and maintenance roles and
responsibilities delegated to Plaridel under IMT will fall under these two broad themes.

The consequences of Plaridel’s IAs’ inability to fulfill the roles and responsibilities

105
delegated to them under IMT, for both the short and long-term viability of their irrigation
systems, cannot be understated. Without the proper maintenance of their irrigation canals
and the subsequent timely and equitable delivery of water to all farmer members, the IAs
will quickly fall into the ‘vicious cycle of irrigation management’ (Panella, 2004). In fact,
some Filipino researchers state that, "O&M is the… activity on which the success or
failure of an irrigation association depends" (Illo & Volante, 1984, p. 16). The immediate
consequences of the failure of the IAs to perform these two vital tasks include, among
others: a rapid deterioration of the irrigation systems' infrastructure (Sampath & Young,
1990); a rapid decline in the ability and willingness of farmer beneficiaries to pay their
ISFs (Uphoff, Ramamurthy & Steiner, 1991, p. 22); an increase in the number of
conflicts between farmer beneficiaries (Araral, 2006, p. 68); and a decline in productivity
(Uphoff, Ramamurthy & Steiner, 1991, p. 412).

Under the ‘Combined Stage I & II’ contract Plaridel’s IAs will be delegated the following
maintenance roles and responsibilities from NIA (NIA “IMT Contract”, n.d.):

1. Prepare yearly operations and maintenance plans (jointly with NIA) for all
infrastructure covered by the IA and implement the tasks outlined in them.
2. Create and implement rules and regulations for the maintenance of the irrigation
system, including enforcing penalties and fines for all violators.
3. Undertake all minor constructions and repairs of the infrastructure covered by the IA.
4. Communicate and cooperate with NIA in all major construction and repairs of the
infrastructure covered by the IA (for example, NIA will usually provide the heavy
equipment and materials and the IA will provide the fuel and labor (NIA “Review of
Irrigation Management Transfer Program”, n.d.).

With respect to the first maintenance responsibility delegated to Plaridel's IAs, all of
Plaridel’s IAs stated that, although they do not have experience in preparing operations
and maintenance plans, as they will be preparing them jointly with NIA, they are
confident that they will be able to easily complete the task (Farmer Group Interview 2,3
and 6-8). With respect to the implementation of the tasks outlined in these plans, which

106
consist of tasks such as, clearing debris from the canals, small repairs to the canals to
minimize leakage, and greasing the gates (NIA “Review of Irrigation Management
Transfer Program”, n.d.), all of Plaridel’s IAs stated that they were currently capable of
completing most, if not all, of them as most of the tasks are relatively straightforward and
a large number of the farmers already possess the necessary skills and knowledge to
complete them (Farmer Group Interview 2, 3 and 5-8).

However, Plaridel's IAs are concerned about their ability to pay for farmers, or day
laborers, to complete these tasks, as well as their ability to rent the necessary equipment,
as NIA does not currently have a sufficient amount of equipment for all IAs to borrow
them in a reasonable time frame (Farmer Group Interview 2, 3 and 5-8). This is because,
as was determined in the fourth 'best practice', it is unlikely that Plaridel’s IAs will have
the capacity to collect a sufficient amount of ISFs from their members on a sustained
basis. In addition, when asked if the farmers would work without compensation if their
IAs were having difficulties paying for labor most farmer members interviewed said it
was unlikely (Farmer Group Interview 3-8). Therefore, unless Plaridel's IAs do indeed
collect a sufficient amount of ISFs once these tasks are delegated to them, or if they are
able to find alternative revenue source(s), it seems unlikely that Plaridel's IAs will be able
to perform half of the first maintenance responsibility delegated to them under IMT.

The second maintenance responsibility delegated to Plaridel's IAs under IMT is: Creating
and implementing rules and regulations for the maintenance of the irrigation system
including enforcing penalties and fines for all violators. As discussed earlier the only
penalty that a farmer in violation of the rules will be obligated to respond to is the
suspension of their water rights (NIA Interview 2). However, as Plaridel uses a gravity
irrigation system it is effectively impossible for the IA to cut service to any one farmer,
as all water is controlled at the headworks and will remain under the authority of NIA. As
a single turnout gate is all that separates a farmer from water access, all he or she has to
do to obtain it is to open the gate when no one is there, usually at night. One NIA
fieldworker stationed in Plaridel spoke of his frustrations on this matter. He said that it’s
almost impossible for him to enforce the rules, as the farmers know that "they will still be

107
able to receive the water anyway" (NIA Interview 2). Therefore, it has been determined
that Plaridel's IAs will be unable to perform the second maintenance responsibility
delegated to them under IMT.

The last two maintenance responsibilities delegated to Plaridel's IAs under IMT are:
undertaking all minor constructions and repairs of the infrastructure covered by the IA &
communicating and cooperating with NIA in all major construction of repairs of the
infrastructure covered by the IA. Plaridel's IAs’ insufficient access to both temporary
financial support and low-interest credit sources seriously impedes their ability to create
replacement capital funds as their current collection rates are too low to reasonably
assume that they will be able to generate these funds on their own. As the irrigation
systems in Plaridel are in dire need of repair (Farmer Group Interview 2-8) it would be
virtually impossible for Plaridel's IAs to complete major construction projects, even if
NIA provides partial assistance, as the cost of the required ‘minor’ and ‘major’
construction far exceeds the financial capacity of the IAs (Farmer Group Interview 4, 5
and 8).

Therefore, if Plaridel's infrastructure is not rehabilitated before the implementation of


IMT, the IAs will not be able to undertake all minor and major construction works.
However, if the irrigation systems are rehabilitated before IMT, the IAs would still find it
extremely challenging to undertake these maintenance roles and responsibilities, although
there would remain the possibility to do so if their ISF collection rates increased, or if
they were able to find access to credit or other financial support.

Under the ‘Combined Stage I & II’ contract Plaridel’s IAs will be delegated the following
operations related roles and responsibilities from NIA (NIA “IMT Contract”, n.d.):

1. Prepare yearly operations and maintenance plans (jointly with NIA) for all
infrastructure covered by the IA and implement the tasks outlined in them.
2. Prepare irrigation management plans and cropping calendars for the area covered by
the IA (with the assistance of NIA).

108
3. Arrange the master list of all those who use irrigation water in the IA.
4. Create and implement rules and regulations for the O&M of the irrigation system
including enforcing penalties and fines for all violators.
5. Measure, monitor and record water flows in the lateral and sub-lateral canals.
6. Monitor and distribute water equally to all the sub-lateral canals at turnouts and
uphold at all times the farmer’s right to have access to water.

Plaridel's IAs indicate that they would be able to complete yearly operations, irrigation
maintenance and management plans (#1 and 2); arrange the master list of users (#3) and
measure, monitor and record water flow (#5) without significant difficulty as they are
comprised of fairly easy and straightforward tasks and because NIA will assist them.

However, Plaridel's IAs stated that they will have significant difficulty completing the
second half of the first, the fourth (same as the 2nd maintenance responsibility, discussed
above) and sixth operations responsibilities delegated to them under IMT for two main
reasons. Firstly, because they are already fighting over the distribution of water within
their IAs and, secondly, because most farmer beneficiaries do not trust their fellow
farmer members to fairly distribute the water to all farmer members of the IA (Farmer
Group Interview 2-8). For example, one typical complaint made to municipal staff is that
some farmers are intentionally blocking the passage of irrigation water to other farmers
downstream if equal distribution does not provide them with the amount they desire (NIA
Interview 8; Municipal Government Official Interview 3). As these actions usually occur
at night, it is next to impossible for other farmers to prevent this from happening, as they
do not have the time or means to monitor all upstream gates (Municipal Government
Official Interview 3). 'Strengthening the level of cooperation and trust within IAs will
allow more equitable water allocation and enable them to complete these two operations
responsibilities delegated to them under IMT. Addressing this obstacle will become more
challenging in the future as Plaridel's farmers' water rights are becoming less secure over
time, as will be discussed further in the next chapter.

