Khairatunda 2019 April
Khairatunda 2019 April
r-irl 4 'LI t
Authority
National Highways Authority Of India
ASHOM Concessionaire
M/s Ashoka Khairatunda Barwa Adda Road Limited
Ashoka Khairatunda Barwa
Adda Road Ltd.
Name of Project
Legend
Proposed Road 1-:,,a.w.3 Add:.
! Feature
Khairatunda to Barwa Adda a I hole atvntle
Route
Project Road
Khairatunda to Barwa Adda
rotunda
is Erlrnr- Macho
Porto 77.
r4-411 Sahna
aeon 48 min 3 mahuh.or.,
all 41. .' km r 00E141
• Gramoh
NaorracPh n'Invot
rcinft
Barwa Adds br indpr,t
rkhinc
59 min f
Rar,Hraara 476krn Dhanbad
Galudfh
Arrairrtfa Sahrwrilih MaIkera t 1.141 d
11 Kusunda
irTa
;Thaler)
•••• ASHOKA
Ashoka Khairatunda Barwa
41 *V :'°' Adda Road Ltd,
NHAI
Monthly Progress Report for month of April 2019
Content
SI.
Content Page No Annexure
No.
1 Abbreviation 3
2 Project Overview 4
2.1 Preamble 4
2.2 Scope Of Project 4
2.3 Specifications and standards 4
2.4 Salient features of the Project 4
2.5 Project Completion Schedule 5
2.6 Payment Milestone 5
2.7 Scope of Work 5
2.8 Structural details and project facilities 6
2.8.1 Vehicular Underpass: APPENDIX B-VII 6
Details Of New Minor Bridges And Rehabilitation /Repair
2.8.2 7
/Widening For Existing Minor Bridges - Appendix B — IX
2.8.3 Culverts 8
Construction Of New Box Culverts On Proposed Bypass
2.8.4 11
Locations
2.8.5 Project Facilities 11
3 Organizational Chart 11 Annexure- I
4 Preconstruction Activities 12
4.1 Site Establishment 12
4.1.1 ABL Base Camp 12
4.1.2 RKC Camp 12
4.1.3 RE Block Casting Camp 12
4.2 Design Review 12 Annexure- II
4.3 QA /QC Reports 12
4.4 Status Of Source Approval 13
4.5 Mix Design 15
4.6 Weather Report 16
5 Construction Programme 17 Annexure- III
6 Summary of progress 17
6.1 Financial Progress 18 Annexure- IV
6.2 Physical Progress 18
6.2.1 Structure Work 18 Annexure- V
6.2.2 Road Work 18 Annexure- VI
7 Hindrances And Other Issues 18
7.1 Details Of The Trees In Row 18
7.2 Details Of Tube Well 18 Annexure- VII
7.3 Details Of Electrical Utility 18
7.4 Details Of Other Hindrance with Photographs 19 Annexure- VIII
7.5 Photographs of Hindrances 19 Annexure- VIII
7.6 Details of Land Acquisition 19 Annexure- VIII
7.7 Delay Events 19
Page 1
...„,
AshoS
il kAadKli
cihaaRiroC) .Barvva
aatudnLdtadill"
.00---------wir
1144751r1
t4,41
Monthly Progress Report for month of April 2019
Page 2
lir
wto ...,S
ASHOKA
*.
la vi in SO Ashoka Khairatunda Barwa
• Adda Road Ltd.
. ,
1. ABBREVIATIONS
Abbreviations Meaning
BC Bituminous Concrete
IMP
BM Bituminous Macadam
Ch. Chainage
Cum Cubic Meter
114
4II
RCC Reinforced Cement Concrete
RHS Right Hand Side
IMP
ROW Right Of Way
Rs. Rupees
TMT Thermo Mechanically Treated
41P
TPH Tonne Per Hour
VUP Vehicular Underpass
41,
Page 3
IF
N.,,, ASHOKA
No4.
svotory 1;11 Ashoka Khairatunda Barwa
Adda Road Ltd.
14 I
• 2. PROJECT OVERVIEW
The Government of India had entrusted to the Authority the development, maintenance and management of
•
National Highways No.2 including the section from Km.360.300 to Km. 400.132. The Authority has resolved to
EIP augment the road of Six laning from km.360.300 to km 400.132 Khairatunda to Barwa Adda section of National
Highway No.2 in the State of Jharkhand under NHDP Phase-V Hybrid Annuity basis.
The Authority had invited proposals by its Request for Proposals dated 06.09.2017 (the "Request for Proposals"
• or "REP") for qualification and short listing of bidders for construction, operation and maintenance of the above
referred Project on Hybrid Annuity basis. National Highways Authority of India has awarded the project for "Six-
laning of Khairatunda to Barwa Adda Section of NH-2 from km.360.300 to km. 400.132 in the state of Jharkhand
under NHDP Phase-V on Hybrid Annuity Mode" to Bidder i.e. M/s Ashoka Concessions Limited.
The Bidder pursuant to condition of Concession Agreement has formed a SPV Company i.e. M/s Ashoka
ar Khairatunda Barwa Adda Road Limited.
This Monthly Report covers the activities up to April 2019. This report mainly focuses in financial and physical
progress, quality assurance and quality control. This also highlights of any shortfall, weaknesses and critical
issues that are observed during the works being carried out.
411
Or
2.2 SCOPE OF THE PROJECT
The Scope of Work involves six laning of Khairatunda to Barwa Adda Section of NH-2 from km.360.300 to km.
400.132 in the state of Jharkhand under NHDP Phase-V on Hybrid Annuity Mode (HAM).
/Or
The Bid Project Cost is Rs. 860.10 Crore; the project involves one Bypass, 95 nos. of minor junctions, 10 nos. of
VUPs, 25 nos. of new minor bridges/widening of minor bridges, 17 nos. of new minor bridges on Service Road at
9 locations, 62 nos. of slab culverts, 1 no. of box culvert to be widened, 35 nos. of Pipe Culverts to be
rehabilitated/repaired/widened and 2 nos. of new box culverts on bypass locations.
11.
2.4 SALIENT FEATURES OF THE PROJECT
tIP
Sr. Description
Details
No.
41,
"Six Laning of Khairatunda to Barwa Adda Section of NH-2 from km.
1 Name of Project 360.300 to km. 400.132 in the state of Jharkhand under NHDP
Phase-V on Hybrid Annuity Mode".
2 Authority National Highways Authority of India
IMP
Yet to be appointed (Interim arrangement - PD,PIU will be
3 Independent Engineer
authorized till the appointment of I.E )
MP,
4 Safety Consultant Yet to be appointed
Page 4
N. ASHOM
•
Ashoka Khairatunda Barwa
ift WI 46°1 Adda Road Ltd.
Al
Monthly Progress Report for month of April 2019
730 days from Appointed date and as per the condition set forth
10 Construction Period
in CA
11 Scheduled Completion Date 07.01.2021
Concession period Construction Period of 730 days from the Appointed Date plus
12
15 years of Operation & Maintenance Period
13 Bid Project Cost Rs.860.10 Crs
2 Project Milestone II 257'h Day i.e. 22"d 35% of physical and financial progress
September.2019 (Rs. 249.08 Cr)
Page 5
N. ASHOM
Ashoka Khairatunda Barwa
-41 4111f Adda Road Ltd.
NHAl
Monthly Progress Report for month of April 2019
OP Rehabilitation/Repair/Widening of Existing
10 1 No.
Box Culvert
11 New Box Culvert at Bypass Locations 2 Nos.
41,
12 Pipe Culverts 35 Nos
Roadside furniture, Pedestrian facilities, Landscaping
and tree plantation, Truck lay-bys, Bus-Bays/Bus
Shelters, Way Side Amenities / Rest areas, Highway
13 Project Facilities Patrol, Emergency Medical Services, Cranes, Advance
•
Traffic Management System (A.T.M.S), Traffic Aid
Posts, Vehicle Rescue Posts; Communication System
Page 6
•
N. ASHOKA
•
Ashoka Khairatunda Barwa
VI VI "rgg Adda Road Ltd.
Page 7
`... ASHOM
•
it.
Ashoka Khairatunda Barwa
16 01"11 Adda Road Ltd.
2.8.3 CULVERTS
Page 8
N.N,4. ASHOK/I
Ashoka Khairatunda Barwa
Irevet In °I Adda Road Ltd.
14 A I
Monthly Progress Report for month of April 2019
Page 9
••••
%• OMI
ASH Ashoka Khairatunda Barwa
strel RWil Adda Road Ltd.
Page 10
IP
ASH<>K/1
Ashoka Khairatunda Barwa
Adda Road Ltd.
2 No's Box Culverts are proposed at Bypasses and their locations are tentative. Final location shall be finalized during the
detailed design.
Details of Entry/ Exit Ramps
Entry/Exit locations to flyovers, VUPs, PUPs, Slip Roads and Service Roads should be provided at the start and end of
approaches as per requirement.
The locations shall be at the start or the end of the service roads as per Appendix BIV of Schedule-B. However, the final
locations shall be finalized in consultation with NHAI and Independent Engineer. The design of the entry/exit shall be as
per manual.
The Concessionaire shall construct the Project facilities described in this Annex-I to form part of the Six-Lane
Project Highway. The Project Facilities shall include:
(a) Roadside furniture;
(b) Pedestrian facilities;
(c) Landscaping and tree plantation;
(d) Truck lay-bys;
(e) Bus-bays/Bus Shelters;
(f) Way Side Amenities/ Rest areas and
(g) Foot over bridge
(h) Others
1. Highway Lightning;
2. Highway Patrol;
3. Emergency Medical Services;
4. Cranes;
5. Advance Traffic Management System(A.T.M.S)
6. Traffic Aid Posts;
7. Vehicle Rescue Posts;
8. Communication System
3. Organizational Chart
Organizational Chart is attached in An nexure-I
Page 11
ler
N. ASHOM
Ashoka Khairatunda Barwa
lir IR VT itiN5r Adda Road Ltd.
AI
Monthly Progress Report for month of April 2019
4. PRECONSTRUCTION ACTIVITES
ar 7 Mess Complete
8 Batching Plant (30Cum) Commissioned
9 Batching Plant (120Cum) In progress
10 Hot Mix Plant (160 TPH) In Progress
2 Workshop Complete
ger
3 Crushers Puzzolona 250TPH Complete
4 Crushers Metso 250 TPH In progress
Page 12
V'
"... ASHOM
%4.
Ashoka Khairatunda Barwa
VP la la III Adda Road Ltd.
-41
Page 13
vr
--. .. ASHOK/1
Ashoka Khairatunda Barwa
41 <011 531 Adda Road Ltd.
VIP
Monthly Progress Report for month of April 2019
No
5 Reinforcement Steel -TMT 1. Company profile submitted to NHAI PIU Dhanbad vide
1. Shyam Steel, Kolkata (WB) our letter no. AKBARUKBAJNH-2/2018-19/038 dated
02/11/2018
2. Reshmi Metaliks Ltd., Kharagpur
• (WB) 2. Company profile submitted vide letter no.
3. Electrosteel Steels Ltd., AKBARL/KBA/NH-2/2018-19/044 dated 05/12/2018
WP Ranchi(Jharkand) 3. Company profile submitted vide letter no.
4. Thermocon (TMT) Shakambhari AKBARL/KBA/NH-2/2018-19/034 dated 31/10/2018
VP Ispat & Power Ltd., Kolkata(W.B) no.
4. Company profile submitted vide letter
5. Jindal Steel & Power Limited, AKBARL/KBA/NH-2/2018-19/034 dated 31/10/2018
Patratu, Jharkhand
5. Company profile submitted vide letter no.
6. SRMB Srijan Pvt Ltd, Kolkata AKBARL/KBA/NH-2/2018-19/106 dated 06/03/2019
6. Company profile submitted vide letter no.
AKBARL/KBA/NH-2/2019-20/161 dated 12/04/2019
VP
7 Third Party Laboratory 1 & 2. Company profile submitted vide letter No.
1. Quality Test Lab Pvt. Ltd., AKBARL/KBA/NH-2/2018-19/034 dated 31/10/2018
VP
Patna(Bihar) 3. Company profile submitted vide letter No.
2. Omega Consultants Services, AKBARL/KBA/NH-2/2018-19/141 dated
•
Kolkata(WB) 04/04/2019
3. Global Testing and Research
IP
Laboratory, Patna (Bihar)
8 Soil Test Results: 1. Test Report submitted vide letter no.
VP
1. Borrow Area No.1 at Ch.361+500 AKBARL/KBA/NH-2/2018-19/042 dated
LHS & No.2 at Ch.371+900 LHS 19/11/2018
2. Test Report submitted vide letter no.
2. Borrow Area No. 03 at Ch.
AKBARL/KBA/NH-2/2018-19/043 dated
361+700 LHS
26/11/2018
3. Borrow Area No.04 at Ch.371+550
RHS, Borrow Area No.05 at
Ch.361+350 RHS, Borrow Area 3. Test Result submitted vide letter no.
No.06 at Ch.378+800 LHS, Borrow AKBARL/KBA/NH-2/2018-19/052 dated
Area No.07 at Ch.371+000 LHS, 21/12/2018
Borrow Area No.08 at Ch.365+500
4. Test Result submitted vide letter no.
LHS, Borrow Area No.09 at
• AKBARL/KBA/NH-2/2018-19/061 dated
Ch.393+450 LHS, Borrow Area 02/01/2019
No.10 at Ch.397+400 Borrow Area
No. 11 at Ch. 377+750 RHS and
Borrow Area No. 12 at Ch. 5. Test Result submitted vide letter no.
•IP
366+450 RHS AKBARL/KBA/NH-2/2018-19/069 dated
4. Soil Test Report for Approval of 11/01/2019
IP
Borrow Area No. 13 at Ch.
6. Test Result submitted vide letter no.
363+430 LHS, Borrow Area No. 14
AKBARL/KBA/NH-2/2018-19/086 dated
at Ch. 367+350LHS, Borrow Area 06/02/2019
No. 15 at Ch.377+750 RHS
sp. Page 14
ASHOK/I
Ashoka Khairatunda Barwa
Adda Road Ltd.
Page 15
ASHOK/I
Ashoka Khalratunda Barwa
Adda Road Ltd.
IP
5 Concrete Mix Design (M- 1. Bharat Cement OPC(43 G) with Submitted for approval vide
35) for RE Block & GGBS letter no. AKBARIJKBA/NH-
Concrete Mix Design (M- 2. Bharat Cement with Admixture 2/2018-19/060 dated
30) for structures (Vista Chemtech Pvt Ltd) 02/01/2019
► 6 Concrete Mix Design (M- 1. Bharat Cement Submitted for approval vide
35) for structure letter no. AKBARL/KBA/NH-
2/2018-19/103 dated
28/02/2019
Page 17
No 441•4„ ASHOM
Ashoka Khairatunda Barwa
le -41 I'll 131 Adda Road Ltd.
W.'
Monthly Progress Report for month of April 2019
5 WMM(Km) - -
OP
6 DBM (Km) - -
7 BC (Km) - -
CHAINAGES Estimate
SR NO
FROM RCC RSJ POLE Approval
TO TRANSFORMER
POLE 11M Status
Km to Km - Location Plan attached in Annexure-
1 360+300 369+000 0 426 20 Approved
2 369+000 394+050 160 481 38 Approved
3 394+050 400+132 20 309 21 Approved
Total Pole & Transformers in Nos 180 1214 79
Page 18
• ASHOM
•
• Ashoka Khairatunda Barwa
+SP 10 101" 121 Adda Road Ltd.
NA'
Monthly Progress Report for month of April 2019
IV
Si
Status
No Description Remarks
Length(km) %
1 Total length of the To be upgraded to 6-lane specification
40.332 100%
ro.ect
2 Stage-II Clearance received on 31.10.2018.
Ile
Forest Land 1.750 4.4% However, length not available due to
withholdin. of tree-felling sermission.
3 Total Length LHS RHS
29 5% Details are attached as Annexure VIII.
unavailable 8.301 15.57
VW
V/
a) Delay in Land Acquisition.
b) Delay in Tree Cutting Permission.
c) Delay in deposit of Supervision Charges of Utility Shifting (Electrical).
d) Delay in handing over of Bypass Land.
e) Delay in obtaining statutory Permission due to holidays, Strike of Govt. Staffs and declaration of Election
tar date.
f) Delay in Appointment of Safety Consultant.
OP
Sr. Location/Km. Capacity/Qty Source approval
status
1 Stone Quary,
Paharpur, Golpahadi, Brahmndiha and Ledatand Awaited
2 River sand
VI Barakar River Awaited
Page 19
ASHOKA
Ashoka Khairatunda Barwa
Adda Road Ltd.
Page 20
cr:.%,
ASHOKA
AT Ashoka Khairatunda Barwa
NI 41
Adda Road Ltd.
NAI
Monthly Progress Report for month of April 2019
11 MOBILIZATION OF RESOURCES
Page 21
Nii,
% ASHOM
'ii in fa Al Ashoka Khairatunda Barwa
Adda Road Ltd.
Page 22
4
ASHOKA
Ashoka Khairatunda Barwa
le In Ili Adda Road Ltd.
43 Manager (Liasoning) 1
44 Mess Incharge 1
45 Security Supervisors 4
46 Jr. Officers (HR) 2
47 Liaoning Supervisor 2
48 Plumber 2
49 Doctor 1
50 Mess Helper 19
51 Cooks 9
52 Security Guard 30
53 Sweeper 6
54 Peon 3
55 Gardener 2
56 Washer man 2
J) Laboratory
57 Material Engineer 1
58 Sr. Engineer 1
59 QC. Engineer 3
60 Sr. Lab Tech. 6
61 Lab Tech. 6
62 Lab Asst. 6
K) Planning & Billing
63 Sr. Planning Engineer 1
64 Sr. QS Engineer 2
65 Jr. QS Engineer 2
66 Planning / Contract Eng. 2
L) Survey
67 Sr. Survey Engineer 2
68 Surveyor 8
69 Survey Asst. / Helper 8
M) Safety
70 Safety Officer 1
71 Safety Supervisor 2
72 Painter 2
Total 370
Page 23
... ASHe.,)1Q1
Ashoka Khairatunda Barwa
WI VI :III Adda Road Ltd.
At
Monthly Progress Report for month of April 2019
age
*o.t..
-------:"-'-'''..s7
ASHOKA
in va Ai Ashoka Khairatunda Barwa
Adda Road Ltd.
01.
Monthly Progress Report for month of April 2019
Sr. Capacity of
Type of Machine Make Deployed Remarks
No. Machine
1 Aggregate Crushing Plant - Metso Metso 250 TPH 1 Working Condition
Aggregate Crushing Plant -
2 Puzzolana 250 TPH 1 Working Condition
Puzzolana
3 Excavator 10 Working Condition
Sr. Capacity of
Type of Machine Make Deployed Remarks
No. Machine
1 Columbia machine (Ch-368+000) 1 Working Condition
Page 25
".... ASHOKA
•6.
Ashoka Khairatunda Barwa
40041111 Adda Road Ltd.
Sr.
Description Side Location Remarks
No.
Pot Hole Filling (Patch work) with BM Material and
1 LHS 360+350 to 389+080
Median Cleaning
Pot Hole Filling (Patch work) with BM Material and
2 Median Cleaning RHS 360+350 to 389+080
14 LINE STRIPCHART
The Project line plan along with camp details are mentioned in (Annexure —XII)
15 CORRESPONDENCE RECORDS
The details of correspondence records up to April 2019 are mentioned in (Annexure- XIII)
16 SAFETY FEATURES
...
age
•
6
a
S
4
• ANNEXURES
6
S
1
Organization Chart
Annexure-I
Design Review
Annexure-II
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132
Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase V."
DRAWINGS REGISTER
Statement of Designs & Drawings Submitted by Concessionaire (As on 31.03.2019)
simmision to \ IIAI
Sr. No. Letter No. Letter Dale Description Submission Date Remarks
3 004 29-08-2018 Inventory and conditional survey of Bridges and Culverts 31-08-2018
6 007 29-08-2018 TCS and MCW plan and profile 360 to 373 31-08-2018
008 29-08-2018 Service Road plan and profile 360 to 373 31-08-2018
9 010 14-09-2018 GAD of Pipe Culvert at Ch 3624625, Ch.362c978, Ch 363,128, Ch 364,578. Ch 367.845 & Ch 370,354 15.09-2018
IS 017 03-10-2018 Service Road plan and profile 373 to 400 12-10-2018
17 018 I 1 -10-2018 Box Culvert at Ch 365 754. Ch 365 876 & Ch 366 941 15-10-2018
21 022 31-10-2018 Typical Drawings of Bus Bay and Truck Lay Bay 02-11-2018
23 024 29-11-2018 Design & Drawings of Minor Bridge at Ch 361 886 03-12-2018
24 025 29.11-2018 Design & Drawings of Minor Bridge at Ch 362 253 03-12-2018
25 026 29-11-2018 Design & Drawings of Minor Bridge at Ch 377 006 03-12-2018
26 027 29-11-2018 Design & Drawings of Minor Bridge at Ch 383 653 03-12-2018
27 028 29-11-2018 Design & Drawings of Minor Bridge at Ch 399 250 03-12-2018
32 033 18-01-2019 Revised Design & Drawings of 22.5M VUP Superstructure 21-01-2019
34 035 24-01-2019 Details of Culverts coming under approaches of Underpasses_Widening change to Reconstruction 25-01-2019
Revised Highway Drawings of Typical Cross Section, Horizontal & Vertical Alignment Report, MCW and Service Road
35 036 07-02-2019 09-02-2019
Plan & Profile
36 037 12-02.2019 Submission of Revised Design & Drawings of 22.2M VUP Superstructure & Bearing 13-02-2019
37 038 12-02-2019 Submission of Detailed Design and Drawings of VUP at Ch. 362 705 13-02-2019
38 039 12-02-2019 Revised Design & Drawings of Minor Bridge at Ch.361 886 13-02-2019
39 040 12-02-2019 Revised Detailed Design & Drawings of Minor Bridge at Ch.362 253 13-02-2019
40 041 18-02-2019 Revised Design & Drawings of Minor Bridge at Ch.361 886 18-02-2019
41 042 18-02-2019 Detailed Design & Drawings of Minor Bridge at Ch.362 253 18-02-2019
42 043 18-02-2019 Detailed Design & Drawings of Minor Bridge at Ch.372 676 18-02-2019
43 044 18-023019 Revised Detailed Design & Drawings of Minor Bridge at Ch. 399 749 18-02.2019
.44 045 18-02-2019 Design & Drawings of Minor Bridge at Ch. 366 291 18-02-2019
45 046 21-02-2019 Design & Drawings of Minor Bridge at Ch.383 653 26-02-2019
47 048 21-02-2019 Design and Drawings of VUP at Ch. 368 545 26-02-2019
48 049 22-02-2019 Detailed Design and Drawings of VUP at Ch. 370 450 26-02-2019
49 050 22-02-2019 Design and Drawings of VUP at Ch. 374 295 26-02-2019
DRAWINGS REGISTER
Statement of Designs & Drawings Submitted by Concessionaire (As on 31.03.20 9)
50 051 22-02-2019 Detailed Design and Drawings of VUP at Ch 375 830 26-02-2019
51 052 22-02-2019 Design and Drawings of VUP at Ch. 384 428 26-02-2019
52 053 22-02-2019 Detailed Design and Drawings of VUP at Ch. 395 750 26-02-2019
-or
53 055 26-02-2019 Revised Design & Drawings of Typical Retaining Wall 01-03-2019
54 056 01-03-2019 Typical Design & Drawing of PCC Retaining Wall 01-03-2019
VW
55 057 04-03-2019 Detail Design & Drawings of Minor Bridge at Ch.387 271 07-03-2019
56 058 08-03-2019 Minor Junction Drawings under VUPs _07 Nos 11-03.2019
57 059 12-03.2019 Reg. Submission of Revised typical design and drawing of RS Block 15-03-2018
58 060 25-03-2019 Submission of Revised Detail Design & Drawings of Minor Bridge at Ch.377 006 29-03.2019
59 061 26-03-2019 Submission of General Arrangement Drawing of (28 nos.) Pipe Culverts 29-03-2019
• 60 062 05.04-2019 SR PQC Slab Layout, Dowel Bar and Tie Bar Arrangement of 5.5m, 7m 8 9m width 05-04-2019
61 063 05.04-2019 RE Wall Working Drawings for VUP at Ch.362 705 08.04-2019
62 064 05-04.2019 RE Wall Working Drawings for VUP at Ch 368 545 08.04•2019
63 065 05-04-2019 RE Wall Working Drawings for VUP at 01.370 450 08.04•2019
6S 067 22-04-2019 Friction Slab with Crash Barrier Design & Drawing 23-04-2019
aer
66 068 23-04-2019 Regarding instruction for Execution of Bon Culvert at Ch. 368 716_Change of Scope 20-04-2019
67 069 24-04.2019 Regarding Instruction for Execution of Boo Culvert at Ch. 368 716 Change of Scope 26-04-2019
68 070 24-04-2019 Regarding Additional, Missing & Differnce in sizes of Culverts_Change of Scope 26-04-2019
OW
•
•
•
• Construction Programme
•
•
S
•
S
Annexure-III
Monthly Progress ReportA pril-20 19
AMOUNT (Cr.)
ACHIVM ENT
SCHEDULE
MONTH
r—
inCr
inCr.
cu
o § 8 8 g '8' g g 8 3• A2111,
b b b Po
0 0 8 8 0 8 8 8 8 0
Am.
Jan-19 1.952 2.844
Jan 19 cu
CU
11)
O.
o_
May-19 116.208 May-19
crl
0
MILESTON E-2 I
3
Dec-19 445.165 Dec-19
O 0 CD
Z 0
tn
i
—I .... .... C
MILE STON E-3
Apr-20
Apr-20
595.533
O
may-20 C
May-20 630.343
Jun-20
Jun-20 667.813 O
Jul-20 I
Jul-20 712.242
i I
Oo
Aug-20 . E (.1
1
Aug-20 752.526 01
i
O_
Sep-20 &
Sep-20 790.372
- 4 Di
COD
Oct-20
Oct-20 818.634 111
a_
Nov-20 C
Nov-20 846.213 A
CL
(D
Dec-20
DeC-20 858.874
0
Jan-21 .•
Jan-21 860.100
(T)
S
S
S
0
S
S
S
Physical Progress
6
Structure Strip Chart
6
or
Annexure-V
.,aiiing of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid
Annuity Mode In The State Of Jharkhand Under NHDP Phase V."
50
41
40 ,
35
30 —
20 22
20 15 16
13
10 a
7 7
10 5 5
3 3 3
00 0 00 0
0 , MI lot
FOB MNB VUP SLAB C BC PC
g Oil a 4.10 ;
T pe of Structure VUP SLAB C B6r• -*
Scope 7 20 10 62 3 35
Completed i
In progress (' 41 r4
Yet to Start 7 15 7 16 1 13
NC 2 Lone
g .n .: g
NC 3Lone
NC 3 Lane
NC 3 Lone
(1x 20.75)
0g
(2 x 32.00)
(1 x 16.70)
(1 x 18.89)
(2 x 2650)
NC 2 Lane
NC 2 Lone
,, g ;5... i
(2 x 9,750)
NC 2 Lone
(1x 17.75)
i, w ---: § oz g
369+578
380+648
f g §".
379+765
g g-
381+707
399+749
397+845
i ° g 2Wg
391+110
3 g 3-in
LOCATION & SPAN . i. --'
, ,,,
.. a g '?^.- p, ,,,, , 0; s9 , '2 A 7,1 .6 g . ii,-,, y 9. -, .1. ,674' Vc6 e„ ;0;.1
SIDE
Sr. No. 2 3 4 5 6 7 8 9 10 11 12 13 14 1 15 16 17 18 19 20
A
Port of Structure Al A2 Al A2 Al AZ Al A2 Al A2 At A2 Al A2 Al A2 At A2 At
Al A2 ....- - At
Al I A2 Al A2 Al A2 Al A2 Al A2 Al A2
Excavation
PCC
Raft
Bottom Haunch
Wall Ist Lift
-
Wall Ilnd Lift
RIGHTHANDSID ECARRIAGEWAV
.,. ?,,, a
8 n0 ; 6' R ,Y,,
m -6 A A ?A ,0 0
—
LOCATION & SPAN
t- tf! C4
6-
g
4x .ll' r'l. ,7 . X' it, .
,r,r/
S IDE
1
Excavation
PCC
Raft
Bottom Haunch
Wall 1st Lift i
Wall find Lift
RIGHTHANDSIDECA RRIA GEWAY
Annexure-IV
Progress Strip Chart of Box Culvert (3.00 x3.00)
Marker Post
Guard Stone
LEFTHAND S IDECARRIAGEWAY
Flexible appron
Rigid appron
_
Parapet
Slab
Final Lift
Wall Ilnd Lift
Wall 1st Lift
Bottom Haunch
Raft
PCC
Excavation
W 368+716 391+700 392+150
LOCATION
12 WD NC 6 Lane NC 6 Lane
« Sr. No. 1 2 3
Excavation
_
PCC
RIGHT HAND SIDECARRIAGE WAY
_
Raft
Bottom Haunch
Wall 1st Lift
_
Wall Ilnd Lift
Final Lift
_
Slab
Parapet
Rigid appron
_
Flexible appron
_
Guard Stone
Marker Post
1
1731 1 mmmmm
crmcnomoomormommonnommmommimmeammi mmmmm mmommmummommammaim mmmmmmmmm mmummoommummammommmommommummummommummamm
catamommimmmam MMMMM MMMMM nnommommmommommommomm m MMM mommommommammummmammmommmemmammammon=mammnamm--
MMMMM amommacommommaimmomaummamm— • — =mammon Nimmmamoonummomm ommummummaammommomr' -=
MMMMMMMMMMMMM mom ummmunmomomommammonommiummommommomammammam
[1=I l In=
MMMMMMMMMMMMM mmoommumiammamommonammommummomusiummmommmommmummmmumnommmannonnniiiiii
MMMMM
CTIMIIII=M111111111 MMMMMMMMMMMMM MMMMM MMMMMMM
r=onffaimin immegimi MMMMM
MMMMM
11111111111•11111111111MIIIIMMMMININIMMIIIIIIIIIIMMIMMMWEIMININIIIIIIIIIIINIMM•11111111111111111MUMMINIIIII
MIMI= MMMMM 111111111MIMMEIMMEINIIIIIIIIIMME11111•1111111111111M
casnommomo =cm OM MI nnnOMMIMMOVOIOMMINIIM MMMMMMM
MMMMM MINIIIIMIIIIIIIIINIMME111111M•11111111111111111111111MMIIIIIIIMINIMINIMMEI1111111
(1=111MMMIN MOM MMMMMMMMMM IMMO
MMMMMM
MMMMM MMMMM
=MINIM
anumm====rnamon mismomm mmommummmummonmmonommoommammumemmummummommoonsmo mama ammumammomummommm
G1=1111111=MIM MMMMM
MMMMM
ornmmommomm ummzmnoomminammammummonsmamonommmoom============mummammummamoimumm nMM==a=MIMMMMBnMMM MOM
11:11 =1771111MINI MMMMMMMMMMM
MMMMMM
r1=111•111MMINIIIINEFEM11111111111111•1111111111B MMMMM
MMMMMMM MMMMM INNIMINM
=Immo MMMMM ammilommnaammummammomamm===========armommommaimmommommmomminnummlnanOMMIMMMMMOIMM
C177E =MINIM Mil UNIIIIIIIIIIIIIIMMUM11111111111•111111111M1=======ZIAMILIZSCOMIIMMINIMINI INIMM IN MMI
07:1 11W.TIIIIIN MINI IM MINIM MMMMM MMMMMM IMMINIIMMIIMIN NMI MMMMMMMM
rfn l MMMMMM 11111,111•1111111M/1111111r11111111111111111111111111111111111111111111NIMINIIIIIIIMUIMMMINIIIIIIIIIIIIIIINIMMMIMINIMMInn ,76, rz
=MEM=
11111=111111111EMIIIMIIIIIIMMMIIIIM UMW
Structure
Chainage
Structure
111008080868MEREMEREEENEEMOMEMEIMIEMEMOREMEMMEIMEMBEGMEEM
-11111111111111111M111111111111111111MINIMIMMINIMMUMUMMIMIMMIIIIMIIMMEMIIIMIIMMIIIIIIM
LLArki. MIMI IIMMINIIIMMMMINNIMIIIIIIMIIMMI111111111111•1111MINUIIIIMMMIIIM11111111111.U1111M
IN1111111111111111111111111111111111111111111111MINIMMgR En 7-E NW IMINIIIMMINIZIMMOMM
MMMMM MN Min _ OMNI MI IN MI UNE MMM 11111111EIMMEGISIMMMMINIIIIIIMIIIIIIIIIMM
ren umnrano mn ono nom Manann OM= MMIMMIMInall=1•71-.. —111111101111111.111•1111MINIIIIIIIIIIIIIIMINIIIIMINIM11111111111111111111111111MINIIIMMINMIIIMMINIIIIIM=-.=MIIMINIMM3
OrlF11 111E=1•1111110 MMMMM mummononommonoommmmummonliammommommumummium mumm amminammomm:.-: == mum sa
rcimmonomwommommmmarommmummonosmonamonnmmmoommimmomoommoammoommoonammommmomm====nnoonn
in=
-
CIMIC INE=IIMMMM•11111111111111NOMMMININIIIIIIIIIIIIIIIIIIIIMMIMMMumUnismnrnmmmINIMIMMININIIIIIIIMINIIMIIIIIIIIMINIIIIMMEIMIMIENIMM=M
it
(C21 11111r1111111111111111MIUMIIIIIIIIIMIIIIIMIMMINIMMIIIIIIMIIIIIIIIIIIIMMIIIMINIMIIMMENIMMINII11111111111111111111111111111111111111•1111111111MMIIIIIIIMININIMINMIBIIIIIINIMMIIIIIIIIMIMM
111=IZ =12:11111111111MM MEI INIIIIMMM MIMI
MMMMM MIMEO
•
mmommammummomonnummmommmumumemmisinimemmumisommummonmesimmoommmunnonomammmoommoommtmmamoono
=mammon= mmmommonsonmommummnoommommonoononamomommummmmunnoommommoonnmmmonommimmonanammummosummommommomammomommm
cmazimmommmorram MMMMM 11111111MMIIIIIMI111111111111111110111MMMIIIMINIVIIMMININI MINIM
--
..z=summummummommaimsommison
rraNN prg Agg wg num mi
IMIIIIIIIMIIIIIIMM111111111111111•111111MININIUNIMMINIIIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIMM111111111111111111111111111111111•11111MIIIIIIIIIIINIMMMMINIMMIMEN1111111111111111111MIUMMIIIIIIUMINIIIIM11111111
Annexure-VI
,Aucia section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
otf • 1A
...........
mummommumplos NOMINEES
mimonunnomm
-on
mummmummemommmummommommuomm
illimmommmimmm
mommommummum
mimmummommomummumm
mipmmummommommomm
46,1.
leN
........-. ............
—
===
=====EIARR:i—
........111 WM/MEM
=
MMIMMKRWMICK
MUMMMUMM MMOIIMM
MAI • Toe Mc",
yia • mew
I IM P 1111111111111111
14- VW mew
:NM
•••• TO. %Kw
wt %NM
gl....,;_-.4aiiirismi "g1.111111111111111111M11111111
===MMMOAMM
110411
Ilan
mown MmlIAIMAM
=WM
111111111111111
gne WM **MOM MMMMM -------- MMMMM
111:
11111111111111111
Iw
IMIII111111111111"4
me4
11111111 animus
ado
wi
MMMMM MMIN .61
-1
111111111S111111
•
t
Iti 11111nn
WW1 WNW M
Oda
-- 1111...M.1111M
lc 00 TO MS tor sa MMIMMMMMMMMWM
Structure Ilrc KC SUM
op.
▪. I t
rm. *wangle=
1.154
OK%
I-6441
MOW 7-1-1 •
(S. 0.1*.
clam Ins i
ifue•24
en 14041.
1-4•16
fue-17
t us- Is
tulk•ri
ION- OP 1.16,
I NKvi
46. I WV/
ia TO. May
Ti
GU • Mew
WW1 • 101 ,KW
1,11. • INEW
:c • law
(maloria
us•IU,
a.Iaa
.41
ccc
roc -a
arrIM MIIIIIMI11111MINIIMINIIIBIENIIIIMINIMMINIM111111111111111111111111MINIIMINIIIMINISIMINIMMIMMMIMMMININIIMINIMINE1111111111111111111111111111111MMIMIIIIIIIIIIMINI==MIEM111111111MIMINIMIMIENIIIIIIIIIMMININIIIIMIIIII
1:17131 1 MMMMMM
CM:=EZMINIMM •
DICE NIIIIIIIIIMMINIMMMIN11111111111111111•1111111111111MIMMMMINNIMINIMUMMINDIMIEMMENIUMMOIMINIEMMIIIIIIIIIIIIIIHNIMINIMINIMMMINIMI111111111111111M111111
11:111 1M1=======r-
-
ENIZ =UM ::::=====MRMIMIMEIIIIIIMIMIMIMIMIMMIMMMINMIMIMIMMUMINIIINMIIIIIIIBIIIMIMMMMIIIIIMIMMIMIIINIIIIIIIINNIIIIIMIIIIIIIIOMIMIIIMIMIMMMMIIEIMIIIMMMIMIMM
1311MMI EMU 1
IMMMM
CTIE
Chainage
00000000000000000000000000000000000000000000000000000090000000000000001000000000000000000000000000
Structure
mmomm....m.......m....m....rnmm.1...mommmmmummommommommimmumumummmrnmmummmomm
mrannimmmmm mmmmmmmmm===mm=mmmmmmmmmm MMMMMMMMM m MMMMMMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
arammmmmm gmnimm m==== um= m m m Ism w mm ram mmmmmmmmmmm !Immo m m mm m=======m mmmmmmmmmmmmmmmmm m mmmmmmmmmmmmmmmmmmmmmmm mommem
ir=mmmmmm mom gmumm===mmimmimmrammommmon====mmommm=========m============mimmummommmummimmmmmmommimm===mmmmumminm===mmingmm
mmmmimmmm mmmummmummmimmmimmomrammummmmmmmmmmimmimmmmmmimimmgmgmmmmmummmramming= mum MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmm
imemmmimmum mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmnnmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
imoommmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmimmmmmi mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
immorammmmon mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmm= mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmmngmmmmmmmmmmmmmmmmmmmmmm
m=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mamommon mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmrammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mnImmmmimm mmmmmmmm=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmommmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm===
mmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmgn
=mnmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=
mmrammmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmm
mm=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmgmmmmmmmmmmmmmm
mmmmmimmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmm=mmmmmmmm=mmmmmmmnmmmmmmmmmmmmmmmmmmm
mmrammmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
MMEMM=MMMMMMIMMMMIMMMMMIWIMMWMMMIIIMMIMMMMMOOMMIMMMMMMIOMMMIMMIMMMMIMMMWMMIMMMMMUMMIMIMMMMWMMMMMIMMMMWMMWMMIMMMWMOIN
MMEMMIIIMMINIMMMIIIMMMMMMIMIMMMMIMMMWMMMMMMMINIMMIEMMMMMIIIMMIMMIMMMMMUMMMMMMINIMMMWMWMMUIMMMMUMMIMMIMMMMMMMMIIIMMMMWM
ZHAIMMMMMMIMMMIIIMIMMOMMMWMWMMIMMMMMMMIMMWMWMMMMMIIIMMMMIOMMMMMWMWOMMIMMMMIMMUMMIIMMMMMMMMMMUMWMWMMOMMWMWM1111111111MMUMMM
MOMEMMMMM MOWN MMMMMMWM IIIMMIMMMIMMUMMMMMMMMUM WINIUMMMIIIMMMIIMMMMUMMIMMMIMMMM=MMMMIIIIMMMMMUMMMMINIMMMIMMIMMMIMMIMMMMMUIMMM
=MEMO= MMMOIMM=MMIIIMMIMMIMMIOMMIMMMOIMM WM MMIMMOMMINNOMMMIMOMMMMMMINIMMWM MMIMMMUMMIMMIIMMMMMEIMMMMOMM WM M MMOIMMMMMIO
C=WOMEMMMM MMIMM MMM WM= M IIIIMMMMMMOOMMOMMMMM MM=MMWM=MMMUMMMIMMUMIMMMMMMMM MMOMMOIMMMMMMMMMIMMMMUMMUMMMMMMIMMMM MOM=
MMMMIIIIMMM MM=MMMINI MMMMM=MMMMUMIIIMMMMM • MMIIIMMIMOMMIMMIMM IMIMMMEIMMMMIMMMMMMMINIMMOMMEIMMIMMOIMMM MEM WM M1111 UMW=
MWMIMMMMM IMO= IIIIMMMIEMM MMMIIIMIUMMIMMMMIRMIMMIIIMMMWMWMMUMMMIMMMIIIMMMMIMMMMIMMMIMMMMMIMMIMMMMMMMIIMMIMMOMMMMMMMMMIMMMM
MMMMIIIMMM MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmourammmm mmmmmmmmmmmmmmmmmmmmmmmmmnrmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=m
mmramm=== mmommommminemmimmmummmmignommm====mmommunmimmungimmummingmmummmmmmmimmommummimmmommingummimmommmminnmmommommommimmm=
mmra=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmmmmmm==mm
ararammmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmmmmmmmmm
emrammmmmmmmmmmmmmmmmmmm=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mrammmmmmmmmmmmmm=mmmmmm=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
11111 1111111•1111•1•11111111•MMINUMINIIIIIIIIIIIMINIMIIIIIIIIIMININIMMME11111111101111111111111118111MIMINIIIIIIIIININIIIIMMINMNIMMUINIMMEMINIMMIMBINIMIIIIIIIIIIIMINIMIN
IMI:E M11111 MMMMMMM MIN MMMMMM MMMINIIMMIIIIIMINIIMMINIMINIMIIIMMIIIIMMMUMM1111111111111M MMMMM MMMMM 111111111MMEN
MMMMM
113=M11•1111MMM MMMMM IIIIMINIIMINIMMIUMMMUMME11111 MMMMM
0317 11•11B MMMMM MMMMM MMMMMMM MIMMUMMINI MMMMMM MMMEIMMIMIIMINIM
MMMMM MEI min
MMMMMM MMMMM MIIm
aran neommumminommmrnmaisummuommummommumummmumummimunisonsmiummonimommumimmiimmmumumimmommi
arson ommismommeimmomminomummumaimmommiumumEommimm•mmummaimiiiimieimmiimmsinommonnuommomm
azor ionummmonnenenummilummommummn••••••••••••••••••••••••Neummummumnimmtmoiummumummoniumn•
tize mournelsommornimmensommulommonommummrnmeimemommonommimmimmusannimmmmumnimomismiiimiummemin
armanitummmummmimmotommmummossounosammournisommummowimsummummumommommmummimmotmm•
erm inimmanommum MMMMM sionommummelummmummommimemummmusimunummummemmusismoommos
azar umummentimmosimommustmostommumommummmummummummummomoimmummomminsommustuusen
arlr MMIMMIMIIIIMMIN 11/1111111
MMMMMM
L1710 11111111MMIN111111111111111UMNIMIIIIIIMMIIIIIIIMUMM•1111•11111.11MIIMINIUMMUMMMIIMIIINNIIMIIENIMMINIMININIIIIMMIIIIMIIIININSIMMINIMINIIMMIMIN
tari ummmmensmoisnommommommon===========mummommmuimmmimmommumisoommmumumommum
trne mminommouammomminsummum============mumummimmommiummrnmmmomimmimiimmounimommimmistm
on:r ammanummu MMMMMM ISMINIIIMMME1=1:1====.1112111111=1:=MMIIMIIIMIMMIMININIMINIMIIIIMMENIMIIIIIIIMINMUMIMMIMM MMMMM
MMMMM
MM MMM 1=1111111EMIN1MIIMMIMMEIIMMMMIMMME11111M111111INIMINIMINIMM,r am ill WM 711 Inn IIIIIMITImmimm "-lir C-ir-IngomMiNimak
OPTO 00 ,0.0
MMMMMMM MIMINIUMIMMIIM111111111Einu
Structure 3EIMMOMMEMOMMEZIMMEMEMEMENIMMODEMEMMICZNIMMEIMMINIMMI:31111.
