Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
71 views5 pages

Muhammad Abid Khan2

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 5

Muhammad Abid Khan

Address: Village and post office Shiekhan Kohat, Pakistan


Phone:0092333-9617556 and 00923109414094
E-mail:abid_khan1101@yahoo.com
Date of Birth:02th March, 1989

OBJECTIVES
As per my experience, I would be seeking a position in a renowned institution/organization to make the best use of my
potentials/skills and to contribute effectively for the betterment of the institution.

EDUCATION

MBA(Project Management )
 In process from Preston Kohat.
 3rd semester
Bachelor of Electrical Engineering (Telecommunication)(2007-2011)
 Bahria University Islamabad, Pakistan
 (2.98/4.0) CGPA= 1st division
F.SC (Pre-Engineering) (2005 – 2007)
 Garrison Cadet College Kohat, Pakistan
 (863/1100)=78.4% =A grade
Matriculation (2005)
 Garrison Cadet College Kohat, Pakistan
 (920/1050)=87.6 % =A1 grade

EXPERIENCE
SCT ( June 2017 – till)
(Telenor/ZTE NPM/Nokia OGS,ODS)

 Optimization and reporting of different cluster drive ,patch drive, customer complaints, cooperate complaint etc.
 North1 major cities Islamabad, Kashmir , Rawalpindi , Mirpur , Muzafarabad , Bagh etc Pre cluster drive 2G ,3G
, 4G and post Drive after optimization.
 Reporting of different Ativities by using Mapinfo.
 Resume:

 2g,3g and 4g Rf optimization of complaint location.


 Performing QOS activity with PTA.
 MOS Cluster drive of major city.
 Cluster drive of approximately different 16 cities drive Pre and post.
 Resolving Customer complaint .
 2g 3g and 4g patches drive for improving network performance.
 3g, 4g static sector testing in null and in main loop.
 Cluster drive checking CFSB by short calls script.
 Pre and post 2g,3g,4g cluster drive with different configuration.
 Feasibility survey for 3g and 4g customer device performance.
 2g, 3g and 4g Sector swap Checking Activities.
 Islamabad and Rawalpindi complete cluster 2g,3g and 4g drive.
 New Islamabad airport cluster drive and whole indoor testing.
 SSV of swap site.

Turnotech ( Sep 2015– 2017)


(CMPAK/ZTE and Huawei project)
 3g and 4g SSV on Cmpak Huawei Swap project.
 Huawei Pre cluster drive on Cmpak project.
 Huawei swap on Cmpak project in centre region.
 4g SSV on Cmpak rollout project by using tems investigation.
 3g SSV on Cmpak rollout project on dual carrier 10562 mhz and 10587 mhz by tems investigation.
 Snag removing on 3g and 4g SSV sites.
 Audit of different sites.
 2G, 3G and 4G drive test.
 Resolve 2G,3G and 4g Customer complaint
 2G cluster drive and Audit.
 Sector scanning.

BSS Engineer and Microwave Engineer (1st May 2012– 2015)


Hyquip (Alcatel, ZTE and Huawei Vendor)
 ZTE Rectifier battery bank installation, Commissioning, alarm patching and verification on CMPAK project.
 Power swap survey on CMPAK project.
 Alcatel Media clearance of 3g and 4g on CMPAK Project.
 3g and 4g ZTE installation, Commissioning on CMPAK project.
 3g Alcatel to ZTE swap survey on CMPAK project.
 Cutover of Alcatel to ZTE 3g on CMPAK project.
 Alcatel rollout site installation, commissioning on CMPAK project.
 3G and 4G ZTE and Alcatel BSS survey on CMPAK project.
 2G MCTRX Alcatel swap and expansion on CMPAK project.
 2G Alcatel TRE expansion.
 Installation of ZTE HLR for CMPAK.

 Page 2 | [Type your phone number]


 Resume:

 Installation of 2G and 3G Alcatel sites.


 Microwave link Installation and commissioning of Alcatel on CMPAK project.
 Alcatel Media expansion of DCS and GSM.
 Link up gradation of Alcatel on CMPAK Project.
 Cutover of Alcatel equipment on CMPAK project.
 ZTE 4G installation on CMPAK.
 Pat of 2G and 3G sites.
 LOS & TSSR survey on PTCL&Mobilink project.
 Installation and Commissioning of RTN on Mobilink Project
 Cutover and swap of ZTE equipment to Huawei on PTCL LTE project.
 PRE ATP, Quality Check and commissioning of PTCL LTE sites.
 Installation & commissioning of microwave links using RTN 900 series
 Quality Check during the site installation according to client’s standard
 Documentation of Sites as standards
 Software & Hardware up-gradation of MW links
 Dismantling of free MW links from Mobilink Network
 E1 patching on terminal sites during cutover
 Worked as BSS Engineer on Ufone expansion projects.
 Installation &Commissioning of BTS 3012 indoor, 3012 outdoor and BTS 3900.
 Audit and power up of BTS 3012 indoor, 3012 outdoor and BTS 3900.
 Configuration (One way and two ways) and expansion of new TRX.
 Trouble shooting of different problems like VSWR, Call Degrading.
 Worked on Zong Microwave link project using RTN 900 Series.
 Installation of new battery bank.
 Patching & testing of BTS alarms from NOC.

Internee (1, Aug 2011 – 4, Oct 2011)


UFONE
Kohat
 Done my internship in Ufone BSC.
 Worked on IManager M2000.
 Clearance of Different BTS alarm.
 Worked on Monthly base Fuel and Electric Bill data.
 Trouble shooting of different BTS Alarm.
 Patching of E1.

Internee (10, Oct 2011 – 30, Dec 2012)


PTCL
Kohat
 Worked in main distribution frame MDF on patching of Broadband and land line.
 Worked in transmission department.
 Installation and Maintenance of different power Bank.

 Page 3 | abid_khan1101@yahoo.com
 Resume:

Internee (Summer Internship, Degree Requirement)


SUPERNET
Islamabad
 Worked on CDM 625 satellite Modem.
 Pointing of Satellite Modem with china set satellite.
 Configuration of power station 5-EXT.

TRAININGS/MAIN PROJECTS
 RFID(Radio frequency identification loses):
RFID Designing and implementation in security system using RFID tag.
 Huawei 3G Training on BTS 3900 node B:
3G training on BTS 3900 node B, quality and network safety.
 Huawei 3G Training on Microwave:
3G Training on Microwave indoor, outdoor devices, quality and network safety.
 Huawei Training on Power Cube:
Training on resolving power issue in telecom Industry using Power cube technology.

SKILLS
 Computer Skills
 Proficiency in MS Office
 TEMS investigation, Nemo, Mapinfo ,C++ Language, Matlab, Opnet.,
 Languages
1) English 2) Urdu

 Page 4 | [Type your phone number]


 Resume:

REFERENCES
Will be provided on request

 Page 5 | abid_khan1101@yahoo.com

You might also like