109
One of the most common issues and constraints affecting the management of irrigation
systems worldwide is the heavily deteriorated condition of infrastructure (Wijayaratna,
2004, p. 13). This is a huge barrier for affected IAs as it impedes them from obtaining
reliable and sustained access to irrigation, ultimately reducing the overall productivity of
the area concerned (Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005).

As a consequence, some irrigation management specialists have stated that a precondition


for IMT should be that the portion of the irrigation system's infrastructure being turned
over to farmer groups be turned over in a 'fair condition' (Svendsen, Trava & Johnson,
1997). 'Fair condition' meaning "the hydraulic infrastructure is in operating conditions
capable of delivering water to farms in sufficient amount to satisfy crop needs and in a
timely manner" (Svendsen, Trava & Johnson, 1997), and that if they are not in fair
condition, that rehabilitation should be undertaken (Svendsen, Trava & Johnson, 1997).

Rehabilitation of irrigation infrastructure prior to IMT has become increasingly important


in Asia where "the older public schemes reach the age of 30-40 years in most countries"
(Wijayaratna, 2004, p. 37). However, it has been observed that these governments are
often unwilling or unable to complete the necessary improvements (Svendsen, Trava &
Johnson, 1997). Improvements can be extremely costly, as they are usually a "significant
departure from the mere cosmetic or light rehabilitation, or upgrading, which is typically
financed" (Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005, p. 286). In the
Philippines, NIA has acknowledged the importance of the rehabilitating ageing irrigation
infrastructure before they turn over the irrigation systems to the IAs (NIA,
“Rehabilitation and Improvement of National and Communal Systems”, n.d.). In fact,
NIAs goal is to rehabilitate all irrigation infrastructure being turned over to IAs, and in
some cases, even provide an "expansion of service areas and provision of additional
structures like adequate control structures, drainage systems, on-farm facilities, and
service roads" (NIA, “Rehabilitation and Improvement of National and Communal
Systems”, n.d.). However, due to severe financial constraints and the extent to which the
irrigation infrastructure across the country has deteriorated, NIA is having extreme
difficulties improving all of the infrastructure (Araral, 2006, p. 68). Specifically, in 2002

110
approximately 80 percent of NISs in the Philippines were in need of some form of
rehabilitation or improvement. The extent of this problem is represented in Table 6.1,
which lists the percent of NISs that were in need of rehabilitation, by type of repair, as of
2002.

Table 6.1: Percent of NISs in need of rehabilitation, by type, in 2002

Type of Facility Total % Needing Rehabilitation


1. Head Works 145 units 34%
2. Main Canal 3,917 kms 61%
3. Control Structures Main Canal 11,423 units 53%
4. Lateral Canal 10,299 kms 63%
5. Control Structures Lateral Canal 39,949 units 56%
6. Service/ Access Roads 13,967 kms 74%
Source: Araral, 2006, p. 136

In Plaridel, the situation is no different. Plaridel's IAs are demanding that the following
infrastructure be rehabilitated or they will not sign the 'Combined Stage I & II' IMT
contract with NIA (Farmer Group Interview 2-8; NIA Interview 10):
• Relining the canals with concrete.
• Improving farm to market roads.
• Renovating working stations.
• Repairing or replacing all broken gates.
Figure 6.1: Broken gate that makes it impossible for the IA to properly regulate the flow
of water

Photo credits: Jennifer Bedore

111
In addition, the IAs are demanding that NIA increase their equipment stocks as currently
there are not enough to go around. This results in the IAs not having sufficient equipment
to conduct some of the maintenance responsibilities delegated to them under IMT as
purchasing the equipment is financially prohibitive (Farmer Group Interview 2-8; NIA
Interview 10). For example, currently there is only one backhoe for 12 working stations,
this has resulted in the improper maintenance of many of the canals in Plaridel (Farmer
Group Interview 3,5 and 6), one such obstructed canal is shown in the picture below.

Figure 6.2: Unmaintained canal in Lagundi, which is said to have occurred due to a lack
of necessary equipment

Photo credits: Jennifer Bedore

NIA is in agreement with the IAs that rehabilitation needs to take place and that
additional equipment must be acquired before IMT, if the IAs are going to successfully
undertake the roles and responsibilities delegated to them (NIA Interview 3, 8 and 10).
NIA's Bulacan office alone had been implementing hundreds of millions of dollars of
rehabilitation projects since 2006, which takes up a majority of their IMT budget (NIA

112
Interview 8). However, they have been focusing on the main canals and headworks as
NIA indicates that the lateral and sub-lateral canals are of a less pressing importance
(NIA Interview 8) The NIA staff implementing IMT believe that, although it cannot be
guaranteed, it is possible that Plaridel's IAs' rehabilitation and equipment demands could
be met in the future, once the priority projects were completed, but could not specify a
date (NIA Interview 3 and 8). Plaridel's IAs are hoping that the funds do become
available, as one small steel gate alone costs upwards of 40,000 PHP (NIA Interview 9)
and to repair all of the items they have requested from NIA would cost millions (Farmer
Group Interview 5), but they are not optimistic (Farmer Group Interview 2-8).

As a result of their lack of confidence in NIA, some IAs stated in confidence that if NIA
is unable to complete the repairs requested, they might still sign the IMT contract.
However, they also indicated that they would then require a greater share of the ISFs
collected to finance undertaking the operations and maintenance roles and responsibilities
delegated to them under IMT (Farmer Group Interview 3, 5).

Therefore, it has been determined that there is a low likelihood that Plaridel's IAs will
receive a properly functioning irrigation system at the time of turnover as NIA is
financially incapable of undertaking the necessary rehabilitations. Consequently, it can be
said that the likelihood of Plaridel's IAs being able to perform all of the O&M related
roles and responsibilities delegated to them under IMT is thereby further reduced. Thus
there is a high likelihood that Plaridel's IAs will fall into the 'vicious cycle of irrigation
management'.

113
Best Practice #7: IAs Must Have a Clearly Recognized and Sustainable Water Right
and Service

Without a clearly recognized and sustainable water right and service the chances of an IA
being successful post-IMT are low (Araral, 2006; FAO & INPIM, 2001; International
Water Management Institute, 2007; Panella, 2004; Sampath & Young, 1990; Svendsen,
Trava & Johnson, 1997; Sander, 1979; Sangupta, 1991; Shivakoti, Vermillion, Lam,
Ostrom & Pradhan, 2005; Vermillion, n.d.; Vermillion, 1997; Wijayaratna, 2004). This
'best practice' has been deemed one of the key ingredients to an IAs success post-IMT. If
an IA does not have a reliable and sustainable flow of water to its gates, it must have
legal recourse to access that water. The only way this can be ensured is to have a clearly
recognized and sustainable water use right, meaning its water right is strong, well defined
and secure (Svendsen, Trava & Johnson, 1997).

IAs that do not have this right are (Svendsen, Trava & Johnson, 1997):
1. Less likely to invest in improvements to their irrigation systems.
2. Encouraged to think and behave in the short-term.
3. More likely to incur heavy expenditures in legal costs to defend their poorly-
defined water right.
4. More likely to experience a reduction in water supply.
5. Less likely to pay their ISFs.
6. More likely to experience system collapse.