Chainage
Structure
MEEMMONEMOMMEMEIZENIMMOMMORIMMEMBEINEREEMBERIMMEMEEMEN
MMMMM 111111111111MMIMMIMINIIIIMMMIIIIMMMIMEMIINIM
IC II/ TO ION TOO
MI MIIMM•MME111111111 MMMMMMM
MMMMMMMM MfiaM1 -11•11M els Ell INEEMPIN ut min ER WM= .- M1111
tramminusimmumeomeammtumm••••••••===========================.m======mmu============mmmommumm
artamommoommommiemmuommulmmumm=========ma===============•••••====.- ..zmmminoi========z- ..z..-==mmmummumm
timE immimmoncemitimmrnmommeimimm=========••=imci=onsomerm=====immum=====•••••••====—=:=1;2—===mumminnsom
rcer miimmoummommummuummummumm=========••===============immio=====•••••mi============mmimmummon
ccu mwm•mminammoimmumnammiansimoima.-.========muars============mmm======minnoilm===========•••••••••••=mm
cer ommonommummosommitimmomistme=====.===••=ilizi==mmoimeammmumaium=;.-6=•••=mai=======zrzzzzrazimmonmmommoi
rin monimmommismommixonommommumumm==========m1=====mmummommo=====_- ..ainummiNim============memommomm
IIMMNIIIMMIONEIMMMMIIIIIIIIMIMINIIIIIMIIMMUM--,-,--ft===========MIIMMINIMUM1======MMMIIM============l1MIIIMM1111/111•11111.11111
1:1 11MINIMINIBIIIIMIIMINIMUMME111111•1111111111111111MM-= IMM=====IMIIIMMIIIIMMIIIMMINIMM11110===========MMINIMIININUMM
MMMMM 111111IMMINMMMMMMMM1111MIEMMIMMINIMIIMIUMINIMIMI1111111111lM1111.-
11:1 111111111MMEIMIEMMUIIIMMIIMINIUMINIMMMMINIMIIIIIIMINIMIIMMININIUMINNIIIMMIENIMIIIIIIMMMUMMUMMININIUMM.1111
comm oimmenowimmonimmmimmaimmionmeommoinummmoimminominiinimimmimminimmiummimummuimiummmommmommonumum
cron iummiummiximimmminumisim•••••••••••••••inummummumommummilimisommommowiminommomiNimmiummummummum
rim mmimmustommeniumusimmommantommommumimmuniiimimmumoommmisimisiuminsumminummimiiimmummummu
0=12
cno mmmimommommumuniumiuminsummutuaimmumminimummilsmummommummummimmommoiiiinummommummalum
EzErr ammulummiimumismommimicommommumossionumiimaiwinuoisimmomminunismosimminowisisionmiimumummismosommonstummosam
rns ummustsinumimmomminnommisesemmommunommommumemmoinummiiimummummimminosiummmumussiummumisomm
emtrz mmusimmommimantommommumumnionommomm-mmmumsommommaiimiummimimmiumiumisimmummommmiumiummoui
sni mminummusimmusimmemmutsionissimmuniiimmummummummmummunommiumamomiummummiumostunnunim
MMMMM
MMMMM • MMMMM mwmwm•mmossummummaim IMM11111111111111111111U11111UINUMMIUMMIIIMMMUMMINIIMMIIIIIIIIIIMMIMM MEM
NOMMNIIIIMMININIMINNIMNIIMNIIIININIIEMMIIIIMMEINIUNIIIIININIININUINIMNIMNININIMIN NI MMMMM MMMMM
Ii=1:NMMIMM•MMI MMMMM NINININNNNIMMMINMMMMNIINMMNIMIIMMMMNININIININNNMMNININININIINMINIININNININIMMMMNINIUMIMMINIIMIIIIININIINNBMIINM
car iumsommumumm_____====--= M
"-"
CEEMmsNINIIIIINIINMUMNIMMININILZ—,.... • - - — — IN111111=======.--.NIMMININININNIMMINIINMMMINIINIMME11111
MMMMM INMMINMMM M
INMIMINIMM••• ININI = M MM MMMMM INUMMMINISSIMM
t1:7I NIOMNINIIINNIUHNMIIINININIMMMMMMMMNIINIIMINMMMMMMMMMININNNIIIIIMMINIINMNNNMNINMNIIIIIINNIMIONIINIMMINNBUNIINMMMIM
13=1 M
OZMENIINIMNMMMMMININININHINIIIINIUMINIMMIINMININIIINNMMINMINIINMNIIMMMININIIIIUN'NIIMNIMMININHMINMINNMNIMNNNMINIMINIINININUMMZMMIUMIU
MINIMUM NINIUMMUMMMMIMMUMMMMUMMUMININUMNUININNIINININNIMININIEMMINIIIIMIUMIININUMMMMINIM
11:0 11115MUMMINI MMMMMMM MMIIIIIMMMUMMMMIUMUMMUMUUMNIMMMEIIMMMUMMININIINNINIIIIIIMNIMMMININININIUM
MMMMMM
MMMMM INNININNINININIMININIMMINNIMMIMMINNIENMNIININ MMMMMM MB MMMMM MINIM MMMMMM
MINN NM= MMMMM MMIIIINUMMMEIMINEBINMMIN
1=1 111111NIINMIMINNIIMMINININI MMMUMMMMMMINIMIMMMMMINMMMMMMMMNIIN IMINNINIINNIUMININNINSINMM
Chainage
Structure
OBROBROMMEMODEMBIEDEMOMBERIMEEMOOMMOMMEMEMBOOMEMEMBO
IHNIENHIEEnninuniuMnrunrunnIMMILZAINHINEEmmumInrummm
AAA
CCEE MIININIINNBNIMMMMMMMUMMINIMMINMMMINMNINNNMIMNININIIMMINIIIIIINMMNINNNINMMMINNHIIIMIINMMINMIMIINNIIMINMMMM
IE!r:I NININIIINMMMIINNIUNIUNINNMINIMMININIINIMIIMNMMIMIINNINNIINMINIMNIIMIIIINNNMIMMMMIIMNIMMMNIMMINBINMIINMINMMMMMIMMMNIINIINMIMNISB
tarl omomm••••••=ummumumminmummmimmilionsmommommoimuummoimmummimmesumummummotmeumu
1173
ONSNNNINMNNININIMMMMINUINIIMMMIINNININIIMMIMMNIINNINIINNIINMMMIIMNINIIMNIMMMIININNIIININIMINININIINIMIMNNNNNIEINMMMMMMNINIININIIIINMMMININNNMIMIMM
lr:CS IMIMMMMMMIIIIIIIIIIIIMIMIMMIMMIUIIMMMIMM•MllMIMMINMIMMIMIIMIMIMMIMIMMMMMMMMMMMMMUMMIMMM
VIZI1 111•11•1111111111•11111•11111MMINUMMMMMUMMMMMUMMEIIMIIIMMIIMINNIM11•111M1111•MINIMIIIMMIN•11111•11•1•1111•11MINIIMIIIMIMUMM
02:311111111111111111=111UMMM MMMMM
1:1=1 1MIOM MMMMMMEM MMIMIMIIIIIMMMMMMMMUMIMMMIMIIIIIMMIIBMMIMMIIIIIIMMIIIIIIIIIIIMIMIIIIIUIIIVBNIMIMMMMIIIIIIIIIIIIMIIMMMIIMMIMIIMMISBMMIIIM
— 111U111111•111 MEI 1111111111U-3 MOM= NMI EMI SIM 1•1•11111111•11M MI URI IIIMUUM
=====MMM =MN= MINIMMMIIIIIIMMIEMIMMIMUMMMUMMINIIMUMINIIIIIMUMUMMUMIM
MMMMMM
mmi ammummo unfilimmuzusizuzzamm ummm•••• num • miumum umn Et um inammi onmemm unnommm ummmune ust • to
aznrtaimss==:rzzonammsumnmnmmimma=======—=mtuommmmmmommmmmmmmmmmmomimwrmoommmuimmmmoamnnm
arnEr=====mommummommummommommounimismiummumummummumnimmommimimmummeinomumummunnommnimmm
===r=.ommmmoonuowmocnummmmoemmmmmnsmmumwcmmimmummmmmmmmmmmmmmnumnmmmmmmmmoommomo•mm
re:E:
armmmmm=..^===omummmmomrommmmmmmnmm000ioummmmmmmmmimmmmimmmmmmimmnmmmomsmmmmmmmwommm
nmr zz==rrc=mmommmootoummmmmemmomsuummmmmmmmmmmmommmmmusmnmmuonimumummugmmoomsommnummi
azesnmwx====mimmmunsommumuommommuninsmummoommummumumeommumomommirnmounmunnommumummomumm
MMIMMMMMMMMMMMMMMMWM= ====M1MMMINIMMOIM
2311 MIMMIMIIMIIIMI===INUMUMMUI
Z211 1EMME111.11===MMINIMMINIIMIIIMI ...1.—.....6—MMMMMMMMMIMMIMMM====—MMUIMMIMMIMMIOMMMMMMMIIMMMIMMMIMMIMMMWMMMIMMMMMOR
EIGME
IMEI MMIMMMMNIUMNIIMIUMM•1111•1111111111•11111MMMEIMIMININIIM••••1••••••••••••••MMINIIIIMINIMIBMIMINIINIIIIIMINIMINIMUININIMMI
0131:=1111111MIMMINIMMUNIMIIIIIMINIMIMINIMINUINIMIIMMUMMUIIIIMINE111111MUNIIMMIMIMIIIIIIIMMSMIIMMININIMMEIIMINIMUMMMUMINSUBMIMM
MEIEIMM MINIMMINIIIIINIMMINNINEMMONEIMMIIMMIN111111•1111•••1111•MMMUMMIIMMINIMMIIIIMMIIIIIMEMMIINIMININIMMIIIIIMMIIIMMININIIMMMINIIIM
CrIS
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
'I
V.
STRIP CHART HIGHWAY
MMMMMMM
MMMMM UMU============IMMIIMMINIMIIIIMMMrnmensimmummumMINIIMIIMINIUMIIIIIMMUMMINIMIIIIIIMMIall
MEI MIN IIIIMMININIMMNIMMIIIMIIMMIMIMIMINIIIIIIIIIIMMINIMMIIIIMIlimm
MMMMMMMM MINIM = = ==- =UM MMMMM Mt
IMUMMIEMINIIIMINIIMMI MIIMMIIIIINIMMMININIMMIIMINIMMINI•MMIEMMIMIIIIMINIIIINIMININIIIIMINIIIIMMIMIUMINM MININ1111111111131111111111111111UMMIIIMMINI
MIZIE MMMMM MMMMM
ITIIIMUl
l "=
--.==7.--.=
-=====
=="--7-
--===
=i2==
==-7.
9= ===========n111 91112U
1.2:11 9::::::::11221::::::::::::Ini anlinnininitiM111. 11111122121:12:=1:21: 121111:
C111 - -================== ========
1111I IN • =
CE111211111.1 MINIM MMMMM MMMMM =MINIMUM MIMMMIIIIMIN1111111111MIIII MMMMM
111:31: MMIMIIMIUMIIIIIMMMMMMMIMIIIIIIIIIIIIIIIIIMMMIIIIIIIIIIMIINMIIIIIIMIIMUMMIMIMMIIMIMIIIIIIMOIIIMIMIIIMIMIMMMIIIMIIMNIIMMMMIMMMINBIIIIINIMMMMIIIMIMIIM ism
1=1131MINIMIEll
CET11 1
1173 MMMMM MMMMM mm
1:1=C 1 Mom iNINIIIIIIIIMMMMMMMMMMMMMMMIMMMMMIMIIIIIIIIIMIMIIIIIBIMIMIIIMIMIIMIIIIIMlmsimm
MUM IMMIIIIMIIIIIMMMMmmmmmmMIIIIMMIIIIIMMMIIIIIMMIMMMM
MCCIIINIIIII IMIIIIMIIIIIMMINIIMINIMIIIIIIIIIMMINIMMINIIMIIIIIMMINIMMINIIIIIIMIMMINIMMINIIIIIUMMINNIIIMINMIUMUMMIMMMIIIIMIMMIMNIIMmmill
azt: immiumminamemisonnomiummommummaiummunumiummommounumusommennumusisimminu
ccniinmmnimmmm••••••••••ummumminumummmmmmmcmmmmmimiwiwimiminuissimimnunmmmnmm
amil ineinenumsommmonimialmummensiommummummommmowinimmiummiommmummowimmnimmwmmensmumnimmommmin
car imininuommonsimum MMMMMMM MMMMM mainumiummumummeimmiliummummummouimem MMMMMMMMMM immummmumemum
arr miomminummaimemoommemmummummommmummrnmammmummummmumummummummissinummimmummom
am=mi mmmmmmmmmmmmsnmm.ammmmmmmmummummmmmimmsounimumwimismum
lit OP ,01.0.0.1A1 iiiiiiimummommouniiiiimommismommummiumm imemmmimiummimmiimionno iiimmionsommin
Structure
Chainage
111110
11111111111
.10
.11EMENIMINIMI1MIRTERIMMEINEE1
. HUNINLIERIMBRIENNILMENEMEHH!!!HEI=NELIEENLIMIHMILTIMIIIIIIIIH
Structure
0=11!
1=111
11 1.1 111:::11112:1211:1211111111:11:11i IliII iirailaill
=ilinr
= 1.1:11:17:::::::::::12221:1=
111171:111111 112212:12:21112.11
1111:=1
.111
911:12:112:=1111
.11::::
azornimmimiummilm............aumna••••••••••mommonommommmommoimiummammimmummummontommmaimon
azno..................nammimommo.••••••mummommummaimaimmmnsmmumonommommuammunimm•IN
atoromm.....masimmummeNtommiumni....••........•••=meimmimmusoun...ammimmaammmemm.....mmommmon•
/1/111/1/111/11111111111111111/1111111111111111111111111111111111111111111111//111111111111/111111
E=11ErlIMMIIIIIMMNIIIMMINIMINMIIMMMUMMUMMIMMIIIIIIIIIIIMME111111•11111111•11111111111111.MMI.M111111111111115M11111111•1111111111111MMMUMMIMMINIMU
ammtrominummimummiommo—
crisrmilimmmismimommingue = mommiummismmumimminimmansmuumaiimmumimiumummim
immmunt inn M M M M MMMMMM
MM MMMM MMMMM
MM MMMMMM
MMMMMM MMMM
MMM MMMM
MMMMMMM
MMMM
MMM MMMMMM
MMMMM MMMMMM
MMM MMMMMMMMM
MMMMMMMM
MMM
MMM MMMMMM
MMMMM MMMM
MMMMM MMMM
MMMMMM
MMMMMMMMMMMM
MM
arer unmmimnIImIN00.11iNmmiiiimewmnorm-tngvmammasmcrtenearaizmimmmmminnmmmmnmnmmwmmmmiwmmmmmmuwimmnniiim
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MMMMM WM= MMMMMMMMMM WMMMMMMMMMMMM MMMIMMIMMUMMMINEMMMIIMMWMM MMMMMMMM MINOMMMMIMMWM=MMIIIMMM MMMMMMM MMMMM MMIMM
ONMMMMIMMMMUM MMMMMM MU MMMMMM MMM MMMMM IIIMMMMMMMMOIMMMMMMMAIMMIIIMIMMMMMMMMUMMMMINOMMIMMMMMMMMMIMMMMMM MMMMMM MMMMMIMMMMINMM
=M7MMIIIIMMMM MMMMM MMMMMMMIMMIMMMMMMMMMIMMMMIMMINNIMMMMIMMIMMMMMMIMMMWMMMIMMMMMMOMMMMIIIMMIMMMMIUMMMMMIMMINIMMMMMMINIMMIMMMMMIM
MWMMMMMMIIIMMMMMINIMMMUMMIIIMMMMMMIMMMMMMMMWM=-2......------==-MMMMMMMIMMMMMMMMMMMMMMIMMIll MMMMMM MMIMMMMIMMMMMEIMMIIIMMOMMMMOOM
MMMMIIIIMMMM= MMMMM MMMIMMM MMMMM MMMMMMMMMIOMM=============MMMMMMMMMMMWMMIIIIIMMMMIMMMMUMMMMUMMIIIMM MMMMMMM MMMMMMIMMMMIll
OMMMMIIIIMMMMMMMMINIMMMIMMMMMMMMOIMMMIMMIMMMMM=============.111211 MMMMMMM MMMIMMMMMMMMMMUIMMIIIMMMMIMMMMMMOMMMMMMMMMIMMMMIMIMMWM
IMEEME MIMIIIIMIUMMM=111111MIIIMMIINIMINIIMMMUMMIMIIMIM==="--= MMMMMM MMMMMMMMIIIMMMUMMIIMMMMMMMMMM=MMMIONUOMMMMMIIIMMOMMUMMMMMM=MMM
I IIMININIMINNIINIMIIIIIIMMEIMINIIMUMMMMMUMMMINIIMMIliill.MMENUMNIIIIIMINIMMUIIMMMMINIMIN1111111•11111111111111MIIMINIMIIIIINIMMIIMM•MMMMMMIMIMMINIMIIIMMMM•1111111111NI
MIZIE MM11111111111111111M MMMMMMMMMMM MMMMMMM MINIMMOMMMIMMMMMIMM MMMMMM MAIMMOMMMMMMMMMMMMOIMMMIMMIMMUMMMOMMIMMMMMIM
MMMMM MMMIMMMMOMMIIIMMIMMMIMMMIMMMMMMINIMMUMMMMMMINIMMMMMMMMMMOIMAIMMMMMMMMMMMMIMI
MOOMIMMMMM MMOM MMMMM MIMMMMOIMINIMMMOMMMMMMOOMMMIIIMMIONOMMMUMMMUMMMMMUMMMMMMMMMMMMMIIIMMIMIMMMUMMWMIIIMOMMMMMMIMMMIMMIMMMIMMMM
MW=MIIIMMM MMMMMOIMMMMMMMIMMMMIMMMMMMMMMMINOMMMMIMMIMMUMWMMMIMMIIIMMMMEIMMMMMMUMMMIIIMMMMMMMMMMMMMOIMMIMMMUMMIMMMIMMMMMMIIIMM
MEDIEMMMIMM MM MMMMMM MMMMM MMOOMMMMMMM MMIMMMMMWMWM MMMMM MMUMMIIIMMMMMMMIMMUMUMMIMMMMMIMMIIMMMMWMMMMMMMMMMWMIMMMMOIMM
EMMIIMMMMIII WM 1111MMWMWMMM MMMMM MMIMMMMIMMIIIIIIMMMIMMMMMMIMMMMMMMM MMMMM MIMIMMMM MIME" 1111MMIIIMMMUMMMIIIMMIIIMM MMMMM IIIIMMINIMMMMMM
MM=MIIIMM WM MMMMMMM MMMMMM MMIMMMMMMMMIMMMMMMMOOMMMINIMMWMIIMMMMMWMMIMM MMMMMMM MMMIMIMMIMMMMMUMMMIMMMMMMM
MMMMMM MMMMMMMMMIMMINIIMIUMMMMMMMMMMMMUMMMMMUMMMMMM MMMMM MMMMMMMMMIIIIM
MMMMMMM MMMMIIIMMMMMMIIIMMMMMMMMIMMMIMMMMMMUM
MMMMMMMM MMMIMMIMMMMMMIIIIMMIMMIMMMMMMMIMMMMM==
MMMMM MMMINIMMMMIMMMMMMMMUMMIMMMMIMMMIMOMMMMMMMMMMWMMIMMIMMWMMMMEIMMMMMMWMIMMMIMMMMMMMMMIMM MMMMM
M=MMMMMM MMMIMMMMMMIIMM MMMMMMMMM MMMMMMMMMMMMMINIMMMMMMWOOMMMMINIMMIMMMMMMMMM MMMMM MIIIMMMMMMMIMMIMMMMMUMMMMMMMMMMIMMMIMMMUM
M=MMMMMM MMUMWMMUMMIMMMMIMMMMMMMIMMIOMMMIIMMMMMMMMMMMMIMMMWMWMMIMMMMIMMMMMMMMMMMUMM MMMMMM IMMMIMMIIMMIMMMIMMINIMIUMMOOMMM
MMMIMMMM MMIMMIIIMMMMMMINI MMMMM MMIIIMMMMMMMMMMMMMMMMMIIIMMUMMMWMMMMMMMMMMMMOMMMMIMMIMMMMMMMMMMMMMMMWMM MMIMMIMMMMMMM • MEI= M
MMMMMMMM MMMMIMMINIMMMMMMMMMIMMMMMMMMMMIMMMUM
ICL IOMMIIIMIIIIMIIIIIMMUMMEIMIMMIMMIIIIMIUMMI1111111111111111111MINIIMMMMUM••••11011111111MIMMINIMMMUMME11111111111111EMMINIMIIIMINIIIIMIIIINIMMUMMIIMMINIINIMMEIMIIMMI
MMMMMM UMUMMMIIIMMMWM
MMMMMMM
MMMMM MMMM MMMMM MIIMIMMOMM MMMMMMMMMM MMMM MMMMMMMMMMMM MMMMEIMMM
MMIMMMMMMMMIMMMMIMMMMIM MMMMMMM MMIIIMMMIMMMMMMMMOMMMIIIMMMOMMMINIMMMMWMWMMMOOMMMIMMMMMMIMMIMM MMMMMMM
MMMMMMMM MIIIMMMMMMWMMMIMMIMMMOMMIIIMMMMMMMIMMMMMMIIMMMINIMMIMMMMMMMMMISMM7- MMMMMMMM MMMMOIMMINIMMMMMMMMMINIMMIMMIMMMWM
MMMMMMMMM MM MMMMMMMMMM MMMMIIIMMIMMIMMWM MMMMMMMM MMIMMMIMMIIIIMMMIMMMIMMMUMMMMIMMIMMIMMIMMIMMMIMMIMMMIMMWM=
0:32:1==MMIMINIUMMMM MMMMMM MMMMMMMMMIIIMMIMIMMM=MMMMIIIMOMMMIMMMMMMMWMMUMMIWIMMMMMUMMMMIMMU MMMMM MM=MMMINIMMIOMMMMMMMMMIIIMM
MMMMMMIMMMOIMMIMMUMMMMMWMWMISMOIMMMIMMMMMMMINIMMIMMMMMMMMMMMM
Structure
Chainage
00B00808000000008000000000800000000000000000000000000000000008800800000000000000000000000000000000
r
Structure
MMMMM MMMMUMMMMWMMIMIMMOMMMIIIMMMMMMMIIIMMMMMMMIIIMMMMMIMMMWOMMMMIIIMMMMOMMMMMMWMINIMMMOMMUMMIMMIMMWMMMMMMOMM
.mmmmommemmmommommmommommumommommmommmimmommmmmmrnmmmmommommummu
MMMINIMMMM MMMIMMMMEIMMMMIMMMMMM =MINIM WM IIIIMMMMMMMMMIIIMMMMIMMMMMMMOOMMMMMMIMMMMMIMMMMIIIIMMMMMIIIMMMIMMMMMUMMMMMM
MMIMMMIMM MMIMMOIMMMMMIM MMMMM MMIIIMMMEIMMIMMMMOOMMMMMM MMMIMMMMMWMWMMIMMMMUMMMMMMIMMMMOMOIMIIMMMMOMMMMINIMMMOMMMMMIMMM MIEN M
EMMMMEIMM MMUMMIIIMMMOMMUMMMMMIMIMMIMMMMMMMIIIMMIMMMMMMOIMMOMMOIM MMINIMMIMMINIMMMM MMMMMIMIMMMMMUMMMOIMMIMMMMMMUMMMMMMMMM MM MOM
mmmmommommummmommmmommommommmmommimmmmmmimmmmmimmommommmommmommummimmilmmmmmommommmmommmmummmmammmmmilmul MMMMMM •
mmmmmmmmommmmmmmommm MMMMM mmommummmmmummommummimm MMMMM mmmmummummimmummommommommmmmommummmommmmmommmmommmum
mmmmmmmommonummommummommimmommummommmmmummommimmummummmommummilmm MMMMM mommmom MMMMMM mmmmmm MMMMM mmommommomm
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MMMMM MEIMIMMMMIMIMIMI MMMMM IMIMMMIM MMMMM MMMMMINIMIMMINIMMMMI1MMMMMMMINIMIMMISIMIMMIMMIIM IMMIMMMIMIM MUM= MIMMIMM MMMMMMMMMMM MMMMMM
OMMIMIll MEMO MMMMEIMMIMMIIIMIMMIMMIMMMMMMI • IMMISIMM MMMMMMMMINIMMISMIMMIEMMIMM MMIMMIMMINIMMIM IMMISIMMIMMIM MMIMMIMI MUM MIMMIMMIM IMMIMIMMMEMMIIMMMMI
12031=MIMIIIM MMMMMMM IIIMMIMIMMIMMIMMMMUMMIMMIMMMMMMMMMMIMMI MMMMM IMIMMMMMMM MMIMMIMMIMMMMEIM MMIMIMMINEMMIMMI MIMMIMMININIMMI MEIN MMMMM
INIMMIIMMISIMMIMIMMMMIMIMMIMMIMMIMIIIMMIMMMMMMMMEIMISIMMIMMIMMMMIMMMMMINIMMMIMMMIESIMMMIMIMMMMMMMIM MMMMM MMMMIMMMMMIMMMMMMMIM======
EMI MMMMM IMMINIMIMMEIMMIMMMMMMMMMMMMESIMMIMMIMMIMMIMMMMINIMIMMEIM MMMMM IMMIMMMMMMMMMMMMMINIMMIMIMMMMINIMIZ:7-:====
MMMMIMIMMMMMIIM MMMMMMMMMM =WM MIMMIMMMMIMIMMIMMIM MMMMM MMMMMIMIMMMMIMIMMIMMOMMMMMMIIIMIMMIMMIMMMMIMMMMIMMMMMIMMMMIMMMM=====.==
OM MMMMM MMMMM MMMIMMIMMMMIMIMMMMIMMMMMMIMMIMM MMMMM MIIMMIMMMMMIMIMMMM MMMMMMM IMMMMIIM MMMMMM MMM MMMMMM ===
MMMMMMM MINIMIMMIMISS MMMMMMMM MMINIMIMMI MMMMM MIN MEMMMNIIMMISMIMMIMMEIMI MEM IMMMIMIMMIM MMMMM MUM IMMIMMMMMMM MMMMMMMMMMM MIMIMMMIMMM
I:3 1== MMIMMMMMMIMMIMIIM MMMMM MMINIMMOMMMMMMMMISMIMMIIMMIMMMMMMMMMMMMMMIMMMIMIMMMMMMIMMIMISSIMMIIMIMMIIMMMMIMMIMMMIMMMMMMMMOMMIIMIMMIM
C2:11= MINIMUM IMMINIMM MMMMMMMMMMMMMMMMM MMMIMMIMMMMIMIMIM MMMMMM MINIM= IMMIMMIMMINIM MMMMMMMMM MMM MMMMMMM MIMMIMMMINIMMISMI MMMMMM MINEMMIMMMI
CSMIS IMMIMMMMIMMIIMMIMMIIMMIMMINIMMMIMMIMIMMIMMIMMIMMIMMIMIMMMMMMMMIIIMMIMMIIMMIMIMMMIIMMIIMMIMMMIIIMIMMUMMMIMMIMMMIMIMMIMMIMMIMMINIMMMMMMMMMMMMIMIMMMMI
CEIES IIMIMIMMISIMMIMMIMMIMIMMISMEMMIMMIMIMMMMINIMIMMMIMIMMIMMIIMMIMMIMMMMMMMMEMMrnMIMMIMMIMMMINNIMMIMMIMMEMMIMMMMMMIIMMINIIMMIMIMMINIMMIMMMIMIMMMrnM
EnEI MIIIIIMMIMIMMMMIMIMMMMMNIMMMMMMMMMMMMMMIMMMIMIMMIMIMIMMINIMMMMIMMMMMMMMMMMMMIIMMEMMMIMMMMIMIMMIMMIMMMMMMINMIMIIMIMIMIMIMMIMMIMIMMIMMIMIM
MIECIMMI MMMMIMMIMMMMMMINIMIMMISIMMIMMIMI MMMMM MIMMINIMMUMMMMIIIIMMIMMIMIMMIMMMIMIMMIMMMIIMMSIMMIMIMMIIIMMMMMIMIMMMMIMMIMMIMMIMIMMMMMMMMMIMMIMMIMINIM
In11 11111MIMIMMMIMMIIMM MMMMMMMM IMMIMIMIMMIMMIMMMIMMI IMIMMINIMMM MMMMMMMMMIMMMIMMIMMMIMMMM MEM IMM MEM= MMM !MEM IBM MM MEI MMIMIMMMMMM
IIMEME- 11111111MM MMMMM MEI MMMMM MMMMMMMMMMM MMMMMM MMMIMMIIMMMIM MEI MM MIMMMIMIMMMIMIM MIMMIMMIMM MUM MI MUM MMMMMM MMMMMMMMMM
ang! MMMMM MIME MMMMMM MIMMIMMM MMM MIM MOM MMMMMM IIIMIMMMMISMMMMMMMMIMIMMIMMMIMMIMINIM MMMMM MMMMEIMMI MMMMM MMIUMMMIMMINSMIMMIMMM
132:1 MMIMMMMMMMENIMMIMIMMMISMEMMMMIMMINMMMIMMMMMIMMMMINSIMMMIMIMMMMIMMMIMIMMMIM MMMMM MMMMMMIIMM MMMMM IMMMMMMIMMMIMIMMINIMIMMIMMIMINIMMI
an:1 11111M MMMMM MMIMMIMMINIMMIMMMINIMINIMMMMIM MMMMM IMMIMIMMMMMMMMINIMMIIMMIMMMIMIMMIMMMMMMMIMMMEIMMMIMMMMMMMMMIMMIMMISIMMMMMMMMMMMMMMINIM
MMMMMMMM MMMMM MMMMM ....mosommommionn..
MMMMM MMMMMM MMMMM mommumnim. MMMMMMMMMMMM
®I MIN MMMMM MMMMMMMMMM MMMIIMIMMMMMIMMMMMMIMMIMMMISMIMMIMMINIMM MEM MMMMMMMMMM MMM MMMMMMMMM MMMMMISIMMI MMMMM IMMMIMIMMINIM
MMMMMMMMMM MMIMIMMIMIMMMIMMIM MMMMM IMMMMMMMMMMMMMMMMIMMMIMMMMIMIMMMMMMMMMMIMMIMMMMMMMIMMMMMIMMIMMIMMMMMMMMIMIMMMMMMIMMMM
GEMEE
IMMMIMMMEN MMMMMIMMMMMMMMIMMIMMIISMIMMIMIMMIMMIMMIMMI MMMMMMMMMIMMMMIMIMINIMMM MMMMMMMIMMMSMMMMMMMMMIMIIMMIMMIM WM MMMMM
111=11 1MMMMMMIMIMMMIMMIMIMMMMMMMMMMMMMMMMEMNSIMMIMMIMMIMMIMINSIMMIMMIMMMMMMMIMMIMMIMIMIMMMIMMMMM MMMMM MINIMUM MMMMMMMMMM MMIMMMIMINIM
reennmom MMMMM nimiumemmummoomm..............momiliummimmuminummimmemoim.m.nummmommin•
irtsmommmomossimmommommoies...miumminim.......momomimmmowimminualcommummummimm.....••••••mos
inniosommosu MMMMMMMMM MMMMMMMM MMMMMMM mmoimilmmionmensi..
MMMMMMMMMM .....msmiumocmo•Niommmoa.i.M11MIIIIMMIIIMIIMMIIIIIIIII1111111MMMMMMMMM
MMMMMMMMM MMMMMIMMI MMMMMMM =MIMI MMMMMM MINIMISMMMMM MMMMM IMMIMMMIMMIMMMIMMMI MMMMM
C12:1 MMMMM MIMIMMMMMMM MIMMMMMIMMMMMIN MMM
112: MIMIMMMMIMMIMMI MMMMMM MIMIMMMMMMISIM MMMMMMMMMMMM MMIMMIIIIMMMMIMMIMMMIMMI MMMMM MMMMMMMMMM MEI MMUS MMMMMMMMMM IMMMMIIMMIM MEM
Chainage
.
11011111112
1111010111111110 116
11011111 11110
11
0 119 ildll
11MERMa
Structure
HI!!!!!!!!!!!!!!!!!!!IIIMEINERINIIIIIIMILEMEMMHIMMUHMENEERM
IME1=== MMIMIMMMMIMMMIMMIIMEMIMMMMMMMMMIMMIMIMMIMMIMMMMMMMMMIIIMMIIMMMMMUMMINIMMEIMMIMMIMMIMMIMMMMMMMMIMMIMMIMMIMMMIMMMISMIMMIMMIMIMMIMMIMMIMIIMMI
MMMMMMMMMM MMMIMIMMMMMMMMMMMMIIIMMIMMIMIMMINIMMMMM MMMMMMMMMM WMINIMMMM MMMMMMMMM =MEI MMMMMMMM IMMMIMMMIMUMMINNMIMMMMIMMIMMI
1!2 IMMMIMMIMMMMISIMMIIN MMMMM MIMMMIMMMMMMMMINIMMIIMIMMIIMMMIMMIMMIMMIMMMMIN r-,—NimMMMISIIMMIMMIMIMMMMIMMMNIMMIMMIMMIMIMIIMMMMM,7
M rzsi
IIEEI MIMMIMIMMMMIMMMIMIMMMMMIMMIMMMMMMMMMMMMIMIM MMMMM MMUMMMMMINIMIMMIMMIIMMMMM MMMMM MIMIMMMMMM MMMMMMMM MEM MMMMMMESMIMMMINI IMMIM
MMMMMMMMMMM MMMMMMM MMIMIMMMIMMMMIMMIMMIMMIMMIIMMMMMIMMMOMMMMIMMIMMIIMMMMMMMMINIMMIMIMMMMMMEIMMM MMMMM IIIIIMMMMMMMIMMIMMMM
1=1: 11MIMMIMMIMMIMMMINIMMMMMMIMMMUMMMIMMINIMMIMIMMMMMUMMIMIMMIMMIMIMMMMMMMIMMIMMIIIMIMMMMIIIMMIMMIMMIMIMMMIMIMMMMIMMMIMMIMIMMIMMIMIMMIMMMMENIMI
11:=MIIN IMMIMMIMMINIMMINIMMMMINIMMIIMMIMMMMMMMMINIMMMIMIMMIMIMMIMMMMMMMIMMMMIMMIMMIMMMMMMM MMMMMMM MUM= MMMMMMMM MMIMMUMMMIIIIMIMMIMMIMMI MMUS
11101 MIIIIMMMMIMMIMMMMMMMMMMIMINISIMMMIMIMMIMMIMMMMIMMMMIMMINIMMMMIMIMMMMMIMMMIMIMMMIMMIMMMMMMIMMMMMMMMMMINEMMMMMIMMIMMIMMMMMMMMMMMISM
lecil isusimmisimmaiummummmoommemmumnommesmummimmummemmosommemmommuummumimm
carn imummoncsimummoimmesommommummummommumumummmumnimmmummemmommournmeou
renr imummommosommmaessimoscommommmimummomiumommuniimmemmommummmimminsminmummennumummumm
ani onomommumwm MMMMMIMMIMMMMMMMMMMMMIMMIMMIMMMMMMMMMIMMMMMIMMMMIMIMMIMMMIMMIMIMMIMIMMMIIMIMMIMIMIMMIIMMMMMIMMIMMINIMMMIMMINIMMMINMEMMMM
MMMMMMMMMMMMM MI MINIUM IMMIMIMMISMIMMM MMMMMMMIIMMIMMMMMMMMIMMISIMMINIMIMMMMMMMIMMIMEMNIMMMMMMMIMINIMMIMMIMMIIIMMMMMIMMIMIMMIMMIMIIMMIMMI
ECIE
IE:11T 1SMNIMMMMMMMMMIMMMMMMMMMMMMMMIMMIMIMIMMMMMMMMMMMIMMMMMMMMMMMMMIMMIMIMMMMMMMMMIMMMMIMMMMMMMMMMMMIMMMMMIMMMMMMMMMMM
IMEE MIMMMMMIMMIIMMMIMIIMIMMMMIMMMESMMMMIMMIMMISIMMINIMMIMMMMMMIMMMIMMMIMMMIMMIMMIMMMMMIMMIMMINMMMMMMIMMINIMMIMMIMMMINIMMIMIMMIMMINMIIMIMMMIMMEMM
0:11:1 11M85MMMINMIMMMMIMMMMMMMMINIMMIMIMMIMMUMMMMMMIIIIMMEIMMIMMMMMMMIMIMMIMMIMMMMMMMIIMMIMMINIMMMMMIMMIMMIIMISIMMMMMMMIMMIMMIMMIIMMIMMIMMIMIISM
1=11 1MMMIMMIMMMMMMMMMIMMMMIMMIMIMMMINMMMMMMUMMIIMMIMIMMIMMIMMINIMMMMIMIMMMISMMIMIMMMIMMIMIMMIIMMIMMMIMMIMMIIMMIMIMMIMIIMMIMMIMMMMIMMIMIMMISIMMIMINIUM
OZCIE MIMMMMIMMINIMMIMMIMMIMMIMMMMMMMMMMMIMMIMMIMMIUMNIMMMMMMMIMIMMMMIMMMIMMMMIMMMMIMWMIMMEIMMMIMMIMMMMMMMMIMMIMMMMINIMMMMIIMMMMMMMM
EIMI MMINIMMIMMMIMMIMMIMMMMIMMMMIMMINIMMIIIMMMMMMMMMMMIMIMIMMIMMUMMMIMMIMMINNIMMMMMMMMMIMMIIMIMMEMMMMMIMMEIMMIMMIMMIMMMMIMIIMMINIMMMIMMIMIMMIMI
aMM IMMMMMEIMMIMMMINIM IMMIMMMMMMIMMIMMMIMMMMMIMMMIMMMMMIMIMMINIMMIMMMMMIMMIMMMI NOM MMMINIMMIMMIMMIMMMM MMMIMMMMMMM
02:11 MMIMMIMMIIIMMIMMMMMUMMMMMMIMMIMMUNIMMMIMMMMIMIMMINIMMMMIMMMIMIMMMMIMMIMMIMMIMMIMMMMMMMMIMMIMIMMMMIMIMMIMMIMMMIMMMIMMMMMISMIMM MMMMM
tEll SIMIMIMIMIMIMISMIMMIIIIMMMMMMMMINIMMMUMMIMMIMMMMMMMIMMIMMIMMMMMMMIMMMMEMINIMMMMMMMMMMMIMMMMMMMMIMMIMINIMMEIMIMMMMMOMIIMMIMMIMMIMMIIMMIM
02::=011111MMIMMMINIMMMEIMIIMMIMMEIMMIIMIMMMMMIMMIMMMMMIMMIMMIIMMMMMMMMMMIMIMISIIMMMMMMMMMMMIMMINIIIMMMMIMIMMMIMIMMMMMMMMMMIMIMMMMIMMIMMMMMMMMMM
MIMIMMIMMISIMMEIMIMMIMMIMIMMMMMMIMMMMIMMIMMIMMMIMMMMMIMIMMIMMMMIMMMMMIMMIMMMISSIMMMMMMMIMIMMIMMMEIMMMIIMMIMMIMMMMIMIMMMIMINIM MMMMMM
01Efr MENEM MMMMMMIMM MMMMMM IMMMMIIMOMMMMIMMMINIMMMIMIMMMMMMIMMISIMMIMIMMMMMMINIMMMIMMMMMMMINMErnrneeMMMIIIMIIMMIMMMMMMMMISMMMEIMUMMMI
CrIE IMMIIMIMIIIIMIMMIMMMIMIMMMMMMIMMMIMMINIMIIMMIMIMIMMMMMMIMIMMIMMMMMMMMMIMMINIMIIMWMMMMIMMIMMIMMIMMMMIMIIMMIMMIMMMMMMMMINIMMIIMMIMMMIMMMMMMM
enir MIMMMMIMINEMMIMIMMIMIMMIMIMMIMIMMIMMIMMMIMMIIMIMMMMMIMIIMMIMMIMIMIMMMIMIMMIMMMMMMMMISSIMMIIIIMIMMMMIIIMMMIMMIMIMMIMMOMMIMMIMIMMIMMMMMIMIMMMIMMIMMIMIMI
C=MIZ INIMMIMMMMOMMMMMMIMISIMIMMIMIMMMMMMMIMMISIMIIMMIMIMMIMMMMIIIMMIMMIMMMMMMMIMMMMIMMMMMMMIIMMMMMIMMIMMMIMMIMMMMIMMMMISIMMMIMMMMIMMIMIMMI
I:=I=MMMIMMIMIMMMIMMIIMMIMIMIMSIMIMIMIMMMMIMMMMMMMMMMMMMMIMMMMMMMBMMMMMMMMMIMMMMMIIMMMMMMMMMMMIMMMMMMMIMMMMMMMMMMMMMMIMIMMMMIMMMMM
Imir mimmummumummommomm_____._______m__________Nummommummaammumuommummumemmrnm
IIIMIMMIIMMINNIMINIMMIIMMIMMIMMIMMMMINIMMIMIMMMEIMMIMMIMMMMMIMMEIMMMMIMMMMIMIMMIMMMMMIMMMIIMIMMMIMMMMIMMMIMIMMMMIMMMOMMMIIMMMMIMMMMIMMIMMMIMINIMMIMI
a:r:Ecxmnmmmmummmmmimmmmummtscmmummmommmuiommmmmmemmmummoommmmnmtmmmsmmommm=..-.--z._z- .. __—
menn imimommumsomm•mmuummummummommui MINIMUM
0111:11 1MIMMIMMIMMMMMMMISMISMIMIMMINIMMMIMMEIMMMIMMIMMMIMIIMMMMMMMMMIMMIMMIMMMMMMMMMMMMIMMIMMMMMIM MMMMM MMMMMIMMMINSIMMMMMMMMMMMMMIMIMMINI
EXIMEIMIIIMMIMM MMIMMMINII MMMMM IMMIMMIMIMMEMIMIMMIMMIMMIMMIMMIMMEMIMMIMIMMMIMMIMMMIMMMMIMMMMIMIMMIMMMMIMMMMIMIMMIMIMMMIMMMMIMMMMIIIMMIMMIIMMMMMMMI
IMIE MIMMIMMMIMMMIMIMIMMMIMMMMMMMMMIMMIMMIIMMIMMMIMIMMIMMMMMMMINIMMINIMMMMMIMIMMIMMEIMMMMMMMINIIMIMMISMIMMMMMMIMMMMMMMMMMMMIMMMMIMMIMMMM
1:11: 11USIMMMMMIBMIMMMMMMMMIMMIMMMIMMMIMMMMMMIMMIMMMI MMMMM MMMMMIIIMMIMMMM MN MEM MINN MIMIM MMMMM MIMMIMMIMMMMMMMIMIMMISIMI MMMMMMMISIMMMI
MEM=MIIMMMIMMMMMIIIIMMMIMMIMMISIMMIMIMMMMIMMMIMMIMINIMIMMMIMMIMIMMIMMMMMIMMMIMMMEMMISMIMMIMMErnMMMMIMMMIMMMMMMMMISIWIMMMMMMMIMMMIMMIMMIMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
= =================MWMMMMUMMIMMOMMMMMMMMMMMMMMMM
ITIEME 1=========n1IMMIIMIIIUNIIM=================== =================rn.==..=MMIMMWMWOMMIMMWM=MMMUMIIIMMUMMO
crotommimmr: L=m0•••••======================
mum=============mmmommum=============================—====—===—======--=—mm— mummummummommmmmmummom
==mmmmm=========ommommomm—
immiossumosommienesimmummounemmansammiummummumusimmumaiiimmusiummonemsommememmummumeneinnummommom
cns=zmmmmmimmmmmimmBimsmuwiumummuumaummmmwivaomnmmmimmiuomsooimumtmvammumimmmmmumimsimmnumenuomumm
manmoisommmusimm ======= mmmummmmmmmmimmimmmmummummmmmummm ===== MMMMM =mom MMMMM =mums MMMMMM mom MMMMM mama=
e=s=immmmosemmina MMMMM mmummummimmummmummummummomummommimmommmmulmmm
mormammommmemmmummrnmummmimmummimmummmummonmmummmiummummummomm MMMMMmmilmmmmmmummummommmmmmummmumm
MMMMMM ummmommmummummommannommummmummm
MMMMMM muslin
miummmimmmmmm..mmommummumum.mmmonommm..mmmommommuummomm......mmommomm....mmmmommmommumommommomm....mmomm.
mammmmimmammmm..m.mmum...mmmummummummommommommimmummomm..mmimm............mmmmmmmmmrnmpm.....mm.rnm
mmonamm.mmummummmmummommmmimmummommummummm...mon...mommmum.mmmmummommommommommommou =—
mmimmmmmmmummumm.mmum.mmmmummommumm.m.m..mumummommmommmommommw..m.....mmmummilmmmmummommommmom
azoir immusimmiamos...mm......mummimmoommmummmmummmumniumminummowimmmmmEgmummi
mmEmmmmmmnimmemmmummmmommmm MMMMM mommmmmummmommum.....n...wommmummmum...mmin...m.....mmimummmummumm
MMMMM MMIMMIIIMMOMMMIMM
MUMMUMMIIIIMUMMIIN MMMMM MMMOOMMMM=MMIMMMMMMMMMMMMMMMMMMIMMMMWMWM=MMMMMMMMIMMIEMMOM
MMMMM MMMINIMMMMIMMIMMMIMMMMMMMMMMMMMMMMMMMMMMMMMMMMIMMMIUMMIMMU
MMMMMMINIMmommommmummimmummommomm..m.mm===.......m.mmummommammommmummommommimmrnmummmummmummommmumm
limmssmummmimmommmommmumummmommmmmwm===mmmommmommimmmmummommummmmommummmammimmommummommmommummumommm
..morsommmn......mmmmmmmmmmmum===mmummmmummommmumwmmummmmommmimmmmmumummumummummommmumwmimm
mm.....mmumm======mm..mmommommommmum===mmummummummmummummommummommum...mmmommonm....mmmmomm.....
