CMRP Quiz 1
CMRP Quiz 1
CMRP Quiz 1
2. 1 point(s)
Which of the following does not support people
development?
3. 1 point(s)
With series systems, reliability ______________ as the
number of components increases.
o decreases
o increases
o remains constant
o is undefined
Correct
Great
4. 1 point(s)
A large manufacturing company installed some asset
monitoring device on some large motors that were deemed
critical equipment. The monitoring devices provide
engineering with vibration data, acoustic data, as well as
operational performance data. What asset management
strategy has the company selected for the motors?
5. 1 point(s)
What does the picture below represent?
6. 1 point(s)
A system with parallel structure have built in redundancy.
Components are backed up, and the system will work even
if some of the components fail to function. Which of the
following statement(s) is correct?
7. 1 point(s)
Which one of the following is generally true?
o Most mechanics can easily alternate between doing capital project work and doing equipment
diagnosis and repair work
o Reliability Centered Maintenance can be applied on capital projects in the pre-
construction stage to determine the maintenance plan
o Maintenance is often reduced through project designs that provide in-place spares for all
rotating equipment and heat exchangers
o Construction contractors are usually equally skilled at performing all maintenance work
Correct
Nice
8. 1 point(s)
If a machine is running for 1000 hours and five failures are
observed during this period, what is the Mean Time
Between Failure?
o 2500 hours
o 200 hours
o 0.005 hours
o 5000 hours
Correct
Very Good!
9. 1 point(s)
What relationship should Maintenance and Reliability
Teams have with customers and suppliers for optimum
effectiveness?
10. 1 point(s)
Which of the following metrics definitions is not accurate?