A clearly secure and recognized water right will only become more important for IAs as
time goes on. Of the world's total water withdrawals, 70 percent is from agriculture and
in developing countries, this figure averages 85 percent of the total (International Water
Management Institute, 2007, p. 40). However, as "the world's welfare improves, demands
from other water sub-sectors are increasing. Domestic water supply, industry and
manufacturing, and the environment itself, are now in direct competition with the
agricultural sector for increasingly scarce water resources" (International Water
Management Institute, 2007, p. 40). In addition, growing populations, climate change,

114
and pollution are reducing the total amount of available water (Shivakoti, Vermillion,
Lam, Ostrom & Pradhan, 2005, p. 24). It is therefore not surprising that agricultural
sectors in countries all over the world are already feeling pressure on their water
resources (Attia, n.d.; FAO & INPIM, 2001; National Economic and Development
Authority, 2004; Shivakoti, Vermillion, Lam, Ostrom & Pradhan, 2005; Svendsen, Trava
& Johnson, 1997; Wijayaratna, 2004), or that one of the most common issues affecting
the management of irrigation systems worldwide is an unreliable supply of water due to
both competing users and shortage of supply (Wijayaratna, 2004, p. 8).

In the Philippines the water resources available to all sectors is becoming increasingly
scarce. It is estimated that the Philippines has the second lowest per capita freshwater
stocks in Asia (National Economic and Development Authority, 2004, p. 46). These
stocks are rapidly decreasing due to the “over extraction of groundwater, salt water
intrusion, water pollution, denuded forests/watersheds and lack of catchment basins”
(National Economic and Development Authority, 2004, p. 46). In addition, the El Nino
phenomenon along with the Philippines’ extreme vulnerability to climate change has
made them highly vulnerable to the rapid loss of their fresh water stocks (Rincon &
Virtucio, n.d., p. 20). Engineer Samuel Contreras, from the Department of Agriculture,
stated that due to the above reasons, as well as the rapidly increasing population of the
Philippines, competition among water users (principally agricultural, domestic, and
industrial sectors) has been drastically increasing over the past decade (Conteras, n.d.).
He believes that without an increase in water productivity and ensuring water security in
the agricultural sector, the Philippines will be unable to meet the needs of all of its
irrigation users in the near future (Conteras, n.d.). While more significant challenges
loom for the entire agricultural sector of the Philippines, AMRIS, and therefore Plaridel’s
IAs, are already experiencing the effects of dwindling supply and strong competition
amongst user groups.

The Angat Watershed provides irrigation water to NIA’s AMRIS system (serving
approximately 30,000 has), potable water to Metro Manila and other neighboring
provinces through the Metropolitan Waterworks and Sewerage System (MWSS) (4,000

115
million liters per day) and is also used as a source for hydroelectric power generation
(capacity of 218,000 kWh), which mainly serves the areas of Bulacan and Metro Manila
(NIA “Irrigation Delivery”, n.d.). The National Water Resources Board (NWRB) controls
the allocation of water rights for these three uses in the watershed and is also the agency
NIA’s IAs must go through to individually register their water right (NIA “Irrigation
Delivery”, n.d.).

Initially, Metropolitan Manila had no water rights to the Angat watershed. However, in
1998, the national capital region was granted temporary water rights from Angat during
emergency situations. However, over time, they gained permanent rights through the
NWRB due to the increasing needs of their rapidly growing population. Slowly, the
allocation of water rights came to be weighted in favor of domestic consumption in Metro
Manila, and thus reduced the amount of water available to NIA (NIA Interview 1). The
following is the current allocation of water rights by use in the Angat watershed (NIA
Interview 10):

• Metro Manila, domestic: 36+ cubic meters per second


• NIA’s AMRIS, irrigation: 22 cubic meters per second
• DENR, river maintenance: 2 cubic meters per second
• National Power Company: 0 cubic meters per second

The NWRB is legally permitted to appropriate NIA’s water rights in favor of Metro
Manila’s domestic use as, under the Water Code of the Philippines, domestic use takes
priority over agricultural use (National Water Resources Board, n.d.). Although this is
true, the agricultural sector believes that they are at an unfair disadvantage in protecting
their stock of water rights as they do not have enough money or power to be fairly
represented on the NWRB’s board of directors, who make all of the decisions with
respect to water rights allocation for Angat (Farmer Interview 1; Municipal Government
Official Interview 3; NIA Interview 10).

116
NIA’s inability to secure its water rights and the consequences of this on the farmers of
AMRIS where made evident during the drought of 1998 (Rincon & Virtucio, n.d., p. 20).
In 1998, due to an El Nino event, there was an extreme shortage of potable water in
Metro Manila. In this emergency situation, the NWRB decided to temporarily allocate all
of the water for irrigation in the Angat Dam to the MWSS. In return, the MWSS stated
that it would reimburse the farmers for their lost crops resulting from the lack of
irrigation water available to the AMRIS farmers that cropping season (Rincon &
Virtucio, n.d., p. 20; NIA Interview 1). The outcome of this reallocation to Metro Manila
was a decrease in the total agricultural production of more than half (Provincial
Government Official Interview 1) and 10 percent of AMRIS’s farm land unable to realize
a harvest at all (NIA Interview 8). However, the MWSS has still not repaid the farmers of
the AMRIS system for their lost crops (NIA Interview 8; Farmer Interview 1).

Subordinating agricultural water rights during periods of scarcity is not uncommon in


AMRIS. A staff member from NIA’s water management department stated that before
Metro Manila was allocated water rights by the NWRB, there were water shortages due
to El Nino events that were severe enough to impact AMRIS’s production levels.
However, these occurred only every 10 to 15 years. Now that MWSS has gained water
rights, these shortages are occurring on average every 2 to 5 years (NIA Interview 3). A
recent similar event occurred while this research was being conducted, wherein, Plaridel
was promised irrigation water from Angat in June, 2010, however by the time the
research was finished, in July they had still not received any water, nor was there any
indication as to when it would be coming (NIA Interview 3; Farmer Group Interview 2-
8). This resulted from the water level of the Angat dam being too low and yet continuing
to supply all water to the MWSS (NIA Interview 3; Farmer Group Interview 2-8).

Unfortunately, Plaridel’s and AMRIS’s ability to maintain their water rights will only
become more difficult over time. This is because Metro Manila’s population continues to
rise (Provincial Planning and Development Office, 2010, p. 20), the quantity and the
quality of the Angat watershed continues to degrade (Rincon & Virtucio, n.d., p. 20) and
it appears as though Bulacan's dwindling domestic water supply will be replaced with

117
water from Angat. (Provincial Government Official Interview 1).

Bulacan currently obtains 97 percent of its domestic water supply from groundwater.
However, due to massive over extraction, many coastal towns of Bulacan, up to 40
kilometers from the shoreline, experience salt-water intrusion to many of their ground
water sources and many more are at “critical” risk of intrusion (Provincial Government
Official Interview 1). For example, in Plaridel, they have already lost 2 pumping stations
to salt water intrusion and are constantly looking for new places to set up wells to address
existing shortages of water. They are currently in the process of setting up two new wells
in the municipality (Municipal Government Official Interview 7), however, exiting
groundwater supplies are only expected to last for another five to ten years before salt-
water intrusion and other contaminants render the remaining water saline (Municipal
Government Official Interview 5 and 6). Therefore, the board of directors of Plaridel
Water District, along with the rest of the province of Bulacan, are looking to Angat for
their future water needs (Municipal Government Official Interview 7; Provincial
Government Official Interview 1).

By way of the proposed Bulacan Bulk Water Project, the province intends to secure
permanent water rights from Angat’s already overextended supply. It proposes to take
230 million liters of water per day from the Angat dam (Provincial Government Official
Interview 1), treat it and send it through a series of pipelines to the cities and
municipalities in Bulacan and Metro Manila that need it the most. The NWRB has
already allocated them temporary rights to do so, as well as much room to grow
(Provincial Government Official Interview 1). However, the project was supposed to be
implemented in 2007 but is currently on hold. Firstly, Bulacan's memorandum of
agreement fell through with the MWSS, due to a change in the administration, who they
were partnering with to erect and operate the plant (Provincial Government Official
Interview 1). Secondly, the former vice governor of Bulacan opposed the project
(Provincial Government Official Interview 1).4 Therefore it still remains to be seen if

4
The former vice governor supposedly opposed the project due to public outcry opposing further
privatization of the dam, as two companies privatized MWSS in the late 1990s (Provincial Government

118
NIA’s water rights will be diminished in order to help provide for Bulacan’s and Metro
Manila’s domestic water needs. However many are confident that it will push through as
the domestic water supply of Metro Manila and Bulacan is dwindling every day
(Provincial Government Official Interview 1).