mimmm...m....======= MMMMM nommemon....0====..mm...nummummommommm...mmmummmmemm....m......mm..mmummum
aza: Huummo=a==mmmmmmmmmmmmmimamm:.-..=:r.mmnmmmimmmmmmmmmmmmmmmmmmmmmmmu•eumrnmmmmmmmuum
i=rinizimmem==.=uniummummommissom===mommumimmeimmommummommommumommummismumsummaiumum
ttrc omommm===mmaimommommumimmEmm=uncummaimmonemnimommummmommmummmummemomomemummoommimmem
172 MMMMMMMM MMIMMIMMIMMMMMIIIMIMMMMIIIMMWMIMMOMOMMMWIN MMMMMMM MMMIIIMMMIIIMMIIMMMOMMMIMMIMMMMMMIMMMMMMMMMMOMMMIOM
11711111M MMUMMM MINIIIIIIIIMMIU1111111MMMINIIIIIIMIE
0:130:121===UMMIMIMINIINIIMM111111111.11MMIMMINMMIMMINIMMMEMMMIMINIMMINUMINIIMIIIINIMIRIMMUMMMIIIMINIINIIIIIMIUMINIMMUNIMIN IIIIMMIMMMMMIMMM
MMOMMIMMMMUMMIIIMMMMMMIEMMUMMINIMMM MM MUMUMMMUMMM
Structure OMMEMMUMMOMMESMOMOMMEMOOMM=MMEMOMOMOMMOBONOMMEMEMOMMOMMEMMOMMUMMUMMUMMOMMIMMUMMOMMOMOM
Chainage
Structure
00000000000000000000000001100000000000000000000000000000000000000000000900000000000000000000000000
!!!!!!!!!..1111130.0.110011119111111111111!!!!!!!!!!!!!!!MIMMOMMOMMOMEMMIEMIRIMMIMUMMIMMOMMIMMEng""
UMMMMINI IMMINIMMIMIMMM
021====NIMMIMIIIIMMIIIIIMINNIMMIll IMMIMMMMMIMMMMMMMMIUIIIIIIIMIIIIMMMEIIIIIIIIMIMIM11M1M11MMMMIM INIMMEIMMIMM
tim mimmiemormmumnimmummmmwsimmanninsummmomemmumummmummommoreemmommimionumumnimrmim MMMMMMWM
MaNII IIIIIENIIIIMSNINGTINMEIVISITIPPIIN MMMMMMMPI MMMMMRMITZEIIIIIIM MMMMM 111116XMINIMIIMIIIIIIIIIIIIMIIMMINIIIIMUMIIIIIMMMUNIMMUNIMMNIMIMIUMMIMPEPIMIPMINIE
OZET IONIBMINIMIIMINIMMIIIMIIIIIMIMMINMMIIIMIMMIIMMINIMIEHMINIIIMIIMUlliallIIIMMINIIIMIUMMIIMMININIMEMMMUMMEMMINIMMONIMMIMIIIIIIIIIIIIIM
Ctrll IMIIIIIMIIMIIIIIMIMIIIIIMIIMIIIIIIIIMIIIIIIMIMIIIIIMIIIIIIMIIMIIIIIIIIIMIIIIUUMIIIIIIINIMMIIMIMIMIMMIMIMMMMMMMMMIMMIIMINNIMIMIMIIIMIMMIMIIIIIMIMIMIW
aZITI MIMMIMMINUMMUMMMUMMMUMMINIIIIMIMMINIIMMIIIIIMINIMINIIIIIMIIIIIIMMEIIMIMIIIIIMUNIMINIIMIMINIIMIMINIMMIIIMMINIMM
GIM IIIIIIMIIIIIIIIMMMMIIIIMMINIMIIIMMMIIIIMIIM===.1111MMIIIIMINIMMOIIIIIMIMINIUMIIMINIUMMINIMMUMMIMMUMMUMMEIMM
C1=2MMMMIIMMIIMMIIIIIIMIMIMIIMMIMIIMIIINIIIIIIIIMMMIIIIIIIIIUM:.:T=MMMIUZIIIIIIMIMIIIIIMMMMUIIIIIIIIIIIIIIMIIINIIIIIIIIISIMIMIIIIMIMIIIMIIIIIMIMMIMIIIMIMIIIIIMIMINIIIIIMMIMMM
C1::: MMIIIMMUMUMMUMMINUMNI=.-1:- -MMMUMINIIMIIIMIMIMMMMINIMMIIIMMMIIMIIIMMMIMIIIIMIMMIIIIMINIMINIIMIIIMIEIMMIMIIIIMIIMIMINIIIIIIMIll
CIME I MNIMMIMMIIMINMIMMIIIMIMMEIM1111===111111111•1MINIMMIIIIMIMMIIIIMBIRMUNIUMMINIIIIIIIIMMMUMNIIIIIMMINUIIIUMININIMMINMIMIE
EIZZI NIII IMME1111•10111111•111111111MIMIIIIIIIIMMIIINIMIIIIIMINIUNI3=7.-"MEIMIMM•1111111IIMMIMMMMUMINIIIIIIIIMIIIIMMININIMIIIIIMMNIMMIIIIIIIIIIIIIMMINIMIMMMM
1112 11111111111EUUMMMUMMIMINIIMMMIMMI===MININIMMINIUMIIIIIMIUMMINIUMMIIMIMIIIIIIMIIIIIMUIIIIMININIIIIMMIIIIIIIIIMIIIIIMMINMMUM
Irtli 111111111MMIIIIIIIMIMIMMMMIIINIIMIIMINUIIIIMMIIIIIIMMINI=MMINIMMEIIMMMIIIIIIIIIIIIMIMMIIIIMMINIMIIIIIIIMIIMIIIIIMINIMIIIMIIIIIMMMMNIMUNIUMMMUNIIIIIM
EIII IIIIIIIIIIMININNINIMMIIMINIIIIIIIIIIMIIIIMIIIIMINIMIMINIIIIIMINIMIIIIIIIMIIMMIIIIIIIIIIMINIIIIIIMINIIIMMININIMMUMMUIMMEIIIIMIMIIMMIIIIIIIIIIMMIIIIMIIIIIIIIIIIIIIIMMIIIIIMINI
DM INIMMIIIIIIMINIIIIIIMMINIMMIIIIMUll1111111MIMMINIIIIMIIMMINIIIIIMIIMIIMIIIIIMMIEMUMIIIIMME11111•11•10111111111M1111111111MMMIIMMEMINIMMMIMINIM
ar!ITMMIIIIMIMIIMMMMIMMMMMMMMMMUMIMIMMIMIIIIIIIIIMMIMIUIIIMIIIIMIIIMMIMIIIIMIMIINIIMIIIIIIIIMMIMMMMMMMMMIIMIMWIM
OMr:I MIIMMMIMIIMIMIIIMMIIMIMMIIIIMIMIIIINIIIIIMIIIIIIIIMMMIIIIMIMIIMIMIMMMMMMIMIIIIIIIIIIMMIVIIIIIIMMMIUIIIIMIUIMMIIIIMIMIIIIIIMMIIMIIIIMIMMIIMM
1:1=12 11MININ111111EMMMMIIBMIIIIMINIIMINIIIIIMMIMIIIIIIIIMIMMMUMNIUM1111111MIMMINIMMINIMMIMINIEMMMIIIIMMIMIIMMINIIMIIMINIMINIM
2!TI IRIIIIMMUMMMIMMIIIIIMIZIMMIIIIIIMINIMIIMINIIIIINIMMINIIIIIIIIIMINIMMIIMMIIIIMMINIIIIIMIIIIIMINIEIMMIMUMIIMMIMIZIMIMMMMINIII••••
01311 MIIMUMNIIMIOUMINEMBINIIIIMINIIIIIMIMINWIIIMIMMININIMMIIIIIMINIIINIMIMIIMIIIMINIIIIMMIIIIMUMMUMMINIMMIIIIIIIIMIIIIMINIIMMMNIMMINIIMINIIIIIII
te:11111111=11111111111MISIMINIMIIIIMMIIMUIIIIIMMMIIIIMIIIIIMMIIIIIIIIIMINIMMINIMIIMMUMMUINIIIMIMMUUMMIMUMININIIMIMINNIIIMMEIMM
0:71II IIIIIIIMMIMMMIMMMMMNINIUM1111•11111MINIIIIIMMIIIIIIIIIIIIMMMINIIIIIIIMMIIIIMIIIMMMIIIIIIMMEIIMMEIMUMMIIIIIIMMIIIIMMIll
aZIXEME MMMEIIIIIMMIMMININ11111---====7-7MMIUMNIIIIIINIMIIIIMIIMIMMINIMMINIMINIIIIIIIIIIINIMIMIMIIIMIIMMMINININIMMINIIIIMINIIIII:== ==========11111MIN
Z111 1111111MIIIIIMINIMININIIIIIIIIIIMMIIIIIIIIIMMINIMMIMIIIIIIIIIIIIIIIMINMMMMMMIIIIIIIIIIIIMUMIIIIIIIIIIIMIIIIIIMMINIIIIIMIIIIIMMINMINIMMINIIMMINIMME11111111•11MIMMM
IMECE IIEIMMMIMIMIMININIMME1111111111111111BIMIIIIIMINIIMMMINIIIIMIMMMIIIIIIIIIMMINIMMINNIUMNIMMIIIIMMEIIIIIIIMM•1111111111111MUMMIIIMMUNIMMIMMINU
C21E1= IIIIIMIMMMMMMMMMMIIIIIMIIIIIIIIIIIIMIMIMIMIMIIMIMIIINMIMIIMIMIIIIIIMIMIIMIMIIIIMMMIIMMIMMMMUM:Z======Ml
t3M117 1111111MIIMMINIUMMMINIIIIMINIMIIIIIIIMUIIIIMINIIIMMIIIIIIIIIMINIIIMINIMINIMIIIIMMINIMININIMIIIMMIMMEIMMIMMIIIIMIIIMMIIIIMMZ.====-T .= MIME
C:t!:IV:Z IIINIMIIIIIMMIMIIMIIIIIMUIIIIIIIIMIMIIMMIMMIMMMIIIIIIIIIIEMMIMIIMIMIIIIIIMIIIMUUMMIMIMMIIMI1BMMIIMMIIIIIIIUIIIIMIIIIIIIIIMIIIIIIIMIMMIIMMMMMMIIIIMMIMIMMIU
IZZIIME IMMIMIIIIIIMMINIMMIIIIIIIIMINMEINIMMIIIIIMM11111111M1111111MIIMMINIIMINIIIMININIMMIMMIMMUMMIIMUME11111•11111EMMINIIIIMMIMIIMINIIIIMIM
C!ll niliMMIIEMMUIMIMMIIIIMIMIIIMIIIMMIIMIMIIIMIMIMIIMIIIIIMIIIIMIIMIUMIIfIIIIIMIMMMIIIIIIMIIIMMIMIMIIIIIIIMIIIIIIIIIIEIMIMMIIIIMIIIIIIMIMIMIMMMMMMIMIIIIIIIIIIIItIIIMUIMIM
ilinommommulimommmommonneummenummmommmumummomminmumernsiumummummommumisomminommmummuu
tmarxmomm===========mm================.------==:-- ...====:--.=.7--Aimmon— —:ammusenu-----=.-.-1- .====..- --z.:--mmumu
crenrommuumumumsi=mounc================================mmmrnmmumwom==============--mmmonum
nrialoommummunnummunausszatssies=========================somummememummmm==== armana=mummmmm
cri mensumiumummommummimm MMMMM sonamuleimull11•111111111•11•11111111111111111111111•111111MEIMMUINIEMMMUNIIMIIIIIIIIIIMIIIIMMIMMINIIMIMMUIMMIMMI1111111111U
C2EI IIII 11111MAININIIMMMINIMMIIIIMMIIIIIIIIIMINIMMI MMMMMMM INIMMIIIIIIIIIMM=UZIMINIIIIIINIMINIMIMMINIMMMINIMIIMMINIUMIIIIMIIIMIMINIMMIIIIMINIMINIIMIIIMU
CBC: MMOIMMINIIII1111111M=MMIIIIIIIIMMEIIMMENIMINIMMIIIIMIIIMMMIMUMMIMINIMIIMINIMINIMINIMININIMININIMIIMINIMMINEINIIIIIMMEIMMIIMININIIIIMINIMMININIMIIMMIIIM
CMIIEI IIIIIIMMIMIIIIIIMIIIIMIIMIIIBMIIMIIEMMIMIMIIEIUMMIIMZIMIMIMMMMUIIMOIMIIIIIBIIIIIIMIIIIIIIMIMMMMMIIMIIMIMMIMIMMMNIMIMMIMHIRIIIMMIMMMMMIMIIIMMIIIII
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
03011111•11NmEllEimmiNmiNimimiNmiNiminimNIININMUMININIINIENIMMININIMMNIINMINNMINIIMMI•MilEMMINININIMIN•MIINIMININIIMmumommusIMINIMININNINimaimi
E:SrlirIIINNIMMNNNINNIMIINNluNimmmmmmimmNNmmillININIMNNMINI,MMINZN•NuiNmumnmNimmmMINNIINMMMININNNNIMNIIIIEIINIMNIMIMINMmmmiUIIIMINI•NN
INMINIEMINIMINIMININimmiNimim IN Ni MMMMM MMMMM
MMMMM NNusiimimmmmm mom mmoimmummIN MMMMM MMMMM MMEMIMMMMINIMINMIMMINIMMMMENInniiiMIIINuiN
ZNEE MlimmmmmmNimmmmmNmimummnisimINMIMIMININUMINIINNIINMIMIMIMNINIIMINIMIN•NIINNlnmmm•mmmiININIIIsimmINmINMmmmlllimiiNINummNiuIN
C1731 111MMININillimmiNINININININUmmisiNimimiNINIUNNINININMININ MMMMMMM MMMMM MININININNUIN MMMMM MUNN lUINIIIIMIMMIMINrn
IIIIIMIMNININMMNNINNINIUNIININNNillmmmmmNlmmiNmmmmmNBmmmmiminINHNNHNIIIIININNINMMMMMMmmmiMMINIIsinNio
CMI7MMINNIININI immimminnimmNiimuNININNE1 MMMMMM IN MMMMM
C=3!Ern mmnllNimNIIIEINmmmiNIMNINNIImNNNNNIIN•MiuNmmmmmmmmmmmmmmmmmmmmummmmmmMMUMMMMMMINIIMINlmmmnillNMIN
MMMMMM
MMMMM NmmmmmmNiolsuNiNIINIMNIIINIImmmmmmmmmmnmmmmmMMMMMMmmmmIMMINIUINim
tnrEM 'NM MMMMM MMMMM
irrNr mNIIIIINIINNNNIImmimNNNIINMMIIMNNINilliNillnmmmmmimmmmmmmimMMMMMMMMMmmmMINI•MNIIIINIMMININNINis
CEI: ININIININNIIIIINNiimmimmmiNINIMMIMINEIMINIINIMUINNIMINMIINinomiNimmiNMMINIMINMNIMINNElmiNNINIMMMININIMMINIIMINIINMIIIIMMINI•••■=1111111•1111Minms
Innit iMMINUmmiNIMINIIIMMIIMENNININIIMINIMI•NINImmmunimmummilNimmmuMIMMMINIMMIMMIMIIIIN•mmmiNIMmrnmilmmnimiNINININIMMINIMMININIMINNEINIIN•
0:13 ••=m1ININIMININIININIENNINimimmNiimiNIENINMNBINININMMININMNINNIIImmumommmm•MININummmNIINMMIIMIMMMIMMINIMUmUninisiMmsi
MIEMONIMIM =MIN
oe~ mmiNINNINliiimmliNIMNIINIIIIINNimmIliummrnmumumummummEIUMMUMMMummININIIIIIMmamm
irl:IE I1NmlirimmiNlmiislNmmmINNNIINIMMNNININNNNNIIMiNlimmNNNIMlimmmINNNmMmmnimmmmmMINNIMNINIIMINMMNBNNmmNININNIIIINm.NNN
Irri MMIINININININimmiNINMINIINININNINIMINMENINININ•••••••••••=mmummummummnimiMMUMUMMommmilliiIINNIMINImilmo
02:1:I MNINIIINIININNNmMNINBINNNIMIIMIMININNNINImmmmmmmmmmmmmmmmMINMMMMMMMNIMIImNiNNN•NN
rer:1 lNilimmNNNI•••••MMIMINIIMIMINNiNNOINIMINinmNIMNimmINIININlmMimliNimmMnimmmimimmmmMINNMMMNNININIMINMINNIMMIMUINIMINNIIINIIMNNimill
tl:=MilNiMllimmmmimIMINiNiNiNi/ININmmmmmmmmmmimmmmimmmmiiNmiNimmmoiNNBINIMINIINNINBINMININIIIIIMNIIINMMMMMMmmmillmniNBINNNnm
1=72 MMMMM INIMinmNINimmimimummmim
MMENIIIMININMINMMUMMININIMMINNIMININIMINIENNINININIUmmmumammiimimimmrnmalmmummmuMMMMIIIIIIIIIIIIIMMENNIIIIMINIUMINIIMMMMEINEMINmimiN
IM:I MMmmmmWIIINlimiNiNNmmmmmmmmmmmmmmuNNINimmmiNNHNmmNiNINNINNNmilIlliiNiMNIIINilliNINNIMMINMIINIMMMMMMMMMmNNIIIINIMIINniaill
anIENINIINNIN MINNIE MMMMMMMMM MMMMM mom MMMMMMMMMMMMMMMMMMMMMM MMMMMMM -_____mown
arlr iMIINmmmIINNImnmillimmiNmmmmmmimmmiNmmmmmmiNNmmminimmmNuimNNINIMMIINIMIMIMMMMMINMMMMMMMININIImi
m mNi m fog mINMEINNIMMININIIIIIIIIIIIIIMNIININININIINNI MMMMMMMMM MNINN ;as eninn MINIUMINMMINIMMMIMIIIIMINIONNrnm
INNINIMEIINIIN•mmommmummummUMIIIIIIIINMIEMINNINNUININIMEMINIMININminIMINININIMMINNININNmi _ • nir9
=MI MINIMMININNIMIlimirnmiNINNEMinmulmm mmummum •••=•••• mummommmNIINEimmmimm•MMMINIINIIIIMMINMMINIMMMOINN=
Structure MEMEMEMINIMEMEMEMEMEMIUMMOMMEMEMEIMEMEMwacm. MIUMMEMINIIMMEMEM
Chainage
OMMOOODEMBOMMOMBEHOOMOOMEMEREMONOMONIENEEMOME
Structure 31MMOIRIMIONMEHMEMIEMOMMEMBEEMEMEMEMIC:IMME luscuL IMMEMEMEMEMBE
anrlri MillMMININNNMMWMMNIIMMnmmINIIIIINlmNllNMIUINUMIMinnNNIMMNNIIMMIMIMIINIMM111MMMMMMMMNIMMNIIIIIMIMMININNINNNNMMMMININN
ri:2111=MININIM
C:31 NIMMIMIMNIIMINNIIMIIININNIMININIIMMMININK mai( Num ism el iNim In limn m INEINI MMMMM NErn nmacNiimr_ MNINININNEIMMINIIIIININMMIMINIMMMMMMUMNIIMINIrnm
trrrMIINI13:L==31NZZSaa=,Z=:_-.:-_-_MMINIMMMMMINIIIINIMMIMMIINIMmmmmmmmMNNINMIENI•1NMIIMININNIININMMIIImmmNNNIN.
III1:11 17,===11= MMMMM
ECTII I:1====111 mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
tin:I NIZ'==CZ=gg===NIS=="-ZMINMMNlmmiiNimmmNNNIMimnIEIMNIMININiNimININMMNIINMIMIBMIIUNNINIINMIMNIIEMIIIINNEmmmmmmmmlliNIMMMIIINIIMMI
CIZr NL====Z11::Z=I:INIMI===IMMIIIIIIIMMIMINMMNIMNIMNNMNiammNliMMIIININNMMNIININIIIMMNIMIIIINMMIINimmmnmmININMMNIMMMNNMNIINIMINIMMINIMMINIImm
02171 ••••=mm•mmi•••••••••immiNimmmolimUmmnilinimNIINIMINNININNININIIIININININININNMMINININININNIMMNIIMIINNININIMINIIMINIMINIINMMINININIMININNIIMIIIMBIErn
117:1
2311EZ;
CZ:!N11mmNIMMINIINMMNIININIININIMINNINMNIMMNIMIINMMMMINimmNINIINmMNIMIUIMMNIIINMMNIMMIMMMINMIIIIIMIMINIMMINIMNMMININNNIINMMIINIMMMNIMMIN
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
tr:IEE MMIMMIINIIMINMMMMNIisimimmmININNiimimilimmmioNNNIIM•MiNiiNNNIMMIINininiMMMINimNIINMIMIUNEIMMINE•MiNINNNIWMINNMmmmmmmimiEMimnim
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
11
V.
MMMMM
MMMMM
CZ:=7:C IIIIIIIIMMMIMIMIIIIIMMMMMIIIIIIIMMPMMMIIIMIIIIIMMMIMMIIIMMMMMMIIMMMIIMMIIMMIIIIUIIMIIIMMMIIMIIIIIIIMMIIMIIMIMUMMIMIMIMIIM
13M11
0111=1 =
IMINIMIIIMINIMM • • MEI
C1111= PIM MMM
3.__========
CIME
===.1=MIM
amammisimmiumimmummmummmussommimmimmoweimemsmiwommummimmumimmummommusiummaimmmommoommemmimum
trIFE
MMMMM MI MIN MUMM MMI
MMMMM
37171 MMUMMUMMUMMIMIUMMIUMMIMMUMMIUMMUMMISIMUMMISIMMUMMUMMIUMUMMUMUMMUMMUMUMUMMUMMUMUMMUMUM
OUMMUMMMINIIIMMUMMIMMUMMUMMUMMUMMUMMUMMUMMUMMUM tl"'" rIrt rIUMMIMIUMMUMMUMMUMmummimumummiiiimmimmon
1721 meimmoinummoimommasommiummonnomomilommisiensomssmummummiummosimmilimmumimmomimmiuminimmiiiminummimiisimimmEN
amr:rarmm ummisiumminmmoimuisimmommsessommimmmummummummoimmrnmin
ccr3a2t=mmmmmmmmsmuiinmensmmmmmmmmmmmmmwmmnmummmmuiuwimmminsmmmumisimmummmwimumn
Structure 1.1110MBI=MMEIMMIEMEMMEMEMEMEMEMEMOOMMIEMIMMINInn "'"'L MUM
Chainage
gagggggagEgagganagaggliagEnagagagnangagnaganaggnagEnaggEggaggagg00
Structure
ammilaimm IMIUM=IIIIIIIIMIIMMIMMIMIIMMIIIIIMMEMEMMUIMMIMI1111111111M1111111=111111111111=1
UMMUMMIUMUMUMMUMMIUMMUMMUMMUMMUMUMMUMMUMMUMMI MMMMMMIMMMMMMMMMIMMMMMMSM
02MILE IMMINIUMIMMUM MMUMMUMUMMIMMUMMIMMUMUMUMMUMMUMMIMMUMMUMMEMIUMUMMUMMUMMUMMUMMUMM
IrDI MUMINSIMMIUMMUMMUMMIUMMIMUMUMMUMMIUMUMMUMMIUMMUMMUMMUMMUMMUMMUMUMIMMIMMIMUMUMMUMIUMMUM
MUMII MMUMMUM MMMMMMMMMMM MIMMUMMUMMIMUMMUMMUMMUMMUMMUMMUUMUMMINIUMUMMUMMUMUMIUMMUMMUMMUM
ELTI MIIMUSUMMIMMUSIMMIUMIUMMINUMMUMMUMMUMMIUMMUMUMMUUMMIUMMIMMUMMUMMUMMUMMUMM MMMMM MIMUMINIUMMIUMIMM
OMMIII MMUMISMIIMMIIMIMMIUMMUMMUMISMIMMIMMUNIMMUMIUMMUMMUMMUMUUMU MMMMM MUMMINUMMUMMUMMUMMUMMUMMUMMI
0:33 MUMMUMMUMUMMUMMUMMUMMUMMUMMUM MMMMM MIMMIUMMUMUMUMUMMIMMIMMUMMUMMUMMUMMUMMUMMUMUM
IEII: IMIMMMMIMMMMMMMMUIMMMMMMMMMMMMMMMMUMMUMMMMMMIMMMMMMMMMMMMMMMMUMMMMMMMUMUMMMMMMMMMMMMMMMMMBMUMMHMIMU
UMMIMIUMMUMMINIUMIMMIMUMMUMMIMMUNIMMIMMUMMUMMUMMUMMUMUMUMMIUMUMMUMMUMMUMMIMMUMMIMMUMMUMIN
OZCII IMMUMMUMMUMMUMMUMMUMMUMMUMMUMMUMUMBIUMUMUMIUMMUUMMUMMUMMIMUMMUMMUMMUMMUMMUMUM
trri milmmommumiiiimmummosommumommmommimmweimmosimmrnmmummiiimmeisisesounmmummommumme
MUMMUMMUMIUMUMMIMMUMMUMMUMUMMUMUMMUMMUMMUMMUUMMUMMUMMUMMUMMIMMUMMUMMUMMUMUMUM
a=EM IMIMMMMMMMMMMMMMMMMMUMMMMMMUMMMMMMMMSIMMMMMMMMMIMMIMMMMMIMMUMMMMMMMMIMMMMIMMUMMMMMMMMMMMUMMMMUMMMMM
CE:I MMUMMIUMMIIIIMMUMMIMMUMMUMMUMUMMUMUMMUMMUMMIMUMMUMUMMUMMUMMUMUMMUMMUMMUMUMMUMIUMINS
EIZET IMMIUMIUMMIUMMINIMMIMMUMMIMMUMUMMIUMMUMMUMUMMUMMUMMUMMUMMUMIUMMUMMUMMIMMUMMIUMUMMIMMUMMIN
M!r MIMIMMMIMMMMIIMMMMMMMMMINMIMMMMMMMIMMMMMMMMMMMMMMMMMMMMMIMMMIMMMMMMMMMMMMMMMMMMMMMMMUMUUMMMIMMMMMMMMMMMMU
023M IMMINIMMIMIMMIMIUMMIMMINIMMUMMIMINMUMIMMUMMUMMUMMUMMUMMUMUMMIUMMUMMUMMUMMUMMINUSUMMUMIUMMIMMIUMUNIUM
MISIMUMMUMMUMNIUMMIUMMUMMUMUMUMMUMMUMUMMUUMMUMMUMMUMMUMMUMUSIMMIUMUMMUMMUUMMUMM
MMMMMMMMUMMMMMMMMUMMMMMUUUMMMUIMMMMMMMIMUMMMMMMIUMMMMIMMMUUMMMMMMUMMMMMMUMMMMMMMMMMMMMMMMM
t1=Ir MMMMM MMINIMMUMNIMMUUMMUMMINUMMUMMUMMUMUMMUUMUMMIMMUMUMMUMMUMUMMIIMMUMMUMUUMMUMMUM
tEtTI IMM MIUMUMMUNIUMMUMUMMUMUMMUMUMMUMMUSEMIUMMUMMUUMMUMMUMMUUMMUMMUMMUMBIUMMUUMUMMU
MUMMUMMUMMIMMUMMUMMUMMUMMUMMUMMUMMUMMUMMUMMIMMIMUMMUMMUMMUMIUMMIUMUMUMMUMMMUMUMI
02133 MMINIUMMIIIIMMUMMUMMINUMMIUMIMMUMMUMMUMMIMUMMUMMUMMIUMMUMMUMMUMMUMIMMUMMIMIMIMUMUMMUMMMIMUMMI
anE: 1111=MM=IIMMUMM:7---- MMUMMUMMIUMUMMUMMUMMIUMMUMMUMM MUMIUMMIMMISMIUMMUMMU MUM= MUM MMIIMIUM
M111 1111===1:1=11===•• IMMIUMMUUMMUMMUMMUMMUMMUMMUMUMUMUMMUMMUUMMUMMUMUMIMMUMMUMUM
ErM IIMIMMUMNIMUMMUMMUMMUMMUMMUMUMMUSIMMUMMINIUMMUMUMMIMMUMMUMMIUMMUMMUMMUMUMUSSIMUMMIMUMMUM
MICIMIMMUU=MNS=MMIUMMUMMUMMISIMMIMMUMMISIMMUMMUMUMMUMMUMMUMMIMUMMUMMUMMUMMUMMIUMUMUMMUMMUUM
ME::EUUMnZ======MMMMUUMMMMMUMMMUUMMIMMMMUMUIMMMMMMMMUUMMMMMMMUMMMMMUUMMMMMUUMMMMUUMMUMIMUMMM
EMME:=MUMMIUMMUMMUMMUMMUMMUMMUMMUMMUMMUMMUMMUMMUMMIUMMUUMUMMUMMUMMUMMUMMIMUMMUMMUMUM
a::IZ MMIMIMMMMMMMIMMMIMMMMMMMMMMMMMMMMMMMIMMMMMMMIMMMIMMMMMNMNHMMMIMMMMIMMMMMMMMMMUMMMMMMMMMUMMIHUMMMMMMMUMMMIMMM
CiErMM MMMMMIMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMUMUMMMIMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMIMMIMUMUUMUUMUUMM
UIMMUUUUMMMMMUMMMMMIMMMMMMMMMMMMUMMUMMUMMMMMMMMMMMMMUMUMMMMUMMMMMUMMMMMUMMUIMMMM MUM
0=EUMMUMMUMMUMMUSIMMUUMMUMUUMUMMUMMUMMUMMUMMUMMUMMIMUMMUMMUMMUMM MMMMM MUMMUMMUMMUMUM
MMMMMMMMM MIMUMMMMMMMMMMMHMMMMMMUMUUIMMUMIMMUMUMMMMMMMUMMMMMMMMIMMMMIMUMMMMMMUMUUM
EliEMUIUMNIMMIMMUMMINUMMIMMUMMIMMIUMUMIUMMIIMMIUMMIUMMUMMIMUMMUMMUMMUMMUMMUMMUMUMMUSIMMUMMUMMINUMNIMM
EMZLEIM IMMIMMUMMUMUMMUMUMMUMMIUMMINMIMMUMMIUMMIMMUMMUMMUMUMUMMIUMUMMIUMMUMUMMIUMMUMUMMUMMUM
ISIMMMUMMUMMIMIIMMMIUMIMIINIMIMUMMUIMMUMMMMMMMMMIUMMMMMMMMMUMMMIMIMMIMIIIMMMMUMMMMMIUMMMMMMMMMMUIMMMUMIMMMMNMIMMMIMM
CMUMMUMIUMUMMUMMUMMIUMMIUMMIUMMUMMUMMUMMUMMUMUMIUMMUMMUMMUMMUMMUMIUMMUMMUMMUMMUMMUMMU
CZEUMMEMIUMIUMMUUMMIMIUMMUMMISMIUMUMMUMMUMMIUMUMMUMMUMIUMUMMUMMUMIUMMUMUMMUMMUMMIUMMUMMUMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V.
STRIP CHART HIGHWAY
0117:11 MMMMM
21:11 MUM MMMMM
MMMMM
MMMMMM MMMMM
MMMMM MMMMM MMMINIMIN111111111 MMMMM
MMMMM MMMMM MINIMUMMINIUMUMMMMM
MMMMM MINIM MMMMM MMMMM IM MMMMM MMMINIIMMIMMUMMIN11111111111111MIMI MM/MM.
C=111:3 UMI UMMUMMU MMMMM
MMMMM MMUMIIMENIMMINIMMIIIIMINIIMUMMM
MMMMM MIMM MMUMINI MEIN MMMMM
EVEMZEN
6211 1MMIMIIIIIMMUMI MMMMM
IENE
IMININIMMIMINIIMM MEM
t1=111 MMINIMIIIIIIIIIIIIIIIIIIMMIMINIUMIEMMMUMMUMMUMMUMMIMMUMM•MMIMMMUMIMU
MMMMM
anximorm. MMMMM ummimummumismisimmummommesimmo••••••••••••••mmissumisimmitumummouni MMMMM =mum
0:=M111111nUMIIIIIMIIMIIIMMIMMIMINIIIIIIIIIIIIIIMMMEIMMUMMMMMNIMMMUMMMMMMUMMM•111111111MUMINIIMMIIIIIMM
0:7:1 1U111111•••••••••••MINIMINUMMomMIMOImm•lommommimUnismommisiiminmIMIMMUMUM••UMMININIMINIMI11111MINIMIIIIMIIIIIIM•1111111MUNIMIU
MMMMMM MUM Mrn MI MMUMIMIIM MIMINIMIIIMINIMINIMIUMIIMINIINI11111111•11111111111111111UMIIMINIIIIIIMMEIMIUMM
CIZT MMMMM IMIMMMM
MMMMM
07311 11111MMI MMMMM MMMMMMMMMMMMM
ars~MIIIIIIIMMIIIIMIMMMUMIIIMMINIMMINIIMMIIIIIMINIIIMMINIIIIIIMINIIIIMIMIMINIMMIUMINIIIIIIIIIMINIMIIMMINIIIIIIM========11MMMUM1=...-L
MMMMMMMMMMMMM OEM M ra 1Z all OE M
INIMMEI MN= INIMMINI IBM INI MI MI =MIN IN MIMI MI IN rr 1111INIIIIMIN
6=C:1=M MMMMM EMBEIMMINMUNMNIEMMWIIMMINIONNOMEMMINNUMMEMMUNUMMIIIMINIIMM•MIMIlm•mmwmiNINIMmin
Structure MIIIMUMEI MIIIMMIIIUMMINI=IIMEMOMMMIMMIIMICIIIIIIMINIUMII=MINIIIM
Chainage
Structure
ZERIMMOMBOOMMOOMMEEMMEMMEMEMEMEMORMEMOMMOMMEMEMES MMMMM UMMUMMM•111111111MM
tnt .niamolleleillIIINIMINIMISINImm is miNIMILMMIIIIIIN121 MUM IM '23 ran,_111MMilisMINMM•MMEIMIsi MMMMM
C2111•11111111111MINIUMMUMMIIIIIIMMINININIMINIMIIIIIMMIIIIIMIIIM MEme Immo r— mmisinommumminommumweimv r4a MMMMUNIMINIMI MMMMM
ELWIIIIMMEinN=M11111MINNinmienniumMiliMMMOMM1====MINUMIIMINIMINIMINIIMIIIIIIIIIMUNIMIIMINI=ZEIVZVEMIS::••••=1111MMIMINNIMIMIIIMMIMIMil=====MIN
ILIT IMMMIIIIIMINIMIIIIIIiIIMINUMErniiMiNsimmUMMMI=1"-^"=•MMEMNINIMMINIINNIMMUNIN=.7========••===MMINIIMINIIMMIIMM=====••
1:1 1111111MEMISMMIMINUMMOMMINUNIIMMiMMMUNIMMNIM====mmuMMIUMOMMIMMMUIIIIIIMMIIIIMMINIIIMMMINIIIIMMNIIIIIMINIIIIIIIIMIM=====111•1
carariummimmmummmummmmommmummmummmummmummossonemomemumwmuninumummummummumumum
0:::1111111=1
1 1:INI
MITLIngli
alliaNI
M:111::1 9:211
1:1111111n=1:111 1111
:22:1111111=11
1111111
711:1212:1111:1112=1
11.11=1=1 1:::::111:1112111:111171
.112::::222121 1MIVIMIELI
MW11112:21
CEIFEM
02211=MMMINUNIMIIIIIIMIIIMIEMINNIUmillMIN=MINMamMEIUMIMMIIIMMINUMMIM•MiMMMINI111•1111•MMINMMEIMBNIMMIUMMIIIIMMIIIMMIIMMINIIMMINMMNI
1=117 10mIMMIUINIIIIIIMMIMIIIIIIIIIIIIMMINIIIIMMIMMINNEM=MIEIMINIMMIIMMUMMIMMMEMEIINIIMMINMMIEN11111111M111111MENMINUMMEMIMIErnolla
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
tlf117 111111MIMMIIIIMIIIIIIIIUMM•11111111111111MININIIIIIIMMIENIMMIIIIIIIIIMMININIIIMMINIMMMIMMIMMINIIIIIMIIIMIIIIMM111111111•11•1111111MOMMI111111111011MMINIIII
MMMMM
CE32 11111MINIIIIIIIIIMUSINIIIIIMMIEMMMININIMMINIUMMUMMUMMUMMIUMMMMMMNIMMINIMIIIIMIMMEINIIMI
MMMMM
Inn iummoluminimmeimmommummimmiummacummemmomiumumumwomminaimmoommilommisimmisimmiommimmeniumminummos
¢=111 ••••••••mounemminienom IN mourn ismaimuimimm isammim nummisimminimuminsum imimommeiimi min wiiiimmum imiumminsommiiiimm
E=11 11M111111111111111MIMINIMMUMMMMUMMUMMIMM•MIMMUMMINIMUMINIMIIIMIIIMMINIIIIIIIIIINIMMIMIIMIIIIMINIMMINIIIMIMMMINI
ea:IMMIIMMIMUMNIMMUMMMINIMMUMMIUMMIMAIMIUMOMMIMEMOMMININIEMMUMNIMINIMM•••MMINIMMUMMEIUMINMM
t=111ZINIIMMIENIIMINUMEIMMINUMNIMINMEIMUMMIMIMMNIMMINIMMIUMMINIMINNIIIIIIIIMMIIMMENIMIIMMINIIMONMEMMIIIMBININUMMINMINI
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V.
STRIP CHART HIGHWAY
MMMMM
® iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
CIZT I MMMMMM MMMMMMMMMMMM MMMMMMMMM MMMMM NUMMI= MMMMM MMMMM
IZIFM iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
animminmomminummminimmulummummenummummmummummmummmmumminsommumnimummimoommosmormisinimm
irr mmnmuwimmuwmmmmmmwimmwemmmusmmwiiimmoBsummmsousimgomonuiummmmnmmmmmmmmmmmmmmmmmmomoiniumnmmmmmm
cttwmr nioowimmmmmimimmmnmmmmmmmmmmumimnmnmummoummmmmoommsiimoimimmnmmowmmmimimmimoiwimmmmmiwmmuim
cari mmummirniminiismmuummummisimimmuniummommummommimmnimmoimmmummisimiumeiimusimiNimmummeem
Structure
Chainage
MaganagglagangaganinalgagaiManagEMEMEMOMMOMMOMMOMMOOMOMMOIEMOO
01111MUMMIMMEMIIIIIIIIIMMIMMEIMMEMBEIMMIMMIIIIMMUM11111111111111111MIIIIIMMIM
Structure
arri=mmmmusimummummmemmmulummoimmonomummummummmrnmrnmmummunimommounimmuimmimi
ctEexrimnmmmmmmmmmmoomimmmomwismmsommmimimimmmmmmmmmoimemummmemosmmuanmsmimmmmmmmmmmnmueo n
iirmiummummimmoimimmommummmummummommummommilusimmonsemomitommomummmoismimememmimmmionnsimmi
irm mumsomminusiommonnumumommummmwmmummummmimmummmmumummummonmommominmummmummmo
MMMMM 11111•11•MININE MMMMM
MMMMM
azerr oilimmummmumminnommiNimiiimimmiimmiusimiiiimumnimuniemimmimunmammommmummenumommemiummmionnimm
timm imiscsimmemmoisiummoimmumsommummaimmommemommommieummomommumiumminoimaimminiminommimeinimmimmimummumme.
oriz mommmousionimmummuisimimmumemiorniminmniimmumiommimmommoimmonsmammummimmummiummismionommimmimm
anir moluemmmummmmmummmmmmmeseuisimmmmusommwemimmnwmmiwmmmmmmmmmmmmmmmmmmmmmmmmim MMMMM somm
arin ammummosmommonimmummummmumummummummumummoimisommuimmimmoommimmimmimommummi
trzi onowimimmummummiosiimmommosammilimmiusiiiimmummmuminummommmummommoinmemmummummiemimmoimisi
arir minommommrnmmrnmimmumminimimmummommiumommommmommummrnmmumisommommmussimm
oz=rminumumemmensimmumwomminmmommummmiummummummummousounimmilummommisoimmammimmumm•
tnrim milinommmuminommumummmiumemommaimimmomoommommimmoommisommimisioessimmainiimmimmumiummimmissinuommn
rrirx:immasimomminnimusommummemmoimmoimimmimmiwiiimmiiimiammoimimmimmommmummuimummusummmoimmumm
cnirx nmemimmmmmmmmmmmmmmnmm000uimimimimuuimmsioinmimminiwmiiomimmmmmmmmmmmmmmmmmmmmmmmmimmwuomwimmm
tric immsimmmnimmomommommrnmrnmwm•••rnmmummummimmoimimiwimmiiimaimmiewimomiimimmummommusummmommor
EMEM iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
MMMMM NM=
1110 iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
CrIFEINIMMINNI iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
2311 iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
Structure
REOMMOREMMEMBEREEMBEEMMEMBEEMIEEMIEMOBBEEMEMBEHOMME MIMMIIIMII=111111111111111111111MIUMMINUMMIIIIIIIIMMIINI
15Cr UMM • UM MMIMIll INIIIIIMMIIIIMMUMEMMIIMMM•••••1••••1 MMMMM
17:7•=1111MIM
Inn= :nnM M 111
1::111
112:11
11LIITI M
MMMMM
MMMM 11111111MMaZZI:::::21::2122:11111:11111nI::: MMM
MMM LIIITZINIMMI
N1111:6
11:11:12 MMM
MMMM
MMM
MMM
MM 616MM
LI61111•15
-'
EIE!! • MMMMMM 11111111•1111111•1•1111MMIIIMMINIMINNIMIIIIIMEMMMMMNIMMIUMUMMMIIIIIIMIIIIMMINMSIIMINIMMINNIMIMMISMIIIIIIMM
IrCT I • MMMMM
1=11111•111 MIMUMIMIM MMIIMMMUM MMMMMMM
11!:E IMUNIIIMM111•11111•1•11111 MMMMMMMMMMM MMMMM
81•111 11BEIMIMINOMMINIMMIMIIIIIMMIIIIMIIIIIMMINIMINIMIMIMMIIMIMMEINNIMINIMMEIMBINM•IlllM111•111•1UMMIMIONII•11111111MINUMIUMIMMIMIIMIMIIMMIIMIIMMIIMMIIIIIMMINMIMMM
• ====NIMME11111•••••••11111MIUMINIMMMIIMMMINII111111M
MIEMMINI MUM MUMBINIMINIM MMMMM 1111•••••• • MIUNIIMMINEIMIRMIIM
MMMMMM MMMMM MOM= MMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of iharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MMMMMMMMM IMINIMINIIIIMMUMM=M•2111•1211MIIME11111111IM MMMMMMMM MMMMMMMMMMMM IIIIMMIIIMUII2111=1•1•211•1212Mm
0111131=111111 MINIMIIMINIMMMIONIIIIIM1111.1111MMUMMMMIMINIMIII1111112112•11211111•MMINUIIIIIMIIIIMINIIIIMIIIINIMINIEMMMUMMMIINIMMIIIIIMIMIN121111IMMIN1112.12
MMMMM
MMMMM
e nm nmmnsmmounnnmammummommmumnummonnumma iemsmmmummo s ummumwmmummunmmou
eiom =21 11M111•11•21111MMMMMIMMUM
M
13Z1 11 2==========--- =--- - -1211•MMIIMMN1011•1IUMM =..-= M:.
=1•221MNMMNMIMNMMMIMM2
1:01:11•1111
112•11111MMINIMMMINIM,==============•=1•11111111•1111MIMMIMIIIIMIIMIIMMINIM211111MININIMINIIMMEINIMMIIIIMMMUMMMUMMINIMIN•MMIN
8:1:: •••••••••••=••••=riscs==============•=mumusammoommommeninummumummmumunimmommomminimm
0,:mr nimmseummarniumailiszi=================mmummummmrnmmummummmainsiumimminmrnmmom
arsi
ECMI!
