Certificate in Hardware & Networking Administration Under SCVT Craftsman Training Scheme
Certificate in Hardware & Networking Administration Under SCVT Craftsman Training Scheme
Certificate in Hardware & Networking Administration Under SCVT Craftsman Training Scheme
Eligibility - 1) 12th Class(Science) pass under 10+2 system or duly recognized Diploma
in Engineering from any AICTE approved Polytechnic Diploma of 3
years duration after class 10th.
1) To prepare students with the latest knowledge in Computer Hardware & Networking
Page 1 of 12
Certificate Course in
Computer Hardware and Networking Administration
SUGGESTED COURSE OUTLINE
V) NETWORKING 16 WEEKS
1. Networking Fundamentals 1 week 12 12
2. Network Components 1 week 12 12
3. Netware 5 5 weeks 60 60
4. Windows 2000 5 weeks 60 60
5. Linux 4 weeks 48 48
Page 2 of 12
TOTAL 50 WEEKS 600 hrs 600 hrs
NOTE – 2 weeks are reserved as buffer to hedge against un foreseen circumstances, revision,
and preparation for final examination.
4. Microprocessors 3 weeks
- Introduction to Microprocessor
- 8085 Pin Configuration
- Interrupts
- Logic and branching operations
- Arithmetic operations
- IC 8155
- IC 8255
- IC 8259
Page 3 of 12
II) Computer Application (9 weeks )
1) DOS 1 week
- Installation
- Internal Commands
- External commands
- Making Bootable floppy
- Formatting
2) Windows 98 2 weeks
- Desk Top Management
- Windows explorer
- Control Panel
- Task / Menu bar
- Add/remove programs
- Wall Papers and Screen Saver settings
- Add new hardware
- System configuration
3) MS Word 1½ week
- Type text
- Insert Menu
- Edit menu
- Format menu
- Tools
- Tables
- Mail merge
- Creating Hyper link
4) MS Excel 1½ week
- Creating work sheet
- Insert Menu
- Edit menu
- Format menu
- Tools
- Tables
- Creating the Graphs
Page 4 of 12
- Inserting Photo, Audio, and Movie
Page 5 of 12
III) COMPUTER HARDWARE & PERIPHERALS
(15 WEEKS)
1) Study & Identification & testing of Parts & cards 4 weeks
a. Processors
Definitions of processor, Bus speed,
Study & Identifications of 8086, 80286, 80386, 80486, P I, P II, P III
Study & Identification of different Processor Sockets
b. Mother Board
Study & Identification of I/O Slots
Study & Identification of BIOS
Study & Identification of I/O Ports
Study & Identification of FDC & IDE Channels
c. Display Cards
MDA
CGA
VGA
SVGA
d. I/O Cards
I/O CARD
MULTI I/O CARD
IDE CARD
SUPER IDE CARD
INTERNAL MODEM
SOUND CARD
NIC CARD
3) Assembling of a PC 1 week
Page 6 of 12
6) Installation & Configuration of HDD 1 week
Types of Printers
Impact & Non-Imapct Printers
Working of Dot-Matrix Printer
Installation of Dot-Matrix Printer in Windows-9X
Identification of Different parts of Dot-Matrix Printer
Working of Ink-jet printer
Identification of Different of Ink-jet Printer
Page 7 of 12
V) NETWORKING (16 WEEKS)
1) Networking Fundamentals 1 week
Terminologies Client, Server, Topology, Technology etc
Types of Network
Hierarchical Central Computer,Peer to Peer Network, Client Server Network
Types of Network Topologies
Types of Network Technologies
Types of Data passing Schemes
Page 8 of 12
5) Linux 4 weeks
Installation of Red Hat Linux 7.0
Installtion of Linux with windows 9X
Installation of Linux with windows 9X & windows NT
User Creation & Administration in Linux
Accessing FDD & CDROM & HDD in Linux
Configuration of TCP/IP in Linux
Connectivity of Linux with Windows 9X & Windows NT
Installation & Configuration of NFS Server
Installation of software packages in Linux
Installation & Configuration of DHCP Server
Connecting to the Internet in Linux
Linux Security
Installation of DOS Emulator & Windows Emulator in Linux
Page 9 of 12
Minimum Furniture and infrastructural facility required to conduct training for
Certificate course in Computer Hardware and Network Administration
1) Neat and Clean premises duly painted .
2) Cold drinking water facility available
3) Toilet facility available, separate for ladies and gents
4) Classrooms and Lab facility available as per the requirement of the course
5) Proper lighting and ventilation provided
6) Proper storage facility available to store the components, meters , etc
7) “A” class electrical line laying done wit proper Earthing to avoid hazards.
Page 10 of 12
- Server - 1 no. – P-III –500Mhz / 10GB HDD / 1.44 FDD / 101 key Board / Mouse / 52x
CDD / NIC / SVGA Monitor / MM kit
- Nodes – 8 nos. – P-II – 500 Mhz / 10 GB / SVGA Monitor / NIC / KB / Mouse /
- Printer – Dot Matrix and Ink Jet
- Modem – Internal or External
- Hub – 16 port HUB with LAN wiring and Cabling
- Over Head Projector
4) Legal Softwares
- Operating System – win 95/98/me for all machines
- Novell Netware
- Microsoft Win 2000
- Anti Virus Packages
- Ms Office
5) Other Requirements
- Ups-1 Nos- 500VA(for Server)
- Stabilized Power Supply
6) Faculty Qualification
- Diploma in Computer Science/Computer Application/Computer Technology (2
years OR more) by any Institution approved by AICTE. OR BCA (3 year course)
or MCA or BE (Computer Science) from any recognized university.
7) Faculty Requirement
- FOR ONE BATCH Minimum 2 faculties are needed with above qualification for
1 batches each of 16 students. (1 Faculty for theory and 1 faculties as a lab
coordinator )
FOR TWO BATCHS Minimum 3 faculties are needed with above
qualification for 2 batches each of 16 students. (1Faculty for theory and 2
faculties as a lab coordinator )
Page 11 of 12
Page 12 of 12