So what are the chances of AMRIS’s farmers being able to maintain their current water
rights? It appears as though this will depend on the domestic water suppliers of Metro
Manila and Bulacan finding alternative water sources, as NIA has been seemingly unable
to protect their water rights in Angat from such powerful forces. As well, NIA has been
unable to find any viable alternative bodies of water to help meet their current and future
demands (NIA Interview 10). Currently, the MWSS and Bulacan are looking for
alternative sources, the most promising so far being Laguna de Bay (Farmer Group
Interview 3 and 5) and the Upper Pampanga River (NIA Interview 3). However, these
projects are still in early stages and none have been committed to as of yet. As well, they
both require substantial investments in infrastructure so they will likely not be
implemented unless absolutely necessary (Provincial Government Official Interview 2).

Therefore, it can be said that although AMRIS’s, and thus Plaridel’s, IAs have legally
recognized water rights, through the NWRB, these water rights are neither clearly
recognized nor sustainable, as they are not strong, well defined, or secure. This has
resulted in Plaridel’s IAs having unreliable water service as they are unable to defend
their water rights against the more powerful MWSS. This scarcity will continue to
increase into the future due to increased pressure from competing stakeholders. It has
therefore been determined that this ‘best practice’ is not being implemented in Plaridel.
This makes Plaridel’s farmers extremely vulnerable to the ‘vicious cycle of irrigation

Official Interview 1). This may have been fuelled by the recent dispute between the Power Sector Assets
and Liabilities Management Corp. (PSALM), who is charged with managing the Angat Dam, and a group
of petitioners (comprised of the "Freedom and Debt Coalition and four other "caused oriented" groups).
These 'caused oriented' groups recently filed a petition "before the Supreme Court seeking to stop the
privatization of the… hydroelectric power plant component... of the Angat Dam in Bulacan", asking for a
restraining order against PSALM from proceeding with their deal with the Korea Water Resources
Corporation (K-Water), for the management and operation of Angat Dam. The Petitioners believing that it
is not in the best interest of the Filipino people to lose control of vital natural resources by selling them to
foreign entities (SunStar, 2010).

119
management’ as well as to the unsuccessful implementation of IMT.

If Plaridel’s IAs are to have a fighting chance at success post-IMT, their water rights need
to be strengthened so that they can sit at a bargaining table as equals with the other, more
powerful, stakeholders. This would require the clarification of their currently weak water
rights, which would most likely require action on the part of a national legislative body or
the executive branch of the government (Rincon & Virtucio, n.d., p. 21). This will be no
easy task as they are dependent on voters who value drinking water more than farmers.

120
Chapter Seven: Conclusions

It has been established in the previous chapters that the accepted requirements or
preconditions for 'best practices', with respect to the implementation of IMT, are not
currently being observed in the case of Plaridel, Bulacan. So what does this mean for
Plaridel, the Philippines, and all other countries of the world implementing IMT? This
chapter will attempt to answer this question through the subsidiary research questions of
this thesis.

Subsidiary research question 1: Given the present course of IMT implementation in


Plaridel, what degree of success, in terms of productivity, profitability and
sustainability, are Plaridel's IAs likely to achieve post-IMT?

Referring back to the 'vicious cycle of irrigation management' (see Figure 5.1), which
specifies that the presence of even a single of its constituent parts can serve as a catalyst
for an irrigation system’s entry into the “downward spiral” (Araral, 2006, p. 132), it can
be seen that there is an extremely high likelihood that Plaridel's IAs will fall into the
'vicious cycle' post-IMT. This is because Plaridel's IAs currently have all five of the
'vicious cycle's' components. Therefore, it is also highly improbable that Plaridel's IAs
will be productive, profitable or sustainable post-IMT.

Subsidiary research question 2: What are the main impediments, if any, to adhering
to the 'best practices' for IMT implementation in the municipality?

It has been determined that the largest impediments NIA faces to adhering to the ‘best
practice’ for IMT implementation in the municipality is the absence of clearly recognized
and sustainable water rights and service (discussed in Best Practice #7) and the severe
lack of financial resources. NIA management staff at the Bulacan office stated that they
would need a budget five times larger than what they currently have to adequately
implement IMT in Plaridel (NIA Interview 4 and 6). They also indicate that they fully
understand that IMT, at present, cannot be properly implemented in Plaridel, given their

121
existing financial constraints. They further indicate that they nonetheless had no choice
but to implement IMT given the national government’s explicit requirement to do so
(NIA Interview 6).

Implementing IMT in the absence of an adequate financial base is not a circumstance that
is particular to Plaridel. The shortage of funds available to NIA has resulted in IMT being
poorly implemented in regions throughout the Philippines (Raby, n.d.; Araral, 2006). As
well, the lack of government financial support for IMT has been a fundamental problem
to its implementation in many areas of the world (International Water Management
Institute, 2007; Raby, n.d.; Thompson, 1995; Uphoff, Ramamurthy & Steiner, 1991).

Irrigation experts have found that IMT has been moving away from its original objectives
of achieving national rice self-sufficiency and improving the livelihood of farmers, to an
exclusive focus on reducing the state's financial obligations (Zialcita, 1984, p. 277). In
other words, the implementation of IMT is not achieving the positive goals that it
purports to provide to the general public. Instead, NIA is implementing IMT solely out of
the necessity of becoming financially viable, which has resulted in the rapid
implementation of IMT without sufficient supports, leading NIA to delegate irrigation
management duties to unsustainable, or marginally viable, IAs (Panella, 2004; Raby,
1997). This is exacerbated by farmers who are incapable of paying their full ISFs in a
timely manner, thus severely restricting the capacity of their respective IAs to gain
financial independence (see Best practice #5).

How might this situation change in the Philippines? Many of those interviewed in this
research indicate that a fundamental shift in the priorities of the national government
must occur for these problems to be resolved. Currently, the rhetoric of the national
government, focused on promising better programs and policies to achieve rice self-
sufficiency and improving the livelihoods of farmers, has not been followed with
sufficient financial resources for their implementation. The main reason for this is that the
agricultural sector is simply not a priority (NIA Interview 6; Provincial Government
Official Interview 1).

122
However, another way in which these problems might be lessened, without having to rely
on changing government priorities, would be to implement a pilot project in Plaridel that
deals with both the supply and demand sides of water resources management as well as
the insufficient financial resources available to properly implement IMT.

With respect to the supply side of water resources management an Integrated Water
Resources Management (IWRM) approach would be of great benefit to the Angat
watershed in view of facilitating a legal, regulatory and institutional framework that
allows for the fair and enforceable allocation of water rights between all stakeholders.

IWRM is a participatory planning and implementation process that brings all


stakeholders together to determine how best to meet their long-term water resource needs
while maintaining essential ecological services and economic benefits (USAID, 2006).
The premise of this model is that if all parties participate in the water allocation and rule
creation process they will be more willing to abide by those mandates. Furthermore,
through engagement with the IWRM process, stakeholders begin to view water resources
as a common asset of all stakeholders and accordingly something that should be jointly
managed for the benefit of the collective (FAO & INPIM, 2001, p. 5).