umommmmmmznmaz==========oo=smmmscmmmmmmeimnmamnmnnmminumummmmmmnsmimmm
07:1111
IIIIMMININIINUMNIUMIIIMGC21============•=11111111MMIIMINIIIMININIMMIIIIIMMINIMINMEIIMMININ211112211•1211211•1111•21112MIIMIUMIMMIIIMMI11111•1111111MMIMIIINIM
ECtil MINIMMIN1111111•111NNIIMMIS====-========-==.111101111MMININIMIIIIMINIINI2111MMUIIIMMMIMMIMMIMMINIMMMINIMMIIIIMMIN211111111M1111111
CIMEr 11111MIMMINIIMIMIIIMIIIMIIMMIIMINIIMNIIIMINIIIIIMMUMIINIMIEMMMIMMUMINIIIMIIIIUMMIMINIIIIIIIMINIIMINIMIIII•1•1111•11•1•2111•1•1111W11•11221•111111111.11MMININIM
tElfrZIMMINIIIMINIIMME111111UNIUMIIME12111MMIIIIMMIMMIMMUI2M121MMIMIIIIIMMINIIIIIMINIIMIMMIIIIMMIMMINNIIIIIMMINE211•121M111111111MIIIMIMIMMISMINI
[S3.SI02=1•2=1212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212/1212/1212121212121212
X12121212121212.1212121212121212121212121212.1212........1212..1212121212121212.12.121212.1212.12121212121212121212121212121212.......1212....1212.12.12121212....12
==--" -123111011MMENIIIIIIIIM11111611111•11111•111211MINIMIIIIMMIIIMM•11111111•1111•11•112
IMIEE MMINIIIMINIIIIIMMIUIMININIIIIMINIIIIIMIM11111111MMMIIIIMINIMM11211•1111MIMINIMINNINIIIIIIMININIIIIMIIIINIMMIIIMUMINIIIIMINUMMIN11•111111111111211M1111211•1111MMIN
C312E1=MIN1121•112•11112•111M11111MIMINIMIIMI12•112MMINIMMIMIIMIMUUMMIIMMEINIIMMUMINIMMIMMINIIMIIMUMMININIMMUMEIMMININIMIIIMMMI2
CZNEMINIMIIIMMEIMMIIIIMINIIIIIMMIIMINIMININIIMIIIIIIMUM11111•2111MINIUM211111M•1111111•11111.111OMMINIMIIMIIIIIIMMININIMEIMMIMINUMMINIUMMIIMINIMIONIIMIIIIMIIIIIMMIM111211M
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MMMMIMMIMMMIMMM MMMMM MM MMMMMMMM M MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMMMVIIMMMIIIMMM MMMMMMMMMMMMMMM MIMMAN
MWMOMMMMIIIIMMM MMMMMM MMMEIMMMMM MMMMMMM MMMIEMMIIIMMMMIMMMWMWMWMMMMMMMMMIMMIMMMIMOMMMOMMONIMMIIMMMIMMMOMMMM MMMMMM MMEIMMMMIIMim
EMMIMMMMONOMMIIIMMMMMMMIIMMMOMIMMMMMMMMMMMIIMMMMWMINIMINIMMMMMMMINIMMMOMMMIIIMMMMMMMMMMMMMOMMWMOOMMIIIMIIMMMMMIMMMMIIIMMMOMMIM
MMMMM MMMMM MMIIIMMMMOOMMMMIOMMUMMINIMMMMIIMMMMMMWMIIIIMMIMIMMIMMMMMMMMMMMMM MMMMMMM MMIMMMMIMMMIMMMMIIIIMMMIIIMM
MMMMMMMMMWMMMMMIMIIM MMMMMM MMMWM MMMMM OMMMMMMMMIMMIMIMMMMOMMWMMMMMMMM MMMMMMM MMMIIIMMMMMMMMUMMIIIIIMMIMMIMMMMMIIIMMIIIMIMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MEMIIMMEMIN =NM MMMMMMMMMMMM MMMMM MMMMMMMMMMM • MMMMM • MIM•
171111 UMM MEIMM MMMMM MINIM MMIMUMM MMMMMMMM INIMIMMEM MEM MEM
122EEM MMMMM MINN MMMMM MMMMM MMMMM IMMIUMM • •
ITIMEE11 MMIMINI NUM NM MINIMUM MEM MIIMM INIMMM MINNIMIMMIIII MI MMMMMMMMM MIM MMMMM IMMM MUNIIMMIN MI MIM MINIM MMMMMM 111111•11111MIIMMIMMIIIM
• MIIIIMIIIIIIIMIIMMIU1111111MMI MUMMIMM MMMMMMMMM MMMMM MMEI MMMMM MMMMM MIM MMMMMMMMMMM Mann IMINIMINI NIM INIMM MINIUM
MI Men IMMIMMIN MMMMM EIMMIMIMINOMIIMI IBM MMINEMMI MEIN MMMMMM
MMMMMM MUM MI
111111=1111BIIIMIMIIIMMIUMUMINNIIINISIUMMIMIll11 MMMMMMMM
MMMMM MI
G:=11 MMMMMMMMMM MMMMMMMMM MMMMMMMMMMM MMMMMMMMMMM MMMMM MMMMMMMMMMMM
12=11=IMMMIE
MMMMM
MINIMMIUMMIIIIMINIMIMM MMMMM INIMI1•111111111•1111•MMMIIIMMIII MMMMMM
MICI=11.11 MMIIIIMIIUMMIMIUIIIIMM Urn UMM • IMMIUMINIIMMUM • MMMIIIMIIIIIIIIMMIMINIMMINIMIMIIIIMINIMINIIMI•11•111M
MMMMM MMMMM 11111M11•11MIIM INIIMIIIIMI•IMIIEN111111111111•••••1111MIMMINUIII
IMM MIMMIM MINIEM •••••••• • MMIEMMIIIIMMM MMMMIMI MMMMM • MMIIMIIIIMM •
Mr11,311=1=111M OMNI MIM NIMM MMMMMMMMM MI IN MI INNIIIMMINIIMMIIM MIIIMM MMMM MMIE MMMMM MEI= MENEM=
11:S MMEIMIE MMMMM MIMI= MEM
0=IT IIMI MINIM IIMMUMMM • MM • MI IMMINIMMEI1111 MMMMMM MMMIMMOIM MINIMUM= MMMMM IN
MMMMMMMMM MMMMMM MMMMMMM
MMMMM
MMMMM • IIIMMMMIMIII MMUMM IMMIIIMMIIIMMMEIMM IN MMMMMM
CIZTE 11111•111111INIMMIMM11111 MMMMMMMMMMMM MMMMMMMM MMMMMMMM MMMMM •
MMMMM
MMMMM
0=1: 11•1111 MMMMMM MIIMININIMMMINIMMMIIIIMINIMMIIIIMMMIMMM
IZZI WWI MMMMIMMINIMI
MMMMM IMM MIN MMMMMMMMM
IMMEI IMIEHINININIIIIIMMI MMIMMMMMIMIEMM • MMMMEINIMINIIIIIMMIEMI •
CI:11 MEI MMMMM • MMUMM MINIM NM INIMINI MIMEO MMMMM MMUMM MMIIIMM MEI
11=1:MM MMMMMM MMMMMM MMMMM
1=71 IBM MMMMM MMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMIN MMMMMMMMMMMMM MEM MMMMMMMMMMMMMMMMMM
111711 11M MMMMMMMM MEI MMMMM MMIMMIMM MIMI= MIN MIM MMMIIIIMMOIMM MMMMM MMMMM MI
MNIMIN MM IN MMMMMMMM 111•11•11111•111•101111111111MIIMIIIIMMIIII MIIMMMMIEMIIIIMMIIIMMI MENEM= MMMMMMMMM
MEI MMMMMMM MMMMMMMMMM WINNOW MMMMM MMMMM
• IESE== • MMMMMMMMM MIM • MINIM ••••••• MMMMM MMI UMMIMI MMMMM
Structure
Chainage
Structure
MEEMONEEMMIEBECOMMEEMOROMOMMOMOMMEMEMMEMMEEMBERBECOM
MEMIMMEIMMOMMEIME=111110IIMMIEMBINIMMEMOMMEMMIMICIIIIIIMOMMINIE
MMMMM
MMMMM
MIIMMMINEMBIIM MMMMM
MMMMM MI
MMMMM
MMMMM MMMMM
MIMM MIIEMM MINIM=
MMMMMMM =MIN
M=MNIIMMMM MMMMMEIMMMMMIll MMMMM MMOIMUMMUMUMMMMMMUMMMOIMMMMMOMMINIMMMMMMMMMMMWMWMUMMUMMUMMMMMMIMMIMMMIMMMMMMIMMMMIMMMMMMM
MMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
amer mmmommoummon MMMMM mmimmommummaimmmimmmummommmmummommmmommmimmmmmmommmmmommmmommmom MMMMM mimmummmmmmmimmmmmmmmmumm
ccn imin MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
arre mmommummimmmoommmoomm MMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmm MMMMMMMMM mm
ceni mmmumnammum MMMMMMMMM mommummomm MMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
MMMMM mmmmommmommmmmmmmummummmmummimmimmmommimmummomm MMMMM mmmmmmmmmmmmmm======m===mmmmmmmmmmmmmmm
arem=mmoommmmoommmoommommmmummimmimoommammmimmoimoommmmmmmmmmummmimimummoommommm=====amsz==mminm MMMMMMMMM mm
=ammo= mmmmmmmmmm MMMMMMMM mommommmoom MMMMM mmmmmmmmmmmmmmmmmmmmmm MMMMMM mmmmmmmmmmmm=— =mmmmmm=m MMMMM mmummmummumm
m=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=a=m=mm=a=mmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm==mma====mmmmmmmz==m==mm
MMMMMMM MMMMMMMMMMMMUM=Ali========MMMMM=Inigni==MM
M=MOIIMMMM MMMIIMMMIIIMMMMIMMMIMMMWM MMMMM IIIIMMMMOMMIIMMMUMMUMMMMMMMMMMIIIIIMMUMOMMMMIMMIIMAIMMIMMOOMZIMMWM======MMEIMM
temmmimmmm mom= MMMMMMMMMMMMMMMMM mm MMMMMMMMM m MMMMM mmmmmmmmmm MMMMMMMMMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmommommmm MMMMM m=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm=mmmmmmm==mmmmmm==mmmmmmm
EMMMIMMMM MIME= UMMMMM MMM W IMMMIMMMOMMINIMMIIIMMIMMIMMMMIMMMMMMIMMOMMMMMMUMM MMMMM MIIIIMWMWM MMMMMM INIMMM • MMMMM
MMMMM mmaim iummimmiumoommoommonom sommoommmmisim
trriz mn MMMMM mmmomm mmmmmmmmm =mom MMMMM mmimmmmmommmomm
cal=mrimmmimimmmoomommimmommummommommismoimmmimmormmmmusmoimmmmmmmmommummmoommumnimmumoomoommmimmmmmimmmminimmimmmmm
Structure ftm "- MIEMEIMEME=MEMIIIMMIONEMEMEMEMEMEMONIMMEMEMBOOMMOMMIC:IMEMBEIME
Chainage
000000060000000aBGEMMOCHEMOREGOON000000000009090HOOMMOCOMMOBOOMOOMBERECOOM
Structure MIIIIIIIIIIIIIIM=MMIIIIMMIMUMMIUMINUMMIIIMMEIMMIMIMMEM1211111:2111111111•111111111111
mamormnimmm. MMMMM mam. MMMMM MMMMM
MMMMM MMINIMMMMOOMMMMUMMIIIMU MMMMM MMMMMMIMMMMEIMMM
MMMMM MMMIIMMMIMMIIIIMMMMMMMMMMMMIOIMMOMMIMMMMMIMMIMIMMMMMMMMMIMMOMMIIIMMIMMMIMMMIMMOMMUMIMMINIMMINOMMIMMUMM
grl! MMMMM MMMMMMMMIMMMIMMMUMMIIMMIMMIMMWMWMMWMM MMMMM MIIIMMOIMMOMMMIMMMMM MMMMM MMMMMMMMEIMMOOMM
MMMMM MMOOMMIIIIMMIMMMMMMMMMMIMMIMMMMIMMMMMMMMMMIIIMOMMMOIMMMMMMINIMMMOOM
M=MMMMMM MMUMMMMMMMMMMMMMMWMMIIIIMMWMWMMMIMMMINIMMEMMIMMOIMMOMMWMWMMMMMMMVOMMOMMMMMMMMMMMIMMMIMMIMMIMMMMMMMUMMIMMMINIMMMMIMM
MMMMMMM MMOIMMMOOMMEIMMMIMMMMMMMMMUMMIIIMMMOOMMOIMMMMMMMIIIMMOMMIMMMIMMMMOOMMIMMIMMMMMIMMMMWMMMMMMMINIM
M=MMMMIMM MMWMMMMMMMMMMMIIIMMMINMMUMMUMMUMMIIIMMMMMMMMOOMMMMMMIIIMMOIMMIIIMMIMMMIMMMMMMMMMMUMMWIMMEIMMIIIMMMMMMINIMMNIMMMMOMMMIMM
mmmmmm
mmmmm.mmmmmmmmmmmmmmmmmmmmmmmmm.mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm.m..mmmmmmmmmmmmmmmm.mm.m...-.mmmm
MMMMM MOIIMMIMMMMUMMMMIIIIMUMMWMWMMMMMOOMMOIMMMUMMMMMOIMMOMMMMMMMMMMMMMMNIMMIIIMMMMMMMMMMMMMMMMMM
aMMMIMMMM MINIMMMMMMIIMMOMMIOMMMMIIIMMMMMMMMMMMMMMIMMIMMMEIMMMMOOMMMMMMMMMMOMMIIIMMEIMMIMMIIIMMMMUMMIMMMMIMMMMMIMMMOIMMIMM
C=MOMMMM MMIIIMMMUMMMMMMMMMIIIMMIMMIIIMMMIIMMIMMIEMMMMMMINIMMMMWMWMMOMMIMMIMMMMMOIMMIIMMMOMMMMWMMMMMOIMMMMIMMMMIMMMMM
OM,MMMMIMM MMIIIMMM=MMMWMIMMMMMMIMMMMMMUIONIMIMMMMEIMMMMMMMMIIMMMMWMWMMUMMMIMMMMMWMMUMMMMMOMUMMMMIMMMMMIMMIMMMIMMMIMMMUMMM
MMMMM MMMIIIMIMMMMMMMIMMMMIMMIMMMMMMMMIIMMIMMINIMM
IrETEIMMIMMIMMINIIMME11111111M1111•111111111MIMM•MMINIIIMIMINNIIIMIIIIIIIIIIIIIMMMMME11111 MMMMM IIIIMMMMIIMMIIIMMIIIMMMMMMMMMIMMUIMMMMMIMMMUMMMMMMIMMMMM
MMMMM MMMMMMWWWWWWWWWWWWMMUMMMMOOMMMIIMMIIIMOMMUMMIBMIMMIIMMMMMMMMMIMMIMMMMMMMIMIMMM
MWMIIMMWM MUM MMMMMMMMMMIMMOMMIMMIMMMOOMMOIMMMMIOMMMMMMOMMMMEIMMIMMMMMMMMMIMMMMMOMMEIMMMMUMMIIIMMMMMIMMMMMMOOMMIMMWMMM
MMMMM IIIIMMMIMMWMIOMMIIIMMMMMMMMMMIIMMIMMMMMM MMMMM MOIMMMIMMMMIIIMMMIIMMMOMMMMMWMWMIOMMEMMMIMOMMMMMMMMMM
MMMMIMMIII MMMWMWMMOOMMIMMMIMMIMMIMIMIMMMMMMMMMMMMMOOMMUMMOMMMOMMMMMIMMEIMM MMMMM MMUMMMMMMOMMMMMIMMIWIMMUMMMIMMWMMMMMMOOMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
VIITINUINIMINUMMNIUNIMINIMMININIUMMINIMMINUMUMMUNSININUMNIMUMMUNIUMINNIMIUMIUMUUMMINUNIIIIMINIINU MMMMM MINIIMIMMINUMUMUMNIMMINI
MUMMUNINSIMUMMUNIMIIMMUINUMUMUUNIMUNINIMUMMUNIUNIUMIIMUUNINIMINNIUMMUUMMUMM UM MUUMUU INUMMIN
MMMMM MINNIMINIUMMUNIMIUMMIMMINIININIMUMINUMMUNIMININUMMUMMUNIUNIUMINUMUINIUNINIUMMINNINIUMNINIMIIMUMMUMMNINIM
1±11 111111111NUINNIUMIUMINNINIIIMUNIMINININUMMUMININIMMUNIUMMININMNIMMINUIMMININIMMUNIMUMMUMUNIUM MMMMM INIUMINIUNI1111=111- •
MUNIIINUMNIMIUMMUMUNIMNIUMINIINIMMUMUNIIMMINSIMMIIIMUMIUNIMINIMMINIMMINIUMUNIUNIIMMUIMMUUMUNIMUMMUMUM
ENIIIIMIN IMMIUMMUMINIMMUNININININIUMMINMINIBMIUMUNIUMMUMIMMIIIIMININIUNIIMUMUMMINIMINUNINIMMUMUMUUNIUMMUNIUMUNK==="'==
tIMILI IIIIIIIIMMININNIMMUMMINIMIININIMMUMMIIIMIUMMUMMIUMMIUMINIMINININIUNIUMMIUMIMMUMUMMUMUNIMINUMMINIMMINIUMUNNININIIMIN====a7
INMII UMMNIIIMININMENUNIIIIIIMMUMMUMINIMINUUMININUMMINIIMINUNIUMMUMMUNIMIIIIIMINIMMUMNIMMIIINIMMIUMMUMNIUMINIUMMUMMUMMIUMMUla
CIII ININIUMINIMMINIMUNIIIMMINNIUMMUMINIIIIININIMMUMMUMUMUNINIUMMUMMUMUMINININNUMMINIMMINUNINIUNIMMIUMINIUMMINIMMIUNIUMNIMM
MMMMMMMMM MMMMM MUNIINNIUMIISMIUM
I:=11EMMINIINIMMINIMININIMMUMMUMNIININNIUMINMIIIMINIMUNINIIMINIIIMIUMUMMUMINNINIININIUMUINIMIUMINIMMININUMMIMINNIUMMUMMUMMUNIUMIU
IMIIMEMMUIIIIIMMUMMINMINNIIIIINIMMINIMMINMININIINUMMUMMUININUINIMIMINIMINUMMUMMININIMMINUMMUMMINNIUMINIUMNIUNINIIIINIMINNIUMMUMUNIMUNINE
MMMMM MININUMUNINIMIUMIIIMMUMMUMMUMMUMUNIMMUNIUMINIMINIUM
ZNIMIIMUIll=========...:.:INIMNIUMMUNINIIMMINUNIUNINIUMMUMUMMUNIUMMNIMUNINIMINIIMIMI:I==== MINIMMINIMUIMININININUMUUM
MMIIMINIMMIUM =MINIMUM= MMMMM MIUMINMININUNIM "==== UMUMNIMMIUMINUNININIMININ
IDINUMNIMIUMUMINISIMINUMMIMINUMMUMMUMMUNIMININIIINNIUMMUUNIUNIUMMUMUNIUMMINIUMUNIINUNIUNIIMMUMIUMMUMIIIINUMUUM
MTMIIIINIMUINUNIINIMMUMMINIUMUNIUMMINIMNINIUMMUNIUMUMMIUMUMMINMININUNIMMIUMMUMUMMUINNINIMIUMINIMINUININUMMUMMUMMININIM
13=1 1M MINIUMNINIUMUUMINININIMMUNINIUMINUNIUMMUINUMMIIINIMIUMINIIMINUMINUMMINIUMMINIIMNIMINNIUMUMMUMMUIMMUMMININIMINUIUM
IMMUNINIUMNINIIIMININIUMMIMINUMUNINIUNINIUMMIMINIUNIUMMUMMUMUMUMMUMININIMIUMMUMINIUMMINUIMINNIMUNIIIMNIMMINUMUMMUMMUI
II:MNI ININIUMMIIIIMMIINUMNIBMIMUMMUUMIUNIIIIIMIMINUNIMINUINNUMMINIMINIMIMINIUMMUMUNIUNIUMNIMINUMMIUNIUMMUNINUMNIMINIMMINUNIUM
IIME 11 MINIIMMUNIIIMMUMMIIIMMINIIMMIUMUNIMMINININIUMUMMUMMUMMUMINIUNINUNIMMINUNIMMINIUMMINIMINUMMUMUMMUMUNIIUMINIUNIIIIMINIM
13=31711=1 •••11sMilmmilommiim MMMMM INUMMUIMUNIUMUNIMMINIUNIUMIIMMINUMMUMUMUNIUMMUNIUMMUMMUNIUMNIMMINIUNIUMMUMUMM
ILMNIN IUMIIMINUMUNIMIMMIUMUNIUMINUMMUUMMINIIIINIUMMIUMMUMUNINNINNINIIIIIMINUMMUMMUMMUUMINIMUMINIIIIIIIIMUNIUNIU=NIUNININI
MMMMM UNINIUMUNIMMININUMMUMMUMMINUMIMNIMINIMMUMMUMINIMININNIMMIUMMIUMMINIMMIUMMUMUMUM=MNIIMUIN
MMMMM MMINUMMINIMININIMMINUMMUMINUMUNIMIUMMUMMUMMINUNIUNIMMINIMINIUMINUNINNIMIUMUNIMMIUMM=UUNIM
121UN IMINIINININUMNIIMINIUMIUMMIUMINIMINUMMUMMUUMINIMINUMINIUMMUMUNIMMINIMINIMINUMUMUNIMMUMIUMMUMUUMMINIM=,"
MINNIUNIMINNIUMMUMINUNIMNIMUUNIINUMNIUNIIMUUMMUMMUMINUINIMMINUMUNIUMIUMUNIMMINIUMINININIUMMINIMUM
17:11 1NUMUMNIIMINIMINUMINMINUMINUMMUMMUMUNIMIINUINIMMIUMUUMNIMMINUMINIMUINUMMUMUMMUMUMUMMIMUNIINIIN=====
EQUIINUMNIMMIIIMINIINIUMUNIMUNINIMINUMUNIIIMUNNIMINUMUMUUNIMUMUNINIMMIUNIMUUNIMINIUMIUMINNIMININIMMUNIUMIUMMUM=.=
IZIMI MINNIMMUNIIIIIIIIIMIUMUMMUMNINIMINIUMMMUUMIUMININIMMINIMMINIUMMUMMUNIMMINIUMUMINIMINIUMININNIIINUMMUMMUNIUNM===.,..
MMMMM UMUMMUMMUMMUMMUMMUMMU111==
tIZUNNNINUMINUMMINUMMUININUNIUMUNIMNINIINUMMUUMMUNIUMMINIUMNIMMINNIMMUMMUMMINUMMININUMMIUMMINIUNIMNIMMUM=IN
EIZIM MIMMIIMMINMIIMMIUMINIIIMMIUMINUMMUMMINININIMINIMMUNIMMIN MMMMM IMMIM MMMMM INNINIMINIUMM=.=,===========INUNIMINMINIMINIMINIMIMIIIMMINIMU
CEMI IIIIMINININUMMUMIIIIMMIMINUMMUMMUNNUNIMMINUMMUMMINIMUMINIMMUNINIMUMMIUM==============NIUMMUMMUMU=UMUW.
En Ea; ir MMUMIM M.= MMMMMMMMMMMMMMMMMMM =min •• MU= UiMMUMMI EI
EN MMMMM NSMIUMMI MMMMM
nalMUNIINIMMIMINNIMINUMMUMUNINBINIMNIMMINUINIUMMUNIUMMIIIIMMIMININUNINIINUNIMUNIMIUMINIIININIUMMINUMUNIIMMINNIM
MIMI133M==IIMIMMINIINMMMMMMMMIINIMMIINUIIIIMM MUUMINUMUMNIMINININNIIMMINUM MUMINIUMMINIIMINNIMMIUMIUM
fit I. to CM 7001.2 IMUNIUNIMMUMMINIUMUMMINIM MUM MUMMUMMUMINNIMMUMINIMNIMMIUMMUMUININIUNIUMMINM MUUMUU
Structure 111111M1111111111111H=IM amai, IMMO
Chainage
008008000000801100008080000008000000000008000000000000808008800008000800008000000080B0000000000000
Structure
ituct.-111111111111MMIIIIIIMMIIIIIMMIIMMUMMOMM1111111111•0111111111121111M11=111111111M
IME=NE:=11M MUUMUU MUMNININININIUMMUMMUMMUMUNIINIMINIMINUNIMMUNIUMUUNIUMMUNIUMUMMIMUNIUMUNIMMINIMMIMMUNIUM
MMMMM INIMINUMMUNIMUNIUNINIMMIUMMUMMUMUMUMMIIMMINUMINNINIMINIIMIMININIUMMINNIMNIMINININUNINIMUMUMINMINU
1:21M=IUUMIMMIIIIMMIIIMIUMMUMUMMINUIBINIIMININIIIMINUINIUMMUINUNINIMINUINNIIIIMMININUMMUUMMUMMUMUMMUMMUMUMMIUMMININNIUNIM
ICL INUMMUMMINIMIMIIMUMINUMIIMININMINUMUMMUMUMMUMMINUMINIMMINUMUNIMMIMMIUNIMMIIMMUNIMMIUMUNIMMINIMINIUMMUNNINUMNIU
IIIIMMINIUMMUUNIUMININININIUMMINUMMIUMINUNININIUMMIMMINNIUMMUMMUUMMUMUMUMMUMMUNIMUNIUMUSIMINNUMMIUMMIN
IrrI IMINIMMINIUM1111111=11111111MUNIMMUMMUMINIUMININUMMINNIMUMUNIMMINIMIUNIUMUNIUMINIIIMMINUNNIMMINNIMMINIMINUINIMUMINUMUMUMUM
ILMINNIMMIUMMUNIMINNIIMINUMMIUMMIUMMUNIMMIUMUUMUMMUMMUMMINIUNIUMINIMUNIMINININIIIMMINININIMININIMINIUMMIUNIUMUNIMMUNIMNIUMM
IMEIUMMUMMIINUMINNINIIIMINMINUMUUMMUMIUMUNIIIIIINNINININNNIMINIMNIUNIIUMMUMININUNINIIMIUMNIUNIUMINIUMINIUMMUNIUMMINUMUMUMUM
anUMIUMIIIIIMMUMMUINININIMINNIUNIUNIMMININUNINIMMINIMMINIUMUMMUMMUMMUMMUMMUMUMMIUMMUMUINUMMNIMINNINIMMUNINIMINIMMUNIMMI
=NUMMI= IMIMUNIUMUMMUMUNINININIMIUMNIUMMUNIMNINIUMININUMMINUMMIUMUMINIUMMUNIUMUNIUMUUNIMMUMMUUMMUMMUMMINM
1=IIN IMIMMNIMMIIIINMMMMIMMMMMMMMMMMINMININNNNINIMIIIIMNIINMUNIMMMINUIMININMINIMNIMMINUINIMIMININININMNIINMIUINMNIUIMMUINIMINMIIIINMIMMIIMMIUUUU
Cl!IIII MMINIIMMIIIMNIMMUNININIMIUMINIUMMUMMUMMUMMUMUMINIIININIUMUNIMINIMINIMNINIUMININIMNIMININIUMMINUNIMINIUMMINUINIMINIUMMINIMINIMIN
a2:3111 11MMUMMINIIIMUUNIMMUMINIMMUMNIUMNIMIIIINUMMIIIMMUMMUMMUMMUUMMUMINUMUNIMIUMMUNIIMNBINUMMINIMINNIMINIMMIIMINNIMMUMI
OZIMMINMUMNINUNINIUMUMUUNIIIMMIUMMUMUMUNIUMMUMMUMINIMININININIMMINIMMUNIMMINUMINUINUMMINIMUMININNIMMUNINIUMNIMMIIMMUMMIU
IIELI NIINUMMINIIINUINUMMUMMUMMINIMMUNIUMMIIIIMMININIMINIMMINUMINUMMINUMMINIMMINUNINIMIIIIMMUNIMINIMINNININIMININIMMINUMMININNIMMUMINU
LI:t3 IIINMIMUMNINIIMINIMMINIMMIIIMINIUMUNIMININIMINIUMNIIIIMINMINIMINNIUMIUMMUMMUMMUMMUMMUNIMMUMUMIUMMINIUMIUMNIMMININIIMIUMINIMMI
GIZMUIUMIIIIMMINMININUMUMMUMMUMIMINUIUMMINUNIMINIMINUMMUUNIUMMININUMMINNINIUNIINIMINIMNIUMMINIUMMUMINIUMMUNIMMUMUMMUM
LIMENINUMIIIIIMNININIMMINNIUMNIINIUMMINUMMUUMMUNIUMMUNIUMINIMMUMMINUMMINIMUNIIMUNIUNIMNIMMINUMMINIUMINUMININNIMIMMINUNIUMIUM
IIMII IIMMUNIIININUMMIIMMUINUMNIMUNINIMMIUMMINUMMUMUMMUINUMUMMIUMMIMMUMMINININIUMMINUNINIUMUNIMIMINUMNIMMIUMMINIUMMI
ItMENNUNIMIIINUMUUMIIINUINIMMUMNINIMMIUMINIMUNIMMIUNIMMUMMINNIMMINIMINIUMIUMINIMMUNINUMUMUMUMUMUMUMMUMMINIUMUIMUNINIIM
NEMMMIUNNININIMINIMNIUMNINUINMNIUMMUMUMMUNINIMMININUMNIUMINIUMUMINMINUMMINIMINIUMMUMMINUINMINIUMNIUNIIMNIUMNINIUMNIMMUNIUNI
IIRIII IIIIIMNIMINMONNIMMUNIUMMINUMUMMINIMNIIMMINIUMMIUMMUMMIUMIUMMININUMMINUMIUMMININIUUNIUMMINIUMMUINIININUINNIUNIININIMM
ETI=MI UMMUNIIMMIIIIIIMINIMIUNIUNIIMIMININMINIMUNIUMIIMMIUMUNINIMIUNINIMIMINUMMUMMUMMUMMUMUMUNIUMMUINNUMUNIIINUNIIIMMINUIN
MEIMEIMUMMUIMUMMUMMUMMINIMINIUMINUIMUUMIUMNIUMMIUMMIMININBINIUMMUMUMINIMINNIMMUMMINUMMIMUNIIINUMMUIMUMUMMUMIUMM
(1301 MNIINIMIIIMINUNIMIIMINIMMINIUMMUMMUMMUNIIINUMMUMUMNIIIIMUNIMIIIIMINIMUNIMMUNIMNINIMINIMINUMMUNIMUNIUNIUMMIUNIMMIUMNINIUNI
NMIEN IMINUMNIIMIMININIMNIMMINUINIMINUMININIUMINIMMINIMINIUMMUNIUMMUMUNIUMMINUMUMMINNINIUNIMMIMINIUNINIIMIUMMIUMMUNIUNIMMIUMM
12:=1:TZIMM= MINIUMMUNINIMUININNIUMMIUMMUNINSMINUMUNIUMUINIMMUNIUMMUNIUMNIMINIMMUMINIMUMMINUMMUNIMINIUMUMUMMUMMUM
0=11=1 1=11MUNIIIIIMMINIMMUNIMINIMMINIMMIMUMIUMMUMINIMINUNIINUMUNIIMMINIUMINIUMNIIMMINUINIUNIMMININIUMMUMINUNIMIMINUMMUMMUMUUM
ENII IMMUIMIMINUNIIMIMININIIMUMUNIUNIIMINUINIUNIMINIUMMUNIIIMUINUMMUMNIIIMMIUNIUMUNIIMINUNIMMUNIINUMMIIMIUMMININMINIUMMINIUMM
UNINIUMINIMMINUMMINIUMMUNINIMINUMINIMMUNINIUMMINUNIUNIUMMINIMMINIUMMUMMUMMUNIUMMINIUMUMMUMUNIUMINUNINIMIN
IIMECT IMINIMMIMMIUMIUMINININIUNIMIIINIUMINIMUNIMMINUNIMINIMMINMINIMINIMMIMMUININIUMININNINIUMMIUMMUUMMUMUINIUMMUNIUMUMUMUM
MIUMMUMMIUMNIUMMUMMUMUNIUNIIMMINUMNINIMMIUMMUMMUMUMMUMUNIIMNIUMINIMNIUMIIMMINUMINIMINUNIINIMUMINIIIIIMMININNIMM
MIIM INIUNIMIUMMIIIIMIUMUMMINIMMINUNIUMUMMUNIMMIUNIMMINIMUNIMININUINUIUMUMUNIININIUMNIMINUMININNIUMMUNIMNINIUNIMINIMMUNI
ENUMNSIMUNI
III:11 11MINIUMINNIMINIUNINIUMUMINININNIUMIIMINIMINUMMUNIMMUNIINNIMINUINIUMMINIMINIIMUMMINUNINIMININUMNIMMINNIUMMINUMMINIUMUNIMUNIMI
MMIUMINUMUIMUMIUMMUMMUMMUMMUNIIMIUMMUMMUMIIIMMUMMINUMMUIMMINIMIMINIUMINUINMMUNIMIUMUNIMNIIMUNIMMINIMMINM
Chainage
Structure
000080000000000000000000E0000000900008008008000000000008808000000000020800001188000800000660080O8
MOMOMMUMMUMMOMMUMMOMOOMMIMMEMMOMMEMEMOOMOMMEMMOMOMMEMOMMOOMOMMEMOMMOMMOMME=MIMMOMMEMOMMI
azturnm=m mum.. MIMMIMMMMMMIMMMINIM
IN IMMM MMMMMMMM
MMMIMINIIMUMNIMIONNINIMMOBOMMININIMMMMMMMMMMEMBINEMNINIMINIMI
MMMMMM IIIIIIMIMMMIIMINMMIMMIMIONNINNINIMMMIMMMMMMMMMI
MINIM MOM MIME MMMMM MMMMM MIIM MMMMMMMMMMMMMM ', A • MINMIMMIMMMIMMIErnin.
MII MMMMMIIIMMININIMINIONIIIIMMINNINIMINIMINIIIMMINIMIIM===11111MMINININININIMMMMIMMI==========MMIMNIMININNOMIIMMINIMMOINNIIMINIMMINIMMIMINOMINI
IIMEMMIMMI MOM MMMMMMMM MIN MI MMMMIIMMEMMININNIMINININ
lEI MMIIIMIMIIMMMMMMIMMIIMIIIINIONMINIMMMMMIMMIIIMMIMININIMIMNIMIMIIMMMINNIMINIM==========l1MOMMMMMMMIIIIMINIIIIMINIMINIMINNIIMIMMMMMMM
MMMMM MMMIIIIMINIMMIMINNIIMMUMMIIIMMIMMIIIMMINIMBNIMMIMOMMIMMMMMMMMMIIMIIMIMINIMINIMINNIM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
®////////////////////////////////////////////////////////////////////////////////////// MMMMMEINEIMEIMM
MMMMM
IMUIMMIONIMM•11111MIMM MEM MMMMM MIUMIM MMMI NI MM • • •••••
MMMMMM IN IIMISIMMI MMMMMMM • MIMI MMI UMW' MI MI MMMMMMMMM MMMMM
MMMMM MMMMM MUM
MMMMM MIN MMMMM MEM MIN MMEIMIIII IN • 1••••• • • MMMMM MEIN IIIINIMINIMIIMM MEI MIMM
MMMMMMMMM • MMMMM EMMEN MMMMMMM MOM IN MI IMMIMMII IN INSIMMIMMI MEM= MMMMMMMMMMMMM MMMMM • IIIIMMINIMIHIMM
MMMMM MMMMM
NM MINIM MEI MEIN MIIMIMINIIMIMMIIIMIIMINI MIMI MMMMM WINNE NI IMINNIIIMMIMMIMISMIN • ••••• • MMMMMMM IMEMMINUMINIINIMMI MMMMM MMMMM MIN •••• •
INIMINIOSIMMI MMIIRIMMISS MI MI MEMIM MMEM MIME IN MINIIMMISIMI MIM MMMMMMMMMMMMMMM
////////////////////// //////////////////////////////////////////////////////////MMMMEIEIEIMMUMEIEIMEIEIEI
IIMMINIIM NM MM MMI• ••••• • MM • IMMININIIMM
111: 11M11•11•1•111•1111•111•11•11111MUMMMII•1111111 MMMMMM IMIN•1•111111MINMIIMMNIMIMMIIIMIMM MUM IIIIIMMEN•11•11111 MMMMMMMMMMMMM
MMMMMMMMM MINIM MUM IIMMINIMIM
MIN MMMMMMMMMMMMMM MMMMMMM MEI MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
0Mr••• •1111MMEIMMEIIIMIMMINE11111•1 MMMMM MMMMMM MIMI MMMMM MINIM MMMMM 111MINIONIMMININIMMIMIMM
171 1=M1111MIIMIEMIIIIMIM MMMMMMM MINIM MMMMM MIMM MMMMM MEIN
En1=IIMENIM • • MMMMM •••••1111•••••••••••11111MININIMIIMMION•11111 MMMMMMMM NUN IP 7tr'" MIIMMIMMIIIMMMMMMMIIMMIMIIMMMMMMIIMMM MMMMM MEIER
ECEMIL^Tamnm MMIIIMI•1•MMIN WENN MMMMMMM
0:11=M11•11113111111111
Structure
Chainage
Structure
=Emil
MEINEMIENEMORIOMMOMMOMMESGEHOMEMMEIGHIMEEMBEIEHOMMENEMEMIE
1".WL 111111111111111111111111MM111111111111111MMIMIUMMINIMOMMIIIIIIIINIMMUMMILIMMUNIMIIII
MEI MIIMUMM MMINIM IINIMUMM • IMM UMM IMMM INIM • IMM
ft=i2M WEI IIIMIIMINIMMI MMMMM MI MI IMINSIIMI NUMMI MIIMIIIIMMMMEIIMIIMMINUMMIIIIIMIIM MIME MIME MMMMMMM
1711 MMI MEM MMMMM MMMMM IMMIMMIENNINIMMIIM MMMMMMM MMMMMMMMM MEIN
1:3!MIN MIN MMMMM MOM NIMINUMI IN MINIMMINIMMOM IMMUM
EI=IMEMI I =MI NMI MINIM MI MMIMUMMI IMMINEIMINIMININIMININIMIMIIMMIMMINIMIIMMIIMIll MMMMMMMMMMMMMMM MINIM MMMMMMMMMMM MUNI NM= MMMMMMMMM
MMMMM IMINIMMIN111••••••••••••111111MINIMIMMIMMIIIMMIIMUMMEIMIIMINIMUMMMM
13=1!MII =MNMEIMMM/MMEIMMMMMMMMMMMMEIMMMEIMEIMEIMEIMMMMM•UMMEIMMMEIEIEIMEIEIEIEIEIEIEIEIEIEIEIEIMEIMEIEIEIEIMEIMMEIMEIMMMEIMMEIEI/EIMEIMEIEIEIEIEIEI
IMMINIMINI MEMO IN MI MIMM MMMMM MMMMM IMMII Mann= MI NINO MMMMM MMMMMMM =MUM
MMMMM
®EIMEIEIEIMNEIMEIMEIMMMMMEIEIEIEIMEIEIEIEIMMEIMEIMMMEIEIEIMEIMEIEI MEIEIEIEIEIEIEIEIEIEIEIMEIEIEIEIEIMEIMEIEIEIEIMEIEIEIEIEIEIEIMEIMEIMEIEIEIEIMEIEIEIEIEIEIEIEI
ICI MMMIIMINIIIIMINIIHNIMIII•11111111111111MNIMMMMMUMIMIMUMMMINIMIIIIMINIMIIMMIIMMMINNIMMIUMMMIMIIMMEMIIMININIIMIMM
MMMMM MMMMM MMMMM MMMMM MMMMMM MMMMM IMMO
1:1==11 MIEMMIM • 11111•1111MIN IMMO IMINIMIMMI MEI MMMMM MEM MMMIIMMIIMINM MIIMMMMM • MMINEI MMMM MUMMI
MMMMM
11711MINIIIMMIN MMMMMMMMM MMUS MMMMM
MMMMM
MMMMM 11111•••••111111151•MMUNIIMINIMMIIIMIIIIMIIMMMMINIMIIIMUMMISMINIMMININEMMOININININIIIIIIIMIIWIIIIMIMM
MMMMMM 111111111•11•81.1•1•11MINOMMI MMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
1!Tr M[IMNIMIMMNIIMMMIMNIMHMeenlUIOUIMMIMMINIMBMIMeIMiMMHMMMMMMBIMMMIBMMMEMMMeIMIMMINIMNIMMMNMMM•=MMMMMIUM=IeeleIIM
trelEMMEMIONMEI MMMMM
IMMM==
117:11 MI MMIN11111111111•111•1•111MINIMMINIIIINIMIMI1111111111111•11M
13311 M3 MMMMMMM =UM MMIMMIMMIMMIIIIIMI MI INIMIIMMUMMIM MMMEI
0:=11 MMMMM • MEM IMMIEMMIEMMONNIIN MMMMM MMMMM
02211 MMMMMMM MMMMM /M//MIN
CEDIMMINOIIIM MMI MMMMMMMM MIIIIIMIIMMIIMIIII MIN MM MMM MMIMM MINNIMMEI MUMMM MNIM INIUMINIMM
GI=11 MMMMM MI MI UIMEMIMMIEMIIINIMINNIIMMONIMMUMIUMIIMMIIMMI
MMMMM MMMMMMM
MMMMM MINIMUM MMMMM
1117M1•11 MMIMMIIIMMMIIIIIIMMMIMMIIEIMIIMIMIMIIMMMIMMIMMIIMMMMMMMMMIIIMOIIMMMMMMMMIMMIIOMMIMMMIMMMMMMMI
Structure .1.1.11111raranillinn
MEIRE=111111111.111..11:MMIIMEnirilraniralliiiranniiiiii11111=1 airallr.
Chainage
BEMEMMOOMMOMMEMOOMMOMMOMMEMODEMONEMMEMOMMEREMEMBRIEM
Structure MI111111111=IUMMICEMINIIIIIIMMEMIIMINNIMIMEMEMOMMEI
MEI MMMMM MMMMM
""A '111MOMBEIMMIEME:MIN
07371 11IMMIMMIIIIMIIIIMININIM11111131111MINUMMUNIMIU111111111•11111U1IMININIMMINIMINIIIIIMIIIIIMMIUMIIIMNIMMUMMIIIIIIIMUMINMINIMINIMINIMMIMINIMMM
® 33333333333333333333333333333333333333333333333333/3333333/333333333333333333333333333333333333333
IC!!2 33333333333333333333/333333333333333333333333333/33333333333333333333333333/3333333333/3/333333333
® 3333333333333333333333333333333333333333333333333333333333/33333333333333333333333333333333333/333
ECTEMININNIM 333333333333333333/3333/3/333/3333333333333333333333333333/33333/333333333333333333333/33/33/33/33
®333333333333333333/3333333333333333333333333333333333333333333333333333333/33333333333333333333333
-333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333/ 3333333
333333333//3333333333333333333333333333333333/33333333333333333/3/33333333333/ 33333333333333333333
-33333333333333333333333333333333333333333333333333/33333333333333333333333333333333333/33333333333
Mr2EINIIMMI 33333333333311113111133333==============3311113111333IIIIII333333333333333333333III3III33333IIIIII33III3333333333333333333
IfIn UMMIMMMIMIIIIIMIRIMMUNI==========-"- --'-/33333333333333333333333333333333333333333333333333333333333333
X33333333333333/333333/33333333333/3333333333333333333333/3333333333333333333333333333333333/333333
®3/3/33333333//3333333333333333/333333333333333/3//33333333333333/3/33/3333333333333333333333333333
rgERM1MIIIMINIUMNIMIMIIIIIMINIMMINIM1111111111111•111111INIMIONIIIMINIMMIMIIIIMMMMINIMINIIIMMUMUINIIIIMIMIMIMMINIMIIMMUMMINIIIIMMIEM111111111111MEMIN
Chainage
Structure
BOOMMEHREMEEMOMMIECOMEEMMEHMEMMEEMEREMEHREMMIEMEMEEMME
rimcm=bmiesommusommum......mommimmosimmumminumisommmown....mum.......mmimmioisnimommis
car=rm• MINIMIMMIMMINIIMIMININIMMINIMMMIMIIIMMEINIMIIMIIIMMIIIIIMMMEIMIIMINIMMMIMMIIIIMINIIMMINIMINBIIMIIMMIIMMIMINIMIMIUMIIIMINIMMIIMMUMMUMMM
C2:111MMINM MMMMM
1=11
CE!!!I IMIN MI IN MINIM= Ian EMI MIMIIM MI IM IN MI IN MI MU IM IN IN IM MUNI UM= INI MI MI • MI MI= MIMI IMIU IN MI NMI IMMO ZNIMIIIIMIIM MOM la MIN MINIMIM IMMI
C=IEB MINI IN In El IIII IN MI IM MI MI MI MI MI NI NI IN MI MEI El MI EDE MI MI IN • IM MNIIM MI= MIN MI IIM1111•1 MI INIM MI MI NM IN IN NM MI IN MIN NM
ICE11(17 11 UNI MI III • MI IN IMM • MI MI IN 111111M MUM MINIM MIMI MINIM MEM MIMI UM IMIN MI IN WM IN MIN MI • MINIM IN IM • IMMII MI MINI MIMI MINIUM IMP MIN IM MI MINIM
CTI MM
En113
I2EIE NN
aZIECE
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MMMMMMM nummimmnimMIMMUMMNIIMIIIIIMM•MM1111111MINIMMMUMM•MINIMIIIIMMUMMINIIIMIIIIMMENIMMIEMMEI
Crli MI MMMMMMM NM MMMMMMM INUMMEIIMINIMIIIIIIIMIIIMMMME11111MIIIMIMMINMMUMMUMMINMIIIIMIIMMIMUUMMMM
MEIBIIMEMM IMIBMIMMIIIIINIMMIIIM1111111•11111•1111 MMMMMM MMMMMM MMMMM
MMMMM MMMMMM
GE31
C31! MMMMM
GrCIE 11111111 MMMMMMMM INIMIIIIMIINIMMUMMMIU1111 MMMMMM MMMMMMMMM MMMMMMMM
MMMMM MMMMM MMMMM
1131rEMMI MMMMM MMMMM MMMMMM
1311!
MMMMM MN!
-11111111•111MMUMMEIMMIMMIIIIIMMMINIMIBMINMEIMMMMINMMMMMINMIIMIMINIIIMMMINIIIIMIIIU
OMIE MMMMM
Structure IIIMMHnllnnnMMMMOMIMIMMMIMMMMMMI=IMMIMIMMMIMIMalnnnnnninninM
Chainage
alREMOLIONINEMBEEZEGMESIEBEMENZIMMIEGEBEGMBEEMMIEMEMEEMBEEMBIE
Structure
MMMMM
C2111MNIM=1= 71323,4
MMMMM MMMMM
MMMMMMMM
IMMIIMMIMIIII MMMMM MMMMMM
CIMF2
OZ317!111
CME:
IntEi
a=MM IIIII
II2=2:a.E.Mailltallitli
=21111111i=
==-111711111111 1 12111:711:21211::::=CM1
1.111212: 1.6
.1211:1•1
11.1 11:1171:Eran:12:=11111
1:1:::::::::121111:1117111:1 911111
.11:
tom MUM MMMMMMMM 11111111=11111111MIE • MMMMMMM MMMMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
CMIZIMMEMMINIIMMI MMMMM MMMMM IMINE1111111111MI MMMMMMMMMM MEI
11.1111111111MIN11111011111•1•111 MMMMMM MMMMM
IMINI MMMMMMMM IOW MMMMM
MMMMM
MMMMM
MIII MENIMMIIMIIIIIIMIMIN1111111111111MINIMUllIMMIUMMIUMMINIIIIIIIIIMINIMMIUMINIMMIIMINNIMMUMMIUNIIMUM11•1111•1111MMIMMINMIIIMMMINI
MMMMM
MMMMMMMMMM IMO MMMMM MMMMM MMMMMMMM MMMMMMMMMMMM
E221117 1•1111MIMMIMMIIII MMMMM
MMMMM MMMMM
MMMMMMMM MIM
MMMMMMM MMMMMMM
MMMMMMM 11111•1111•11111MMIIMIMMIMMMUMMENNINIIMMINIIMINOMIIIMIENIMIMMIEMINIIMINIMIIMINIMINIMMM MMMMM
MMMMM MMMMM MIN
MMMMMMM
fr:1 1111MMINIMIMIMM MMMMMM
Structure IIMEMMICEMMIUMMEMEIMEMOMMIMMEMEMEMEMEMEMIIMIUM=MINEM=IMMIEM:=EM
Chainage
EIBEREBOGEIREMIEMEEMBEIREMOREMMODEBEMOMMOMEREMBEEIBEEMERIMEMEENEME
Structure
MMMMM MMMMM MMMMM
MMMMM
MMMMM MMMMMM
MMMMM
MMMMM IMMIMMIIIIIMION1111111111111•1111MUNIIMMINIMIIIMININIMINIMII
MMMMM 111•••••••11111•1111111111•11.11MINIIMINIMINNIIIII
MMMMM
Clir31 1111•111111 MMMMM MMMMM MMMMM
01:11: 111111M MMMMM
MMMMM
MMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V.
STRIP CHART HIGHWAY
="MMMMMMEMIM =========== MMMMMMM MMMMMMMMMMMMMMMMMMMMM =mom MMMMMMMMMM mummommummom MMMMM mmmommommmimmmummmm
mnimmimmiiimmm MMMMM mmmmmommimmimmmmommommmmmmommmmummummm MMMMM onommmommmommummommmummummilmmmommommommommumm
ammmmimmmommommmommummummilimummummummmommumommmummommomommmummmommummmmommommummommmmmimmummmommomm
nowammmommommmommummummimmummmommummummmummommmummemmmmmmommmmommummmummomme MMMMM mmommummmmommmummin
TMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
ffMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMOMMMMMIMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMM
MMIMMMIMMIMMIMIMMMIMMMUMMUMMIMMIMMMI MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MWMMMMMMMMMMMMMMMMMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
CMMMMMMMMM MMMMMMMMM M MMMMM MIMMM MMMMMMMM M MMMMMM M MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMM MUM MMMMMM M
M=M=MMIMMMMIMMMIMMIMMIMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
IMMMAMMMIMIUMMI MMMMMM MMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MV=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
EM=MMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMM MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMIMMMIMMMEM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMM=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMM MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMIMMMMMMIMM MMMMMM MOMMIMMIMMMUMMM MMMMM IMMMIMMIMMIMMIMIMMIMMMMMIMMMMMMMMMMMMIMMIMMIMMIMMMMMMIMMIMMIMMUMMMMIMMIM MMMMM MMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM 'MEM
M=MMMMMMIIIMMMMMMMIMMIMUMMIMMIMMIMMMIMMEMMIMMIMMUMMMEMMMIMMMIMMMMIMMMMMMMMMMEMMIMMIMMIMMMMMIMMUMMMIMMIMMMMMIMMMMMIMMIMMMMMIMMMMIMMIMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMIMMIMMEMMUMMMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
IMMIMMMMMMIMMMIMIMMUMMMIMMMMMMIIMMMMIMMMMMMMMMMMMEMMMMMIMMMMMM MMMMMM MMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMM
IMIMMMMMMMI MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MIMMIMMMMIMMUMMMIMMMI MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMM
MICEMMMMMMIMMMMMI MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MIME
MMIMMMMIMMIMMMMIMMMMMUMMIMMMIMMIMMUMMIMMMMMMMMUMMMMIMMIMMMIMMUMMIMMIMMMIMMIMMUMMMMIMIMMMMIMMMMIMMIMMMUMMMIMMMIMMIMMMMIMMMMMMMM
IIMMMMIMMMMEIMMMMMIMMM MMMMMMMM MMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
CMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMMMMMM M
EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMrM MMMMMM MMMI
MMM===MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMM MMMM MMMMMMMMMM MMMMMMMMMMMMMMMMMM
MMMM==MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMMM MMMMMMMMMMMMMMMMMMMM
Structure 1111111111111111111111111MIMIIIIIIIIIIIIIIM=11111111MMII -"'""r" "1111111111BE 111r- TP11"-- "191
121111111111111111
I 22R ?StSIR
Chainage pl;
00 0000
I 111
00000000000000000E00000 0 000000000000000 000000080000000000000008000000011010
Structure
,.pis-'rwr
amoi=milL memn
iiiillai itiElimi IM
MILILL MI
M INI
MMillennilZionemmontssmimmmommommaijimiami MMMMMM
(Lammimmimmimmmummummommimmrnmmommommmmmumm MMMMMMMM mommmomm
mmmmmmmummimm...mmmmmmummmummmumummmmmmummiummin•m MMMMMMMMMMMM MMMMMMMM milmmmommommmm MMMMMMMMMM
mommmmmummmommommummilimmommmmmmomm minimmum
_gammilmwmum
cmmommmmmommommimmwomm
mammmmimmmom MMMMM mmmossmommummommommmmmmmmumnimmommumommimmummmmmmummimmummmommmummmm -11 MMMMMM
MMMMMMM mmummommommmmimmmummmmmummmommwm.. MMMMM mommommummommommmummimmm.m...mmmmommrnmammum mom
mnammmmimmmommommommimmummommommommommummommrnmmummmommommmm....nommimmmmummommommmmommiammm....mmmmummmm
mummmmmammmmimmummmummommmummmommommommmmmmmummommummmumilmmommmommmmmommommimmommimmommummommommmrnm
mammmmmmimmommommommummommommmummommommummummmmmommmmmmommommommmummummmmmmmmmmmommommmmummommmimmummm
mommmmmmimmm....mmmommmmmmmmmmmummmmium....mommummummmommmmommmmommummommammummmimmmumm MMMMM mommm.mmummon
mammmmmimmonommwommwommonwmwmemimmummimmimmmimmrnmmommommommimmilimmommmmmummommommmummemmummismommummummom
immommmmmmommommommommmommumm...mmmommmommommommommommommommommummommummommommommmm....mommummommmmumwm
m=mm..mmommmommmmmmmmmmommmommmm....m• MMMMM imemommimmmmimmmommm.
