Ground Floor Plan: Schedule of Floor Finishes

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CL

1 2 3 4 5 6 7 8
7 EQUAL BAYS @ 5000 = 35000mm

2900 5000 10000 5000 5000 1300 3700 5000


1750 3250 1950
(CLEAR)

PIPE CHASE LINE OF R.C. CANOPY ABOVE 650 1750 PIPE CHASE
S I D E W A L K 900
LINE OF R.C. ACCU LEDGE ABOVE UP 900 LINE OF R.C. ACCU LEDGE ABOVE

G R E E N G R E E N

1500
LINE OF MEDIA AGUA ABOVE LINE OF MEDIA AGUA ABOVE

750
1000

1000
W-5 W-5

D W-2 SDW-1 W-2


W-2 W-2
D-5 D-5

2350
STORAGE PANTRY
FL-1 STOFL-7 FL-1

3350
MAINTENANCE CHIEF OF SECTION D-6
STORAGE W-5
D-2
SECTION FL-1

G R E E N
FL-1
5000

FL-1

G R E E N
D-6
6250

LANDING
PROPERTY UNIT
2650

FL-2
W-8 D-5 FL-1
CASHIER
UP
FL-4 FL-1 FL-4 W-10
LINE OF FIRE ESCAPE
PANTRY/STO. TOILET

D-6
ABOVE

2900
FOR PWD
C FL-1 FL-4 D-4a
D-6
3 EQUAL BAYS @ 5000 = 15000mm

PIPE CHASE STO. / UTILITY RM. FL-4


1250

UP D-4
FL-5 FL-4
D-4a
D-2
3 DW-4 DW-4

19 mm
(VERIFY

DROP
19 mm DROP
A-5 ENTRY 1300 1200 EMERGENCY EXIT
H A L L W A Y MANUFACTURER'S H A L L W A Y
5000

2500

2500
UP PORCH DW-2 FL-1 SPECS.) ONLY D-1 FL- 2 UP
FL-1
FL- 2 3800
DW-4 DW-5 DW-4 DW-4

1500
W-11

BEMBEM
2175

WAITING
PANTRY
B FL-1
AREA

DOTS CENTER /
PANTRY
FL-1
D-6
2000 PLANNING & DESIGN
D-6 SECURITY / INFO.
S I D E W A L K

S I D E W A L K
SECTION MONITORING / D-5

G R E E N
200 600 600 200
D-5 FL-1 NETWORK
2400

2400
W-11 FL-4 LOBBY FL-1 ADMINISTRATIVE W-10

BRIDGE & OTHER PUBLIC BUILDING/


6250

ENVIRONMENTAL, SOCIAL & RROW


2175

INVESTIGATION UNIT/ HIGHWAY


1200
CARDS SMITH WENG MILOY JUN
FL-1 SECTION D-8 FILE STORAGE

ENGINEERING SURVEY &


G R E E N

W-11
5000

FL-1

BLUE PRINTING AREA


BAMBIE
FL-1
FL-4

FILE CABINET
DESIGN UNIT
PLANNING
D-6

PLOTTING &
UNIT

UNIT
1200
ANALYN EPOI FEMAR ATZ JOVEN

D-6 RECORDS
D-2 D-2
W-6 DW-1 FL-1 W-6 LEGEND:
PRINTER
CHIEF OF OFFICE
CHIEF OF SECTION CONCRETE WALL PARTITION

1200
GIDEON TITIW

FL-1 PRINTER
JORNALIN RAYMON

W-1 W-1 FL-1


3825

A
PRINTER

DRY WALL PARTITION


19 mm DROP

W-1 LINE OF MEDIA AGUA ABOVE W-1 LINE OF MEDIA AGUA ABOVE
2000

2000
W-4 W-4

1950
W-6 PIPE CHASE W-6
G R E E N G R E E N

ENTRY
LINE OF R.C. ACCU LEDGE ABOVE S I D E W A L K
I : 12 SLOPE PORCH
1200

1200
FL-6 FL-2

LINE OF R.C. ACCU LEDGE ABOVE


PIPES W/ AUTOMOTIVE
5000
LINE OF CANOPY ABOVE PAINT FINISH (COLOR:
CURB CUT-OUT 1750 3250
UP NATURAL ALUMINIM)
SPACED EQUALLY / AS
MAIN ENTRANCE
SHOWN. TYPICAL SCHEDULE OF FLOOR FINISHES
1 OTHER SIDE (UP TO R.C.
VERTICAL RAILINGS SPACED AT 633mm O.C.
A-6 MEDIA AGUA) 600 X 600 mm UNPOLISHED SYNTHETIC GRANITE TILE FLOOR FINISH
3250 1750 500 500 5700 FL-1 (SUBMIT SAMPLE FOR APPROVAL)
5000 10000 5000 5000 10000
600 X 600 mm TEXTURED CERAMIC TILE (NON-SKID) FLOOR FINISH
FL-2 (SUBMIT SAMPLE FOR APPROVAL)

2 600 X 600 mm UNPOLISHED SYNTHETIC GRANITE TILE FLOOR FINISH


FL-3 (SUBMIT SAMPLE FOR APPROVAL)
A-6
1 GROUND FLOOR PLAN 600 X 600 mm VITRIFIED UNGLAZED TILES FLOOR FINISH (SIZE AND/OR COLOR
SCALE 1:100 M FL-4 FOR APPROVAL BY END-USER) PROVIDE WATER BASE WATERPROOFING
A-2

NON-SKID CEMENT FLOOR FINISH WITH WITH 6 mm WIDE GROOVE LINES


FL-6 (PROVIDE FLOOR HARDENER)

FL-7 PLAIN CEMENT FLOOR FINISH (PROVIDE WATER BASE WATERPROOFING)

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED & VERIFIED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
- GROUND FLOOR PLAN
DISTRICT ENGINEERING OFFICE CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - SCHEDULE OF FLOOR FINISHES
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
JEFFREY M. CORDERO
Architect II