In this framework, all relevant stakeholders of the Angat watershed should be brought
together to reach an agreement regarding the legal, regulatory and institutional
frameworks that are needed for the fair and enforceable allocation of water rights
between all stakeholders. This process should be facilitated by an international
development organization that is experienced with IWRM. Although the main focus will
be at the watershed level, there requires buy-in and cooperation at all levels of
government. Therefore, the following stakeholders should be involved in the IWRM
process:
National:
• NWRB
• DA (Department of Agriculture)

123
• DENR (Department of Environment and Natural Resources)
• NIA

Watershed or Provincial (in the case Angat):


• MWSS
• NIA (Bulacan-Aurora-Nueva Ecije Office)
• NPC (National Power Corporation)
• Provincial Environment and Natural Resources Officer (PENRO)
• Bulacan: Relevant provincial government departments and officials
• Metro Manila: Relevant government departments and officials
• Local Water Utilities Administration
• NGOs

Municipal (Plaridel)
• NIA (AMRIS division)
• IAs
• Relevant municipal government departments and officials
• Municipal Agricultural Office (MAO)
• NGOs

In order for this process to have the greatest chance of succeeding, these actors must
collectively define: what they are going to plan (what goal(s) they want to achieve), how
they are going to plan it (what the planning process will be), when they are going to plan
it (timeline), and who is going to plan it (i.e. deciding if there are additional stakeholders
that should be involved), before the IWRM process is undertaken. In essence, one must
plan the process through which the substantive solutions will be achieved (Boothroyd,
2006).

In addition, it is essential that the stakeholders themselves establish the ground rules for
conduct between stakeholders and for the process itself. This ensures that all stakeholders

124
are willing to participate, thus guaranteeing that this process is as successful as possible
(Boothroyd, 2006).

With respect to the demand side of water resources management, NIA, or an experienced
international development organization, would require Plaridel’s farmers and IAs to
conserve those water resources already available to them in order to reduce the risk of
low-crop yields. A prominent example of water scarcity being addressed successfully is
observed in a project recently undertaken in Andhra Pradesh, India, entitled “Andhra
Pradesh Farmer Managed Groundwater Systems” (APFAMGS) (FAO & INPIM, 2001,
p. 1). The APFAMGS project was initiated in response to a situation where, like Plaridel,
they no longer had reliable access to irrigation water and thus were experiencing
diminishing yields and rising levels of debt (The Economist). Accordingly the principal
objective of the project was to reduce the amount of irrigation water needed by farmers
for the daily irrigation of their farms.

The APFAMGS project sought to enhance water use efficiency by providing farmers
with the data, skills and knowledge necessary to monitor and minimize their irrigation
water requirements (FAO & INPIM, 2001, p. 2). Farmers learned these skills at “Farmer
Water Schools”, which focused on teaching different cultivation techniques and cropping
patterns that could adapt to the varying availability of irrigation water. They also
emphasized conservation practices such as water budgeting and selecting crops that
require less irrigation water (FAO & INPIM, 2001, p. 5). Additionally, to ensure that
farmers would have a support system to help mitigate threats to their farm’s sustainability
they were grouped under local ‘Groundwater Management Committees’ (FAO & INPIM,
2001, p. 4), which provide long-term support and manage future members trainings (FAO
& INPIM, 2001, p. 4).

This project achieved its goal of reducing the amount of irrigation water needed by
farmers for the daily irrigation of their farms, and thus significantly reduced their risk of
crop failure (FAO & INPIM, 2001, p. 3). The main reason the project’s proponents give
for its success is that it allows the farmers to make all of their own decisions, resulting in

125
wide-spread farmer support for the program and positive long-term behavioral change in
conserving water resources in the region (FAO & INPIM, 2001, p. 3).

With over 10,000 farmers having attended the “Farmer Water Schools” in Andhra
Pradesh since the inception of the program (FAO & INPIM, 2001, p. 7) it can be seen
what kind of far reaching effect this pilot project could have for the availability of water
in the Angat watershed. This bottom-up approach to water conservation also fits in well
with the implementation of IMT in the municipality as it places the responsibility of
water management with the IAs and farmers. It also helps to build their capacity to make
informed decisions and find sustainable farming solutions, which would enhance
Plaridel’s farmers in adapting to the implementation of IMT in the municipality. Thus, if
this model were successfully implemented in Plaridel many of the best practices that
were not met would be easily attainable, such as:
• Best Practice #2. IAs must be ‘strong’ enough to mobilize farmer members to
undertake the roles and responsibilities that will be delegated to them under IMT.
• Best Practice #4. IAs must have the capacity to collect Irrigation Service Fees
(ISF) from their members on a sustained basis and to properly manage their
financial resources.
• Best Practice #6. IAs must have the capacity to perform all operations and
maintenance related roles and responsibilities delegated to them under IMT.
And to a certain degree:
• Best Practice #7. IAs must have a clearly recognized and sustainable water right
and service.
Therefore, if both the supply and demand side of water resources management can be
addressed through this pilot project, along with the provision of sufficient financial
resources to properly implement IMT in the municipality, Plaridel will stand a far greater
chance of successfully implementing IMT.

126
Subsidiary research question #3: How can the study inform the implementation of
IMT in other areas of the Philippines and worldwide?

Plaridel can be seen as a cautionary tale for the Philippines and other countries that aspire
to successfully implement IMT. Plaridel shows that when reducing financial burdens is
the only, real, motivator for implementing IMT, disastrous results will likely ensue.
Under such circumstances, it is probable that insufficient financial resources will be
allocated for its implementation and therefore the affected IAs will have a high likelihood
of falling into the 'vicious cycle of irrigation management'.

Indeed, it may be the case in the Philippines, and other developing countries
implementing IMT, that IMT appears to be an easy way out (Bandyopadhyay,
Shyamsundar & Xie, 2007; International Water Management Institute, 2007). However,
for IMT to work "difficult, painstaking efforts... from highly skilled and committed
people" (Korten & Siy, 1989, p. 148) are needed as "it is not possible to design a model
that can cater to different physical, institutional, socio-economical and cultural conditions
that are evident not only across regions and countries but often also within countries
themselves" in a short time frame with insufficient resources (International Water
Management Institute, 2007, p. 11).

As the world's population is expected to rise to 8 billion people in the next 20 to 30 years,
irrigated agriculture is "expected to provide the basis for 80 percent of the additional food
production required" (Wijayaratna, 2004, p. 4). In Asia, many countries must "figure out
how to double agricultural production in the decades ahead" (Shivakoti, Vermillion, Lam,
Ostrom & Pradhan, 2005, p. 12). Therefore, effective irrigation management is essential
to ensuring that the world will have enough food to eat in the near future. As IMT is
currently the irrigation management practice of choice in so many countries worldwide,
IMT planners and implementers must ensure that careful consideration is given to the
nature of all IMT-related policies, the ingredients necessary for policy success, and their
influence on the lives of those who hold stake in them. The current favorable bias
towards IMT worldwide is in large part based on results that are uneven precisely

127
because many of the requirements or preconditions for success are absent - or even if
they are present, that there are underlying complexities in the constraints farmers face in
their livelihood income generation and thus there remains significant systematic research
to be conducted (Vermillion, 1997, p. 256). This case study of Plaridel provides some
preliminary insights into how addressing the requirements of successful IMT can be a
step in the right direction. However, the irrigation community has a long way to go in
protecting the worlds agricultural and water resources.

128
Limitations and Directions for Further Research

There are two main limitations to this research. The first is that this research deals with
several broad themes, any one of which could be a topic on its own. I therefore made the
choice in some instances to forgo a more in-depth analysis to enable the larger picture to
emerge. The second is that although the ‘best practices’ used in this research to evaluate
Plaridel’s implementation of IMT were based on a review of all of the current literature
on the topic, as I stated in the relevance and rationale section, much research remains to
be completed with respect to all aspects of IMT. Therefore, it is not unreasonable to
predict that these ‘best practices’ will likely change over time as more research is
conducted. Additionally, it is important to note that the best practices were based on
‘expert knowledge’ alone. Meaning that if local, or unofficial knowledge (for example
farmer’s or NIA field or regional staff members’ knowledge) was used to form the best
practices, they may have been different. For example, they may have been more focused
on short-term goals rather then long-term.