m=mmmmmmmm....mmmommimmommommmmmimmmmomm...rn MMMMMM mmummmommommommummommm....mummmmommmomm
MMMMM mmimmmmmmmommommimmummommmmmmmmmmmummmommommom....mmmmm
mmmimmmmmmumm MMMMM immummmommummummommommummommommummmommommommmummmmmmommammmommmom...mmmmmmmummommommommom
mmimmmmmomm...mommummmummommmmommmmm.. MMMMM mommemmummmummmumm MMMMM mmimmommommammommmommomm...mmmmmummumm
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
T=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMM MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMOMMMIMMMIMMIMMIMMMIMMIMMIMIMMIMMIMIMMIMMMMMMMMMMMMIMMMMMMMMMMIMMMMMMIMMMMWMMIMMMMMMIMMMIMMUMEMMMIMMMIMMEMMMIMMIMMMMIMIMMIMMIMMMMMMMI
M=MMMMMMMMMMMMMMMMMMM MMMMMM MIMMIMMIEMMIMIMMIMMMIMMIMMMMMMIMMOMMIMMIMMIMMIMUMMUMMMUMMMMMIMMIMMMIMMIMMIEMMMMIMMIMMMMMIMMIMMIM MMMMM MI=
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMM=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
mammommmmmummmommmommummemimmommummimmmmmmmommummwmummommmmmummimmmmummummmimmimmmumanummummummmummmiumm
ffU=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMAMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MM=MMIMMMMMIMMIMMMMIMMIMMIMMIMMIMMIMMIMMMMIMMMMMMMMIMMMMMIMMIMOMMIMMIMMIMMMMMMMMMMMMIMMMMMMMIMMIMMIMMMMIMMIMMMMMMMMMIMMIMMMMMIMMMUMMI
L-iw.MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
CMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
IMIMMIMMMMIMMIMMMMIMMIMMIMMIMMMMIMMIMMMMMMIMMUMMEIMMIMMIMMIMMIMMUMMEMMIMMMIMMIMMIMMMMIMIMMMMMIMMMIMMIMMMIMMIMMMUMMMMMMMMMUMMIMMEMMEMMIMMI
MM=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
ZMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
EMWMMMMMMMMIMMIMMEMMMIMMIMMUMMIMMIMMMIMMMMIMIMMMMMMMIMMMIMMMMIMMMIMMMMMMUMMMIMMMIMIMMOMMMIMMMIMMMMMMMMUMMIMMIMMUMMMIMMMMIMMIMMM
QMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MMMMMMM MMM MMMMMMM MMMMMMMMMMMMMUMMMMMMMMMMMMMMMM MMMMMMMMM MUMMMMMMIMMMM MMMMMMMMM MMMMMM MMMMMM MMMMMMM
OMMMMMMMMIMMMIIIMMMMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMM =MUM mmon mum= MMMMMM mmmmmmmmmmmmm
amm===m0mm MMMMM m mm00= mmmmmmmmmmmm mommomm mmmmmomm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
rwmmimmmmommmummmommmmmmmmommimm MMMMM m mmimm mmmomm mom mem mom MMMMMM mmmmmmmmmmmmmmm MMMMMMM MMMMMMMMMMMMMMMMMMMMMM
EMEMMMMMMMEMMMMMUM MMMMMMM MMMMMOMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMEMMMMMMUMM
MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMIMMMMMUMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMEMMMMMMMMM
M=IMMMMMMMMMMMMMMMMMMMMMEMMMEMMMMMMMMMIMMMMMMMEIMMMUMMMMMMM MMMMM MMMMMMMMMMMMMMMM MMMMMMM MMMMMIMMMMOIMMEMMMMMMMM
EMMMMMMMMMMMIMMMIMMM MMMMMMMM MMMMMMM MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMM MMMMIMMMMMM
EM..MMMMMMM MMMMMMMMMMMM MMMMMMUMMMMMMEMMMUMMM MMMMMM MMUMMMMMMMIMMMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
c=0:
=mmimmimm mm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmm MMMMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
IOOIMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMIIIIIMMMMMIMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMIM
MEMOMMMAIIMMMMMMIMMOIMMMMUMMMMMMIMMMIMMMMIIIMMMIMMOMMMIMMIMMIMMMOMMMMMMMMWMMMMMMMIMMMMIIMMMMMUMMOMINIMMUMMMUMMMMMWMWWWWW
commmmmmmmommimmmmmommmommommommommmummommmmommmmmmommommommmummommimm MMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
cmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
===mmm mmmmmmmmm mmmmmmmmmmmmmmm mm mm=00= mmmmmmmmmmmmmmmmmmmmmmmm mum mmmmmmmmmmmmmmmm mmmmmmmmmmmmm
=mmmmmmmmmmmmmmmmmm MMMMMM m mum manumm mom mummummmmm mom um= momm mmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmm
mammmmmem mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMMM mmmmmmmmmmmmmmmmmmmmm
mmmmoimmm mmmmmmmmmmmmmmmmmmmmm MMMMMMMMM mmmmmmmm m mm mom= memo mmmmmmmmmmm m mommommmm mums= MMMMMMMM mmmmmmmmmm
=mmmmmm mmmmmmmmmmmm MMMMMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
M=IMMMIMMMUmm MMMMM IMMEMMMIMMMMMMMMMUMMMMMMMEMMMmommmummmmmAmMEMMMIIIMMMMMMMUMMM MMMMMMMMM mmmmmommommmminmMMMOMM
M=IMMMMMMMMMMMMMMIMMmmimmommummmAimmommimmmmmmmmmmmmmuMmMmommmmmummm MMMMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMmM
MM=MMMMMMMMMMMMMMMMMMMAAMMMMMMMMMMMMMMMMMmMmmmMMMMIMMMM=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
MMIMMMIIIMMMMMMIAIMMWMMUMMommmmummmmimmmummmMommmmmommmmmmmmommmmMoMmMUMMMMUMME MMMMM mmommommmmoommmmummmummemm
=mmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
=mmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
====emm mm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mummmmm mmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mommmmimm mmmmmmmmmmmmm MMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmm
===m0mm mm MMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmm
mmmmmumm mmmmmmmmmmmmmm mmmmmmmmmmmmmmm mmimmommeem m mmmmmmmmmmmmm mm mummmmomm mmmmmmmmmmmmmmmmmmmmmmmmmmmmm mom
=mmmmmmmimmm m =mom MMMMMMMMMMMMM mmmmmmmmmmmm MMMMMMMMMMM mmmmmmmmmmmmmmmmmmmmmm MMMMMMMMMM mmmmm mmmmmmm MMMMM =mum
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmMMMMMMMMMM
MMMMMMMMMMMMMOMMMMMMIMMMMMMMUMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM own m
mmmimmimmm m mimm m MMMM MMMMMMMMMMMMM MMMMWM W MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
EMM=M=MMMMMMMMMIMMMMMMMMMMMUMMMMUMMM MMMMMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMIMMMMMM
EMMMMZMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMMMM
Structure 111111111111111111111111111111MI 1111=111111111111111111111111111111111111111011111111111111111111101111111011 ■■11■■■11■
Chainage
Structure
IHRIESEMMIEGOMMEMMOMMEED
-77
SEEM HOOD -PROMMO11EMMEMMOMMIIMMin
'mm1 71 r
A A E
amir==mmmemoommmmmmmummmmmmmem MMMMMMMMMMMMMMMMMMM mmmmmoommeommummummmommemmmamonommmumm
3333
R
MUM
=mum
~ ~
mmmmmmmmmmmmmmmmmmmmmm MMMMMMMMMMMMIMMIMMMMMEMMMMMMMMMMMMMMMMMMMMOMMMMM
MMMMMMMMir. UMW, ' MMMMMMMMMMMM =MOIL M MMMMMMM MMMMM MMIMMMMMMMMMMMMMMMMMMMMMMMMIIMMMIMMMMMMMMMMMMOIMMMMIMEMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM M
M=MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
EMI MMIIII=IIIMIIIIMIIIMIIIIIIIIIIIIEIMIVIIIEMMMEMWMEEHMEEEEEEEWEMIIIIMMMMMMMMMMMMMMMMMMEIMIIII==EWMEMMIEMMMMMMMMMMIEEMMMMMIEMMMMMMMMMMMM
MSE IMEEIEMEMMMMMEMII1MMMMMMMMMMMM01MEIMMMMMMMMIMMMIMEMEEIEIMMMIIIIWMMMMMMMMMMMIMMIIIIM=IIIIMIMEMMMIMEEIEMMMMMEMIMEIIIEMIMnn=E=1111
M=MMMMMMMM MMMMM MMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMUMMIMMWM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMOMMMMMMM
M=MMMMMMMMMMMMMEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMIMMMMMMMMMEMMMMMUMMMIMMMMMMMMMMMMIMMMMMMMMMMMMMMMIIMMMMMMMMMMM
mommmimmm mmmmmimmommmimm MMMMM mmmimmm mum mmmmmmmmmmm mums= MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mom
====mm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
maimimmmmm m mmmummm mmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mm0
==mmummm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
amr: mmmoomummmmmmmmoommimmummummmmmmmummmusmonamommoommmommomm=mmmmmmoommmoommuommmummummemmonommummimm
Mn!MII MMIMMIMMMMMMMMMMMMMMMMMMMMMMIMMIIMMMIIIMIMMMMMMMMMMMMMMMMMMMMMIMIIIIMIIBMMMMIIIMIIIIMMIMMMMMMMMMMMMMMMMMMMMMMMMMMMMIIIIMM
EMIE MEMINIMMIMMIIIIIIIIMMINMEMMINIMMMNIMMMEIMMMOMMMIIIMMIEMMMIMEMMMIMMEMIIIIIMMIMISMMINMMINIMMIMMINMIMMIIIMMIMOIMMINMINIIIMMIMMMMMMEMMMMIIIIMIIIMMMMIMM
MMMMEMIMMOMMMMMMMMMIMMMMIMMIMMMMMOMM MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
M=MMMMMIMMMIMMMIMMUMMMMMMMMIMMMIUMMMMOIMMMMIMMMMIMMMIMMMMMMMIEMMMIMMMOMM=MMMIMMIMMMIIIMWMMOMMUMMIMMMIMMMIMMMIMMMMMMMMMMMMMM
MMIMMMMMMUMMMUMMIIIMMMMIMMMMMMMMMMMMMMMOMMMMMMMIMMMMMIMMMMMIMMMMMMMMMMMMMMIMMMMUMM/MIMMWMMMMMMMWMMIMMMMMMIMMMIMIMMVIIMMM
IMMEIMMIIMM MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
CMIXI MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMNBMMMMMIIIMIIIIMMMMMMMMMMMMMMMMMMMMMMMIIIIMMMMMMMMMMMMMMMMMMMMMMMIIIMMIMMMMMMMM
MMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
CM711 MMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMM MMIMMMMMMIMMUMMMUMMUMMM
11:73MX=MIMMIIIMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMIMMMMMMMMMMMMMMMMMMIMIMMMMIMIMMMMMMMM
Mr1=3 1•111MNIMMNIMMIMNIMMMMMIIIMMIMMEIMMMIIIMMIMMMMINNIMMMINNIMMMIMMIMMMINNIMMISIMIIIMMUMMMIEMMMIMMIMMINMEIMMMEMMISMMIMMMIIIMINIMMMMINMMMMMMM
MIE IMINIIMINMEIMMMIMMINIIIIMIIIIMMMMMMMMMIEMMMIMMIUMIIIMMEIMMINNIIIIMIMIMMMIIIMMMMMMMMMMMMMIMMMMMIMMIMMIIIIMMIMINMEINOMIMMINMMEIMMMMMEMMMISMISIIIM
CMML!M: MMMMMMMIIIIMMMMMMMMMIMMMMMMMMMMIIIIMMIMMMMMMMMMMMMMIMMMMMMMMMMMMMMIMMMMIIIIMMMMMMMMMMMMMMMIMMMMMIMIMMMMMIMMIMMMMMMMM
C2===INMEMIIIIMMIIIMMINIMMMIIIMMISMNIMMMIMIMMIMMEIMMM•MMMIMMIIIMMMMMIMMIMMMIMMIMMIMMIMMIMMIEMMMMMMENNIMMMMINIMMIMMNIMMIMMIIIIMMMMIMMINNIMMMIEMMINIMMIM
CMMM::1=I=MNMMMMMMMMMMMMMMMMMMMMMMIMMMIIIMMMMMMMMMIMMIIIMMMIMIMIMMMMMMMINMMMMMMMMMMMMMMMMMMMMMMMMMMMINMMMIMMMMMMMMMMMMMMMMM
EIMEIE MINIMMMMMIIIMISMIIIIMMMIMINMMMMMMMMIMMMMIIIIMIEMMMMINIMMMIEMMMMIMMIMMMEIMMISIMMIMMMI MMMMM MMIIIMMMMIMMMMIMMIMMIEMMMOMMMMMMIMMMMIIIMMM
CIE=MMI NIIMMMINMIMMMMISIMUIMMIIMMOMMINIMMIMMINIMINMMEMMMIMMMIMMIMIIIIMIMMIMMMINIMIMMIMOOMMMEIMMMMMMMMIMMMMMMUNMEIMIMMIIIIMMISIMMMIEMIIIMMIIMMMMIMMIMM
IMIM IIIMMMIIIMMMINMIIIIIMIMMISIMNIMMMIIIMMMEIMMNIMMEIMMIMMIMMUMMIIMMMMMIMMIMMIMMMMIMMUMMEIMMIEMMIEMMEIMMINMEMMMIMMIMMIMMMMMMMMMIMMIEMIMMINMIN
MIXE MIIIMPINIMMIIIIMMMMMMMMMMUMMMMNIMMIBMISIMMMIMMIMMMIIIMMIMMOMMMMIMMMIMMIMINIMMIMMESMIIIMMINIMINIMMMIMMMMMMMMMESMMMISIMMIMMINIMMIIIMINIMMMMINI
CNIMN=MMIMNNMMMMMMMMMIMMMMMMMIIMMMMMMMMMMMMMMMMIMMMMMMMMMMMMMMMMMMMMMMIIIIIMMMMMMMNBMMIBMMIIIMIIMMIIMMMIMMMMMMMMMMMMMMMIIIIIIIIIIMMMMM
CIETE MMIMIIIMMIIMMIMMIIMIMMEIMMMINIMMMIMMMINSIMMMMMMIUMMMIIIIIMMIIMISIMMIMMIMMIIIIMMMINIMMMMIIIIIIIMMIIINIMMMMMMMMMMMEIMMEIMMIMMIMMINMIIIIMINIMMIIMMINMMIN
MISMITIMMEIMMMINIMISMNIMM•MMMMMEIMMIIIIIMINMMEIMMIEMMIEMMIEMMMIEMNIMMUMMEIMMMMMMMUMMIEMMMMMOMMISIMMISIMIIIMIIBMMMMEIMMMMMMMMMMINNIMMIIMMMM
911 111MMIMMIIIIMMMIMMIINMIMMMINSIMMEIMMIMMMMIMMMINIMMSEMMOMMIMMISMMIMMIBMIMMNIMMMMINIMINIMMMINMEIMMMMIIIIMMMMMMMMMMMMMMIMIIIIIIIIIIIMMMIIIMMMEMMIMMIIIIIM
CINCIIMMIIMMIMMMMIIIIMMIUMMEIMMMMIMMMMMNIMMMMMMMINIMMIMINIMMMMMMINMEIMMMINIMMIMMMIMMMMMIMMIEMMEIMMMMINIMIMMEIMMINIMMMINNIMM•MMINNIMMNIMMIIMMMIMMIN
M!EMMIIMMMIIMMMMMMMMMMMMMMMMMMMMMMMMIEMMMIMMMMMMMMMIMMIMMMMMMMMMMMMMMMMIIIMMMMMMMMMMMMMMMMMMMMMMMMMMIMMMMMMMMMMIIMMMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
MEEMINNIN MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMOMMOMMMMMUMMMMMMMMMMMMIMMM MMMMMMMMM MMOOMMIMMMMMMMMIMOMMIMMMMOIMOOMM
MN=MMMMIMMOIMMMWMrnmillim MMMMMMM MMUMMIIIIMMMIMMMMMMMOOMMMIMMMIUMMIMMMMWMMIMMIMINIMMMMMMMMIIIMMWMWMWMMMMMommummimmomm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmm
rammimmmmommm MMMMM momm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmummmommm MMMMMMM mmm MMMMMMM mmmumm MMMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMMMM mmommmm MMMMM mmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mm.mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
EM=MMMMMWM MMMMMMMMMMMMMMMMMMMM MMMMIIIM MMMMMM MMIMMIMM MMMMMMMMMMMM MOM MMMMMMMMMMMMMMMMMM VIIMMMIIIMMOMMOOMMMUMMMMMMIMMIM
EMMOMMMMMMMOMMMIMMMIMMMMIIIMOMMMMMMMMMMMIIIMMIMMMMMMIIIMIMMMMMIIIMMUMMIMMMMMIMMIMMIMMO MMMMM MMIMMMMMMMMMMMMMMMIMMMMIMM
UMOOMMWMMmMMMMM immmmm MMMMMMM immommumm MMMMM niminummommommimmummmimmirnirnm MMMMM AmmommummUnrnmommommmoimmommurni
MM=MIIIMMMIAMmosimimAAMMEAmmommmmommummisrnmrnmmmummommeMimmommommommumnimmmmirnmmmommmommuminarnimmlumummmmumm
mn=mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mnmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmm MMMMM mmmm MMMMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMMMM mmmmmmmmmmmmmmm MMMMMMM
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMMMMMMMMM mmmmmmmmmmmmm MMMMMMMM mmmummommm
mmmmmmmmmmmmm MMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMMM mmmmoommmmmemmmummm MMMMMM
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm MMMMM mmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmm MMMMMM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
MMOMMIIMMMM=mmummimMormmmmmmummmmommimmmimmoMmimmumommmmOmmmimmmmummmimmominnWMAMMIMAMMAAMMMEMMMMMMMAAMMMIEMmmoimm
MMIMm==mirnMUmmmmmimmimmornimmmmmommimmmmommemmommmmoommmommummilmimMummoimmomM=MMMMUMmmrnmommummuMMImmAmm
M=MIAIMMEAm=m=mMEAUWEAMmummmmmimmin MMMMM mmemmommirnmAmimmummimmmmmummmimmmismommmmmmimmmimmimMAIMAAmommAMAAMMA
MIMMIMm=MIMAi MMMMM mimmimmimmurninnIMMEAmMmimmummommimmmommtimmmomnimmoMMAAMMEIMMIEMMAAMMWMAAMIAMIAmmimmEM
TrAIMMImm=mmmimmirnmimmummmmmmmmimmimmo MMMMM milimrnimmImmrnmmmmmmmmmmmimmimminm MMMMM mimmiummuirnimUmMMAAMmimmomminimnrnmrn
MMIMMImm=MMAAmmmlimmommimmmmimmmummimilmirnimmmmmmmmmmmimmmummmommmommmAmmmrnimMArnirnmmimmiMMANAAMMEMAMMAmmAmmmAA
MnilMmmmmiMniMMismommimmimmmommommmimmmmimmmmummommismmmilmommmommommomemmomm MMMMMMMM AAMmUmMimrnmemimmimmi MMMMMMM imimmurnimm
MMAMMMIon mmmmlAimmErnmommommmmmmmm onommummimmimmommomommommommuMmimmmimmommmmmmmmummmmumnimmMmimmimimmmmommimmm
MMIlmilmm=mmmi MMMMMM mmommmmmimmommmommommumummmommmommuMmWmmmmmmmmmummummmmomminmummiummmommmmommummrnommANAAAA
M=MmAmm=moimmimmommommimiimmummomm MMMMMMMMM mmommommemmommummummummmum MMMMMMMM mmummommmummimmummummammimmummrn
13=TIMIMI MMMMM mmoMm•MMAAMMMAAMMmUMmmmmmmmommmommimmmilmmommommmmmmmummimummimmmomMWMIMMEMMmrnmnrnaMiommAmm
CMMIIIMMMWWWMMIIMMMIMINMIIMMWMMMMIMMMOMMWMMUMIIM MMMMMMMMMM OIMUMMIMMOMMUMMM MMMMMMMM MOOMMMIMMIMMUMM MMMMMMMMMMM
EMMIMMMMMUMMMUMMMUMMMMMOMMMMMM MMMMMMMMMMMM MMMUMMWMWMMMMMMMIMMMMUMMMMMMMIMMMMMMMMMMMMMMUIMMMMEIMMMMMINIMMMMMMMIIMM
====MMMMMIIMMMIMIMMM MMMMMMMMMMMMMMMMMMMMMM MMMMMIMMIIIMMOMMMMMMMMMMOMMMIIIMMMMEIMMMOIMMMMIWIMMMMMMMOMMMMIUMMIMIMMM
IMM=M=MMMMOIMMOMMMIMMMMMM MI =mum mmmummmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
Structure MIONOMICOMMIUMit, JAMMOOMOOMMOOONMOMOOMOOMMOMMOOMMOMOMMEMMOOMMOMMOOMMWEMOMOMMO.—.
Chainage 3F§
AAAAAAAAAAIAA11111 11
AA
00000000"400BOB000000000000000000111000091111189ARVAS OBBill1000060000g000600000000660
Structure NE AU mummummumr- 1110MOIMMOMMEMMOMMINOMMICOMMOMOMMUUMMOMOOMMUMMOURNMEMOMOMMOMOMOO...e
mmm=mnmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
MMMMMMMM MIIMIIMIIIMINEIMMININIINIMIN11111111111111111111•110MMMM1M111111M11•1111MIMMIMINIMINIMINNIMINIIIMMIN
ELMEN1 MMMMMMM
IrM11 MMMMM IMMIN11•1111111 MMMMMMM MMMMM MMMMM
MMMMM MMMMM
1=11 1•110U11BMIIMININIIIIM MMMMMMMM
MMMMMM
MMMMMMM
MMMMMM MMMMM
MMMMM
MMMMM
MMMMM
MMMMM MMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
Il
V.
STRIP CHART HIGHWAY
mist:moimiamm[sionsmmulinuirmiumummionimm MMMMM mommummommmommmmmismummmmmommimmummmwmummmimmmimmmonmmommmummummimm
mrammienomminimmoisiminumminiimmmiiimiumaimmimmummarnimmmismoininunimmummeeemeimiummmwmmoimmenamimosmmmmmommin
erommiusimummionimmumminimmiummummoisommanwisummmummimmunsisomeminnuommimmuminnummuummomusionm
rimmimmimmimmimmummommummommmmmmmommmmommmmilmmummmommommmommmummommmmommmmmmmmmmummmommonwommommimmmomommmmimon
exammommismiommolummummemismimmoismomeimensiminimemomiimmiimminimiwinnwimisionsiseinnimmimmummimmumuusimmmmoomm•
mmmmmmmmimmmmummummmimmmommummmimmmmmmimmummmuminimmummummimmmmmmummmoimmmmmomumummummmummwmommummummmmmmommmmmilmsm
mmummmommommmmmommommommommmummmmommmmmmummmmommommmmmummmemmmmmmmmommmmmmmmimmmommummommommmimmmommimmnimm
MMMMIMMIMMMIMIMMIMMMIMMMOMMMIMIMMIMMMOMMIMMMIMMMOMMMMINIMMMUMMIMMMMMIMMMMUMMIIIMMUMMIIIMMMIMMIMOMMOMMMIMUMMIMMMMMMMOIMMIMMIMMMIM
MOMEMMMMWMWMMIMM===MMUMMIMOMMIIIMMMEIMMINIMUMMIIMMMOMMIMMINIMMMMMMMMMMIMMUMMWMIUMMWMMMIMIIIIMMMIMMIIIMMMMMMMIMMIMMMMMMMMUMMMM
MV=MOMMMMMMMMMIMMIMMMWMWMINMMIMMIMMUMMMWMMMM=MMMWMMMMemmummommimmmummmmilmommimmommmmmmmummilmmemminommommimmimmmummusimmum
mnsrammmommwoommmmmummommmommmmommimmimmommwoommommommommmommmmmimmummmmummummmummimmummmimmmummemmmmmmmmmmm
Eammmmmmimmommmummmmmmminumwommommenummismommonmommmmmmummommumummommmmimmmummummmomommummommommmmummlimemmoon
mmammoommommmmumnommimmimmimmmommmummomummummemommommummomommommwmilmommimmummomommenimmmmemmmommummommmmmmmilmm
immmommmmimmommummummimmmumwmmommmmmilmommommommonnmmimmomummommmummiummummmosm MMMMM unmmmummummismimmmmmimmanummimm
m=mmmilmmmmmmmomummmimmummmommimmiimmummmmmommimmmmmimmimmomommummommommimmommimmmmmummmmummimmommummommommuummmmm
cann usimmmiummoimmowinsimimmismomiiminniusommemissinummwm•mmmoisimmiimmummonommmmmummmionommommmimminme
maimmmimmmommilmmmmmommummmmimummmmmmimmimmummmommmummimmmummummommommmmummmummummomommilmommmunimmmmmmmummismommm
azor simemiummumuniammimmiNimmimmolummimmommincummumminumommrnmmommommuitommunimmissommmumnim
mmmmimmmmommummommimmommmommmmumommnommommmmommummonmmommmmmmmmmmumommummummilmommummmmummmmmmmmmmmmmm
a:m.m.MMIIIIIIIIIMMINIIIMINIIIIIMMIIIMIMMMEMMINIIIIIMINI111•111111111•MMIIMMININIM111111111•111111111MIEMMMMIMME11111131•111111•111MUIMMIEMM•1•11111M11111111MMIEMMMMMEIMIEMMINIMMMIMIIII
IMIMMMMMMMUMMUMMMMMMIIIMMMMIIMMUMMIMMMOMMIMMUMUMMMMMMMMIMMIMMMIMOMUMMIOMMMIMMIMMEIMMUMMVOMMM=MMMMMMIMMMMMIMMMMIMOMMWM
M=MMIIIMMMMMIMMMWINIMMEMAIMMOOMMMMIIIMMISIMMOMIMMOMMMMIMMMOOM MMMMM MMMMMMMMMIIIMM MMMMM MMMIMMIMMMIMMMMMMMWMIMMIMMMMMIMMMMMMIMMMMM
0:71 11•1 MMMMM MM MMMMMMMMMMM NOM MMMMMM iMMMMMMIIIMMUMMM MMMMM IMMMIIIMMIMMM MMMMMMMMM IMMIMMIIIMMOMMMIIM MMMMMMMMMMMMMMMMMMMmum=
mmmmilimmmmummommommimmummommmummommommommemmilmmmimmommemmumummimmmiummmummommmmmmmummumnammisomommommmimmum
ammmimmmommmummimmmimmmmmommommmommmmommommummommommmmmimmmumummommmommummmummmmummmummommmummmmummummmm
EMNIMMMMMMINIMMMMIIIMMMMMMMIMMIIMUMMUMMMMUMMIIIMMMMMMMMMM=MMMIMMOMMMOMMMMUMMMMMIMMMOMMWMOMMIIMMOMIMMMMIIIMMMMEIMMMMMMMMWM
MEMM=mmiesn.mmimmommummmommomminmm....mmmmommommoommommmummom.m........m..nommonnommumumm..m.m....m.mmrnmmwmumm
Structure
1111111111111111111C3111111111111MMEIMMIIIIIIIIIMINIUM1111111111111111M111=111•MMUMNIMI-..-MMI111111111111111111111111M11111
Chainage
Structure
601110111000000000000000000000800000000000000000060000000000000000808000008000006000000
nEmmimm"
— • ,.2.1
=111=2121 1111742111:21:1LIZCZZLIVICIVAZZICCZLILIMILTHATALIZLIZICSIZZLILIMILTALISCIZZZLIZZLIZLIZ
EMMIMMMMMWMWMWMIMMMIIMMIIMM=MMWMIIMIMMUIMMIMMMIIMMIMMIMMIIMMIMMUMMMM -_,Biamommommmimmmmommommommommuommummmommommummumwm
ammimmimmmmmmmmommummmummmomummmmmmmimmemommommummwmommemmmommmummimmommommmmmmmmimmmmimmmmimmummnommmiumnimmmn
m=mmmilmoommommommummommommmimmommamommimmommommummmmmmummommummmimmmimmmommmmommmmommummumwmimmommimmommommm
M=IIIMMMMMMMMMUMMIIMMMMIIIMMUMMIMMM===MMIMMMIOMMM=M=M===MOOMMVOMMINIMW================MMIMMIOMMMIMMMMMIIMINMMUMMIMMUMOMMMMMM
MMEMMMIMMMMMMUMMUMMIMMMMMMBIOMMMIMMMIMMIMMIMOMMMIMMM===MMM=MMMIMMMWMINIMMINMUMUMUMMMIM=MUMMUUMMIMMMINISMIIMMUMMIMMIMMIMMM
MMIIIMMMMMMUMIMMMIMMMOMMIMMWM===M=WW=MIIMMUMMM==MMIMMIMIMMWMMMINIMMMMIMMM==MMMMMMMMMIMMMIMMWMMMMMINIMMIUMMMMUIMMOMMMIMMMM
MITIMMINIMMOIMMMMUMMMMMWMIMMOOMMMMMUMMIMMMMMUMMMMMMMMMMMMMIMMMMUMMMUMMMUMUIMMMWMAIMMMIMMMIMMMUMMIMMWMMIMMWMMMIMMMMMMOMMM
M=MMMIMMMMIIMMMMINIMMOIMMIMOMMMUMMMMMM=MMUMMMMMIMMMIMMIMMIMMMMIMMWMWMMOMMWMMIMMUMMMMMMMINIMWMWMINIMUMMUMMIMMIMMMIMMMMMMIMMM
M=MMMMMM MMMMMUMMMIIIMMOIMUMM=MMMMMIMMMIWIMMMMMUMMIMIUMMMOMMOMMOIMMMMMIMMMMMMMMMMMMMIMMMOIMMIMMMMMMIMMMINIMMMUMMIWIMMIMMOMMM
IMMMIMMMMMMMIMMMMMMMMIMMWMMUMMM=MOMMIMMONIMMIMMMMMMMMMMMIMMEMPIMMMMIUMMVIIMMMWMMMIIRMIMMMIIIMMIIIMMMIMMMUMUMMMMMWMMMMMIMMM
MMIMMMMMMMWMMIMMMIIIMMMMMMMIMMMIMMMIIIMMIMMMWMIMUMMMOIMMISMMWMWMWMMWMMMIMMIMOMMMOOMMMWMMIMMINMIIIMMIIIMMMIMMIMMIIIMMMIMMWMMMMMM
MMIMMMMIMMIMMWMMMMMMMMIMIMMIMMMUMMIMMIMIMMMIIIMMEIMMMMMMMMMMMMOIMMMIMMIMMIMIWWWWMMUMMIIMMIMMMIMMMIUMWWWWIEMMMMMIMMMMMIMMIM
IEMMMMMMM MOMMMIIIMMMMMMMMMMINOMMMMMMMUMMUMMMWMMWMMMMMMUMMMMMMIMMMMMMIMMMIMMWMOOMMOMMMIMIMWMWMMOIMMMWMMIIMMIMMMIMMMMWMWM
MM=MIMMMMUMMINIMMMMIMMMUMMMMMMMIMMIMMIMMMMWMIIIMMUMMMIMMMWOMMMMMMMMMMUMMIMMMMIMMMIMMMIWOMMMIMOMMMMIIIMMUMIMUMMMMMIMMMMIMMM
momm.....mmommommemmwomomm..........mummm.m..m.mmommmommmummommmommommomm..............m.mmmommmummomm
MM=MMMMMIIIIMMMMMIOMMOMMIMMMWMMUMMMMMMUMWMIMMMUMW=MM=UMMUMMMMMMIMMMMMMIMMOMMUMMMMIMMOMMOOMMUMMIIIMMIIMMMIMMMMM=MMMMMM
EM=INIMMOMMMMINIMMMIIIMMMMIMMMMMIMMIMMUMMMIMMIMUOMMMMMMIIMINOMMOOMMMIMMWMMMMIMMWMOMMMIMMUMMIMOMMWMMWWWWWWMMOMMIOMMMMMIMMMMWMM
===MMIMMMMMOOMMMMIMIMMIMMIMMMOOMMMMMMM=MM=MMMIIIMMMIMMMIOMMMIIIMMMWMINIMMWWWWWMINIMMMUMMUMM=MMMMMMIMMMMMMMEIMMIMMUMMIIMMM
MMMMIMMMMMMIEMMMIMOMMOMMMIMMIIMMOMMINIMMIMMIIIMMUMM=MMMMMMMUMMIMMMMMMMIMMWMOMMUMIMMWMUNIMMMIEMMIMMMIIMMIMMIIMMWMMMMMIIIMMAIM
MKEMMIMMINIMMMMIMAIMMMMIMMMINIMIMIMMMMMWMIUMMOMMMMWMMIMMMIMMMUMMMM=MMMMMMMOIMOIMMIIMMIMMIMMOMMUMMWMWOMMIMMMWMOOMMIMMMMMM
IIMMIMMMMMMMMUMIMMMMM=====1MMEIMIMMIMMWMMIMMMIRMIMMIMUMOMMIMMUMMOMMMOMMMUMMIN======MMMIRMWMMIMMMIMMOMMMIIIIMMIMMMMIUMMIIIMMIUMMMMWM
EMMIMMIMMMMIIIMMMIMIMMOMMIMMIMMEIMMIMMIMMIMMIMMIIIMMM===M=MMIMM=M==M=MMMMIIMMOIMMISMOIMMMMIEMMMMVOMMIMIMINIMMMIIIMMWMOMMMMIMMIIIMMMMM
nortiomm....mummumieummomm..m.m...mmismommoimmmimmmuommummonnismuminummonimmumemo....imommum......
MOMMMMMIMMMWMMMIIMMMEIMMIMMININIMUMMIMMMUMMMIIIMMMM=MMMIMMMMIMMMWMWMMWMMINIMUMMIMMMINUMMMIMMMIMMMUMMMMIIMMMOMMUMMUMMWWWWWWW
MMMMIMMMMMMMUMMIMMIOMMIMMMMIMIMMUNIMMMOMMIMMMMWMUMMIMMMMMMIIMMMMMMMMMMMIIIMMMMMIIIMIMMIMMMUMM1MMIMMIMMOMMMIMMMMIMMIMMMIIM
CIMMIIIIINIMMII MIME= MMMMM MMMMM IMOIMIMMUM MUM IMM MMMMM IMMMIIIMMNIMM MMMMM
MMMMM
GIMMIN=MMINII MI IIIIMMMMIMINMIIIMI MMMMEI MINIMMIIM1111111111111111MIIIMI MMEINI
OZCII MIMEO MMMMMM
(IMMINIMINIMM
Structure
BREMEREMEGEMBEMBEREGOMMOMMEMMOMMEEMMEMBEEMEMEMEC
IMINIMMIIIIII=IIIMMIII=IMUMMIIIMM111111111111111111111111111111111111111111111111111111111111M11111111•1111111111MMEN
MMMMM
MMMMMMMMMMMIIMMIMIMMMMIIINIMMMMMIIMMMMIMMIMIMIMIMMMIIMMIMMMMIMMIIII MMMMM
rIT ....11111•111111ININIU1111111•1111111111MMIIMMINIIIIIIMIIIMIMMUIMINIIIIIIIMIMIMIN MMMMM
MMMMM MMMMM 111111111111111111111111101111111•1•111101111111MEMINIMIIIIIMMIINUNIMINIMINIIIIIIIIMMIMIIIIIMIIIMMINIMMIIMIMME11111111UMMIIMMIN
MMMMM 11111101111111111M MMMMM 11111•1111111INIMMINIIIIIIIIIIIMI111111111 MMMMMM
11721 MIMIIIIIMIMIIINIIIIIIIIIIIIIIHIIIMIMMMIMOIIMHEZBMIIMMIMMMMIMMMMMMIMMIIMIMIIIIEMMMMIMMIMMMMIMIIBMIMMMIIMIIMIIIUM
MMMMM
tCtlEMMI
(1:7211:
MMMMM
121EM
MMMMM IIMIN
1117:11
121011111111111111 1•11111INIMMIMI111111111MMINIIMIIMIIIIINIMMEINIMMIIMIMMIMIIMMIIIMMIMINIMMIIIINIMMINIMINIMINMIN111111111111MINIIIIMIMIIMINIIMMIMMIIMIIIIIIIMINIMINI
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Tharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
111111 mmimmeinwimummumimmiummummusimmmisimim
Sill millimiournissimmummommeimimminommisimmmimmilmmummumummi
oimmiimininimmisiimminimommilemilmimmoimminowiliernmisimmiNimillinimallimmilimaiiminwsimminiminimaiimmilmmumimmomim
61311 0imionnmminsimmullimminsimmmummoseimmusiimi umimimeium
ITMEr nsinsinsimanniiimminsinsimilimimmimimilmimmillimmi llimilmiimmlinsinsimiiimmiumummimmiwimmimmimmiiiimiiminnimmummimimmim
eiff musimmimimaimelmilaniminsinusimilumomminumnimminummmummusimmem
11111111MINIIIIIIMMIZEIMINIMIMMINIMMIIIIIIMMINIMIIIIIIMIIMIIIIIMINIMMIIIMIIIMOUNIMIIMMIIIMINNIMIIIMINIMIIIIMIIIIIMINIMIIMIIIIMIIIIIMINIMINIIIIIIINIMIIIIIMIUMNIMIMINIIMISMIIIIIIIM
MICIMMIIIIIMI limlislimmumimmisisirnmemmillimUmmilmimmummummilimmillimmilimillimilimmimmuisimmmiorniammimummomilwiminim
10•Nismillmaimminimumm—=================—=—==
1121:1
MIIMMIMNIIIMmismimiummosimmimaimilimilommilmillismilimilliammilimmumilimmil ===—======mommimumnisimminlinnomisimmommemmolum
etimi mminslimIllinilUslismoilliMMINNINIIIinonsillimilmeimiiiiminaimelommimmilm
NIIMIIIIIIMIIIIIIIIIMINIIMINIMINIMIIIIMINIMIIIIIIMMIIIMMINUMMIIIIMIMMIIIIIMMII
GMEZEI IINNEINUINIMIIIIIMINIMMOINIMMINIIIIIMMIIIIMIIMMIMIMINUMMINNIIIIIMIIIMIIIIMIIMINIMMINIMMI
IIIMMIIIIIMMIMIElmillimmiiimmlimmilmmilMIMIIMMINIMIIIMIMINIIIMUNIIMINNIMMINIMINUMINIIMIIIIIMIMMINIMMIMMINIUMIINIMMINIMMIIIMINIIIIIIMMINIMMIIIIMIIMINI
CZ=Ect
Iscees IBINIMIIIMINIIIINIMINIENIMMININIMIIIIINIMMINEMINIIMMIIMINIMINIMMIMIIIMMIIIMMIIIIMINIMMIMMINIMINIIMIIIIIIMMIUMMIIMMIMIMIIMIIMIMINIMIIIIMIIMINIMIMIMIIIMINIMINI
INUMIENIIMIIIIMIIMMIMININIUMBINIIIMMIIIIIMINIEN11111•11111MMIIIIMMEIIIIIM
MIMINIMMIIIIIMIIIMIIIMINIMINIIIMMEIMINIMIIMMINIMIIMINIIMMIIMMIMIMIMMIIMIIIIIMIIMINI
Entr=immeni IMMIMIIMIIMMIMIIMINIIMMIIMINIMIIMIIIMINIMIIIIIIIIIMMIIIIIMUNIMBINIMMININIMMMIIINIMMINIUMININIMIINIMIIIIMINIMMIIIIIMMIIIIMIIMINIMINIIMIIIMIIMMIMINIMINIIIIIMINIIIIIIMINIMIIM
exarl
azir NimMIMINIIMIIIMIMIMINIMMIMIUMMINIIIIIIMINIMMINIIIIMIIMINIIMININIMIIIIIMMIMIMIIIIMMIMINIMIIMMIIIIIIMINIMINIMMINIMINIMMIMMIIIIMMIIIIIIIMINIMIIIINIMIIMMINIIMMINIMMIIIIIMINIMO
MIIMININIIMINIIIMIIMIIIIMINIMINIZIMIMMINIINIMINIIIIIIMMINIMIIMINIIIIMMEINIIIMINIMINIIM
Ett lIMMMINIMINIIMINIMMINIIMININIMMIIIIMIIIIMIMMIIIIMINIMMININIMMIIIIMIIIII MNIIIMINIMINIMINIIIIIEMINNIMIIIIMIIMMEIMINIIIMINIMIIIIIIIIIMINIMMINIIMMUIMINIIIIIMIIMMINIMIMIMIIIE
frr MMIIIMINIMMINIMMIIIIIMMINIIMMIIIIIMMIMMIMIIIIIIIIMININMENIIIIIMINEIMIIMMIMIMIMMINIIMMINIMIMIIIIMININ
liimilimillImillMillIMINIMIIMIMINIIIMINIMINIIIIIMMINIMMIIIIIIMIIIIMINIMMIIMMIIIMIIIIINMIN
aZCF IMIMIIMMIMIIMMIMIMIIIIIMMIMIIMMIIIIIIIIIIIMMIMIIIMIIMMMIIMIMIIIIIMMIMMIMIIIIIMIM IMMIIIIMIIIIMINIMINMEIMIIMINIMIIIIMINIIMMINIIIIIMMIIMIIIIIIIMIIMINIMINIIMMIIIMMIMMINIMINIMI
EIZI IIIIIIIMMIUMIIMINNIIIIIIIIIINIMMINIINIMINIMMINIMMMIIIIIIIIIMINIMMIIMM IIMMMIIIMIIIMUMIIIMIMMIMIIMMIIMIMIIIIIIIIIIMIMIMINIIIIMIIIIMIMIMIMIMIIIIIMIMIIIIIUIIIIUMMMO
ISEX IIMMUIIINIMIIMIIIIIMMINIMMIIMIIMINNIIIIIMINIMINIMIMINIMMIIIIIMMEINOINIMMIIIINIMMIIIIIMMMIIIMMINIMUNIIIIIIIIMMINIIIIMINIMIIIIMMNIIMINIMIIMMIMIINIMMNIMIIIIIIIMIMMIIIIMI
OCIF IMMINIIMMIIIMMINIMINIIIIIMUNIIIIIMIMIIMIIIMININIIIIMMININIIMINUMIIIIIMIRMINUINUMNIMIIIIMMINNIMINO
IIIIIIMINIMIMMIIMIIIMINIMIIMINIMMININIMMININIMIIINIMIIIIMIIIIIMMIIIIIMIIIMMINIIIIMIIIMIIIIIIIII
Irr IMINEIMEIMIIIIIIMIRMMIIIIIIIIMIIIIMIIIMIIIIMININIIIIIMIIIIMMININIMINIIIMMIMIZIIIIIMI IMMINIIMINIMIIMIMIIIMININIMIENNINIIMMIIIIIMININIIIIMINIM1111•11•11111M1111MINIMIIIIIIIIMIIIIIMMINIMIIIMI
1:1: MMINIMOINNIIIMIMIIMMINIIIIIMINIIMMINIMIIMINIMINIMIMIMBINIMINIIIMIMMEIMINIMIIMMIIMMIM MIMIIMININIMIIINIMIMMINIMUMIMMIMINIIMINUMIMIMININIMIMIIMINIMIIIIMIIIIIMINIMIIIMIMIUMININIIIIIMII
CIEIF IMMINIMINIIIIMINIIMIMMIIIIMIIMIIIIIMINIMIIIIMIIMINIMINIMIIMMINIIMIMMINIMINIMMIIIIMINIMMIII
INIMIIM1111•1111MINIMINIIMIMIMIIIIIMIMIIIMIUMMIMIIMIMINIIIMINIMIMMINIIIIMIIMIIMM
terlI IMIIIMMINNIMIIIIIMMIIIIIIIIMMIMIIMINIMUNIMIIMMIENIMINIIIIMMINUMINIMINEMIIIMMEI IMMINIIMMIIIMINIMIMINIMMIMIMMINIMMIMIIMINIMININIIMIIIIIMIIMINIIIIIIIIIMIEMINIIMINIMIMIIMIIN
13:2 MIMINIMMINIMMINNIMMIIIIIMMINIIIIMINIMIIIIIMUNIMIMIIMMIIMINIIIIMINIMIIIIIM NIIMMINIMMIIIIIMMINIIIIMEIMMINNIMIIIIIIMIEMINIMMINIIMINIMINOINIIIIMINIMMIIMMIIMINIMIMIWIMMINIIIIII
a:=mnmmmllMIMIMMIIMIMIMIIIIRMIMIMIIMIIIIIIMMIMIIMIMIEIMIMMIIIMIMMIIIIIMIIIIM UMINIINIIIIMININIMIIMINIMINIEMINIIIMINIMIMINIMIENOMMINIIBINIIIMMINIMMINBINIMMIUMINIMM
ECCI IIMIInIIIMIIIMIMIIIIIMMIMIIMIMIINMIIIIIMMIIIIMIMIIIIIIMMMMMIMIIIIIIIMIMIIMIIIIMIIMUMIIMIIMMIM
IMINIIMINIIIIIMMIINIMINIIMIUMIIIMMIEMIIMMIIIMINIMIIIIIIIIMININIMINNIIIINIMINIM
frnIEN INIIMIMINIMIIIMIIMIIIIIIINIMMINIMMINIMINIMIIIIMMINIMIIIIIMIMMIMIMIIIIIMIIMMEIMIMMINIIMIIIIIMIMMIIMMIN MIMIMI
carl NIIMIIIIIMMIIIMMIMIIIMMIIIIMINIMIIMMIMIIMINIMINIMIMINIIMMINIIIIMMIMIIIIMININIM INI
IEMIMIMINIMINIMIIMIMIIIIIMIMMIMMIMININIMIIIMMUNIMIlillIMINIMMIMIMIIMIMIMMIIIMM INIIIIIIMINIMINIMINIMIIIIMINIIMININIIIIMIIIIMIIMMIIMMINIUMIIIIINIMMINIIIIIMIIIIMMINIIMIIIMIIMMIMIEMIRIMINIE
arlE MIIIMIMINIMIIIIIMINIMINIIMINIMIUMINIMMIENIMIMMIIIIIMINEIMINIIMIMMIIIII IMINIIMMINIIMMUNIMIMIIMIEMININIIIIIIIMMINIMINIUMMINIIIMIMIMINIMIMINIIMINIIMMINIIMINIIMONIMINIMIMMO
(121 1MINIIMINIMMIMINIIIIMINIIMINIMIIMIMINIMIMIIMINIIIIMIIIIINIMMISMINIMMINI IIMINIMIMIIIIIIMININIIIIMIIIMMIEMIIIMIIIMMINIINIMMIMMIMIIIIIIIMMIIIIIIIIMIMIMIIIIIMMIMINIIIIMIIIIUMINI
IMIIMINMMIIIIINIM=1======:."1":.7..7.1==MUMINIMIMMINIMIIIINIMINIIIIMIIIIMINIMIIMMIIMIN MUMINIMIIINIMININIMIIIIIMIIIMIMIMIIMINIMININIMIMINIMMIIINIMIE11111■11M11111MININIIMI
trillI MIIIIMIZ=BEMZE=211=====ELMIIIIIMINIMMEIMMUlliMMIIIMMIIINMMINIMMINEIMMINIMM IIMIIMMININIMIIMINIMMIIIIIIIMMIIIIMINNINIMIMININIMINIRMIIMINIMMEIIIIIIIIMMINIMIIIIINIMINIMINIIMIN
ral: MIIIMMIMUNIMMINIMMIlluloMMIIMMIIIIMMINIMMIllilliMINIUMINIMINIIIIMIIIIMMINIIIMIMMIM
12•1 MEIM===========l1MIIIIIIMMIUMIIIBMIUMIIIIIMMIIIIIIMMINIIIIMMIIIIIIMINIMMINIIIMINIMINIMMINIIIIMMINIMMIIMMIMMIIIMMIN111=============MINIMIIIIIMIMMI
MINIIMINIMMIIIMIIIIIMIIIMINIIIIIIMMIIIINUIMINIMINIIIIIIIMIIIIMIMIIIIIMIIIMMINIMIN
IIT INIIIIIIMINIEMINIIIIIMIIIMINIIIIMIMMIMIIIMIMIMMIIIIIIMININIIIIIMINIIIIIIIIMIIIIIIIIMINIMMIIIIIMIll
INIMM111111111•1111111111•1111•111111MMIRMIIIIIMMINIIIMININIIIMNIMIIIIIIIIMINIMMIUMMIONIIIII
iII3213=MMMIIIIIMIZIMINIMIMMININIMINIMMENUMMIIMIUMMIIIIMMIMINNImummIllIMMINIMIN IIIIIMIIIIIIMISMIIMNINIIIIIIIIIIMMINIIMIIIIMMIIIIIIIIIMIIIIIIIIIIMINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIMIIINIMMIIIN
CE=MIIIIIMIIIIIINIMMUIIIIMIMIMMIll IMMIllmminmIMMIIIIMIMMINIMMININIMMIIMINIM111•1111•111111ENIMIIIIIMINIMIIIIIMMININIMINIIMININIIMIE
Structure
IMEMMIIIIMMOMMICIUMINIMMIMMEMMEMIII
IIIIMSAMAISnalliall.1111111
1.1=1
1.111111111111111
Chainage
Structure HOMMIEMBOOMESEEMEINEENEREMMEMBESEMOMMENOMENIGOIMO
IIIIIIIMMINEIMMINIUMEMIMIMMILEIMMUMMINIMIEMENIMIUMBIUMMIIIIMMEMIEZIMMEMI
IIIEZIMOMMEMEIMMIIIIIMMIMIIMINIMINIMINIUMMINIIIMINMMINIIMMIIIIIIMMINIMINIMINIIMI
1/701==m1INIMINIMINIINIMINIIMIMMINIIIIIMMIIIIIMMIMIMIMINIMIIIIIMMIMIIMIMMINIMMII IMMIMMINIMIIIIIIMMIIIMIMIIIIIMMEIIIMMIIIIINIMMIIMMINIMMINIIIMIIIIMIIIMINIIM
IMMININIMINIMMININIMIIIIIIMININIMINIIIMEINIMINIIIIIMINIMIIIIIIIIIIIMMINIMIEMMIIIMMIIMMIIIIM IIMMIMIMMIIIINIMINIIIIMIIIIIMINIMMIIIMIMIIIIIIIMIIIIMMIIIIINIMMIIMMEIIMMINIMINI
CTIMINNIMMEnININIIMINIMINIMINNINIMIMIMIONIIMMIIIMININIIMINIIMINIMMINNIMINIIIMIUMMIIUMIMMIIIIIMMIIIMMIIIIMIINIIIIMIIIIIiIIIIIIIIMIIIIIIMMINIIIIMIUM111111•1111MINMIIIIMINIIIIIMIIIIIINIMIIIIIIIMe
IIIIMM11111111U111111MINIMINIMIIMINIIIIMIIIMMIIIIM11111•1111111111111M111111•111111111MIMMINIIIIIMMIIIIIIIIMINIMIIMMINI
Dmrimmmwmiimmunsimmimminummmumnimmimmiximmimmimiussummimi
azoo mmumum=======iiii111111=====1:MMIIMUZIIIIIIIIIIIIMEIN11111111111MlitilmilMI
mmismeminsimmiummiumummimmemiumimimmiummi
arrimmommimimumminisummiliammisiamimmimmiNsiminummoiammumminmnimuswim mmiuminimmimimi=a=====nollomvisranzmiliraimatminivanisillientiMISIENIErilimim
orri mmoimiiimiaminimommisiimisiesmummmusimmiumusion uimmommio========liminlisillillamMilismsaumllinMailimililitimillillitniiimm
terzmmommimilmiiiimminmismimmismuminammoimiminmmainommisiu ommiwimminimumm=====milimusilifinis=1M1=anlinuallanim_ iiiallailitimitimniel
mimmirnimmiiiminmemis=======iacinCiatztaiNC=NIMI=IIMIN=Seminal•amminu
amtimmummaimunsinisiuminiiiimusimmimummimismimonimmaimminumiosumminoimiminimminsi================IMlimusitia==== milmm
pritammommonnemmimiimminiiiimommommiumionommiummismiummummummumiam================win=cmilis=====1
azm iiimm
immumisommiNimmiNimismiNiminsiminommomommumisimismenwinimEm Wimm
EarE IMMIIMININININIIMIINIMIMIMMIIIMINIMIMMIIIIMMINIMMIIIIIMMINIUMII nimmumnimmimmisnaimm===-...m==========..••=zazni=====isanlicillilisimaniammili
mttli MIIIIMIMMIIIIIMINIUMMEMIIIIMMINIMIIIIMIIIIIMUNII=3=======••==911[===========11111MC
IIIIMMIMIIIIMIIIIIMININIIMMIIIIMMIMIMIMMIIIIIMIIIIIMINIIIIIIMMINIIMMIIIMMIIIIMMIIIMMMINIU111111 CUM
rell IMMIIMMIIIIIINIMMIIMIIMINIMMININIIIIMINIIMMIIIIIIIMINIMIMMIIIMMIIIIIIIMMIIIIIIIIIIMMIMIIMMININIMI111111 M111MMIIIIIIMIN===========111.11=2121============11111=IBINIM
IC13111 MMININIMINMINIMINEM===========11111=212211111===========11111MINEIMMIIIII
•1111IMMIIIMINIIIIMIIIIMMIIIIIMMINMIIIIIIIMMIIIMMIIIIIIIMINUININIMINIMIIIIIIMMINIMMIIIMMINIMMIIIIIMMIIIIMMNIIIIIMINIMMIIIIM1=========liMMZMil======11111====.11•11M1111
132311=INUMMEIMIIIIIMMIMIIIMINIMIMININIINIMMINIIIMINIMIMIIIMMINIIIMIIIIIIIIMMII 11M
02:11, 1111ININIMIMIIIMINIMMINIMININIIIIIIIIIMIIIIMMIONNIIIIMENIIIIIIIMIMMEIII MMINIMMIIIIMMIIIIIMIMMININIMMINIUMEMONIMIUMINIMMIMMIN=21111=====1:111====.111MINMIN I
11:11 1MINIMIIMINIMIIIIMIIIIIIMIMIMINIIMMIMINIMEMMININIIMIEMIIIMIMIMIIMINIIMMININI IMIIIMMIIIIMMMIIIIMMIIMMIIIIMIIMIMIMIIIIIIMMIIIIIMMIMIIIII1=============MIIIMINI II
ir0111 IIIIMMIMMIIMIIIIMMININIMINIMINIIIIIMMMINIINIMMIMIIMINUMIMIMIIIIMMINIIMIIIIIIMIIIIMIIMMIIIIIIMMIMIIIM
111•1111MIMINUMMINIIIMMININIMMIIIIIMMIIIIMMIIIIMMIIIIIMIIIIINIMIIIIIIIM
prIal MIIIIMMIIIIIMMINIIMMIIIIIMMINIMIIIIIMMINIMMIMINIMININIMMIIIIIMMIIIIIMMIN UMMINIMMIEMMINIMMILIMMIIMMIIIIIIMMIIIIMIIIIIIMIIIIIIMMIIIIIMMIIIIMMINIMIIIIMMINMIMMIIIIMIUM IN
ardE IMMIINIMINIIMMEIMMININIMIIIIMIIMIIIIMMIMINIIMININIMIIIIIMINIMMINIMIIIMM UMIIIIMIIIIMMIIIIMMIIIIMMINIMINUMBUNIMMIIIIIMMINIMMMIIIIIONIMMIIIIMMIUMMINIUMMIIIIMM
CECIE IIIMIIIIIIIIMMIMMINIMINIMMINIMIIIMIIIIMINIIIIIMIIIIIIIIMIMMIIIIIMININIUMMIUMMIIIMIMIIIIIIIMIN
(121 IIIMIIIIIMMINIMIIIIMIIIMMIIIIMIIIMMINIMMIUMMIIMMIIIIIIIIIIMINIMIIIMIIIIMMINIMMINIMINIMIIIMMIIIIIMMINIMMIIIIMMINIMMIIIIIMUNIIIMINIIIIMININIMMINIIIMMIIIIMMIIIIMO
MIIIMIIIIIIMIIIIMUNIMMIIMINIIMIIIIIIMIMMIIIIIMMUMMIIIIIMMIIMMIIIIII
031311 MIMINIMMNIIIIIIIIMIMIMININIMIIIIMMIIIIMIMINEIMMEININIIMMINIMIINIUMIIIMMIMINMI1111M
MNIMMIIIIMMIIIIMIIMIEMINIIMIMMIIIMMIMMIIIMMIIIIIMMIIIIIMMIIIIIMIMIIIMMIIIIIIM
MEG IIMIIIIMISIMMIUMMIIIIM11111•11111111MMEIMIIMIIIMMIIIIMMINIMIIIIIIIIMMIMIMMIIIMIIIIIMMININIMMIIN
IIIIMIUMIIIMIUM1111111MMIIIMIIMIIIIIMIIIIMIIIIIIMMIMIMMIIIIIIMMI
rn1=1EmMIIIIMIIIIIIMINIIIIMMINIMMIIIMMIUMMINIIMMIIIIIMIIIIIIIMMIMIMMIIIIMIMMIIMINIMMINIMMINIMMIIIMMIIIIIIMMINEEMIIIIMONIIMIIIMMIIIIMIMIIIIIMMIMINUMMINIMIIMIMMIIM
NIIIMIIMMINIMMIIIMMIIIIIMMIIIIIMMMIMMIIIIMIIMMEIMIIIIIIMIIIIMMINUINIMIIIIMMIMMIIIIIIMMIMININIMMINI
eze2 MIMINIMMIIIIIMINNIMIIIIIMMINIIIMMINIMINUNIIIIMINIMMINIMMINIIIIIMMINIM
aMIZ MIIIIIIMIIIIMMINIIMMIIIIIIMIIIIMMIIIINIMINIIMMININIMMIMIIIMIIIIMIMMINIMMIIIIIMMINIMIIIIUMIIMIMI
IIIIMIIIIMIIIIMIIMMIIIIIMINIIMMIIIIIMMINIWIIMIIIIINIMMINIMIONNIMIIIIMIIIIIM
cIZIE III
IMINIMINIIIIMIIIMUNIIIIIMIIIIIIIMININIMMIIIIMMINIUMIIIIIIMINIIMMIMMIIIIII IIMMEIMMEMIIIIIIMMINIIIMIIIIMMINIMMINIMIIIIMMUIMMIIIMMIINIIIIMISIMMIMMMIIIMIIMIIIIIIMMIIIMINIE
cEll IMMINMEINIMMIIIIMIIIIIMEININIMMIIIIIMMINIIMIIIMMINIUMIIIIMMIIIIIMIIMMI IMINIMIIIIIMINIMMINIMMISIMNIMMIMIIMMENIIIMIMIIIIIMIIIIIIIMMIIIIMIIIMMIIIIIIMMINI
willi IIMMIIIIMIIIMIIIIINIMINIIMMIIMINUIMIMIIIIMMMIIIIIMMIIIIMMIUMMIIIIIMINIIMUMIIIIM
slis11111111MMIMIIIIMIIIIIMMINIINEIMIMINIIIIMMIIIIMIIINIMIIIIIMMIIIIMIMMIMMII
E=III IMMIUMIIIIMMIMIIMMINIMINIMINIMMINIIIIMMINIMMIMMINWIIIIIMMIIIMMIIIIIMINIMINIMMIIIIIIIIIMMI
MIIIIIIMIIMMIIIMMININIMIIMIMIIIINIMIIIMIMIIIMMIIIIIMMIIIMINIIMINIMMIIIIMMINIIMU==========.