With respect to future research, there is a plethora of potential research topics in Plaridel,
the Philippines and worldwide, that are of crucial relevance to IMT. With respect to
Plaridel, it would provide the irrigation management community with much needed
follow-up information if a study was conducted post-IMT in the municipality. With
respect to further research in the Philippines and worldwide, there is still a huge gap
between the theory and practice of IMT and therefore any community level research
studying the implementation and/or impacts of IMT on IAs and the agricultural sector,
with respect to their long-term viability, would be invaluable to the agricultural
community.

129
Works Cited

Agriculture Business Week (2008, July 20). The Philippines can be rice self-sufficient,
again. Retrieved from http://www.agribusinessweek.com/the-philippines-can-be-
rice-self-sufficient-again/

Araral, Eduardo (2006). Decentralization Puzzles: A Political Economy Analysis of


Irrigation Reform in the Philippines. (Doctoral dissertation). Retrieved from Ann
Arbor. (3215225)

Araral, Eduardo (2009). "What Explains Collective Action in the Commons? Theory
and Evidence from the Philippines, World Development 37 (3), 687-697.

Asian Development Bank (1994). Report and Recommendation of the President to the
Board of Directors on a Proposed Loan to the Republic of the Philippines for the
Rural Infrastructure Development Project. Asian Development Bank.

Asian Development Bank (2008). Irrigation Management Transfer: Strategies and Best
Practices. Delhi: Sage Publications.

Asian Productivity Organization (2004). Improved Irrigation Management for Improved


Irrigation Management held in Sri Lanka, 3-8 June 2002. Asian Productivity
Organization.

Attia, Bayoumi (n.d.). Decentralization and Participatory Irrigation Management.


Retrieved from http://www.idrc.ca/en/ev-88800-201-1-DO_TOPIC.html

Bagadion, Benjamin U (1989). The evolution of the Policy Context: An Historical


Overview. In Frances F. Korten and Robert Y. Siy (Eds.), Transforming a
Bureaucracy: The Experience of the Philippine National Irrigation
Administration (1-19). West Hartford, CT: Kumarian Press.

Balea, Judith (2010, April 20). Philippines unlikely to meet rice self-sufficiency target.
Retrived from http://www.abs-cbnnews.com/business/04/19/10/philippines-
unlikely-meet-rice-self-sufficiency-target

Balisacan, A.M. (2000). Pathways of Poverty Reduction Rural Development and


Transmission Mechanisms in the Philippines. Paper from Asian Development
Bank '01: Asia and Pacific Forum on Poverty: Reforming Policies and
Institutions for Poverty Reduction.

Bandyopadhyay, Sushenjit, Priya Shyamsundar & Mei Xie (2007). Yield Impact of
Irrigation Management Transfer: Story from the Philippines. The World Bank.

Bankoff, Greg (2007). Dangers to going it alone: social capital and the origins of
community resilience in the Philippines, Continuity and Change, 22, 327-355.

130
Benzidane, Hanane, Danielle Blond & Johanna Mazur (2008). Sustainable
Livelihoods: Poverty Reduction & Micro-Enterprise Promotion. Plaridel,
Philippines.

Boothroyd, Peter (2006). Developing Community Planning Skills: Application of a


Seven-Step Model. Appendix 3. Strategic Plan. UBC Department of Family of
Family Practice, 27-31.

Bruns, Bryan (1993). Promoting Participation in Irrigation: Reflections on Experience in


Southeast Asia." World Development, 21, 1837-1849.

Bulacan Province (1997). Provincial Physical Framework Plan. 1998-2007. Province of


Bulacan, Philippines,

Bureau of Insular Affairs (1903). Fourth Annual Report of the Philippine Commission.
Washington: U.S.G.P.O.

Business Mirror (2010 June 15). Noynoy Aquino Agriculture Plans. Retrieved from
http://www.agriculture-ph.com/2010/06/nonoy-aquino-agriculture- plans.html

Central Intelligence Agency (2010). The World Factbook: Philippines. Retrieved from
https://www.cia.gov/library/publications/the-world-factbook/geos/rp.html

Climate Change Commission Office of the President (2009). National Framework


Strategy on Climate Change 2010-2022. Philippines.

Contreras, Engr. Samuel (n.d.). Water Technologies with an Environment and Human
Face: A New Paradigm for Sustainable Agricultural Development. Power Point
presentation. Department of Agriculture: Bureau of Soils and Water Management,
Philippines.

Cooperative Rural Bank of Bulacan (2010). Livelihood Credit Assistance Program for
Individual Loan. Bulacan, Philippines.

de los Reyes, P. Romana & Sylvia Ma. G. Jopillo (1989). The Impact of Participation:
An Evaluation of the NIA's Communal Irrigation Program. In Frances F. Korten
and Robert Y. Siy (Eds.), Transforming a Bureaucracy: The Experience of the
Philippine National Irrigation Administration (90-116). West Hartford, CT:
Kumarian Press.

FAO (2003). Irrigation Management Transfer IMT Profile for: Philippines. FAO.

FAO (2008). Evaluation of FAO cooperation with India: Andhra Pradesh Farmer
Managed Groundwater Systems. Retrieved from
http://www.fao.org/pbe/pbee/common/ecg/378/en/Microsoft_Word__Managemen
t_Response_FAO_cooperation_with_India.pdf

131
FAO & INPIM (n.d.). Focusing on Increasing Provincial Productivity: Rice Self-
Sufficiency Plan 2009-2010. Retrieved from
http://www.grain.org/research_files/Rice%20Self-
%20Sufficiency%20Plan%202009-%202010.pdf

FAO & INPIM (2001). Overview Paper: Irrigation Management Transfer, Sharing
Lessons from Global Experience. International E-mail Conference on Irrigation
Management Transfer. WUA Legislation Country Profiles: Philippines.
Retrieved from http://www.fao.org/nr/water/docs/irrigation/Overview.pdf

FAO Water (n.d). Andhra Pradesh Farmer Managed Groundwater Systems (APFAMGS)
Project: Demand Side Management of Groundwater. Retrieved from
http://www.fao.org/nr/water/projects_andra.html

Frias, Herminio A (2010). Sustainable Rural Livelihoods: Opportunities and Challenges


in Plaridel. Powerpoint presentation. Municipal Agricultural Office of Plaridel,
Philippines.

Giordano, Meredith A., Madar Samad, & Regassa E. Namara (2006). Assessing the
outcomes of IWMI’s research and interventions on Irrigation Management
Transfer. Colombo, Sri Lanka: IWMI.

Godilano, Esteben Celeste (2009). Spatial Impacts of Climate Change in the Philippines:
Challenges and Opportunities for Food and Water Security. Presentation for
the consultation on “Charting Our Water Future: A Multi-Stakeholder Policy
Program Dialogue”, Luzon.

Groenfeldt, David (2004, July 28). PIM or IMT. Retrieved from


http://www.inpim.org/leftlinks/Newsletters/N5/n5a4/view.htm

Groenfeldt, David (1997). Transferring Irrigation Systems form the Systems to Users:
Questions of Management, Authority, and Ownership. Paper presented at 96th
annual meeting of the American Anthropological Association, Washington, DC.

Groenfeldt, David & Svendsen, Mark (Eds.). (2000). Case Studies in Participatory
Irrigation Management. WBI Learning Resources Series. Washington, DC: World
Bank Institute.

Gupta , Deepak & L.P. Srivastava (1999). Status of Participatory Irrigation Management
in India: A Documentary Critique. New Delhi: Institute of Social Studies.

Illo, Jeanne Frances I. & Jesus R. Volante (1984). Organizing Farmers for Communal
Irrigation: Operation and Maintenance in the Aslong and Taisan Irrigation
Systems. Naga City: Research and Service Center.

132
International Commission on Irrigation and Drainage (n.d.). ICID 2nd Regional Afro-
Asian Conference. An Innovative Method of Irrigation System Management in the
Philippines. Manila 5-9 Dec. 1978, Manila.