r21111 111111MINIIMIIMMINMEIMIIMMEIMMINIMINIMMIRMINIIMI 111U11111M11111MMIMINIMMIMININIMIIIM=================.1111=
morismolinilimmlommiwimimialimismisumensminimaimminim NIMIIIIMMIIIM==========INIMINIIIIIMMIMIIMIIIIMIIIMINIMIIMMINIIM=====-"==============
ummimmmusirninsimilimmiamismommumommouillimm=====a
--=—==--.========
aree
comarsimmimmillisimimimlimilmisimmmummisuisumimiummummunumiummoiimmimmisimuummonommimumilinsommmum ===== ormiiiiMissii
miElmimmimisommimmilminimismimmaimmasommimummmimmumiensmmoliMmsinmnimisnommillimilmmillUNIEntiNimimmiammilMinmmiMimmils
ctsr•mmiiiimmmilminmoimmismismumummoimmoimisilm
cr: MINIEmilliiMmuslimmiNimlimimoimmimmusisimaiimmimmiammimmimilimmiwimmisimimmimmommilimmiamillimmusuienniimirnIrnimilli
immosimmillimunimmismsoismemilmmiimimmemilniminumnieumniMilmilliimi
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of iharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
7313:1M=IMMINN MMMMMMMMMMMMMMMMMMMMM MINIMUM MMMMM MMMMM IMIIIIMIMINIMMIMMINMIINMIENI
MMMMM
MMMMM MMMMM MMMMM MIM•••••■••
MMMMM MMMMM
MMMMM NIIEMMUM
MMMMM MMMMM
MMMMM MI MMMMMMM MMMMMM MMMMMMMM MMMMMMMM MIME MMMMMM
MMMMM MMMMMM
IIIMMM MIME MMMMM
mineem minommumniummimmommemiensommi sun nee eti NI MMMMM mom= ^ melsessert tentimommimuimoimmmo MMMMM iminimommum
trinniarramm simommunie mom • MMMMM
Structure
111111111MMIMMI IIIMMIIIIIIM=11111•1111111111111MMIIIIIIIIMMI=MIMMUMIMIMMOMMIIIM nwc
Chainage
Structure
MBEEMBEEHOMMEMEMOMEGEMBEESEMEOCIEMMOMMEMMEIBEREMBENEMBEC
MIIM11011111111111M1=111M1111111111M11=311111111111111MMIIMMIMMIMI=IMIIIMMIIIIIMMEINIMMI
MMMMM MIMMMIMMININEMr'l MMMMMM NM crIr.a IAA
MMMMMMMMMMM IN EF Pm eESEdt3lE 1E?...................MI
M•1111011•111MMI1===•13:--MMIMIMIIMMIIMINIIMI
Chainage
Structure
MOOMENEMEMBEIREMEEMEMECOMMEEMEEMMEMBEEMOMMEMOMMOMM
311.101.1111111.11111.11111111MEMEMIMMENOMMINIMMEMBEIMMEMOIRMIMMIIMINIMMEIME:1111111111
MMMMM
INIM11111111•1111111•11•1111111M INIIIINIIIIIIIIMI•111111M1U1111MMMMMUMIMIIIMIMIMMMIIIMMIIIMMIMMINIMININ
frr i MMINIIMI111111111111111111MININIIIIIMIIMI11111111111111111MININIMIIIIMINIIIIIIIMI
ammorie r-rammommummilimmummunsimmummimiummommeliesenimmimmumummismommommummommummum
aze mmenismoummiommummmimmummummummumummommosommumnicommommoussmimmusommoinimmommmo
117: 1
MEIMININNIMMIMIIINIMMUMM IMMO
MMMMM
MMMMM 1111111111111111MIIN
aMil IMININ1111111111111111NOMININIIIIIMINIIIMIMMOSIN MMMMM IMMO INNIO1111111111•11MMIUMNINIIIMINIMMINNIMM UNIMMUMMIBI111•1111•1111•111111MINIMMIIIMIIIIIIIMIMIIIMIM
MMMMMMM MMMMMM
(1:2/2 1MIMINIM
C!!!
1335=1111
CVE"
az3r: ---...-:_mensimmummummemmainmummensisimmummiummussiumummsemunnummumminammoummummom
MMMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V.
STRIP CHART HIGHWAY
MMMMMMMM MMMMMMM MMMMMMMMMM INIMINIMINIIMMUMMEIM MMMMMMMM =MUM= MMMMMMMMMMMM MEIN MMMMM MMMMM
MMMMM MUM MUNIMUIIIIIIIIMINIIIIMEMIUMIIIIIMMIM
MMMMM
MMMMMMMM MMMMM
MMMMM
1:7131Z IMIIM MMMMMMMM MEI MMMMMMMMMMMM INIUMINNIMM MMMMMMM MMMMMM MMMMMMMMMMMMM MMMMM
C=11:1 1111•11MIIIMINIIIMINIMIE MMMMMMMM MMMMM MMMMMM MMMMMM
MMMMM
ITIM:1 111111MIMMINIIMMINIIMIIIIIIMINIIIIMIIIIIIM1111•1111•111MMINNIMIIIMINMMIIIIMIIIIMMIMIMMUMMIN111111111•1111•11•1111MMINIIIIMMMMINIMINMIIIIMMIIMM
OZZEI
MINIMUM UMMUMMIIIIM111•111.111111111111•1111MIMUMEMINIMIIMINIMMIIIIMIIIMIIIIIMMIIMIMMINIMIIMMUMIIIMIIIIIINIMIIIIMIMMMM
MMMMM MEMOIR
MMMMMM MMMMM MMMMM
MMMMM MMMMMM IIIMIMMUMM MMMMMM
MMMMMM
MMMMMM MMMMM MME11•11111•111M111MININIIIIUMIMM
IIME MIIZ=Z: MMMMMMM WI MMMMMMMMMM MMMMMMMMMM MMMMMMMMMMMMMMMMMMM MEI MMMMMMMMMMMM MMMMMM
ten 1111111111111111111MMIIMIMMIIIIIMININION MI MMMMM IIIMMUMINIIIINIMIMINI
MMMMM
MMMMM
=ME MUINIUM IMM
Structure
Chainage
Structure
MOMOMMOIMEMBECOMMIEMBEGIEGOOMMETIEMOMMEEMEMEREIEEMEMEIEIEMEELE
MMMMM
MMMMM UMIN
MMENIMMIIMMINMMEIMMUIIIMIIMMIUMIIMMINIIIIIMIMIIIIIIMINIIIMMMMINIINIMIN111111111111M1111•111111111MIMM11111111111111111111MMIIIIMMIIIMINNIMEINIIIIIIIIIMMEM MMMMM 'NUMMI
rar IMIIIMIIIIIMMEIIMUM1111111•11111•11111111•111M1111111111111MIMMEIMINIIIMINIMINIMINIIIIMIUMMME11111111111111MMIMINIMMINIMMIUMIONIIIIIIIIMIIMMNIIIIIMIMMMMININI
MMMMM
MMMMM
C=ITIMMM
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
V."
STRIP CHART HIGHWAY
C7311 111••••••••1•UMMmmmmmm ummuummuumuMMUMMININIMMUMMUMUMMUMMIUMMISBUMMUNIMMUMUMM MMMMMMMMM • MMMMM
CM.!U••••••••••••••••••••••MMUMUMMUMMUMMUMM•••••••••IUMMINUMMUMUMUMMUMUMMIUMMUMUM•••••MUMUM
CSIIII IIMUMMUMMUM••• MMMMM ISIMMUMMIMINU•••••••••MUMMUMMUMMUUMMUMUMMUMMUMMUMMUMIUUMMIMMIUMUMMIIMI
231273 11•1•MMUMIUMUMMUMMINUMMUMMUMMIMISUMUUMMUMMUMUMM•1151•••••••••••••••••••••••••MUUMMUMUMUMMUNI•
CIFS•UUMMUMIIIMIUMMINUMM MMMMM MUMUM••••••MMUMMUMMUMMU MMMMM UMIIMIUMIMMUMIMMUMUMUMUMMUMUMMUMUMMUM
CIPCMIIIIIIUMMUMMUMMUMM MMMMM •••••IMMUMUMMUM•1••••••••••MUMMUMMUMUMMUMMUMMUMUMUMMUMMUMUMUMUMM•1•1
re3=MIIMMEIMMUMMINIIIUMMUMUMUMM•••••••••11••••11••••••••M••••••••••••U•••••••••••••••••IMMUMMIUMMUMMUMMUMIUMUI
MIN•1 1111•1•••••••••••MUMM••••••••11•MMUMMUMMUMUMM••••••••1•MUMUMMUMMUMMUMMINIUMMINUMUUMMUM•••••••••
• IC:CIM MIUMMUMM••••••••••••••11111••••MMIUMNIMMUMMUMMUMUMMUMMUMMUMIUMMUMMUMMUMMUMMUUMBIUM•UMMUM
CIZIMMUMM••••••••••MMUMMUMMUMMUMMUUMMUMMUMM•••••••••••••MUUMM•••••••••••••••MIUM••••••••MMUMUUM
L....a.L....a-,,MUM•MMMUMIM••••••••IM•MMMMMM•••IMUMMMMMMMMMMM•••••••••••I•M•M•••M•MMM•••••M••••••IMUMMMMMMMM•••••••UM••••
CIEIC 11••••••••MMUMMUMUMMIMMUMUNIMMUMMUMUMMUMMUMMUMUMMUMUMUMUMMUMMUMUMMUMMUMUMUMUMM•
Mir= 11•1•1•1•MUMMIUMMNIUMMUMMUMUMMINIMMUMMIUMUMMISMIUMMUMMINUM••••••••••1•••••11••••••••••••••MMUMMUMMUMM
ewr:r ommmmmniemmmmmmmmmmonmmmmmmmmmmimmmmmmunnwemmisunmwimaosomimmmmmnwemumumm
cnnzmimminiummumiumimmumummosuammmmummummmrnmummumummommommimumweammomm
tmzrTnr mmmmnmimunnummusiummmmmmmmmmmmmmummmsBnnmmmmmmmmmmmmmmmmmnumsemuummmmmuomwsmmmm
orrri mwioosummmmnmrnmeommmmmwixuwmmmummmmmmmmmmmsinnumumimiiwwisiminmmmmmmmmuuuesssummsammmimum
amEn ummommimmmmomunionommummomenummiseimmisummommummmommummimmmummoiimummmousuumweamm
anrc MMMMM mmaimmusizosimmmmummommmommummasnmsommummummommumaimmummoimiNnotm
arn iummionaummummmoimiummounmmummommaimmiseummummummuumonlIMIMINIMINIMMMUMIIMIIIIIMIMIIIIIIIMUMMINIM
CIZM UM•1•1•1•MIUMM• MMMMM MUMMINUMUNIMMUM•••••••••MMUMMUMMUMMUMMUMMUMMUMMUMMUMUMMUUMMUMMUM
OrIMI UMMI••••••••IMMUM•umumuMmlumuMMUMUMUMMUUMMUMMUUMBINIMMUMMUMUMMUUMMUMMUMMIUMMUMMUM
CLOTIUMMUUMMUMMUMMUMIUMMIUMUMBUIMMUMUMMIUMMUMMUMMUMMUMUMMUMMUMMUMUMMUM••••••••••••••••••UM
CIMFE MEMMIIIMUMMUMMIIMMIUMMUMMUMMUMINIMMIMMUMMUMUMMUMMUMMUMMUMMUSIMMUMNIUMMINIUMUMMUMUNIMUMMIUM
aril l•••••MMUMMUM••••••••••••••••1••••••MINIMUMMUMMUMMUMMUMMUMMUUMMUMMUMMUUMUMMUMMINUMUMMU
ECUUM••••IMMUMMUMMUMMUMNIMMUMINIMUMMINMMUMUMMUMMUMUMMI••••••MMUMUMMINIMMUMMUMUMUMMUUMUMUMMUM
(ErE111111••••••••••••••IMMUMMMUMMUMMUMM•••••••••••••••••••••••••U•1••••••••••••••••••••••MUUMNIMMUMMUMMUM
0:1 1•M••••••••••1111•MMUMMUMS51•••••••••MUMMUMUMUMMUM•••••••MUMUMMUMMUMMUMUMUM••••••••MMUNIMU
02:11EMISIMUM•••••••••••••MUMMUMMUSIMMI••••••NUMUMMIUMIUMIUMUIMUMUMUMMUMUMUMMISMNIMUMMUMMUMMUMUM
02:0 •11MUMMISMIMUNIUMMIMUNIMUMIIIMMUMMUM•••••••••••M••••••••••1•••••••••••••••MUMMUMUMMUMMIUMMUMUMMUS
IT:3 1113111•••••••M• MMMMMMMM UM111••••••••••••• MMMMMMM ummumuM•••••••••••••=••••• MMMMM •1•••••••1 MMMMM MUUMUU
II=CUMUMUMIUMIUMMINI•MMUMUMMUMMUMMINMISMIMM MMMMM UMUMMUMUMUMMUMUMMUMMUMMUMMISSIMMUMMUMUNIMUMMUM
lIE:1 1111MUMINIMMINIIMMIMMUMINIUMM• MMMMM MUMMUMMUUMMUM MMMMMMMMM MUMUMMMIMMUMMUMMUMMUMM••••••••UMUMMU
MUMUMUMMUUM••••••IMIS MMMMMMM
OZ7:1•1 11••1•••••••••••MMUNIMIMMIMM MMMMM UMMUMMUMMUMMUMUMUMUMMUMUMMUMUMMUMMUMUMMUMMUMMUMMINU
01111U=•••••••••MUMMUMINUNIUMMUMMUMMIMM• MMMMMmummiummumimmummummimmomennommummoom
rerami limmommommimmuminumummr rnmEmeemenniammosimimummummmuumminummumummummummumammumwm
latrarnmr=mmiummommouimmimmommmummminnmimi MMMMMM usommaismensmmummmimmummuummom
azEir mimmaimmommummummonommowiimmummimiunimmiewinnumommrnmminennommummonimumummuutiom
Structure
Chainage
Structure
MOMERMEMOOMMEEMOMMORIMMIEMEONEMOMMOOMMOOMMIEMMOGIEMEENEMEE
11111111MMIIIMUEZMIIIIIMMIMEZZOIMIIIMMIMMUISMIMMIIMMIN=IIIIMIUMENMEMMIll
amarmrxtmmumminimismiumaisemmumummuseummumusimmummumminiummiummumiimussimmulommumatimmmummumumi
onmaran=rmsummimmmummommememommummummainimmomismummiumitimimmimmisommutoommseammou
re ensimmusinimimmiummummummmummummommummumm MMMMMMMMMMMMMMMMMMMM IVES Et WP- tit
MMMMM
ILTIM MUMMUISMI••••••••••••MUMMUMUMMUMMUMMUMMUMMUMMUMMUMUMUMMUMMUMMUMMUMMUMMUMMUMMUMM
CE3•1 1.1•11•••••1111MIUMINIMMIUMMUMUUMUMB•••••U•••••••••11UMMUMMUMMUMUMNIMMIUMUMMUMUMUMUMMUUMUMMUMM
0:::IC •••I•MMMMMM••••••IMMMM••••IM•MM•MM•MM•M•M•MM•MU•MM•MMUMMI•MM•MMUMM•••••••MUMMMMUMU•UM•UU•MMMM
azrem oniminvonsimommeniumommumminommummmmumummumm•••••••••••••rnismaiumummumusimmmomum
CIZI M••••••••••••••••••••MUMMUMMUMUUMMUUMMUMMUMMUMMUMUMUU••••••••1••••MMUMMUMUMMUMMUM
CE13 1••••••••••••••••••••••••••MUMM•••••••••••••••••••••••••••••••••M•••••••••••IMUMMUMMINUMUSIMMUMUMUI
EllEMIMMUM••••••••1•••••11•••••••••••••MMUMMUMMUMMUUMM••••••••••••••••••••••••••••••••11•••••••••••M••••••••M
CIME INUMUMMI•M••••••••••1•MUMMUM••••••IMUMMUMMUMMIUMMUMMUMMUUMMUUMNINUMUMMUMMUMMUMMUMMUM•
CCIX •1•111111111•1•11•111MMUMUMMUMMIMMUMMUNIUMMUMMUMMUMMIUMMUUM••••11•MUMM••••••••••••UMMUUMUUMUMMU
EtrE ll••••MMUMMUMMUM•11•••••1••••••MUMMUMMIUMMUMMUMNIUM•••••••••••••••••••••MUMMUMM•••••••1••••••••••
arlit •I••••11•MUM111••••••••MUMMUMMUMMUMMUMMUMMUMMUMMUMMUUMMUMMUMMUISIUMIUMMUMMUMMUMUMMUMM
tMM II•11118•1•MMUI•••••111uu••••••UMUNI•••••••••••••1•••••••••1••••••••••••••••••IUMUMMUMUMM•••••••••••••••••••
MMMMMM Emmisommillummminmiummmummememseisummmummummommimmwmummum
Ir: •••••••••••••••1•1MMMMM UMMUMMUMUMMUMMUMMUMMUMMUMUMMUMMUMMUMEMBIMUUMMUMMUMMUMMINUMMUUMM
amEn nionwimmommunimmonmommummimmimmummummoorminosommmammommnimammommomummommmomimusem
azan umsimmemiummusiammommummaimmommuniummummuummmoineusimmmmuniumaimmmmummummmumen
azr nnumummmmmunommuswummawtimmmtmmmumumusiummmmmmmmumimmnioommummmnuummaummm
arr Ewimmoimummasiosomommumminimm•••••=mmummuummemmimaimmilluusiumommimomiummmu
amiz mnmmeemmimmimmmmuuuuo•meiminmmueumiummmmmmnmwioimiwwimmnmmmusmmiumnsswmiwmmmsmnmmmmwiumm
azrmarzmmmimmmmmxmnomommmmmmmmmwnmmmmnmmsimmmmmmmnmmmmmmosmmummmuimmoimmmmn
earro mmiammummmionimmummumiimmmommiumummommmisnommommummomonmsmummionmmulommuimmoisin
tnom mosimisommumummommommumummmumiumummummlimmanommoimmommonnummummimmiiimms
frinc uminisommimminumummommanummumummammusimummmimummonnmminnuseminmmumumusiummumummumom
CSEICE MMUMMUMUM•••••••••••MUMMINUM••••••••••••MUMMUMM•••••••UMMUMUUMMUMMUSUMMUUMMUMMUMMUM
1=1E173 11111•1•1•111•1•MMUMIMMUUMMUM•11•••••••UMUMMUMMUUMM•••••••••••••••11••••••••••••11•1•MUMMUMMUUMMUNIIMMUM
1:=11 •11••••••U•••••••■•••••••••M••••••••••UMUM••••••••••UMUUMMINUMUMMUMMUMMUMMEMIUMMUMMUMMUM
CIIIM UMMIUMMUMMEMIUMUMMUMMUMMUMINIMMUMIUMUUMMUINUMIUMUMMUMUUMMUMMUMUUMMUMMUMMUMMUMU
111 •••••••••MOMMUMMES••••••••••••M••••••••••••••••••••MUMMUMMUMUM•••••••••UUMMUUMMUMMUMMUMUM
LEXI MMI•••••••••MIUMMUMMUMMUMMUMMUMMUMMMUMMUMIMMUMMUMMUMUMMIIMMUMUMIUMMUMMUIUMMUMUUMMUI
ell• ••••••IUMMUMMUMNIMMISIMIUMMUM•••••••IMUMMUUMM••••••MMUMMUMMUMMUMMUMMUMUMNIUMUIMUMMUMM•
EISTE MMIUM•••••UMMUNIUMMUMMIMMINUM••••••••••••11•MMUMMUMUMMUMMUMMUMUMMEIMMUMUMUNIUMMIUMUUMMIUM
ing=11 11•11UMMIMMUMMUMmumumMUMMUMUMMUMMUMMUMMUMISIMEMMUUMINUMMUMMIUMMUMMUMMUUMMUM MMMMM MUM
VEIM MIUMENIUMMUMUMMMUMUMMUMMIIMIUMMIUMMUMMMUMNIMIUMMUMUMMUMUMMUMMUMMUMUMUMMUMMIMUMMUUM
CM:IUM•UUMMUMMUMMUNIMUMMUMMUMMUMMUMMUMMINIMMINUMMIUMMUMMUNIMMUMMUSIMUMMUMM•••••■••••••MMUUMMUI
CE• •••11•MMINUMM•••••••••••••••••••IMUMMUMMUMMUMMUMUMMUMUUM•••••••MINIMUMUMMUMMUMMUM••••••••••M
"Six Laning Of Khairatunda To Barwa Adda Section Of Nh-2 From Km. 360.300 To Km. 400.132 Section On Hybrid Annuity Mode In The State Of Jharkhand Under NHDP Phase
11
V.
STRIP CHART HIGHWAY
IMI NIMIMIMMINIMIMMIMMIIMIMINIUMMEIMMEIMMMIIIIIIMIMIMMNIIIBIMM1111•11111•1111111111111MINIMMMIIMIIIMMIIIIIIIIMIMMINIIMEIMME111111MIIIMMIMINMEINIIN
ants••••••••••=mommimmimummminamimmomommommomuummummammommimmominmanummommumimmummoisimm
azna nimmumiumniminsimmemmummumumimmmumummummnimiiiniimmiiiiismiinlimmimininummiamommummmummisim
Emainwinmmm••••••••••••••••••••••=mmoismmumm•mmummiineammimmilemennommumuimmrnmomisisiim
immimmiummmommimummumommommmimmmoummummmomommimminnemmininimummimummummiemmommrnmumminimimmi
azotimmonsinamminomummommimmumummummommommiumwm••••••••••••mmmeimmusiniesionimimimisiminnmie
aniemmimmmommEnommumnimmummmmimommmmummummmeinmemommimmimmommomummummummrnmmminom
Emn imiwimomomminummmonsimmommomoommommmrnmrnmwmannamminmsnomommusnminnimmommemmommuminwinn
ire emmonmenasimmimiemmommummrnmummisimimmumommummummimeminommumwmimmommomennm•
rizo
itnnE ommoinummummommaimumimmommommuumummmummrnmummummmwmummmummumm•
anmcmmmnmimomimmmmmmmmmmmwuwmmmimmmmmmmmmmmmmimummmmmimmuummimmmmmmummmmoounmm
trimmumm•mmnimummumminumanm•••••=minummmmimmoommmummiemmumiscmitm•••••••=mmmomm•
tcnn
rin wommumminimmummmummeimommummommommommmummisimmummmumiumummummimommimmmoimismiimi
cont numisminomanimminmmmusummommemmimmemisimisinsimiummomommmowimmommisaiimmiamteneummommimm
ozo immussimEmmommummommilminninommummommournmrnmommummimmrnmommummimmimmeimummou
mmisemumwmmummummismommminemeumminiminsunimmommmwmmummmumummournmuilmemmemimimisi
IMMIIIIIIIIIIIIIIIIMINIMINIMmummEMONIMMIIMMIN•mm•••111111•MMMMMMMMMMMIIIIMIIIIIMIN11111111111111110111111MMEMM
Structure
mmmummonnusummummummnnummizainmmumnummommum
Chainage
Structure
HICOMMEMOMMOMMOMMOMMEREMIEMBEICOMMIEMEEMEIMEMBEMOMMEE
11.1101.1.....MMUMMEMIMMEMIUMNIMMOMMOOMMEMINEMEMILIMMOMMEMMEMMIM
lEIB IIMIIIIMMIMMMINIIMMMMMUM1111111.11•111111111111111111MMMUMMIMMMMIMMIIMMUMUMMMIIIMUMUININIIIII
CEIIIMIIMIMMMIIIMIIIIIIIIIIIIMME111111•11111•111111111.11MINMMIMMINUMMIMINIMMrniMUMMEMMOMMINUMIMINIUMMUMMNIMIMIIIIIIMIIMIIIIMMIMMIMINIMM
IIIIII EINEE••••••••••stemisommumemommommwm••••rnmmommummommmummomommommemomumenimmoimionnmum
ci slinomm•mmmonenamismommummmmummaimminomminimmmommimmumommrnmomosiumumumummwmmwmommumi
MrrIZIIIMIMIMMMMMMIIMIIMIM=MM•MMMMMMUMMIOMMIMiMiMIM•••MMIMVMHNMMIMMUMMMMIMIIIIIMIMIMMMUIIIIIINMMIIIMI
EZII MINMUMMIMINIMINIMIII1U111111111111•1111111MININIMINIMIIIIIIMMIMINIUMMMMMMEMIMMMINNIMIIIIIIIMIUMMUMMINIIMMIIMM
triii mmmomm•••••••=mummommommummommmmusummummminimmommumminiumoimmummensommiummimmiummi
crecnimunummummmmimsummummommommummominiimommuummimmimumummumumummummimmomminummummimmiim
trir m••••■•••••=muommmmimommommummommoniememimmisimmimmommommimmommusimmomonamiismismommemmumm
aais nmmmoouomnummmmmmmmmommummoimmmmmummmummmmimmsimnmmmmvsmmmmmmmmmmim
cras omismommusimmommimmuommummumm•••••••rnimmommoismimusimmiimemiimummuswinomminuessimmoinn
DC MOW
MM 413CW
.0.4-7011 .4
64 , 14.4
W. 1011 4•4
141 MOW
SO 1 MOW
(Ml- 700 33.04
1413-4
OM IS
144-17
LHS
114-11
I. IS
11.00-14
14111-1/
14411
44-11
1.10
144 11
14331.
1.7
1•4•
1441
1.•
144 1
I. 7
041
041
COO
licl .101.10, 4.
M.101.7004
Structure
Chainage 21&§2aRet!R.q.ailliiiii
ii§liiii$1$11
Structure
131C 01 700•11TOO 4
11( U0 TO IMO WO FACW
OW
OW
1.-I
144.7
.111
1144
Itat $
1.•
114-7
0•13-•
1.4
14110
1.11
ion 17
On 31
1•4 It
44 1413 Is
X 11413
CC 11411
1. la
1134 it
1.-100 MOW
SO 1144
06- (MOW
14-Id MOW
MO - 1/44
.0.1-1003 1.1.
MM-MOW
K - MOW
(Kg (OP K
1014
K -) SA
Kt -100K
04. 4
Otc ICI
PO,.
S
S
e
S
0
•
S
4
4
•
S
imp
Annexure-VII
ter
S
•
4
6
6List for Shifting of Tube Wells in G.T Road NH-2
._— Location
Block Panchayat Village
• S.N.
5
_1 2 3 4
4 1 Bagrunara Maheshpur I Bardar Budhan Mahato
4 2 Baghmara Maheshpur I Jarmunai Abni Kumar Agrawal
_ 3 Baghmara Maheshpur I Karnpura Lakhan Mahato
4 Baghmara Maheshpur I Karnpura Suresh Prasad
_ 5 Baghmara Maheshpur I Karnpura Prakash Gupta
6 Bazhmara Maheshpur I Karnpura Pawan Gupta
_ 7 Baghmara Ivlaheshpur I Karnpura Ganesh Kumhar
8 Baghmara Dalludih Dalludih Maa Kali Taukij
9 Baghmara Bag,daha Barwadih Forest Office
10 Baghmara Bagdaha Barwadih Sitar= Mahato
11 Baghmara Dalludih Barwadih janki Mahato
12 Baghmara Govindadih Domanpur Study Centre
13 Baghmara Govindadih Domanpur Durga Mahato
14 Baghmara Govindadih Domanpur Girish Mahato
15 Baghmara Govindadih Domanpur Shanichar Mahato
16 Baghmara Govindadih Domanpur Kishto Mahato
17 Topchanchi Pawapur Amalkhori Durga Prasad Bhathuri
18 Topchanchi Pawapur Amalkhori Laxmi Narayan Saw
19 Topchanchi Pawapur Amalkhori Nakul Prasad
20 Topchanchi Pawapur Amalkhori Mahabir Mandir
4 21 Topchanchi Pawapur Amalkhori Janak Prasad Bhathuri
22 Topchanchi Pawapur Amalkhori Chhotan Prasad Bhathuri
23 Topchanchi Pawapur Kalyanpur Md. Idrish
24 Topchanchi Pawapur Kalyanpur Ashok Mahato
25 Topchanchi Pawapur Kalyanpur Chamari Mahato
4
26 Topchanchi Pawapur Kalyanpur Rambalak Bhagat
27 Topchanchi Pawapur Singhdih Tilak Chand Mahato
4 28 Topchanchi Pawapur Satkira Jagcshwar Mahato
29 Topchanchi Pawapur Pawapur Shiv Lal Manjhi
4 30 Topchanchi Pawapur Pawapur Shekh Rustain
S 31 To chanchi Pawa • ur Pawa ur M.S. Pawa•ur
32 Topchanchi Dumdumi Bhawardaha Pokhan Ram
6 33 Topchanchi Topchanchi Topchanchi Aganbari Kendra
34 Topchanchi Topchanchi Topchanchi Bhim Vishwakarma
35 Topchanchi Topchanchi Topchanchi Yadav Sampa Hotal
36 Topchanchi Topchanchi Topchanchi Jaedish Saw
37 fopchanchi Topchanchi Topchanchi Hari Mandir
38 Topchanchi Topchanchi Topchanchi Asha Devi
39 Topchanchi Topchanchi Topchanchi Balika Madhya Vidhvalay
40 Topchanchi Topchanchi Topchanchi Kay-um Ansari
6 41 Topchanchi Topchanchi Topchanchi Naresh Das
42 Topchanchi Topchanchi Topchanchi Tarak Nath Bose
4
k
3 4 5
4 s'‘
J.E S.D.01 54' r Execu ewer
liaghmara D.W & S Div No-2, Dhanbad
4
4
4
4
4
16.
4
4
tip
Details of Other Hindrance
Annexure-VIII
lir
Imp Project:- Six laning of Khairatunda-Barwa Adda of NI1-02 from Km. 360.300 to Km. 400.132 section on 11ybrid Annuity Mode in the state of Tharkhand under
NHDP Phase-V
11P (RI-IS)
148)01, for non handing of NON /
of Obstructions if any (land issue.
Chainagt Area
Width of 1 •nd 0, telephone !toe. religious structure.
Total Available Land .
TCS to be required for other% SI1,411.11,S Mt.) Land owner/
sr So Length PRO% width of handed Remarks Photographs
adopted construction a Agency. \ dlage
CUM Land over
per TCS
From To 17 ,,,,, On3r
2, om
, / Tree Utility Structure
Struct
ruore
' mIlla
A
3;0.,
2 360+770 160./320 0(3 la 00 orb 1945(1 1751x1 625 Boundary • How Kluuratunda
lop
1 .
!If •
Oil
'
-,...
4 360+900 360+910 10 - limbo 27 50 17 500 125 03+11 Khaustunda
.1....-
.,- .
4> •
....1
• ••
IIP /a
•
.Q3::•:..410111/
v.txpoix
t
7 361+120 361+130 10 2 ,t, 000 27 50 17'00 1.7 0 I hark A halratunda
11/
41411'
4 361+550 36(0700 ISO 2 30 oat 27 00 17000 1305 Hotel, Shop. Home Khauatunda
low
''''......
"
• ut4,711 ..,..,. 4,14•
t.
:
:01On f,:t lloundan Wall For
9 361+700 361+750 50 27 50 17 i0t) 13; hatratunda
11,v1, gnd Office
IIP
Page 1 of 30
(1111P Project:- Six laning of Khairatunda-Barwa Adda of NII-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of iharkhand under
NI1DP Phase-V
300 (RHS)
Reason for non handing of RON .
aria of ObstructIons dany (land issue,
(ha nag 35 tdfit of 1 and
Total - AY allanIr Land not '545'09^,h.r. 0)10005 structure,
TCS to be requtred for othrn structures rtc / Land mane,
SLAo. Length PROW width of h•ntkd Remarks Photographs
adopted construction, as Arency. 1, 'liar
min Land Orel.
per'ICS
From To ho Salm/ Tree Utility Structure
c.
-...ai
lk ..., Ailk
tO1 -.
SIIIIII: I* '-46,--,
361-700 361)00 70 30 000 27 50 19 1631 714
/low Boundary
Ahatratonda tr ,. 4,
,.......... 6 ..„. • Wird^
• itriii0%!,
10
Nall
IP - 106.2.2- •-•`6-.......116
% •
•
lif
Il ',0:'.01.01 162.140 60 .-... I A 30 000 10 7(3) 20 100 594 Pcool Pump Khanatunda ...421r461;j1/116.1 1"11.
141
Mir------.--
-- .,
'6.
0 1
W- ...
12 3620 140 362+100 10 ' 100H10 27 00 220(0) 80 Holt' khatralonda
Mr
ill' .
I.
. _
, -r-
--miPimi ..
11 3625150 362+180 30 3)/000 270o 19.00) 330 Lord Problem Khan (Honda
'1'
'' ''.4. '
41
t tY %.-. 4. *5 •
t --
41
imp
rea 'trig
10 l() 000 160 .-
in'
15 362+420 362+440 20 26 200 22 (XN) Horne . lIosnta1 Khairatunda • Mt
.
vir
. )7".•
..:511a:::213
-r S..- - • j _.---1—,
',,
., . ---. r vitr.: „).,..
7:1.-7
00 100 it, .-
17 362+490 3620000 10 10 :6 ''.» 22 NMI %II 11.11 Italutunda
.lie •.4%ftill
'ar- —r. '-Cf,.,..;,:-.'--
.,
. .
16 362+550 162.4,96 14/1 10 10 i9p 26 250 22 000 1 120 Pt .1+ c ',Won B41.11,c +13
e ..
fir
ler
P,e20130
OOP
111, Project:- Six laning of Khairatunda-I3arwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NIIDP Phase-V
tip (RHS)
Reason for non handing of HON
Area of Obstructions tf tins tland issue.
(hainage W idth of 1.and
1 total Mailable Land not telephone line, religious structure.
1(Sto be required for others strorlures etc.) Land owner/ Photographs
Sr No. 1 ength PROW width of handed Remarks
adopted construction/ as Agency. Village
mtrs Lend over
per T(S
From To lit,Sqtn1 Tree Utility Structure
. .er
ler
10 30 00 240 Ilalutunda A. s. .
19 362.670 362.700 10 26 250 22.000 114)mc 'Shop
- a —
• .
,44028'1:0. _
•
•
_ ..,. .".1‘.
20 362+760 362.800 40 10 100.1 26 2 q) 220W 120 ilorw hr.at unia
11
' ......--.--
•.
...1.*-.1
.......?;;
. . ...... .'.sto
.. -7.-:
';.: s '
IP
U I
40 lo (00 1211 H014131\ W all .3 3 .S. "/ • -
2 16:.x00 362.920 11 26 250 2_000 lam atunda
I loinc • t
*'...:41. i
...
. - ...
c... ..I. ' ,
21 162+990 363+020 it, 10 10 NM 26 250 22 000 210 thtmc larssatunda . 1gt i.. 4haw
.
ver
• •
'• ••• -.
t
• •
. .
•
• -CU.
.I''''
• .-4.16.-toweimiiitf":.!**1
-i.- -ns.
:
; "".------ .:rg1144,e1111,t
• 26 363.580 363.600 20 14 -0,11.10 10 450 17 5)(I s,r 1 and Problcm PO! Ars a
ptiOielhive*
:
Fr:•••-
-r Wave
... iiisabat."-.low'
fir.
, •
'A
s 7.30
1_ -...• . . •
27 161.760 363+770 10 X III oloi) 30100) .251%1 7) )1010e 1.0Iam a
%Br
fib
Page 3 of 30
IMP Project:- Six laning of Khairatunda-Barvia Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Tharkhand under
NHDP Phase-V
(RHS)
Reason for non handing of RIM
Aroo of Obstructions if any I land issue.
(Tannage V) idth of Land
‘ Mailable Land not
tekphone line. religious structure,
-IOW Land owner/
TCS to be others structures etc.) Remarks Photographs
Sr No Length PROW r'qui'd 'r width of handed
adopted construction/ as Agency. Village
mfrs Land OVrr
per TCS
From To On Sfam) Tree Utility Structure
.....
-1..4.1ak
,...
AP' .• l"'"
_ .,,,,;,-k .
29 364+030 364+040 10 a ) 1000) 22 0X0 7< Well t 'parnagat .
2.S. <to .•-02r
i art •
. , ....
3I 364-000 (6i-304) 20 0 301)00 3 01000) 13(X4) 140 Borne Uparnagar
ritIM
.., ...
,
1 Market Arca •
34 364+200 364+280 110 30 000 IX 900 17 0110 1040 Uparnagat
Ilene-Hotel
A ;.+l-f-y-w+iry. *, -. -:
:••
' — 1_
. .
. .— , .. t
, • +l''' 8e7
35 364+240 364+240 I01 I 30 (+0) 1 0 950 lb 000 100 Hand Pump I. 1parnapi 1 l
'
....a.
?..::-...e
INF
33, .4.4.4.40 464.4,70 10 4 3nnru 10430 22 4. I and Problem Elora, a
IIP
Ps,. 4 of 50
IP Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NI IDP Phase-V
(RHS)
Reason for non handing of /1051 /
Area of Obstructions if any (land issue.
cha'nage
Total Vs 001, .1.1.••,1 ,,,a,". Land no, tekphone line. rally., structure.
TCS to be required f or others structures elf.) Land owner/
SrTao. Length PROW width of handed narks Photographs
adopted construction. as Agency. Village
min Land over
per TCS
From To 111, S•100 Tree l Wits Structure
- .
...... .
T
37 164.730 164.750 20 4 31 500 2%450 21 000 170 I i I
Land Problem P.-8'5 3
OF
..--
.
41,
ilP
.071
38 364 710 361+740 10 4 31 04i 20450 :2 5(a) Via Kean.
408
- - a)
....-.-....-,
• ' I
39 364 750 364+760 10 4 31 MO) 28 450 22.(881 vS 11011)(- Porar a
ADP
....-
40 364+760 364 760 20 4 11 5 10 28 4541 23 5(*) 1141 14,1 Noblon Porno I. k___ . _
-• ' 12.,
_,-,),. 11.111MIPIP-
. _
11,8...."8. 76/-
.. L, ... .
..... .. _..,
4NP ..,..,:w.
-. ..,..„.....,..7
..............44444
41 165• I%0 161 7( ) 20 4 115(0)2% 450 -) , 5( / Home Poratv a
•
. s.
1'.
Ver
•kl
sr '.-_ 1
1:nrt1,
.........._
i'lleate _ illi
...
• ':IPaiti
'..' ..........s..;::::
' . .•.
top
Page 5 of 30
Project:- Six laning of Khairatunda-Barwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NtIDP Phase-V
• (RHS)
Reason for non handing of WA%
• sr No
Thu nage
Taal
Length
TCS to hr
adopted
PROW
0. idth of Land
required for
construction/ as
11% mist*
width of
A„, of
Land not
handed
Obstructions if ant (land issue.
telephone line. Avon. structure.
office. strut- tures etc .I Land owner/
Agency, Village
Remarks Phologr mph.
min Land OVee
per TCS
From To 9.3 )
0% !•, Tree Utilit, Structure
46 •1.6•130 3 (A, -04(1 570 300)0 30 000 21 500 4175 Petrol Pump Ficthuar
• MIL r.—..40.-
-
r
ll
VIP
1PP
"_ :• .01.01s..-46+ '...
,
:
l
fill=
INF Merle • Hounds,
49 366.100 366.900 70 X 30.000 22 000 lea, fiethuar
Vial]
41/
ter
PlIr.....•
"• 4 .4
• 49 367.000 367+100 100 I 011.X1 1%950 17 500 1250 Home Pusaditi 1/..... sre•--.
•
IMP
•
• 1...jahr
• k
1*-
-- '
;;Iie f
. irrill'.:4417
;
1011.
• c., e"....st...
'''- ile..i...
r.
,, . ;...!. •
•
• Home • Isnd
•
54 367+610 367+630 20 4 300X1 1%450 22 500 150 Shankardih
Prot.km
•
ASP
Page 6 el 30
IMP
b Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of.lharkhand under
NI1DP Phase-V
(RHS)
Reason for non handing of ROVr 1
.,,,. of Obstructions if ans lland issue.
Chain•ge N 1444 A of Land
Land not telephone hoe. religious structure.
TOIal Asailable
1CS to he required for others 0 Iot tures et c/ Land (inner]
Selso. Length PROM width of handed Remarks Photographs
adopted construction/ as Agency, Village
intrs Land over
per TCS
From To lin (Sc101/
,0 Tree llility Structure
a• .
-...-ii:'. .
Sr 367.720 367.740 20 4 2 0(60 2%450 11 000 180 Ihinic Shankarchh
......... ,
., _ i.,..... -
I—
i ..
.. .., •
i.--
11
60 368+000 368+020 20 4 30(X10 28 450 21 000 180 School Shinikardth
r Ir
— •• A
rd 368.050 368. 1411 00 4 10 000 ?%4 4 11 21.000 t110 I loose Shankaishh • 4.*
IMP
..'`...•-.;*j
f --t, 4...
,,O
, ._ 4,-"it
62 360+050 360+060 10 4 301X)0 20 4 10 21 500 5 IA el) Shank.irdih - 106--.
, ..- •
sli..4
ii,.•
lagialtelim.
r4Isi ' ' • I. " "'"
',"-- * ' , -,
40:
1.1 360•240 11.0•200 40 1i 10 000 24 2 10 22 )00, 12), Ilonw Shankarshh 71
air
IMP
Pate 7 of 30
1110 Project:- Six laning of Khairatunda-Barwa Adda of NI1-02 from Km. 360.300 to Km. 400.132 section on I lybrid Annuity Mode in the state of iharkhand under
NHDP Phase-V
(RHS)
Reason for non halnItna of HON%
Area of Obstructions if Ins (land Mlle.
(lsainage 55 idth of fond As .d.m.
Land no, telephone brse. religtous structure.
i(Mai
TVS to be relrulr“1 for others structure, cr.) Land owner/ Yhotograp.
Sr.No I ength PROW ..01111 of handed Remarks
adopted constructor.' . Agency, Village
min Land over
per TCS
From To (in Sq.) Tret Utility Structure
ottiliKias
113
•
64 3684280 3604360 /10 II 300610 24 250 22 000 61/0 land ProNcm Shankardth
stew
Of vrik ..