International Water Management Institute (2007). Irrigation Management Transfer:


Worldwide Efforts and results. Rome: IIMI.

Johnson, S.H., D.L. Vermillion, & J.A. Sagardoy (1995). Irrigation Management
Transfer: Selected papers from the International Conference on Irrigation
Management Transfer. Rome: IIMI.

Kelly, Philip F (1998). The Politics of Urban-Rural Relations: Land Use Conversion in
the Philippines, Environment and Urbanization, 10(1), 35-54.

Kikuchi, Masao, Atsushi Maruyama, & Yujiro Hayami (2001). Phases of Irrigation
Development in Asian Tropics: A Case Study of the Philippines and Sri Lanka,
The Journal of Development Studies, 39,109-138.

Korten, Frances F. & Robert Y. Siy, (Eds.). (1989). Transforming a Bureaucracy: The
Experience of the Philippine National Irrigation Administration. West Hartford,
CT: Kumarian Press.

Lauraya, Fay M., Anonia Lea R. Sala, & C.M. Wijayaratna (1996). Research
Interventions to Strengthen Irrigators’ Associations. IIMI Country Papers, The
Philippines No. 7. Colombo, Sri Lanka: IIMI.

Manaytay, Antonio M (2008, August 6). Rice self–sufficiency plan: Will it benefit the
farmers? Retrieved from http://www.insidemindanao.com/article71.html

Mansuri, Ghazala & Rao, Vijayendra (2004). "Community-Based and -Driven


Development: A Critical Review, The World Bank Research Observer, 19, 1-39.

Merrey, Douglas J. (1997) Expanding the Frontiers of Irrigation Management Research:


Results of Research and Development at the International Irrigation Management
Institute 1984 to 1995. Colombo Sri Lanka: IIMI.

Municipality of Plaridel (1998). Comprehensive Development and Land Use Plan for
Plaridel 1999- 2004. Province of Bulacan.

Municipality of Plaridel (2002). Physical and Socio-Economic Profile. Plaridel,


Philippines: The Province of Bulacan.

Municipality of Plaridel (2007). Comprehensive Development and Land Use Plan for
Plaridel. Province of Bulacan.

133
Municipal Planning and Development Coordinator (2008). Basic Statistics on Plaridel.
MPDC.

National Economic and Development Authority (2004). Medium-Term Philippine


Development Plan: 2004-2010. Manila: NEDA.

National Statistics Office (2009). Number of Families, Total and Average Annual Family
Income and Expenditure by Region: 2009. Retrieved from www.census.gov.ph.

National Water Resources Board (n.d.). Water Code of the Philippines and the Amended
Implementing Rules and Regulations. Quezon City, Philippines: NWRB.

Nemenzo, A.M.R. (2008). Digging deeper towards debt and land inequality. Freedom
from Debt Coalition.

NIA (n.d.). A Primer on the Program on Rationalizing and Improving Public Service
Delivery. Quezon City, Philippines: NIA.

NIA (n.d.). IMT Contract. National Irrigation Administration.

NIA (n.d). Institutional Development. Retrieved from www.nia.da.gov.ph.

NIA (n.d). Irrigation Delivery. Retrieved from www.nia.da.gov.ph.

NIA (n.d). Irrigation Management Transfer. Retrieved from www.nia.da.gov.ph.

NIA (n.d.). Operation and Maintenance of National Irrigation Systems. Retrieved from
www.nia.da.gov.ph.

NIA (n.d.). Rehabilitation and Improvement of National and Communal Systems.


Retrieved from www.nia.da.gov.ph.

NIA (n.d.). Review of Irrigation Management Transfer Program. Powerpoint


presentation for all NIA farmers implementing IMT. NIA.

NIA (1990). A Comprehensive History of Irrigation in the Philippines. Quezon City,


Philippines: NIA.

NIA (2008). Profile of ANGAT MAASIM RIS. San Rafael, Philippines. National Irrigation
Administration.

NIA (2010, April 11). Impacts of Irrigation Management Transfer. Retrieved from
www.nia.da.gov.ph

Office of the President Adviser on Global Warming and Climate Change (2009).
Accomplishment Report 2009. Philippines.

134
Ofrecio, Bayani P. (2006). Participatory Development and Management: A Cornerstone
of Philippine Irrigation Program, Journal of Developments in Sustainable
Agriculture, 1, 1-5.

Oorthuizen, Joost (2003). Water, Works and Wages: The Everyday Politics of Irrigation
Management Reform in the Philippines. New Delhi: Orient Longman Private Ltd.

Oryza (2010, January 22). Philippine Government to Review Rice Import Plans.
Retrieved from http://mail.ricenetwork.com/forums/showthread.php?p=4734

Panella, Thomas Robert (2004). Irrigation Reform in the Philippines: Irrigation


Management Transfer and the Vicious Cycle of Irrigation Management. (Doctoral
dissertation). Retrieved from Ann Arbor. (3146971)

Philippine National Government (1963, June 22). Republic Act No. 3601: An Act
Granting the National Irrigation Administration. Retrieved from
http://www.lawphil.net/statutes/repacts/ra1963/ra_3601_1963.html

Philippines Maps (n.d). Maps of Western Visayas. Retrieved from


www.philippinemaps.ph.

philSTAR (n.d.). Inaugural Speech of President Benigno S. Aquino. Retrieved from


http://www.philstar.com/Article.aspx?articleid=589090

PPDO Research, Monitoring, and Evaluation Division (2010). The Planning


Environment: Where are we now? Powerpoint presentation. Province of Bulacan.

President of the Philippines (1974, September 11). PRESIDENTIAL DECREE No. 552.
Retrieved from
http://www.lawphil.net/statutes/presdecs/pd1974/pd_552_1974.html

President of the Philippines (2007, February 20). President of the Philippines


Administrative Order No. 171. Creating the Presidential Task Force on Climate
Change.” Retrieved from http://www.klima.ph/pdf_resource/AO_171.pdf

Province of Bulacan (2009). Medium-Term Agriculture Development Plan 2009-2013.


Bulacan.

Provincial Agriculture Office (n.d.). Commodity Roadmap for Rice. Powerpoint


presentation. Province of Bulacan.

Provincial Planning and Development Office (2010). The Planning Environment.


Malolos, Philippines: The Province of Bulacan.

Raby, Namika (n.d.). Participatory Irrigation Management in the Philippines: National


Irrigation Systems. EDI Participatory Irrigation Management Case Studies Series.

135
Raby, Namika (Ed.). (1997). Participatory Irrigation Management in the Philippines:
The Learning Process Approach in the National Irrigation Systems. International
Workshop on Participatory Irrigation Management. Cali, Colombia. February 9-
15, 1997. n.p.

Resurreccion. Lyn (2010, April 25). New Technologies can make RP self-sufficient in
rice. Retrieved from http://pepeng.naga.ph/2010/04/25/new-technologies-can-
make-rp-self-sufficient-in-rice-business-mirror/

Rimban, Luz (2005, September 28). Billions in farm funds used for Arroyo campaign.
Retrieved from http://www.pcij.org/stories/2005/farmfunds.html

Rincon, Maria F.G. and Felizardo K. Virtucio, Jr (n.d). Climate Change in the
Philippines: A Contribution to the Country Environmental Analysis. Retrieved
from
http://siteresources.worldbank.org/INTPHILIPPINES/Resources/PhilippineCEAC
C1July.pdf

Sampath, R.K. and Robert A. Young (Eds.). (1990). Social, Economic, and
Institutional Issues in Third World Irrigation Management. Studies in Water
Policy and Management, No. 15. Oxford: Westview Press.

Sander, William (1979). The Impact of Two Communal Irrigation Projects in the
Philippines. Institute of Economic Development and Research.

Sangupta, Nirmal (1991). Managing Common Property: irrigation in India and the
Philippines. New Delhi: Sage Publications.