.r
.• l'ia:V4:;/ 4talli 4._;
'"I
:...;71/..- _ _t--4:
IMP IPI
CIIIIIIIMI "."11'
61, 3614 ,-0%0 ;00.600 20 II ;0(00 2_42,0 2;a0 140 Motnc . (I ell Shanlorddl
law ,, -. !alkaa
C;
'' 7.4.7..L
t'.f4.%'. ill
a:
i v.p
.'
01.
68 368+640 368+648 ON II 301/0 2425(1 21 SOO hi( Had Pump Shankardth
lap
69 368•860 363+890 30 11 30 000 14 250 21 ,00 2, Land Probkrn Shank...ill
mac_
a
%IP
70 360.001 3003'8.() 711 11 30 00 24 250 22 000 9,0 Ili04100, & `,11p Shankardth ..u. 'V #7-.....7.7.11:,,,,.
.b.
10.011.0
7 . .1. 'Ir
/44.
. 1 iii6. M
... .
11117 1:...
w .1.- C.:..-4.4%
71 368+960 3611.980 20 II 30100 24250 :, :00 130 Ilinldiny. ShanLvdih .16,.... iiii
-.3 I
41,
♦ .7 • ..
.? 40
)‘'..4. 4 1. *
4
-..:„.
72 168,000 300• 100 1110 14 30 000 104 ,(1 10 000 :070 1 and Pr0blen, 'shankarddl
''''
,8/1
.0....-,:•.41
. 4,
,, t• ....-
:-
, ''.: a. .'T ' .` - • —
_
ex rt.-..•1.,
"-'I.•7 ..--- ,:-
t' • - - •
SON
P.g e e of 30
gar
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Reason for non handing of ROW /
( "hainage Area of Obstructions if any °and issue.
Width or Load telephone line. religious structure.
SI, Taal .Asada of Land not Land owner.'
UN to be required for ocher,strut lure, dal Remarks Photographs
sr So 1.entit. PROW width of handed
adopted constructs.' as Agency. S Maga
Int rs Land o‘er
per TCS
From To 11. S9.1 Tree Utility Structure
..' ..1'..-1
.... •4 .. I 4 •— .
At4or-r...; ..
Bum., .• Boundary i. '1‘4,
73 369+060 369+250 190 14 30 000 19 450 19001) :090 Walls Land Amalkhun t. •
.*".1111:11 71
......._
..7 •• ...;;):
Problem
. ...j' ..,..-.. .
_ .. .• .,..., ,
.. ....4:th
SD'
74 369+320 369+340 20 0 305%%1 1071%) 22 500 1 ,0 110,10•1.k, • Shop Anialkhull .-n' -ti ' ........X.Sal
.
• --, re'
' ••
44. Se . ' • i•
---.. —- . • V . .
• . h..' • -;•,17, l'-
IR ' •
„. ... t_ . ••• . _ •
iZemo,pet
4. 76 369+660 369+760 100 30 000 10 700 24 000 1100
hoillalari. • Pc001
Pu1p
Kabanpur
E1.
''416."Saikaum..1...samsatr
-* g?
77 360+1160 369+920 110 14 214 500 19 450 18 700 500 Building & Well Kok anpur Sri
r 3. r ° 14
' i#
. ., , 4,
Ole
-1011 . ... . 4.
78 369+970 369+980 10 14 28.9(0 19 450 17 5011 110 lions Kalyanpur •, • Mx. SA I
.i.... _
... - - ' A.
—VS
plidliba ,..,...•-, sc .
,...... . 0,14se
. - ... '
- --.- - , •
79 370+560 370+580 20 11 30 000 24 250 19 000 '220 l_and Problcrn lialanpur 0- , ',..
' , • . 4{ ,` ..
!.....,
_ , ..... • .....
war -, ...Num,'
4144.11i•larr
00 170 •oiXli 370.740 101N%1 720 lioundar• Wall'
60 11 30 000 24 250 Kalsanpur ,..
I tvc
_.--
41rse.
' • 0.% 1,
.AV AFNLOilii:1 -...,--.....- .
Date 9 01 30
Project:- Six laning of Khairatunda-Barwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
lir (RHS)
Reason for non handing of HON /
Area or Obstructions 0 any (land issue.
Chainage Width of Land
Asailable Land not telephone line, religious strum re.
total Land owner/
ICS tot. required for others structures etc.) Phototraphs
Sr No. lArngth PROM width of handed Remarks
adopted construction' as Agency. Village
ants Land o‘er
per TCS
From To 3 i.) Ilx,,S
. t4.3 / Tree 1:tilit) Structure
NIP 218
•'
II*
Air
'7........,..
rao
83 372+150 372.240 90 14 25.500 1"4 50 IX X... ,,-,,, Horne P, op. .. 7 , I.%
,•-r,
,
' -.0- • t
IIP
94 3720240 372.760 20 14 255(X) 10.00 1410X1 1111 lran.t00110 P:0‘ ;spur j .._,..—..!
E60, 11
...
::'
t...56 :,
JP
---,
..." t
- p.
IP ,..
.::...kttir,11._.!,-..—
. .f
pli
05 372+240 372+300 60 14 25 500 19 450 IX 5(10 4:0 Petrol Pump Pau spur ,
. -.se es.771Elktiat.k
b
ee
'S s/ Imo:
._
.._,
06 372.300 372 ,360 1/0 5 25 500 26 1050 24 000 00 Middle School (k, Panapur 11 _
3* Wir'r
. r
g .
4 -: • .
—
s-
1 . . {1,
87 372.360 372.380 20 i 7, 000 26 050 24 100) 120 Old Kane Pax. aftur •
'41 . • .
i lit
-
• .• r .•
..r
? .
b"..111.4•
, \
. 4 , ..,.. 1...,..
•0,,....1' .
. .....
L .
:17 .,,...•..
. i 4:4̀I
net.C.°;,•31
Il
1 I
IIP • -
. cAlg.
_ .
90 373+780 373+800 20 II 31 9/0 24 250 22 qx/ PO Kane 104,0sardaha :!5•-
..-
'''
' -4;44i '.5•41ili.o., ''-' ...- - -, ..
;.:• 5 _
IIP
Page 10 o)30
IMP
411P
to Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RliS)
Reason for non handing of ROW /
Are.of Obs• actions if an!, (land issue,
Chainage Width. of Land
Total Available ,..,no, telephone line. religious structure,
TCS to he for others structures etc.) Land owner/
Sr No 1 ength PROW "qu'r'd width of handed Rem•rks Photographs
adopted as
construction/ Agency. Village
mt rs Land Well
per TCS
From To On Sim) Tree Utility Structure
ir•
as
.4.
sta•Saa. j 1.0
6 91 373.090 373 tMxl 10 11 31 510) 24 2511 2271x1 10( Hounds() Wall [Mass ardaha
e
....
...
4
4
92 374.114 5 975 • 140 1095 11 31 500 24 250 22 500 91555 1.and Problem Blussardaha
... t-
. , , •,:t
..-.40.
Home + lend fI
gjf lilg; a0 .+`
95 324 ,250 374.350 (00 II 26 00 24 25 0 22 000 40 0 Mao ardaha
Problem
46 = ....- . •-•
...
-. . . „ .
k I ....
ear
- •
96 3741325 374.335 10 11 2610/0 N 250 21 500 45 House Budding Rhantodaha ".,
*E".-;.. ,
,
•
97 174-325 374405 00 II 2610x1 24 250 21 000 .40.0 Land Problem Blum ardaha
tap
1100011111re*At7- '._,,,
98 374+350 374+400 50 11 22, 100 24 250 21 100 250 I and Problem Man ardaha
46
r
.
H
VO
.
b 1
MR .
99 374+400 374+420 20 II _2 1.1x111 24 250 22 OW KO Home + Hotel 11h,anard,tha
... -
4
\ \ \s
4
Page 11 of 30
4
Project:- Six laning of Khairatunda-Bank a Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Tharkhand under
NI1DP Phase-V
(RHS)
Beason for non handing of ROW /
,„,„. of Obstructions if aii (land issue.
Cla nape Width of land
, Available Land not telephone line. religious structure,
Total
TO: to br others structures etc.) Land owner/
tir No Length PRONV "q"i"d '''' width of handed Remarks l'hotr(graphs
adopted constructio as Agency, Village
min Land Over
per TCS
From To I io Scion) Tree [Alla) Structure
100 374-.405 374.425 20 11 20 00) 24 250 2214x1 so Muse Building BM. ardoha
INS
leo
...1111.
4IP
.4. _
air • I
lit I
102 374+440 374+460 20 i1 2e, ,,o,, 24 250 2,, (1,,, 110 Shan ardahs inisisie .
1hirel
...... If a
s osSI - -
u: s,,
,,,,
Ja
404
.....
_Ier
':
.- _
104 374+480 374+500 20 II 26 000 24 250 21 1001 loo Shop Bhawardaha
- ....
IMP -...
. .
•-•':=4-5.41,,r.A. ......2.-_--.:----
-‘,1.-i6,-
' 16 ..:-***'
77.144,;,,,, . 7..„,,,,.. • *** - -_
--ke---- -4.-
106 374+520 374+720 200 II 21, OW 24 250 21000 1000 Tice • Tani Man akiah3
107 374+720 374.800 $0 II 26 000 24 250 _ 2 510) 200 land P1,41,111 BF., ardaha
100 574.000 175•1.1 200 II 26 000 .1'1 250 21 010, io., I and Priibli-m Tnpchanchi
INF
Page 12 0130
1111 Project:- Six taxiing of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RIB)
Reason for non handing of ROW /
Aeon of Obstructions 'fan) (land issue,
('tainage
Width of Land telephone line. religious structure.
Total Available Land not
1CS to be for others structures etc.) Land owner/
Sr No Length PROW """" width of handed Remarks Photographs
adopted construction/ as Agency. Village
mfrs Land over
per ICS
From To (in Sqm) Tree Ctility Structure
at .
...a
.....48.4=a. 4,-4.-48
91 373+090 373+900 10 II 31 300 24 230 22 700 XX Bouladara Wall Ohaoardaha
92 374.543 373 •140 1093 11 31 505 24 150 22 500 9055 Land Problem Bhaoardaha
110
41.
it
1.1 o..
'
kil ..
.... • /-
Homc • Land
. ,-• ''''' ime.41P..4.1i. -IP -+-:'Y
93 374+280 374+350 100 II .6 1 24 250 22 000 4,x, Bhaoardaha
Pf oble111 *?*1 * •-•,1- . -
... .e
,...
• 11., ..
4
_‘_* • . -
4 97 374+325 374+405 00 II 26 000 24.250 21 000 400 Land Problem Ohm, ardaha
46
4
_ 1
_ _ ,_,
98 374+350 374n400 50 II 26 000 24 230 21 OW 250 L and Problem Bluoardalia
4
•••• t
xt • *
4 H
•
t
i
- -
99 374+400 374+420 20 II 2e111111 24 230 22 too xi, !ionic • I lord lihaoardahn it- •
tx
0'
Page II of 30
11.
Project:- Six laning of Khairatunda-Barwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on I Ivhrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
6 (RHS)
Reason for non handing of ROW /
Chainage Area or Obstructions if any (land issue,
4IP Total Width of Land mniinbk. Land not telephone line. religious structure.
ICS to be for others structure, etc./ Land owner/
Sr No Length PROW required width of handed Remarks Photographs
adopted construction/ as Agency, Village
mfrs Land over
per TCS
From To (in Sqm/ Tree Utility Structure
4IP
100 3740405 3740425 20 I1 26,+31 24 250 22 000 00 lions.: Binkhng Mao ardaha
:54113.7
sr. 55.e.055.0,
c r _
lug 374-140 374.460 2u II 26 000 24 250 205(X) 110 Hotel 13hao ardaha
JJ JJ •
0 a , it
.._
-N-„, ...1,J."'1;•
_-. ..
vo
....e
103 174.460 374-401) 20 II 260(10 24 250 1', 5(10 130 Hotel Blum ardaha '
boa
es 3
Ns ,.., • 7
.....$12g-
-
-ff
5
104 374.4%0 374+500 20 II 26_(0)0 2425(1 21 000 100 Shop Mao ardaha .-, 5.
....'
'',117Aer
.,,,,
105 374+500 374+520 20 II 2600(1 24.250 22 000 80 Land Problem Bhawardaha
...... ,
..4" ese. .)4.11.44..7),.
NI.F.4.-: •-.4'; wt..t.1) -)14 '
:
4 sr
yr, ,,...,:('=,7% .
.4.4;•;.- 7:174.:-
4 106 374+520 374+720 200 II 26 000 24 7.50 21 (+01 1(050 !roc - land Hs, al -5 - ---
air-.r...-
:
4
107 374+720 374+800 80 11 26.000 24.250 22 50) 200 Land Problem lih.o5 ardaha
4
6
MN 374 - 000 375.0. 21. II 215500 21 250 21 500 IOW land Problem Topchancht
'IP
Page 12 of 30
•
• Project:- Six laning of Khairatunda-13arwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NI1DP Phase-V
• (RHS)
Reason for non handing of RON I
Obstructions if ans (land issue.
Cliainage Area of
Width of Land telephone line. religious structure.
Total Mailable Land not
TCS to be required for . others structures el c.) Land minter/
Sr No I rngth PROW bidth of handed Remarks Photographs
adopted construction/ as Agents. Village
min Land
L over
per TCS
Front To lin SqrrO Tree Utility Structure
109 375+000 375+030 30 11 20 000 24 250 22(00) 105 Land Problcm Topohoochi
S
1
S
41 at
110 375+030 375+045 IS 11 2i 500 24 2 ,0 22. 700 42 !louse BuildIng lopchanchs 4-..,:..103- .
6 .
it) ° i -f—afilt
47,78
1 1,:i, ,..
S
I11 375+170 375+280 110 II 25 500 24 250 22 000 IX( I and Problem roptimn41. .----7
...."...
*,..., .4yi .• ... .
S
S 112 375+280 375+285 00 II 25 500 24 250 22. 200 17 llouse BuddIng I opchancht
4 ...Ore' •
t* •••
la
....- 1111011 I •
S
S N*.
..
114 4411 ?75+510 70 II 25 500 24 250 22 000 184 Petrol Pump lIp lopchanchi . F. y- • ....* L.:i ..;.11
.., 4
Ilk J
S e °
+
.4r^-' -
IMP 115 375+510 375+535 2, II 2 5 500 24 250 22 WO 65 Ilut Top.hancht
Jr-C.' P— •
(41,..sthP` .01110• 46 •
S
we,
116 375+595 375+605 10 11 25 500 24 250 22 000 5 l0)ots-.411 ropchancht
S
• -. .
4 , ._ ...
•
S
,..____
-'"ik . r.i 3 405%, \•.1. t '
375+605 375+620 10 II 25.500 24 250 22 500 V) ell Topsham.).
e' -' A l
117 4i
re.,..-./z-z=- A. --•
' t .._.0.
S
•
S
Page 13 0130
tIP ['Rued - SIXlaning of Khairatunda-Bam a Adda of N11-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
• (RIFIS)
Reason for non handing of 11(1W /
• 9090.
°Waage
total
Length
TCS to be
PROW
W idth
of Land
required for
Mailable
width of
Area of
I.and not
handed
Obstructions if an (land issue.
telephone line, religious structure,
others It Delores etc.) Land owner/
Remarks Photographs
adopted construction/ as Agency. % illage
nth, Land over
6 Fran To
per TCS
Ro S960 Tree Utility Structure
6
6 1 It 375+695 375+700 05 II 24. 250 22.000 IX House Builchng topchanchi
6 _ :* ...., -
.11
• • t
Hospnal Bounders
119 375+710 375+805 •+5 11 25.300 24 250 19000 610 Tope hone hi
\Sall • .c-
k
• 120 375+1140 375+885 45 II 25.500 24.250 21.000 203 Shop lops hanthi
lit . ... /...e. ...,
• J. Li,.
li..,...-
.44;-;-- e
R—.
-.. ' 47,:,,t,
(' A.'
I, to
6
,N,,, HOUSC
6 121 375+935 375+945 l0 11 25.500 24 2 00 2j+00+ 35
Budding
Toixtuinch• ..• ,x. •
t
6 gfu'ilMIIINltINNMMMMIMIIMIMIIIIIIII
• Bank it Police
.4 4far.. \ 4/9
..„ ,..
M.
7•1!.,
„„: ...ls
122 376+070 376+125 5 11 25,00 24 200 2241X1 171 lopallan)111 .'' , , -.1 ,,,f,
compo.ki air
6 AI,,
is
ISO
.
. ,.
6 ...
.... •
,, •
r.
1 ,7 1 176•1” ;70.•ir, II 25.500 24.250 21 '+1,, 124 Bank & BuddIng T Lis. Is.ux hi
/art 11-'6 iNi .. -
i , , I
6 Li • mlw............
.
us.
(mo ..%4'
t
.
6 ...._
I i ire
•
q
124 3764705 376+220 15 11 26.500 24 200 221x10 1,14 House "I •p, ham. h•
13"rtA
• .
,
. • ... •
.4 4....": •
6 44 il?!4.1,.,4.
P,d (onto
Con
..„.:.%
125 376.375 376•47)) .• 4 26.500 28.450 23.000 331 fop. 00m. hi ' ts.try
• i
■
Nall
S •.-*itr IP•
.....
.. .
S ;gat '.-. -,...44.
./.-...,...
6
126 776.470 576.480 10 4 26 500 20 400 21 too 10 How< 110•1,1.ng T•ix ham ht
6 Ili"IIIIIIII
•
•
Page 14 of 30
lir
l'roject:- Six laning of Khairatunda-Barwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on 11hrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Hasson for non handing of ROW /
Area of Obstructions if ans (land issue.
Clusinage Width of Land
Iota! Asadable Land not telephone lint. religious structure.
TCS to tse rrquiret1 for others st ruc t ure- do.1 Land owner/
Sr.'s°. Length PROW *Kith of ha nded Remarks Photographs
adopted con st madam as Agency. Village
RHO Land 1,,ff
per TCS
Fran To I.r. 0SO:1 Tree [14,1, Structure
*
. ."• 0' -4.,_ . , • • v ,. ,
ie ..1.,,,, . , ,1 01 .. ,
M. it
, ;,,,iff
- . - -4-, .
...-1.
;,,,;',..' .
129 176-820 (76•914) 00 2 ,, 0 00 214 450 24 00 200
13,11,Khe ',..., a
s...,1 BA/AI
I opt hanchl ' 1 I. 44
H
t. it
'14 '.'.
130 377.060 377+120 60 4 42 500 28 450 23 500 1140 Land Probkm Chitarput
4IP
r Is
131 377.170 377.100 10 4 4251q 20 450 210(0) I'M liouu Hu ilthng Chliorpur ....._
11
V .......
:i•
.4 ice. imp
4:
.. ...,„ , .. I
...,1
.
133 377+590 377.600 10 4 27 000 2%450 23 050 32 (louse Buildtng Chaarpur ... 6
lia
pagak . '
f. ,
, . ....
-7.•
i— ,.. .t.,.."'W"..:e.'
Ile
1.1
Page 75 of 30
4
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NI1DP Phase-V
(RHS)
Reason for non handing of ROW /
Chainage Area of Obstructions if any (land issue.
Width of Land A‘ Land not telephone line, religious structure.
Total Av ailable
Sr So
lx,,,,,h TCS in he moNs regnired for others structures etc.) Land owner/
width of handed Remarks Photographs
adopted construction/ as Agency. Village
mtrs Ld
.an over
per TCS
From To (in Sqm) Tree Utility Structure
4i
.
w ww 7
11w.. .,
;‘,1
•
0W
aw
,717* 711.44,E4C7 . .....
130 377 , 760 3774770 10 4 30 000 28 450 24.000 00 House BuildIng Clularpur
lir -• , rPr 1,..!- rat.'
-"`
.
1,11; •
k:,̀ ..4-ii•' -
6
137 377+800 378+050 230 4 301(00 28 450 23 500 1025 Land Problem Chnarpur
4
I
..r. .
.4.
Ana*
138 378+340 378+370 30 4 30.000 20 430 24100. 180 Land Problem Sahubalmar
4
es 4,
,,
•4...i.
4 139 :784480 370.490 10 4 28 000 20 430 23 000 30 Well Sahnhahwar ztart,A, r....4%.4.6,.....„.
—
111 .._
4
*,
:•e: . irket . w.....
4
!O II,, ,
140 379+130 379.170 40 I 30)08) (8 950 181X10 400 Sch,x,I Butkfing Sahubalmar
141 379+170 379+240 70 I 301100 10 950 181X8) 040 Pcnol Pump Wall Sahubahnar
4 - r
4 I $3. - i
142 379+260 379+270 10 30000 1X950 17 000 123 Well Sahubahiyar
11.! .4 ' ".1111. ' -,
.. ., .....
- e
ier i i
.4.4...% f
311 Vat..
144 (81 ' 44, 301.470 7 30(X)11 :4450 22 300 5 0,0001 I xdaland
P01110t1
ti
Page 16 of 30
6
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NH DP Phase-V
4 (RHS)
Reason for non handing of ROW /
Obstructions if any timid issue.
6 Cbainage
Total
TCS to be
Width of Land
required for
Area of
Available Land not tek'Ph°" line. "NO"' gru"are'
others structures etc.) Land owner/
Sr No Length PROW th of handed Rtroorks Photographs
adopted construmion/ as Agency. Village
moo widan
L d over
per TCS
4 From To lin Sqm) Tree Utility Structure
4 '.'
4
-.s
_
Various -41/.*7- .
6 145 381+870 381+950 80 7 30000 34A50 22.000 640 Compound Wall Ledatand
Portion .$1,r ' ' i .
-, a
: 1 '. r.9,
r . ..IL - It
146 382+270 382+370 100 14 30.000 19.450 18.000 1200 House & Budding Belauust • --
4
...., '
6
4 147 382+385 382+430 45 14 27 000 19.450 18.400 387 len,k Bclatand
6
6
If li s
4
It
sO,
ts
149 382+570 382+590 20 4 39.51V 28.450 23. 500 320 House & BuildIng Bclatand
__,;. P '
'f4A
'''''' '
4 .:' .
e, itf
. 1. .
,:...::).-.„1 '-• ,
4
4
150 382+640 382+720 80 4 39.500 28.450 22.500 1360 I .and Prohlcm Kangsshh
4
.#.,,
.t,
r
151 382+720 382+860 140 4 35500 28.450 22.700 1792 Water Pond Kancsdth '1*
5
...,
.,,- -...,. ,
or 4,1(1?0,•, .1
4 "... -.7.'
. tr'
r -.
**
fhp .
tr
)t ' vb-tr-y
152 382.870 382+890 20 4 35.500 28.450 23.000 250 Hotel Kongsdill _ill
4
4
4'..
rf''.:;,. ..-
4
Page 37 of 30
4
Project:- Six laning of Khairatunda-Barwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of iharkhand under
NHDP Phase-V
(RI1S)
Reason for non handing of WAS /
A„.of Obstructions if any (land issue.
6 Sr No
Otainage
Total
I ength
1(0 to hr
PROW
Width of Land A‘.iiai,
"9"i"d
(or
Nitlih of
Land m),
handed
telephone line, religious structure.
others strum 0 re, etc.) Land owner/
Remarks Photographs
adopted construction/ as Agency. Village
nun Land over
per TCS
From To tin Sqm) Tree Utility Structure
4
I 4.3%fi
44..igt `+
‘...,:' cit.
6 154 303.0M0 3030970 310 II 30 IMO 24 250 22.000 2480 Land Problem K000ndth
i
fr
iltIca.
4
156 384+325 384+335 10 11 30 000 24 250 21 500 05 }louse Building Braharnandtha
6
4 157 384+350 384+360 10 II 30 000 24 2_50 22 000 00 Well Braharnandtha
6
Ai
6 159 3 04 ,000 304,-620 20 11 30 0)X) 24 250 22 500 150 House Butldtng Brahamandtha
6
4
6
—.........\—.—
....110,14.,..
7. . r
IC:
161 386+215 3800225 10 14 30010 19 4:0 21 5 00 05 . ,
Well Da. shanspahar
41 j
14W Nali
s •
_O•
ins :06.225 :8),-770 15 4 10 000 20 450 22 06))1 :i() House ElpolaIng Da,abanvallar 1 1:
. 4
,....„.-
..,2.-,....7.,„
Page 18 of 30
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Reason for non handing of 80Vs /
•
„,,,,+ 10 R7.
Indian Oil Petrol i.4 •
1,7 77!„770 706,440 70 4 10J0)0 2 1i 4i0 225(0) c Diu abanspahar
y
_
_ 0l , .iii
1,._. -..,,, ,..77„ 260 4 30000 20.450 23 000 1720 (
Pi','1) \leI
1,1 ))os abanspahar
1. w •••
• I
. ...
/Mt /
yu
166 388+000 388+100 100 14 27.0110 19 450 22.0101 500 1104,c 11011dIng Bhinuand
• III
--
4
.,- ,
h tl
giv:::
ris— —
,, :4
rat lu•Or
si re
'
167 388+100 388+115 15 4 27x10 2x450 22 000 75 Ileso, Building Blurni.uid
•404 st st
. •
t•
sr ',•-,
448rWr _
... 7
•
,
168 388+115 388+270 155 4 27 1x10 28.450 22.500 0100 House Building Bhinuasid
--,,-..
.... ,,,...0
.• 511
I
gir
4 169 388+270 388-025 255 4 27.000 28.450 23.000 1020 School Building Bhinuand
k .;:. ,
tip
,4;....-.
170 388+420 388+485 65 4 27 00 2 8 45 0 2:5111 228 Potful Pump Nki all Iihirniond
. ' '-- ' 4
4 till‘Me.'t'
.1191r
1 ^
Pli p,
•
171 ;79.4x5 100•40e to 4 27 000 204511 727,0 47 HOU,” Building MaNdshpur
14
• a 'v 4..”
.t.
.. •
•
el
Page 19 0130
foor Project:- Six laning of Khairatunda-Barwa Adda of N1-1-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Reason for non handing of ROW I
tea
agg
BOirap
F' ,4041,
173 300.5 50 388-770 220 4 27 000 28 450 22 500 000 Land Problem Slaheshpur
4,
. ........ ...s..,
•W/rr 1 '11.0
174 388+780 388+990 210 4 27.000 28.450 22 750 803 House Building Kasitand - • ' • rte
F ,..1, .s
-sag
fi .
175 3119+020 389+390 370 4 27088) 28 450 23 500 1295 Land Problem Kasitand
176 389+390 389+440 90 4 30 000 28 450 22 500 375 Compound Nall Kastiand
177 390.000 391+100 1100 12 30 (80 21.750 19 50) 11550 land problem Daludih
air
178 091 .200 39) • 050 450 12 300(81 21 750 13500 land problem Pawn.'
170 3'11 • 770 391 • 860 ,g) 1, 30000 28 000 2700 1 and problem Bargain
i (9 ] -,001) 092 , 170 Itii) 12 30.000 21 750 5700 I and problem Rawan)
Page 20 of 30
VIP
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Ilybrid Annuity Mode in the state of iharkhand under
NI1DP Phase-V
(RHS)
Reason for non ha nth iiR of ROW /
Aro.of Obstructions if an, (land inn,.
Chainage
Width of Land telephone line, religiout .runt u re,
Total Available Land not
LUS to be required for other, 0 mourn ere I Lund own,/
Sr No Length PROW width of handed Remarks Photographs
adopted constr.-twat. Agency. Voltage
mirk Land
, 0.
per TCS
Front To fin SR.) Tree t- tilit, Structure
;04
1 RI 392.300 392+800 500 12 285(8) 21 730 19 000 4750 Land probkm Raptani
IOW
Ala
41/
15; ;92 ; ,i40 392-5947 07 4 28.5(0 2843(1 21 7511 47 oell Raigani
Ile
fir
tP
SIP 107 392.955 3914.060 105 4 20 500 20 450 23.000 578 building Ramant
re,
iar
41,
Page 21 0110
4
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Reason for non bonding of ROW /
A „. of Obstructions Tans (land issue.
Cbainage
Total Width of Land Available Land not telephone line. religious structure,
T(.ti to be required for others structures etc.) Land owner/
Sr No Length PROW width of handed Remarks Photographs
adopted construction/ as Agency, Village
min Land over
per TCS
4 From To (i0 Sq./ Tree Utility Structure
4
192 393+180 393+220 40 4 28.500 28.450 22.000 20) boundars Karnand
v
4 / . *.sr8
:.., ,
,
...
193 393+240 393+250 10 4 2/i 500 28.450 22.750 40 ,c1I - boundary Karitand ••
.
4
.
`! :itr4
6 4. ao
-A
44r,
.:*X4C.A..:•-*
ttelreilib.:1,,,.,A4,
V.
6
194 393+250 393/2 50 1/0/ 4 214 500 28 450 23 000 33 sic11 Karitand
4
4
4
195 393+260 :93 /200 /6 4 28 500 28 450 22.500 30 boundary Karitand
4 rear
.A.A/ r..4
.4: It'd`
4 196 393+290 393+2% 06 4 20 500 28 450 23 000 33 building Karnand , - .'..i...,
.
. :
.4!
1•11f. ' ..7*, .....
- tiel.ei
... . .
. ........ 7.,,.:.,...
Y. ... .
1... '1. .
Poe 22 of 30
4
tap
\IP Project:- Six laning of Khairatunda-Barv. a Adda of NI1-02 from Km. 360.300 to Km. 400.132 section on hybrid Annuity' Mode in the state of Jharkhand under
NUM) Phase-V
lop (RHS)
Reason for non handing of ROSS /
.•
• V
•
IP
201 393+370 393+376 06 4 2%c1101 2%350 19 900 52 building •Jdop D0rt1ciquir
--i.
ill
AP'
01/
) 111.4(0) 393.410, (0. 3 2% 500 20 450 19 7)0 01 boundary Dinnenpur
• we. '''''''0^4- w.
_
41,
sew
'4 • 11.430 141.416 06 1 20000 2%3511 20 i Cio 31 bounder, Denunpur
elP
105 193.430 393.400 <li 4 2% 300 2% 4 50 19 .i00 4141 shop , building Domenpur
- 4
,
21 M. ,...4q1 193+500 4 2/4 7.410 2103111 I, 7,0 NM bu,k.fing 130itiogno >'0
10 s.rtic
....0 n i• ' 7, .
• --. - )4
4444 '
- .
'ea
VSP
Page 23 of 30
,fr
Aht
‘‘" .441444e-
141,4„fotoj•
4.
a . ,•••• - i
yatriN‘Th /4"..I.C5 J5 '
•:
a. . 44-
.•-- • • 4
• H.
•• • •- •
•
:- 7•
dr-H
*73 7
cc,734"4",. 5, • . ,,
"rlie56. !!.,(-49i
...!!,,.):TII.V.
;i4425-4 .&t,;; t1
,----.-#.14
t C." it --,f ir';:1ri.
-~e
Jr
• = .
4111P Project:- Six laning of Khairatunda-Barwa Adda of NI1-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Reason for non handing of ROW r
Ar,.a Obstructions if any (land issue.
(Itainage
Width of Land telephone line. religious structure.
Total As ailable Land not
TeS to be required for others st union-, ric.) Land owner/
Sr So Length PROW width of handed Remarks Photographs
adopted constructtore as Agency, Village
nun Land over
per TCS
"IP From To 1i. S9.0 Tree Utility Structure
kr
• 49-4::7'...., .. r.r%
11_ s',
OF
. *6-...- --41.t(!'"-
210 393 ,5/0i 303.500 Hi
5004 21; 28 450 22 59(1 , hu,klilir Domenpur
•
1 ...), .......
46 . - -
00160.
'..-.3 ... 10
•
211 393+620 393+630 10 4 28 SOO 2%450 22 000 ri5 shop Dornenpur 4- I /11. 2 '-SII
... ......
12 .41
a.
'i
. .
212 393,
640 393.050 10 1 2% 500 20 450 21 750 lig pato, n Domenpur •. is.* Vcr4
all
•UP
tow
OP
Page )4 0130
43411311111111111111111 144111,111411
I Pi
Project:- Six lining of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on I lybrid Annuity Mode in the state of Jharkhand under
NIIDP Phase-V
(RHS)
Reason for non handing of ROM
Uhainage
Ar ,.. of Obstructions if an, /land two,
Vi idth of Land ..,,,,,,,,, tekphow line, religious structure.
Thiel Land not
TIN lo hr required for others structures et I Land owner/
SOK/ Length PROVS width of handed Remarks Photographs
adopted construction/ as Agenc.s. Village
moo land 0,19.
per T(S
From To 1.n,,,,,
S9..) Tree 1. hitt, Structure
',-
.
217 91 910 1 4 20 500 20 4C0 19 04) buils1ing
. Domenpur •:. azijee -
ii et Mid .
cEr
.......
. 10-...A.
4.•
k;;---..... '0?..f..M..47:14/1
L•711141
411.1
117
11•
.• ,. .. .
._
RHS
--t-f.:::;;i ii.„.
_ -
dr
11, --
. -1.
I44 40 1'.750 10 11 '0 5) ) 24 250 If• gl 117 b ounders Domenpur ,
r• .
4:1 iii .
'ir•-i:" ''?„, -
224 3944400 394+410 10 II ;)( 010 24 250 It) NO0 117 bOlInd.111. I )1 11111:11pIll .
•t• I'LN‘W' -, II 3914 • •• 4•••
'0.0
v 1
. .. • 460
Page 25 of 30
;a. -"•:' • ...;•,!•:'
,N•V ' `t4'/' 49 ;-1
•
• '...'".••-••
••1
••••:•7>
•:)E ;
y,
••'` .6)•"" •Pri '••;,f0•••••
•W • -"II'S? • •
.,
!? •
•
*-*
• • _ ' ' 1+1 • • -•-;'"1.:-. •
10
• •
•.
;., ? ,:•4 . • ,J •
'• - • . •
=
...•••••
•••,"4:-...4g;
••
*•••-•-?,••••,:: -• „
lç
- •-•..rs• • ,:t.a,r aly• a,E1••••
•
7<11 `."•-•'"
•
• -. •
•"
•"7--
;."; .•
Project:- Six !wing of Khairatunda-Banta Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NHDP Phase-V
(RHS)
Reason for non handing of ROSS /
A,.of Obstructions if an (land issue,
Chainage %with of Land A,.i.,
, ,....d ... telephone line. reheious structure.
Total
TCS to hr others 14 ociures et C.) Land onner/
SrAo. Length Pk09. ""."." for width of handed Remarks Photographs
adopted construction/ as Agency, 'Village
mtn Land over
per TCS
From To (in Sum/ Tree Utility Structure
•-,, _
226 194.440 394.450 10 II 28 500 24.250 10 200 103 houndars Domenpur '1111".
-
I
10...r:
41/
409
-..-'----I
•. 1 a "n
/0••
VIP
.., i
S
-...46
••••••12115,4,
.• .3 "2••
-
230 395.970 395.582 12 11 28 500 24 250 21 500 84 houndar• Panthrukhi
S -'' ' ... ' - .:2':.:
; . 3'..:,
* 7'.Cii: 1 •
• ••"':.. i., •
OP
2 ,1 z`N.• 110 396-210 100 II 28.000 24.250 21 500 1,30 land probkm Panchrukhi
AP
...
232 396.970 396.580 10 II 27.500 24.250 IX 500 911 boo days Uclospur • .os
•••
,,
11114.
..
, al: •
S
. ' ; t. -'-, f"... 1.,
"2 14 3%.901 146,60 2 12 II 27 500 24 250 ill 4 00 100 ..Itop 1 fda..p.s.
L ,-........,-;,..,,
RP'
1...
ant
Pee. 26 of 30
•I, Tr'!.! ' ""•!.,Yr
. . :1't.k;;;:7;1' • •
' • ' • -4 14: '
•• -,.•‘••
4.
A
„s•
..,6 •
••••,!: ,
••...-.74.1C: 4 jf ,
r' e
. "
t
•
• • " "1r
.nr:r
—• .
'."
•
>In
•
Project:- Six failing of Khairatunda-Barwa Adda of NII-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of iharkhand under
NHDP Phase-V
(RHS)
Iteakm for non handing of ROW i
of Obstructions if piny flood issue.
(huinage Arr.
Width of Land line. religious structure.
Tad
Total Available Land noi
TCS to be required for others structures etc.) I And owner/
Sr No Length PROW' width of hundnI Remarks l'Inuttgraphs
adopted roost rod ion/ as Agency. Village
men Land over
per TCS
From To Iin Sgml Tree Utility Structure
4'
_7.44 Ilpti•L' j
tr
• 23% 397.050 397-2%0 :?u 4 4: 500 2%451 16 900 5118X land problem 13145pur t
%-....,
i
t:: - 1.- t
41%, .0.•
... .
•
219 107.170 397+129 09 4 42 500 20 450 16 900 710 1,0004111) 11tImpur
11,
3:-...3-). i..ii
T.
sir
Ol/ 241 :,,7.711, 3075719 1,9 1 47 500 2% 450 17 030 . 1-3.undars I 44535.1,
El.
•
•
24 3 397+240 397+249 09 4 47 SIN) 70 440 I%7141 714 boundar• 1.1.1nspor
Jr
400
10,
Page 41 of 10
,.•••
!./ ri•
•-2
,
• 4°.
14.
17.
-oe 4,-
•
r
•
.j z. 4
si •
e-- ”."
,•'
'77
r•
•
IMP Project:- Six laning of Khairatunda-liarwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
NI1DP Phase-V
(RHS)
Reason for non handing of ROV\ I
Area of Obstructions if an) (land issue.
Chainage
Width of land telephone line, religious structure.
'fool A‘ailable Land not
TCS to be required for others structures etc.) Land owner/
Sr No Length PROW , width of handed Remarks Photographs
adopted const 'orison( as Agency. Village
mos land over
per T('S
IOW From To lin Sqn0 Tree Utility Structure
IIP
7.pessisher.
aaw
. ill
kt ' ' r
:4,. ,,,,.,1, 3,7-4, ., -,,, 4 44 0.k , 21.450 20.200 1199) blokling • boundars t d.hpor •
• 1
1/1n
. 44111
.
• j
--. 9 vS:.
248 397.490 397.497 7 4 44 000 28A50 19100 100 hoolidar) lklaspur . , /kW;
6 ft
• ' -- "nit
.
4.• .__
t 41
it
2
. 4, .2 -.. .
;97.010 197 .,I7 +7 4 41 qui 28 450 19 700 I 1,011.11dar \ IAnwur • 0 r 7 '‘..: a i
4
, ,'.,0 '0/7.44 7 II, 4 41.500 28 450 -2511) (13 shop 1,14,por .: .. 7,,. ,•
• ' 11 11A '
..,,•• ....
. •.‘s,,,,,,.
---iiiiihr
. 7,...
sr ....
7,7.5,,,, ou
:5, 0 4 _% ,(10 2k 4,0 :: <ix 1 4k 1.,..onda, ld I
"it11146'
aI
252 0/9 • 100 309.400 t191 9 '_15101 39 7(9) 205(1) 24)91 1 ors) problem I )49.190
IV
One in of 30
111111111111111311111411131111111111
Project:- Six laning of Khairatunda-Barwa Adda of NH-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Iharkhand under
NI1DP Phase-V
(RHS)
Reason for non handing of KIM .
Am.a Obsirortoons if itn
n) (land mot.
f idth of Land m.,,,,,
3l1.1 Land no, telephone lino. religious structure,
TCS to be required for others structures etc) Land owner/
Sr No I ength PROW width of handed Remarks Photograph.,
adopted consi ruction/ as Agency. N'illage
mtrs Land 9,Vr
per TCS
From To (in05g.
0 1 Tree I tility Structure
OP
' 398 • 150 300.158 110 4 20 500 34 700 1 o 0,0 m<II Lslaspor
411
. . -
w A
4
:5 4 398.-200 t 48 +200 08 28 500 39 700 22 500 40 houndar, Wasp!,
i
.. .ra '
...•
.
1
-,W1Z-
7 1
oar
411,
ar
air
-dr
One :9 of 30
•
•
-1
-04 v ;Pa
•,
71'r- • '
7•1;•
0•;;41:44i
1: •
f5c-
)1.
5-.
•14,tf.;.tt
..4•04Lt
.=3••
tt,
• .,
Project:- Six laning of Khairatunda-l3arwa Adda of NI-1-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state of Jharkhand under
41P• NHDP Phase-V
(LHS)
Reason for non hand int of 14090 I
Arta of
Vs idtli of Land Obstructions if any (land issue,
(hainage Total TCS to Asaibtble Land not
required for telephone hr. religious structure, Land owner/
Sr.7sio. Length be PROW width or handed Remarks Photographs
construction as others structures etc.) Agent", VilLage
min adopted land mer
per ICS
Front To 6^ Sqm) dreg t tans Structure
on..._
2 - "WiligliN
-or
I 360+300 360+500 2,x, 1 it, ,i0 1 /1 050 lb 5o 24101 land Problem Khunalunda Var.,. s'.. ' '
-s....?„,.., .
- 3 4.0.....
..• ._,,, -1(,,.+so.i./. . •
er
:1-'4,-'• _
isr . 360-•74) 361-910 r4, 31,1A/ 27 5, IA in 2n Land • Tree - Home khatratunda ...
. r
,ek•
IX II...
- .
at
: ..
.,... . i b. .
5 361+020 361+040 20 ,_ iota, 27 <ii ZI. i xo II,,rne Khxratunds . to y. _
_..o:
ear .
.- ...
' ::-• -
-. ---„,., • . ..--
:
17
,,,,,,
-.\„:.-
, 161 -040 161.050 10 .., 10 110 27 50 21.00 90 Temple Khanatunda
Or
../. • - ,'.5
a
!.
7 361,090 20 It, 101 27 co 2110 , Khatratunda . ..i , ..4
361•071) 2 180 Yatnshed
A
L• :• ', IS j ...:ali, .;..
„ ..,.. ...
• ..,,, „;;.,,,al.
411 SKr" - ' :9,
• ....,,,
.12. ' ••• ' .• 't,, 1 '' • -.
...
. ..s.
X 361+090 361+100 10 - to . :7 < , , Z I gat Abairahmsla ''. .... ' ' 5...e -
..... ' -...
1.. . -
rA .
to i •100 361.120 10 oo 27 ,o 22101 1110 Tree • Forest Kharatunda
—
-.42P -
";..r
..* : ' : 7.4* -- - - • ...* •
PA( f• 1 0, 13
eilV:111fr 4115'. IV SA'S!' it'. et'. a.
::13.
4L-".i°44. •- t •"
. !is• s?' 3
•- .
.7
a.' *,
0
4 '• 0
/dr -
if ! •!.1.41.•!!
• •••"'
"•••••
et.
••••;? .$•
.c 4-•
"c.; ••• 47....w.."4 • •i!e 1
j A'Pri
• • .
- • 7-1!«.-‘,••*-..--'
''' .2. ... -7.- • fr..•—•":"". .."'T--;.:1;•:•te'••.̀:•••"—
'1
ft%
.• •
• • i413- • -"
44 r 7:422 a:
.-
-7 7,1,.7,77>ajz'
- .
•
' •••
• . • -
.•.
06.
%IP Project:- Six liming of Khairatunda-Barwa Adda of N11-02 from Km. 360.300 to Km. 400.132 section on Hybrid Annuity Mode in the state ofJharkhand under
NIIDP Phase-V
• (RHS)
Reason for non handing of RON /
Obstructions . 0 any (land issue,
Chainage Area of
Width of Land telephone line, religious structure,
Total Mailable Land not
ECS to be required for others st ruc t ures etc.) Land onner/
Sr.So. Length PROW ...nth h of handed Remarks Photographs
adopted el/11,11'1010W 1113 Agency. Village
mtrs Land OVI,
per TCS
From To (in Sq.) iron (Tidily Structure
410
263 5,0)4660 349•(.0 (0 4 20 100 10 450 III 000 49 shop - building Darnl,arabars, a
261 ,99 .900 399..930 30 4 29 000 28 430 20 210) 249 11arlet Damlarabarss a
4V
265 39/.930 4(%0.630 700 1 2%000 2%150 22 000 4550 slop. bounders Damlarshars, a
IMF
Taal lanes adabk 1.4[4. 1.) 15549-00 Total area dieted ma headed ...Os Sqs) ......
ter
41,
Is
Page to of 30
11111,.•t.
• 1
J
frS •
;i•
•
1. 0.2 Y
. •-
4_
.4 ,•.,
I ,:, :,:.,
•
1 ..I
7l
'Jr
:st17
t'"I
dtC.L.
14:1 /4
"'W.:t:;::"r •
it
*tr.
—
Reason for non handing of HOW !
4tra of
3% ulth of Land Obstructions irony (land mut,
(/minas, Total TCS to As ailabk I and not
telephone hoe, religious sloveture. 'And 013tri
NrAs. length be PRO% "4""'d for .9,0h of handed Remarks Photographs
constructoon' A> Ottlf rs •tructures Mc.) !teem). Vinare
rotes ado pted 1-and m er
per l(S
Front To ('" Sqm) lire 1 lilit5 Structure
ere
. ..a. .
•
.... • or
. — •
10 361+120 361+122 03 2 to1 lc 27 al, ZZ ao hand Porno Aha/ raw/Ida
.....- -....- -....
cfe .444,0a/1/ • -....
.-___
- -it
...
005 AI
;,,I - I ill P.I . 200 70 . 11100 27 all 2 3u Hone • Shop Kha3rxurbla 5t
5..i. iiiii+
...,.....
/
-.I
w
1,...4. ..
--::-
-- ..•
•
11 l • ''.
12 361+470 tot • 720 250 2 10 1 0) 27 0 0 21 al, 2125 Ilona/ • Shop Khan:num) -
- -.• ,: -
-....... I
VP
:. 1 . - all‘WIllimpt. 1.11111.a11.-1116
...:0 .
-4:: 1
t, . , .:.,......14.--.
14 0/2-580 362-0, 31 229 10 30 00 29101 2010 1100 Home - Shop Balutunda .
41i4111C:1 fr- • e
:
„Ait,... --.' . ,iir 07. , .• ... 4
...
I 363.37, 163.3041 10 3 311 00 26 2 , 21 50 5 Tan/. Pora, a _ . .v.z517
F;..":"*!' ' ..-- -17.:, *
-; . . . 7-1.
Prit
Shop , Land
16 163.450 363.490 40 14 30101 1943 16 rit, a2M Porat a
Problem
-'''....*:.. .
• .4- ' Ni. •
.•
'!'. .% ' • '. ...... .
0.17,3700
: ' .61..... . • - - -V....J.
. .
17 364.650 164 ,730 00 0 3)0X1 3010) 21 311 640) land Problem l'pernagar 3a. .• .•. - - '•.4 .., /GER _.
' •.: -
_ - a.... githafeltjaallIIIII
rt.. ' ,'...: : - :. -_ . •
-- . 7 ...a....1‘
ip-,:-.1.1a
.... _ ...,.::
.....,A. -1.4,,,, .
IS 364+720 364+730 10 4 31 30 2045 2310) 35 Well P.N.IA a -.. -..".".-- C
.1
-7:
2..
'.. ''''..'. '- .**••
:4....
• - .0,ftite . r -
"e '''
• ;If- ' IP _ c...
.•••••••.‘„
.a1:4... e.... - _
..,. .../
....
._,
o/..-
19 ,r.4 • 740 3f.4 • 1{ -10 at 4 3150 204 0 27101 5111 land Problem POIN, a . ........
Page 2 01 13
•
t'
Reason for non handing of R01% /
Area of
%%kith of I. and Obstructions Hans (land issue,
thainate total TCS to 54railahle Land not
for tekplione hew, religious stnrct ierc. Land ow ner4
Sr.No. 1.11gth be PRON '''''''''d ...delta( handed mark Photographs
coruirsairroll as others structures etc.) Agents. Village K"
min adopted 1441011 115er
per I( S
F- to On 'l'l Im) Tree Utility Structure
—
211 104 . 4,0 lt,C•111X/ 40 4 3150 2_ 040 21101 140 11,1911,1Jrc N .11 I Porao a 0
- - :-.4,.......
1";l..
....4
• 4-
21 365+200 365+210 10 4 3150 21445 2200 95 Fiorito Itasallant
' . - 4, ,•..1224••
... 'l• S.._ c ••• .::' • 's • 4
r- ''' - . • ., , ..
Pr.