SAPRIN Secretariat (2002). The impact of Agricultural Sector Adjustment Policies on


small Farmers and Food Security, Structural Adjustment: the SAPRI report. The
policy roots of economic crisis, poverty and inequality. Washington, D.C.:
SAPRIN.

Sering, Atty. Mary Ann. Lucille L (2009). National Strategic Framework on Climate
Change. Powerpoint presentation.

Shivakoti, Ganesh P., Douglas L. Vermillion, Wai-Fung Lam, Elinor Ostrom &Ujjwal
Pradhan (2005). Asian Irrigation in Transition: Responding to Challenges. New
Delhi: Sage Publications.

Siy, Robert Y (1982). Community Resource Management: Lessons from the Zanjera.
Quezon City, Philippines: University of the Philippines Press.

136
Siy, Robert Y (1989). A Tradition of Collective Action: Farmers and Irrigation in the
Philippines. In Frances F. Korten and Robert Y. Siy (Eds.), Transforming a
Bureaucracy: The Experience of the Philippine National Irrigation
Administration (20-30).West Hartford, CT: Kumarian Press.

Small, Leslie E. and Ian Carruthers (1991). Farmer-Financed Irrigation: The Economies
of Reform. Cambridge: Cambridge University Press.

SunStar (2010, May 19). Groups protest Angat Dam privatization. Retrieved from
http://www.sunstar.com.ph/manila/groups-protest-angat-dam-privatization

Svendsen, Mark (1992). Assessing Effects of Policy Change on Philippine Irrigation


Performance. Working Papers on Irrigation Performance 2. Washington, D.C.:
International Food Policy Research Institute.

Svendsen, Mark, Jose Trava, & Sam H. Johnson III (Eds). (1997). Participatory
Irrigation Management: Benefits and Second Generation Problems. Lessons from
an international Workshop held ar Centro Internacional de Agricultura Tropical
(CIAT). Cali, Colombia. 9-15 February 1997. n.p.

Tapay, Nenita. E., S. Greg & D.Hammond (1987). Evaluation of Communal Irrigation
System Performance in the Philippines: The Case of Farmer Irrigation
Organization. Agricultural Administration and Extension, 25,127-141.

Teruel, R.G. & Y. Kuroda (2004). An Empirical Analysis of Productivity in Philippine


Agriculture 1974-2000, Asian Economic Journal, 18, 319-344.

The Economist (2010, 20 May). Making farmers matter: And monitor, budget, manage
and prosper. Retrieved from http://www.economist.com/node/16136354

Thompson, John (1995). Participatory Approaches in Government Bureaucracies:


Facilitating the Process of Institutional Change, World Development, 23(9), 1521-
1554.

Turral, Hugh (1995, September). Recent Trends in Irrigation Management Changing


Direction for the Public Sector. Overseas Development Institute. Retrieved from
http://www.odi.org.uk/resources/download/2164.pdf

Uphoff, Norman (1986). Improving International Irrigation Management with Farmer


Participation: Getting the Process Right. . Boulder, Colarado: Westview Press.

Uphoff, Norman, Priti Ramamurthy & Roy Steiner (1991). Managing Irrigation:
Analyzing and Improving the Performance of Bureaucracies. London: Sage
Publications.

137
USAID Environment (2006, December 6). What is Integrated Water Resources
Management? Retrieved from
http://www.usaid.gov/our_work/environment/water/what_is_iwrm.html

Vermillion, Douglas (n.d.). Impacts of Irrigation Management Transfer. Retrieved from


www.oieau.fr

Vermillion, Douglas (1997). Impacts of Irrigation Management Transfer: A Review of


the Evidence. Research Report 11. . Colombo Sri Lanka: IIMI.

Vermillion, Douglas L and Juan A. Sagardoy (1999). Transfer of Irrigation Management


Services: Guidelines. FAO Irrigation and Drainage Paper 58. Rome: FAO.

Wijayaratna, C.M (2002). Organizational Change for Participatory Irrigation


Management. Philippines October 23-27th, 2000. Tokyo: Asian Productivity
Organization.

Wijayaratna. C.M. (Ed.). (2004). Linking Main System Management for Improved
Irrigation Management. Report of the APO Seminar on Linking Main System
Management for Improved Irrigation Management held in Sri Lanka, 3-8 June
2002. Asian Productivity Organization.

Wijayaratna, C.M. & Douglas L. Vermillion (1996). Irrigation Management Turnover in


the Philippines: Strategy of the National Irrigation Administration. Short Series
on Locally Managed Irrigation, Report No. 4. Colombo, Sri Lanka: IIMI.

Wijayaratna, C.M., Eleanor M. Pintor, Ma. Delia M. Valdez, Robert W. Laitos, & Ma.
Victoria V. Solis (1996). Farmers Organizing Farmers: A methodological Study
of Farmer Irrigators’ Organization Program in the Philippines. Colombo, Sri
Lanka: IIMI.

World Bank (1990). The World Bank Participation Sourcebook. Washington, D.C.:
World Bank.

World Bank (2005). Community Driven Development and Social Capital: Designing a
Baseline Survey in the Philippines. Washington, D.C.: World Bank.

World Bank (2010). The World Bank: Data. Retrieved from data.worldbank.org

Yap, Dr. Nonita T (2009). Global Climate Change Challenge: Opportunities for Filipinos
in Canada. Powerpoint presentation. Vancouver.

Zialcita, Fernando Nakpil (1984). Kinsman and Voluntary Association in Two Ilocano
Communities. (Doctoral dissertation). Retrieved from Ann Arbor. (8620928)

138
Appendix

List of interviewees and their respective roles/affiliations

All interview participants are listed in alphabetical order. These interviews were
conducted in Plaridel, Philippines:

Farmer Interview 1. Personal interview. 10 June 2010.

Farmer Interview 2. Personal interview. 7 July 2010.

Farmer Group Interview 1. Personal interview. 10 June 2010.

Farmer Group Interview 2. Personal interview. 23 June 2010.

Farmer Group Interview 3. Personal interview. 24 June 2010.

Farmer Group Interview 4. Personal interview. 25 June 2010.

Farmer Group Interview 5. Personal interview. 29 June 2010.

Farmer Group Interview 6. Personal interview. 29 June 2010.

Farmer Group Interview 7. Personal interview. 1 July 2010.

Farmer Group Interview 8. Personal interview. 2 July 2010.

Farmer Group Interview 9. Personal interview. 2 July 2010.

Municipal Bank Official Interview 1. Personal interview. 12 July 2010.

Municipal Government Official Interview 1. Personal interview. 18 June 2010.

Municipal Government Official Interview 2. Personal interview. 25 June 2010.

Municipal Government Official Interview 3. Personal interview. 2 July 2010.

Municipal Government Official Interview 4. Personal interview. 2 July 2010.

Municipal Government Official Interview 5. Personal interview. 12 July 2010.

Municipal Government Official Interview 6. Personal interview. 12 July 2010.

Municipal Government Official Interview 7. Personal interview. 16 July 2010.

NIA Interview 1. Personal interview. 16 June 2010.

139
NIA Interview 2. Personal interview. 16 June 2010.

NIA Interview 3. Personal interview. 22 June 2010.

NIA Interview 4. Personal interview. 22 June 2010.

NIA Interview 5. Personal interview. 22 June 2010.

NIA Interview 6. Personal interview. 22 June 2010.

NIA Interview 7. Personal interview. 22 June 2010.

NIA Interview 8. Personal interview. 22 June 2010.

NIA Interview 9. Personal interview. 25 June 2010.

NIA Interview 10. Personal interview. 28 June 2010.

Private Financier Interview 1. Personal interview. 16 June 2010.

Provincial Government Official Interview 1. Personal interview. 11 June 2010.

Provincial Government Official Interview 2. Personal interview. 11 June 2010.

Provincial Government Official Interview 3. Personal interview. 24 June 2010.

140

You might also like