•rt . A- .. %
dam
ss.,
22 10,210 11,0•214 04 4 31000 2:4 40 22 INI 12 11411d Pump Itasioiam '4 ...
...
.
IN;
•••.
23 367.7110 367+800 2. 4 30 01 2%45 19(11 220 1-vtd Problem Shankaubh .c.' •"
za.r.it!il '
.
Ems " ti
.......-.......--
... ..
........"..... .
0.% -14. ..1l• 044) 20 4 30 011 20 4, 17 0(1 2,1, Land Problem Shankardth ,-- '
,....--, ..N-I'l A.*
11r ...`,
„.......7.....•••-..... ,
7.
•
3118 1 100 34444144/ 40 4 3110..0 2%45 17 00 5100 Bulltling Shanlardih
20
..- fr..
1 ...,......
27 ii44. 2141 0191•250 50 11 :WOO 24 20 17 CO 025 Land Problem Shankard,h
... sr.
20 le.% • (AC 3610800 200 II 31100 242 0 1000 2400 Land Problem Shankardih
III
29
1 iliall ' 114
16111020 300 • 11811 00 I1 111101 24 25 IX 00 720 Building r Shop Shank/1MM -
dl
Pate 34.113
10:
••••••70. ••7 kr. it•-•
a 0 11':. te; ••
-74 ,
r ;c.
1
• Tqr . •-•• u.
•••• '2 •
.r.
Jf
c441;t14,,C-r•i•,,,e•all....
3
-
---,--•,-;•••••
.4r
Reason for non handing of RON I
Arta of
%%tdth of land Obstructions ifns (land issue.
(laainage Total TC'S to (satiable I and not
requited for telephone hue. Rilt101.1,shut tort. Land ow ned
sr.s.o. Length be P110%% width of handed Kenuerks Photographs
construction' as others stnxtums etc.) .1genc. Village
mtrs ado led Land os e r
per I (-S
Frail, To (i" sq"" 'bre 19ilit Sins lure
.-,
a..-
, 40. ... -1 . •I
ie. e
r1 ,Ig;r= t . .
33 368-09(X) 3041.930 50 11 30(1(1 24 25 17 50 625 Building . Mal Let Shantardth 3 NI` 10110
:11181.
' 4 i
( • \
A
.-
..,t11•,
• fl. b
35 36.8.961 36.N • 968 us 14 3000 19 45 17 50 100 I land Pump Shankard.h -:.-..,..--- _•r---
-.::: -
....r .........,.....,X, -
. 1
4
ilgoic7.... - . _: '...%.• i
. mini
. ......
Eitimi ... -
3r, 368+970 369+ 1CO 130 14 31) la, 1945 179x1 1573 liome • Shop Shanlardth
_ .
'IWX"
•••.# . --
a.
-c-
. .) -73.-...
. .(v
•). ... ,-(..i. ).
(7 369•(0111 309.010 1 14 2%50 19 45 17.50 110 WO ShanAatdth
• • thZ..—•
... ..,
38 369.040 369,048 OS 14 211 50 19 45 17 50 xx Iland Pump Shankatdsh -.
fr" 00PmtV. _
. .
_____•... ,
• . ...I..
r.• '':..-te".5:::',..
; .. - ".- 0, - .
Page 4 of 13
/E41(111111(111111111‘1111_11,1111111 ,11114 ,11 ,1'11
Reason for non handmg of ROW
36'4' i 10 00 2%<0
Sb,
114 4,,,• I I)) 14 1045 175) 80 I land Pump Am.11khun + V • '
- 41F-41. ".1.7
a. ii,a1..).
r
. e0"4.17
119.(1110
- • +
MP.
42 300 • 17o 369-180 10 14 2x5.0 10 4, 17 50 II) Dargah Amalkhun '" ...
51+ 1. Yom.
ga• LIS.
G.-
.. . ....
r .
.• •
1. .
•, •es)-4‘:
t : . ..a , di. . I 14
41 0,9.300 369+310 10 2%50 11.1) 17 50 I Well Amallhun • 44!.. ,'=
.-- -
-' 1-•-•.„• ,
4,.. •-
....e, 9
* b•
• .0 4...-. .
1;?- ..-
..... ••
...,....= .„,
•t0,;_"1.4. .- ..? - 11;:
.4 .4r:li
P• If tali*. .
. k...4. 5-
0 iirt,
', .... !e 7
11"
.1.r•
16 369+330 3000 05
4....
= y'
369+340 10 8 28 50 23 00 Hand Pump Amalkhur. 'fr.+ !,-.06: .
.;2.,...,t...:
...
,..
' .1,
../
X
At"
if 0 I, •
47 169.6501 169+700 Al 2x90 300q 23 00 27 , Land Problem Jarwaddl 0,5 ....:.... ...
• .11/
-
- .
1•'
-
jjIK- ,i
. •,-. .
. ..• '. 4.
......
,-.--.
t
-`' .
I-..Itt.'
i•:. -t •
48 it.q• 7.10 169.050 1 50 8 2%50 10141 2311) 025 Land Problem kabanpur ..
... - ... ;„•..„: 5`. '. , 0e4
— ,..0:0.0,605/ /
..--. .41:.*:.. • . • . ..
>V^ .;:.:..- 7 ' ''',!.. -....
1,.:-
!....
'" _.-•-•.- -it
....:#,-.4:' ';-....
-,:".::
4, 369. 7100 369.700 08 0 2x 50 10000 23.X1 14 Hand Pump kals anpur • ..0..,..4.,..,'''
. ,,,,„,::: ,••••-c-
••
3 b'D 4.75 •.,,'.- --iir.':101.--
. :
4. . .-
PAge 5 of 13
IK 7‘24-•: •
Zri
Reason for non handing of ROY* /
Area of
W idth of Land Obstructions if any (land issue.
Chanute Total T('S to tts inhibit I and not
notated for telephone line, reltgious 'mature. land o.ner! P110100( :foto
Sr.'s. length be PRON width of handed Remarks
lion a, others st
othenxtures Hr.lI Agent'', Village
min adopted Land in,
per ICS
It Front To (I " S9') T. Mikity Structure
A I
1
1,.. .
-.... _
r — 4- ....o.,•
50 369+730 369+760 10 x 2x '0 11,, • , 2 ,o, cc Mara: lalsanpur IV. -- ...
..-
.,
-,-
46
eta:. -
-Rae•eaWal
: ......r
:5'"7"."----
52 369+860 369+880 20 X 28 50 311110 23101 I 10 Ikmndan V. all kaRanpur
:..... " ''.. (
b '•
. .
..,
ft.
. 1443R..-41R-L-86104
.. ..
o A.
;g1t
ft i
59 374.550 374+560 10 it 2(.10( 24 25 21 00 50
14orel - R.ondory
f opcharwhi .5i9L65. : .,e .e; • -
Wall
:+4.88m8P- ..
RIP
oageo 0,13
Ilr
liea.on for non handing of 110%.% i
Area of
Vs idth of Land Obstrurtiorn if an. (land Mlle.
(lsainage Total ICS to ft...liable land not
recnimd for telephone line, 001.210us at '0 sore. Land on err
Sr.'3.o. length be PROM width of handed Remark. Photographs
comtruclmi .13 others structure, etc.) %gent., % liiAte
,our, ado led Land o.er
per 1 CS
From To (in Sqm) 'Jere Unlit) Structure
- ' -
-.141/ - '-`t ' • . ...
t..- . I'
3.. I
to _1. 1X1 Topchanc hs issni ,..., . • ••
611
/al 374 • 710, 374 • 7to II 2.125 2110s 5, Itoundar Wall amt.
‘1, . . .
,.
. .•:-. '.. •
- .
•
61 375+135 375+160 25 II 2 5 511 24 2 , 21 ill> 113 I tote! Topchanchs
~tt i
. . .... e
-.. t•,-1....---
-4.
VW!
— .....
"% 1
.4.....01±.....71-z..
r ..1
11ouse Boundan ..
63 375+315 375.325 10 11 25 50 2125 2100 45 Topicharnhs
Wall & la.'el I g . ;'', :
_.: ,. .4,...
. -._
ii. .
64 375•900 376.560 660 11 25 50 24 25 21 1 . 2,70 Temperas. Nlarlet Top.chanchs •
• .. MA
•
• 65 375+935 375.945 10 11 25 50 24 25 22 5i• 30 Durga Temple Topchamh,
•
• 66 377+460 377+470 10 4 27 oo 28 45 22 50 45
or 4 n 1.• •
Dp & Well Topchanchs
Nir .• •.
:
,ry, ar....
'
. •
14.
67 377.525 377.535 10 4 27 00 20 45 22 50 45 I land Pump Topchanchs
"
--I
... _ hr..
,
•
6x 170 , o..lo lhornas School
370.715 75 4 2), > 20 45 22 50 413 Sahuhahn ar
Roundar,. Wall — .' - ? ._
ay
Page 7 W 13
4
Reason for non Minding of ROY i
An, of
6 St.No.
Mileage Total
lemath
TCS to
be PHOV.
Width of Laud
required for
comtructton as
As ailable
width of
Lund not
knotted
Obstructions irons Build Moe,
irkphoor line, religious •11/11tillrt.
others structures elc.1
Landon ner
Agrnc,. 3 slInge
Remarks Photoeraphi
noes adopted Lend Ore,
per 'ON
From Ti "n ''41.") Tree Chits Structure
6
70 380+280 380+290 HI 7 10101 28 50 22 5.) 75 tans former Op Nladaulth
6
6 r-
' I,
• 4-iiihe
*',4
.74, .......„,,:r:
A
6 38
w, .
71 7141.7 30 180• 7 ,11 20 7 3111111 2x 50 22 50 1 50 lloirl I edatand ft .1 1I '
iv. -, r t
., ANNO - .- •_
1.1111W -
-III,lit.
4
rb
411, 11...r
....:-...,
... ,K.O. Keil 3%1, 92, ,4 i 7 p.101 :21i <„ 22 0,, 4 h, , Petrol Pump Hp led:mold
611f1. 1
lit
4 I
:.1', :.... 4::•::,
- • 7"P'"117.1"."—
C •-••• -.••••""ilt ;ills
a " kl.;.!
- s - •
I and Problem' Me •
4 73 3811101 381•120 20 7 31118, 28 50 21 50 170 Ledarand ♦ . ,.. •
Roux Building
-.4 - 7-
.. ..
6 3 ,
.
•
'1,3'1! 31,5
sr. . • ••.. ,.:,,.. , , a, ,
.,',. .".... .dr-..
6
6
76 381+305 381+330 25 7 31)00 2/1 50 21 50 211 Home 11011E101g Leda1and
6
K -
IIP
77 381+3(0 381+375 15 7 30 0() 2+) co 21 50 128 Hume ' Shop Ledatruld 13, I
33
—. ' 4•
IMP
kr: '
_.-
f z ;'
-
• -,
iia
• ,3it4 r.76
i .1 .
78 381+375 381+435 60 7 10(10 28 50 21 50 c Ill [And Problem 1.rdwand • t W.;
,
• i..Ait.0106 p
'7
- ....11‘ —
, • •-•••—. -
Page 8 of 13
Reaton for non handing of WE% r
Area of
Y. kith of Land Otntrucnons if am iland nine.
(1Lainaet Total L(S to as ailahk Land not .. ,_ ..
requovd for phony one. religion, ,Irvr lure. landowner,
..,. \ u, Lend. be PROM width of handed Remarks Photoeraph.
fel.1111,1101.1 as others strut fur, etc.) Agency. %illaer
nun adopted L and cner
per Il-S
From 1o (in S'ini) Tree Utility Structure
AMP
•`;;•::- .4.4.,
C
..
81 382+620 3112•080 60 4 10 50 2845 _'Ito 10N0 Land Problem Kanecdth ...k.:
.
. • .
1 14!
..'411 , ' i
-1;•r
"BP
.41.15
742 3/44•4q0 OW . 505 15 II 3000 2425 21511 1211 House Budding Brahamarldtha w^ '
ar
......
ig..,,...:er..-:...7. __.
-'5190#
0.-•-• -- :_________ 1`jllh
83 384+570 384•580 II) I1 30 00 24 25 213o sc Temple Brahomaullha ..o...- ,
...,
- .
co
NIP
..."
r.r.4.. .
.
-I':. • :,....
_
-- ....,,
. • _._ _.. • • 'Ier
IMP
of - •
...
' e —
it
imp -
Ow
• .
.
..), _ • t ..
97 386+560 386•690 130 4 30 00 2x45 2.1 50 1105
Montfort Acadam -
Da) abanspalw
Hounds", wall I • •: A
l• ? .....
..
;...., )" . ' • . 4 4 '''''. :I:I.:: .
A .
. ,. :
88 386+820 386.960 140 4 301x1 28 45 21511 1190 Land Problem Da) abanspahar
89 390+000 391+100 1100 12 301x1 2175 330/0 land problem Dal uchh
Pate 9 of 13
Reason for non handing of ROW i
Arra of
W-idth of Land Obstructions irony (land Issue,
(hainage Total 'ICS to Mailable Land not
required
r' for telephone line, religious %Mally., Land owned
84.180. I Rligth be PROW of handed Remarks Photographs
construction' as others stnictures etc.) Agency. Village
mu, adopted 1.111Hi oser
per ICS
From To '''' Sq m) Tree Utility Strurture
411
111
4111
411
111
111
111
411
Page 10 of 13
IMP
Reason for non handing of HOW /
Area of
Width of Land Obstructions if any (hind issue,
(Tainage lotal IC'S to Aerailable I .arol not It n. h.,
telephone line. religious %mutiny, I And or
ounerl Phoirmraplu
Sr.540. I en th he PKONA "gnir" for urdth al handed r
<mutilation' as others structure. etc.) Agency. e
nitre adopted Iand tut,
per TI'S
Fran To "" q'"/ Tree 1 tarty Structure
' • a
• )
40
I
' .,
100 396+720 396+730 10 II 28.50 24.25 2250 .110p 1 4 a, put ifl .yA
J
0 i
4
, 4..... - .
4
4 • .;
,..
101 396+730 396+735 05 II 28 50 24 25 22 50 30 bulldog 17dmpur -' atre .
- .. ,....
6
102 396+730 396+740 10 11 28 50 24 25 22.50 60 shop 1 de vur
4
•
f r
4
1.•...
'---- ...r." .....-
. .- - - 1, -- I .
-.. ' 541
-1 , ........ . ,,,'
• il .- ,
IP
107 397+590 397+790 200 4 41 Yu 2845 2250 Ixcri land problem l.d85 put
S
4 22 ix) 33 -
........., ,._ "Ar-• • t ' - -
108 397+850 397+855 05 21t 50 29 45 boundary I'daN par
-.44.?"`711P -.- - .
S v .
• • -1!"., _ ,
4 ..-
. .
Page 11 .113
Reason for non handing of ROW /
••• Area of
Width or Land ObsinKnons if Any (land issue.
(laminate Total TO; to Available Land not
R kphone line. religious structure. Land oner/ Rtmark,
Sr.No. Length be PROW "q"i"41 r" width of handed Photemple
construction/ s, others structures etc.) Agency, Vill age
mtn adopted lard Duce
per TCN
From To In " °r") Tree Utility Structure
. _
.
I
S•
t '15 IN
...
120 190• 580 390+585 ((5 9 2850 39 70 220?) 11 boundan Uda,, put
I ,
,...,• br
re
4:
.e ''(iir4,
Ok
Pk
Pbk
024
004
Pk
Ob.
Irk
Pk
Page 13 of 13
61114
Reason for non banding of ROW I
Area of
NS id th of Land Obstrue [ions if an (land issue,
Chainage Total TCS to Available Land not
requited for telephone Init, religious structure, Land owner/
Sr.No. Length be PROV,
colutruction' as
width a handed
others structures etc.) Agency. Village
Reniark5 Photographs
nun adopted Land °see
per Ws
Front To tin Slim) Tree Utility Structure
,..
.446%;
110 397+910 307. 0 15 0‘. 20 30 2849 22 00 boundar) I In pin
-..: •
tO.
,
4
III 397+920 397+925 05 4 20 aii 28 45 22.00 33 houndars 1 rd:n put .
... 2
-..' -
b ..
, •
re••••_
r ..may
4111P
46.
77" i!ivfir""
•
L.r-
--. .1.7”-"17,,,,
... ,.,. .,-.-,
-
•..--:-..---, ..,--4 ,J,k,o....:-_ Fr
,,3 398+030 398+045 15 9 20 Si) 19 71) 22 00 98 shop - building lda> put WI
I- "1111.4117
t -AlY '
"' ••• .C.e.
. ,. .
)
„,. 7.„. i '
114 398+100 398+450 350 '1 28 50 39 70 22 00 2275 Land problem Lida) pun
el* ...
dita.k -4: ....„-' •„1,.,r
398+225 05 20 ,I) 39 70 22 00 33 bound., Ud:n pun ., ... r3
115 398+220 9
....
v
.,
R
... .1
tip
116 398+220 398+225 05 9 20 50 19 70 22 00 33 botular,, I day pun
.,47. ,.:..
ihr
. ..... -.: ••••.•_
....
'..k. '
Page 12 of 13
Project : Six Laning of Khairatunda to Barwa adda Section of NH-2, From Km 360.300 to km
400.132(Design length 40.330 Km) in the State of jharkhand Under NHDP Phase -V on Hybrid annuity
Mode
Calibration Status of Equipemnts/ Instruments for the Month Of April 2019
Actual date of Due date of
SI. No Name of the Equipment/ Instrument Remarks
calibration Calibration
A Soil
1 Proving Ring 30 KN 24.10.2018 24.10.2019
2 Proving Ring 50 KN 24.10.2018 24.10.2019
3 CYLINDER 100mm dia 07-03-2019 06-06-2019
4 CYLINDER 250mm dia 28.11.2018 28.11.2019
5 CYLINDER 500mm dia 28.11.2018 28.11.2019
6 Density Hydrometer 05.01.18 05.01.190
7 Steel Tape (0-500mm) 29.11.2018 29.11.2019
8 Steel Scale ( 0-300mm) 29.11.2018 29.11.2019
9 Digital Balance ( 500g) 28-03-2019 28-03-2020
10 Digital Balance (0 to 30kg) 29.11.2018 29.11.2019
11 Digital Balance (0 to 15kg) 29.11.2018 29.11.2019
12 Weight Box (1 mg to 200g) 29.11.2018 29.11.2019
13 Dial Gauge (0 to 30mm) 07-03-2019 06-03-2020
14 Penetrometer (0-40 mm) 28.03.2018 28-03-2020
15 Le-Chatelier Test App. 29.11.2018 28-03-2020
16 Le-Chatelier Test App. 29.11.2018 29.11.2019
17 CasaGrande Apparatus (0-50 mm) 29.11.2018 29.11.2019
18 Container 02-10-2018
19 Container 02-10-2018
20 Proctor Moulds 1000 CC (small) 02-10-2018
21 Calibration of sand pouring Cylender 13.02.2019 13.05.2019
Sand pouring Cylender(S) 2nos 115mm dia , 380mm
22 07-03-2019 06-03-2020
length.
Sand pouring Cylender(S) 4nos 165mm dia , 510mm
23 07-03-2019 06-03-2020
length.
Sand pouring Cylender(S) 2nos 215mm dia , 610mm
24 07-03-2019 06-03-2020
length.
25 Proctor Compaction Mould, Dia Mtr. 100 07-03-2019 06-03-2020
26 Calibration of sand pouring Cylender 07-03-2019 06-06-2019
27 Moisture Meter (4Nos)25% & 50% 07-03-2019 06-06-2019
28 Victa Needle test Apparatus 07-03-2019 06-06-2019
29 Saybolt Furol Viscometer 07-03-2019 06-06-2019
30 Pooctor Compaction Apparatus 07-03-2019 06-06-2019
31 Fexural Beam Moulds (30Nos) 07-03-2019 06-06-2019
32 Made Globyz model -GZTT- 500, balance Cap500gm 19-01-2019 18-01-2020
33 Dial Thermometer (0 digree to 300 Digree)C 29-11-2019 28-11-2020
34 Digital Thermometer Hygrometer ((-) 50 to 80 Digree C. 29-11-2019 28-11-2020
35 Vernier Caliper (0 to 150) mm 29-11-2019 28-11-2020
36 Glass Thermometer (0 to 360)c. 29-11-2019 28-11-2020
37 Motar Cube(nos) 02.10.2018 01-10-2019
38 Container 02.10.2018 01-10-2019
39 Container 02.10.2018 01-10-2019
40 Proctor mould(No.1) 02.10.2018 01-10-2019
41 Proctor mould(No.2) 02.10.2018 01-10-2019
42 Proctor Moulds 2250 CC(No-1) 02-10-2018 01-10-2019
43 CBR Moulds 02-10-2018 01-09-2019
Annexure-X
SUMNLARY OF ()1 ALI - 1Y CONTROL TESTS RE1)()12'1-
NAME OF THE PROJECT Six Lathing of Khairatunda to Barwa ackla Section of NH-2 From Km 360.300 to km 400 132( Desoir length 40.330 Km) in the State of iharkhand Under NHDP Phase .V on
CLIENT : National Highway Authority of India
4 INDEPENDENT ENGINEER :
CONCESSIONAIRE : Ashelia Kbalralunda Barwa add, road Limited
EPC CONTRACTOR .
4 Meade Apr-2019
Quanots I irtiiird Noel i.,..o, ,,,ndi,‘-n-d S., ..1 ..I. c .n.lt.11,116r. S1-.101, 1 „dal no.61 Ie., condor 0,1
Description tetras as per Frequency of tests as per Um
6 &No Descripdoe
BIS/A:mama! provisions MORTHIBIS/C-A Previous
Month
This Month
Into This
NInnth
Pass Fail Total Pass Fail Total Pass Fail Total
6 1.5
16
CBR
Field density of Orginal ground
As required
I Sct 110 Pt) per 2000m'
- -
- - 721 62 102 110.00 24.00 134 834
.
•
tui 020
1.7 Grain Sue Aruhsis 2 Tests per 3000m' 5.34.0050 48.000 5.82.000 3101 - 3101 22 hi 22 410 . 410
1.11 MDD & OMC (Proctor) ,2 Tests per 1noons' 5.34•000 18.000 5.32.000 188 3118 22.00 22 110 - 410
1.9 BORON Aura used for Atterberg LIMAS ILL& PL) 2 Tests per 3000m' 5.34,000 48.000 5.82,000 388 - 388 22.00 22 110 - 410
1.10 Embankment FSI 2 Tests per ?mom' 5.34,000 48,0401 5,82,000 388 3811 2/00 22 110 - 410
6 1.11
1.12
CBR
Deleterious Content Test
I Tat per 3000m'
As required
5,34000 48000 502.000
-
194
•
194
-
11.00 11 205
-
-
•
205
1.11 Grass Sae Analysts 2 Tests per 3000m' 228 - 228 228 • 228
6 1.15
1.16
MDD & OMC (Proctor)
Anatol Limits (LLit PL)
2 Tests per 3000m.
2 Tests per 3000m' •
-
-
228
228
-
-
228
228
228
228
-
-
228
228
•
Existing Subgrade Top
1.17 FSI 2 Tests per 3000rn' • • - 228 - 228 228 • 228
1.18 CDR 1 Test pa 30000' - 228 - 228 228 - 228
1 19 Deleterious Content Test As required - • •
121 Gram Sue Amhara 2 Tests per 3000m' 231 234 • 231 - 234
6 122
1.23
Exisung Shoulder Top
MDD & OMC (Proctor)
Atterberg Limits ILL& PL)
2 Tots per 30000'
2 Teas per 3000m'
234
231
•
•
234
234
• 234
234
-
-
234
2.34
6 132
1-33
CBR
DCICICIIMS Content Test
1 Test per 30000'
As required
• 12 - 42
-
12 - 42
1.35 Ernbardoncnt Feld density of Compacted layers I Pit per 2000sn'(l Set) 4,43,231 4,43,231 7,462 116 2,966 1.100.00 6000 1160 8562 176 8738
6 1.36
1.37
Sub grade
Earthen Shoulders
Field density of Comprted lasers
Field density of Compacted la)cri
I Pit per 200m' (I Set)
I Pit per 1000m2 ( I Sot)
42,799 42,790 1,614 88 72 1,400.00 80.00 1480 3014
-
16/4 3182
6 2.1
2.2
Slew Analysis
MDD & OMC
I Ten pa 200 w'
As required
• •
•
10.00
1.00
10.110
1.01
10.110
1.011
10
1
23 Attcrbcrg Limes I Test per 200111' 1000 10.00 10.00 10
2.1 CBR As required • •
GSB
S 2_5 um. Fines Value As required
2 7 Field density of Compacied littll I Test pa 500m' 'to 711 120.011 10.011 130.011 1911011 10 200
S
6 1.0
4.1
Bitumen works
Specific Gravity I Test per Lot .
11 Penetration 2 Tests per Lot 6 • 6 5.00 5.00 11.110 ii
Bitumen
13 Sofloune Point 2 Tests per Lot 5.00 5.110 11 011 11
44 I last R.:ewers 2 Tests per Lot .
45 Residue 1 Test pee La .
•6
4 Pen:drawn 2 Tests per La - .
Einulssicin
4.7 Viscosits 2 Tests per La
4 4.8 011CIIIIIV Test 2 Tests per Lot
•
•
S
•
•
Calibration Reports of Lab equipments
•
•
•
16,
S
4.
•
6
Annexure-IX
6
4
Month: Apr-2019
Quanta. I act weal \ on( test. conducted ',set ten. omon im It.,. %tomb I atal n.. 01 fro, co 'dotted
Description of tests ss per Frequency of tests as per 1 pto
S.No DescrIptias Tplo Tbis
BIS/Aggrement proyisions MORTH/B1S/CA Previous This Month Pan Fail Total Pass Fail Total P•ss Fad Total
%loath
Month
42$ 1 Gimess & Elongation Index I Test per 350m' - - - - -
429 AIV / Los Angeles Abrasion Value I Test per 350m' - - - • - -
4 30 Sieve Anal., 1 set per 400Teerics °Imo, . . . .
BC
431 I sirnetion & Snot anahsts subject io a minimum o(2 sets . . - .
132 Marshall Stables ton .per plant pen day . . - - - • .
4.33 Coon density I Test pa 700m2 • - - - - -
4_34 Gradation Isenpav • - • •
435 Combiend F 1°F I As required - • •
4_36 Denson. & Motsture Content As mgmed -
437 DLC A IV As remind •
L A.A V As Ininnted •
4.38 Field Cannata/ Ten 3 sa/2000sqm) • • • • •
4.39 Compresteve Strength 3 act/10005am) - . - • • •
4.40. Gradation lion/pa -
4 41 Combo-rid F I.E 1 As required -
AIV As nxperred
LAAV As assured • • • . •
4 43
4 44 Tenure Depth Test 1 Se/day • - •
PQC
3 beam/ I 50m1(6cobe&: - - -
Flatural strength -
6bcam)
3 tearn/150rn'(6albc& • - • • •
4.45 Cornpresior Strength -
6bram)
3,0 t on crtle
5I Sme Analysis Set • 86 86 3000 30 00 116.00 116
6.04 MIS PCC olds Flv Ash Compresme strength 7 days Set 1.00 - I • 1.00 1
605 M20 PCC Compressive strength 7 days Set - 4.00 4 - 4.011 - 4
6.06 M20 PCC with Fly Ash Compressive sin:rigth 7 days Set 2.00 . 1 • - 2.01 2
6.07 MIO RCC Cornpresso e stratiph 7 doss Set • - - • - •
6.08 M20 RCC with Pb' Ash Compressor strength 7 doss Set 1.00 I • - 1.00 I
6.09 M20 Knob Compressor strength 7 doss Set - . • • -
6.1 M25 RCC Compressor strength 7 dass Set 2 - 2.00.. 22
6.11 M30 RCC Compressive strength 7 days Set • 2 - 2.00
6.12 M30 RCC ugh Fly Ash Compressive strength 7 dins Set 1.00 • 1 - 1.00 - 1
6-32 M35 (RE wall Blocts/Panel) Compressor strength 20 dms Set - 6.00 • 6 • • 6.00 6
702 MI5 PCC Compressor strength 7 darn so 4193 419 28 . 28 10.00 10.00 30.00 - 38
7.03 am PCC tompressise strength Ida,, Sea 475.3 475 - - - 2.00 2.00 2.00 2
707 M30 RCC Compressive strength 7 days Set 1472.8 1,473 435 - 135 614.04, 6900 204010 204
709 M35 (RE wan Blocks/Panel) Compressive strength 7 days Sit 1290.651 1.291 125 - 125 45.00 - 45.00 170.00 1"0
7.25 M35 (RE nail Blocks/Pancl) Compressive strength 28 dap Sct 208 208 148.W 148.00 356.111) 356
EPCsReprrunnative IC.Ncpre•entats.c
List of Laboratory Equipment
Annexure-XI
NAME OF WORK :- Six Laning of Khairatunda to. Barwa adda Section of NH-2 Km. 360.300 to 400.132 KM. 360.300
Month Apr-19
Lab Equipment list
Sr no. Item Description Unit Required Qty. Available
1 Htdrometer No. No. No.
2 Calculator Scientific No. 3.00 3.00
3 Pad Lock No. 5.00 5.00
4 Scale steel No. 2.00 2.00
5 Fan ceiling 3 Blades No. 4.00 4.00
6 LPG Gas Regulator No. 1.00 1.00
7 LPG Gas Pipe No. 1.00 1.00
8 Hot plate No. 2.00 2.00
9 Stop watch No. 2.00 2.00
10 Thickness Guage No. 1.00 1.00
11 Vernier Caliper No. 1.00 1.00
12 Sprit Level 6" No. 2.00 2.00
13 Sprit Level 30 CM " No. 1.00 1.00
14 Tack Coat Try 300"300 No. 8.00 8.00
15 Laser Radition Thermometer(50-550) No. 2.00 2.00
16 Mercury-in Glass Thermometer No. 20.00 20.00
17 Multi Thermometer(Digital) No. 3.00 3.00
18 Dial Thermometer No. 11.00 11.00
19 Flakness apparatus No. 2.00 2.00
20 Elongation apparatus No. 4.00 4.00
21 Fix Spanner 8 x 9 No. 1.00 1.00
22 Fix Spanner 10x11 No. 6.00 6.00
23 Fix Spanner 12x13 No. 1.00 1.00
24 Fix Spanner 14x15 No. 1.00 1.00
25 Ring Spanner 20x22 No. 7.00 7.00
26 Ring Spanner 16x17 No. 5.00 5.00
27 Ring Spanner 14x15 No. 7.00 7.00
28 Spanner 10x11 No. 5.00 5.00
29 Spalula No. 4.00 4.00
30 Pycnometer for Specific Gravity test 1000 ML No. 3.00 3.00
31 Standard weights Box 1gm to 200 gm No. 1.00 1.00
32 Standard weights 50 gm No. 1.00 1.00
33 Standard weights 100 gm No. 1.00 1.00
34 Standard weights 200 gm No. 1.00 1.00
35 Standard weights 500 gm No. 1.00 1.00
36 Standard weights 1kg No. 1.00 1.00
37 Standard weights 2kg No. 1.00 1.00
38 SOO gm capacity Pan type electronic balance No. 1.00 1.00
39 3 kg capacity Pan type electronic balance No. 1.00 1.00
40 15 kg capacity Pan type electronic balance No. 2.00 2.00
41 30 kg capacity Pan type electronic balance No. 1.00 1.00
42 100 kg capacity Pan type electronic balance No. 1.00 1.00
43 Chisel No. 3.00 3.00
Field density test apparatus sand pouring cylinder-100mm dia
44 No. 3.00 3.00
complete set up(calibration cylinder)
Field density test apparatus sand pouring cylinder-150mm dia
45 No. 3.00 3.00
complete set up(calibration cylinder)
Field density test apparatus sand pouring cylinder-200mm dia
46 No. 4.00 4.00
complete set up(calibration cylinder)
47 FDD Tray (200mm) No. 7.00 7.00
48 FDD Tray (150mm) No. 6.00 6.00
49 FDD Tray (100mm) No. 8.00 8.00
58 Annul metal weight 2.5kg 147mm dia with 53mm dia central hole No. 35.00 35.00
59 slotted metal weight 2.5kg 147mm dia with 53mm slot No. 28.00 28.00
60 Gas Stove Skg No. 2.00 2.00
61 kadai Alluminium No. 1.00 1.00
62 Scops(Big) No. 2.00 2.00
63 Bitumen sample Box steel 3 liter(dolua) No. 3.00 3.00
64 Gaitia No. 1.00 1.00
65 Belcha No. 2.00 2.00
66 Rfill Box small No. 1.00 1.00
67 Density Bucket wire type No. 2.00 2.00
68 Le Chatlelier apparatus No. 2.00 2.00
69 Vicat apparatus for cement testing No. 1.00 1.00
70 Concrete mixer 01 CFT No. 1.00 1.00
71 Density Bucket(30Itr) No. 1.00 1.00
72 Cube mould of 150x150x150 mm(ISI marked) No. 92.00 92.00
Type 450 mm dia
73 6.3mm No. 1.00 1.00
74 6.7mm No. 1.00 1.00
75 5.6mm No. 1.00 1.00
75 5.3mm No. 1.00 1.00
76 4.75mm No. 2.00 2.00
77 45mm No. 1.00 1.00
78 11.2mm No. 1.00 1.00
79 12.5mm No. 1.00 1.00
80 22.4mm No. 1.00 1.00
81 2.36mm No. 1.00 1.00
82 9.5mm No. 1.00 1.00
83 75.0mm No. 1.00 1.00
84 50mm No. 1.00 1.00
85 25mm No. 1.00 1.00 _
86 16mm No. 1.00 1.00
87 31.5mm No. 2.00 2.00
88 37.5mm No. 1.00 1.00
89 14mm No. 1.00 1.00
90 63mm No. 1.00 1.00
91 13.2mm No. 2.00 2.00
92 19.0mm No. 2.00 2.00
93 10.0mm No. 3.00 3.00
94 40.0mm No. 1.00 1.00
95 26.5mm No. 2.00 2.00
Type 200 mm dia
96 2.36mm No. 2.00 2.00
97 4.75mm No. 3.00 3.00
98 .850mm No. 1.00 1.00
99 1.18mm No. 2.00 2.00
126 Marshall stability breaking head for 100 mm with accessories No. 1.00 1.00
127 Marshall stability breaking head for 150 mm with accessories No. 1.00 1.00
S
S
0
S
*-
•
4 Line Strip Chart
S
Annexure-XII
Correspondence Records
Annexure-XIII
reeee•••••••POWIPW*0.••••411,P0)0•41.
ASHOKA BUILDCON LIMITED
PROJECT : SIX LANING OF KHAIRATUNDA TO BARWA ADDA SECTION OF NH-2 FROM KM. 360.300 TO KM. 400.132 SECTION ON HYBRID ANNUITY MODE IN THE STATE OF JHARKHAND UNDER NHDP PHASE V.
Outgoing Letter
Mite: .1(1-04-21)19
Sr. Date of
Date of Issue Letter Reference No. Issued To Subject of Letter Enclosure Remark-,
No. Receiving
1 04-04-2018 An.K8A.NH-2.2018-19.4258 04-Apr-2018 R NHAI Introduction Letter from bidder introducing SPV and re. uest to acce. of SVP. 11-04-18
Submission of MoA & AoA of SPV, List of Directors & Board Resolution for signing of Concession
2 04-04-2018 ACL.KBA.NH-2.2018-19.4263 04-Apr-2018 R NHAI 11-04-18
Agreement.
3 04-04-2018 ACL.KBA.N1-1-2.2018-19.4264 04-Apr-7018 R NHAI Reg. Submission of Legal Opinion 11-04-18
4 04-04-2018 ACL.KBA.NH-2.2018-19.4265 04-Apt-2018 R NHAI Reg. Submission of Board Resolution for Equity participation. 11-04-18
5 04-04-2018 ACJ.KBA.NH-2.2018-19.4266 04-Apr-2018 R NHAI Reg. Submission of Board Resolution for SPV & undertaking the project 11-04-18
6 04-04-2018 ACL.KBA.NH-2.2018-18.4267 04-Apr-2018 R NHAI Submission of Board Resolution regarding Authorization 11-04-18
7 04-04-2018 ACI.KBA.NH-2.2018-19.4268 04-Apr-2018 R NHAI Reg. Incorporation of SPV and willing to enter into Concession Agreement 11-04-18
8 04-04-2018 ACLKBA.NH-2.2018-19.4269 04-Apr-2018 R NHAI Reg. Request for the acceptance of SPV 11-04-18
9 04-04-2018 ACL.KBA.NH-2.2018-19.4270 04-Apr-2018 R NHAI Reg. Undertaking as per clause 7.1 (k) 11-04-18
Undertaking fromConcessionaire that the company will not be engaged in any business other than as
10 04-04-2018 AKBARL.KBA.NH-2.2018-19.4272 04-Apr-2018 Ft NHAI 11-04-18
mentioned in the object MOA
11 04-04-2018 ACL.KBA.NH.2.2018-19.4274 04-Apr-2018 R NHAI Reg. Undertaking as per clause 7.1 (a) (I) & (k) 11-04-18
12 04-04-2018 AKBARL.KBA.NH-2.2018-19.4275 04-A r-2018 R NHAI Reg. Undertaking as per clause 7.1 (a) (I) & (k) 11-04-18
13 09-04-2018 AKBRLKBA.NH-2.2018-19.4316 09-Apr-2018 NHAI Request to witness Video recording of the Project Highway 17-04-18
14 10-04-2018 AKORL KBA.N1.1-2.2018-19.4320 10-Apr-2018 NHAI Reg. Request to Grant permission for the conducting Traffic & Engineering Sur\ eys 11-04-18
15 16-04-2018 AKFIRL.K9A.N1-1-2.2018-19.4401 16-Apr-2018 NHAI Reg. Submission of Video recording of the Project Highway 16-04-18
16 25-04-2018 AKBRL.KBA,Nt.1-2.2018-19.448S 25-Apr-2018 NHAI Reg. Submission of Video recording of the Project Highway 27-04-18 N/A
Reg. Request to Grant permission for the conducting Axle load survey/Requirement of Police protection
17 28-04-2018 AKBRLKBA.NH-2.2018-19.4504 28 Apr -2018 NHAI 28-04-18 N/A
for survey work.
18 07-05-2018 AKBAL.KBA.N1-1-2.2018-19.4556 07-Mav-2018 NHAI Reg. Appointment Independent Consultant 15-05-18 N/A
19 07-05-2018 AKEIRL.K8A.NH-2.2018-19.4557 07-Mav-2018 NHAI Reg. Appointment Safety Consultant 15-05-18 N/A
20 10-05-2018 AK13RL.K8A.NH-2.2018-19.4590 10-Mav-2018 NHAI Condition precedent Submission of Representations and warranties 15-05-18 Attached
21 11-05-2018 AKBRCKBA.N1-1-2.2018-19.4600 11-May-2018 NHAI Progress made in satisfying the condition precedent 15-05-18 N/A
Request to provide status of availability of land with respect to 3H(dishurscment of payment to land
22 12-05-2018 AKBACKBA.N1-1-2.2018-19.4606 12-May-2018 NHAI 18-05-18 N/A
owners)
23 17-05-2018 AKBACKBA.N1-1-2.2018-19.4647 17-May-2018 NHAI Submission of draft of EPC Agreement & Schedules. 25-05-18 N/A
24 21-05-2018 AKBALKBA.N1-1-2.2018-19.4666 21-Mav-2018 NHAI Reg. Condition precedent- Submission of Performance security & request to release of Bid security 25-05-18 N/A
25 22-05-2018 AKBALKBA.NH-2.2018-19.4681 22-May-2018 NHAI Request to satisfy Conditions Precedent 26-05-18 N/A
26 31-05-2018 AKBALKBA.N11-2.2018-19.4724 31-May-2018 Rec NHAI Request for the identification of trees to felled causing material adverse effect to Project Highway 01-06-18 N/A
27 31-05-2018 AKBRI.KBA.NH-2.2018-19:4726 31-May-2018 Rec NHAI Submission of Board Resolution regarding Authorization to Mr. R.K.Singh 01-06-18 N/A
28 02-06-2018 AKBRI.KBA.N11-2.2018-19.4741 02-)un:
2018 NHAI Reg. Request for providing signed copy of Concession Agreement 09-06-18 N/A
Reg. Condition precedent- Submission of Amendment to Performance security bank guarantee & request
29 02-06-2018 AKBRL.KBA.NH-2.2018-19.4756 02-Jun-2018 NHAI 09-06-18 Attached
to release of Bid security
30 08-06-2018 AKBR1..KBA.NH-2.2018-19.4811 08-kin-2018 Received NHAI Reg. Appointment of Independent Engineer. 13-06-18 N/A
31 08-06-2018 AKBAL.KBA.NH-2.2018-19.4812 08-Jun-2018 Received NHAI Reg. Appointment of Safety Consultant 13-06-18 N/A
32 11-06-2018 AKEIRL.KBA.NH-2.2018-19.001 11-.iun-2018 NHAI Reg. Falling Weight deflectometer (FWD) test 11-06-18 N/A
33 12-06-2018 AKEIRLKBA.NH-2.2018-19.4831 12-Jun-2018 Received NHAI Reg. Progress Made in Satisfying the Condition Precedent 19-06-18 N/A
Reg. Submission of Panel of firms of Chartered Accountants and request for Concurrence for the
34 12-06-2018 AKBALK8A.NH-2.2018-19.4838 12-Jun-201$ Received NHAI 19-06-18
appointment of Statutory Auditor. N/A
49 04-08-2018 AKBARIABA.N1-1-7.Q18-199Q7 04-Aug,2018 Rc..c.eiverl NHAI Reg. Request to provide information as desired by Lenders 06-08-18 Attached
50 06-08-2018 AKBARLKBA.NH-2.2018-19.53$7 06-Aug-2018 NHAI Reg. Submission of EPC Agreement & Schedules 13-08-18 N/A
51 07-08-2018 AKBAfttK8A,NH-2.2018-19.008 07-Aug:2018 NHAI Reg. Request for Joint memorandum. 08-08-18 N1
52 18-08-2018 AKBARL.KBANH-2.2018-19.010 18-Aug-2018 NHAI Reg. Submission of Tree Identification details to felled causing material adverse effect to Project I !Thy. a, 25-08-18 NA
53 21-08-2018 AKBARL.KBA NH-2.2018-19.011 21.Aug.2018 NHAI Reg. Request toappint Independent Engineer 25-08-18 N/A
54 21-08-2018 AKBARLX8A.NI-1-2.2018-19.012 21-Ayg-2018 NHAI Reg. Request toappint Safety Consultant 25-08-18 N/A
55 24-08-2018 AKBARL.KBA.NH-2.2018-19.5572 7l-Arip,-2018 NHAI Reg. Exemption of custom duty 29-08-18 N/A
56 24-08-2018 AKBARLKBA.NH-2.7018-19.5579 24-Arie-2018 NHAI Reg. Request to provide information as desired by Lenders 30-08-18 N/A
57 28-08-2018 AKBARLK8A.NH-2.2018-19.5588 28-Aug-2018 NHAI Reg. Progress Made in Satisfying the Condition Precedent 04-09-18 N/A
58 29-08-2018 AKBRI. KBA NH-2.2018-19.5434 29-Aug-2018 NHAI Reg. Submission of Supplementary Agreement to EPC Agreement 04-09-18 Attached
59 30-08-2018 AKBARFKBA.NH-2.2018-19.015 30-Aug-2018 NHAI Reg. Cleaning of Bushes for preliminary activity. 30-08-18 N/A
60 03-09-2018 AKBARLKBA.NH-2.2018-19.5662 03-Sep-2018 NHAI Reg. Request for Joint memorandum. 08-09-18 N/A
61 04-09-2018 AKBARL.K8A_NH-2.2018-1.9.5680 04-Sep-2018 NHAI Reg. Request for an early acquisition of land payment distribution (3H) 04-09-18 N/A
Reg. Ful fi lment of Conditions Precedent regarding Procurement of Applicable permits specified in part-I
62 06-09-2018 AKBARL.KBA.NH-2.2018-19.5698 06-Seo-2018 NHAI 08-09-18 N/A
of Schedule E.
63 06-09-2018 AKBARL.KBA.NH-2.2018-19.5699 06-Sep-2018 NHAI Reg. details of opening of Escrow Account. 08-09-18 N/A
64 07-09-2018 AKBARI..KBA.NH-2.2018-19.5724 07-Sep-2018 NHAI Reg. Use of Fly Ash in road/flyover embankments construction. 14-09-18 N/A
65 08-09-2018 AKBARL.KBA NH-2.2018-19.5730 08-5ep-2018 NHAI Reg. made in Satisfying the Condition Precedent. 14-09-18 N/A
66 08-09-2018 AKBARL.KBA NH-2.2018-19.5732 08-5%1-2018 NHAI Reg. Signing / Execution of Financing Documents for Financial closure. 14-09-18 N/A
Granting transfer of mining lease against Khata No.- 149,152,180 and 30 Plot No.- 1709, 1710, 1711,
67 08-09-2018 AKBARL.KBA.NH-2.2018-19.017 08-5eo-2018 DC, Dhanbad 1712 and 1713 Applied Area -1.75 Acers, Mauza-Ledatand, Mauza No.-166. Thana-Topchanchi, 10-09-18
Dhanbad (Jharkhand).Applicant M/S Radhakrishna Construction, applied on ....August 2018.
N"A
Granting of mining lease against Mauza-Daludih, Mauza No.-I87, Khata No.- 30, Plot No.-
68 08-09-2018 AKBARLKBA.NH-2.2018-19.018 08 Seo-2018 IX'- I )11anbad 289, Applied Area -7.00 Acers, Thana-Rajganj, Dhanbad (Jharkhand). Applicant M/S 10-0')- 18
Radhakrishna Construction, applied on August 2018 N/A
69 10.09-2018 AKBARt.KBA.NH-2.7018-19. 748 10-Se -2018 NHAI Reg. Progress Made in Satisfying the Condition Precedent 14-09-18 N/A
70 11-09-2018 AKBARt .KBA.NH-2 2018-19.5753 11-Sep-2018 Received NHAI Reg. Submission of Financing Documents 18-09-18 N'A
BPSCL
71 13-09-2018 AKBARL,KBA.NH-2.2018-19.019 13-Sep-2018 ' Reg. Permission for providing Fly Ash / Pond Ash. 14-09-18
Bokaro N/A
CTPS
72 13-09-2018 AKBARL.KBA.NH-2.2018-19.020 13-Sep-2018 ' Reg. Permission for providing Fly Ash / Pond Ash. 14-09-18
Bokaro N/A
73 22-09-2018 AKBARI.KBA.NH-2.2018-19.1121 22-Seo;2018 NHAI Reg. Information as desired by Lenders 24-09-18 N/A
74 24-09-2018 AKBARL.KBA.NH-2.2018-19.022 24-Sep-2018 NHAI Reg. Submission of Joint Memorandum Attached
75 24-09-2018 4.KBARt.K8A.NH-2.2018-19.5795 24-Sep-2018 NHAI Reg. Intimation of Financial Close 26-09-18 Attached
76 24-09-2018 AKBARL.KBA.N -. 118-19. :1 24-Sep-2018 NHAI Reg. Progress Made in Satisfying the Condition Precedent 26-09-18 N/A
Reg. Request to provide Beneficiary Bank details for BG issuance through Structural Financial Message
77 27-09-2018 AKBARL.KBA.NH-2.2018-19.5857 27-Sep-2018 NHAI 04-10-18
System (SFMS). N/A
78 03-10-2018 AKBARL.KBA.NH-2.2018-19.024 03-Oct-M11 Omega Reg. Rock Sample test certificates N/A
79 28-09-2018 AKBARL.KBA.NH-7.2018-19.5868 28-Se -211.8 Received NHAI Re:. Com,liances to the observation of Financial Consultant on Financin, Al eements 04-10-18 Attached
80 01-10-2018 AKBARL.KBA.NH-2.2018-19. : : 01-Oct-2118 NHAI Re:. Compliances to the observation of Financial Consultant on Financin: Ay - - ments 08-10-18 Attached
81 05-10-2018 AKBARI KBA NH-22018-19 5923 OS-Oct-2018 Rec Reg. Submission of Board Resolution regarding Authorization to Mr. S.K Rai -18N/A
82 15-10-2018 AKBARL.KBA.,NH-27018-6005
122 1S-Oct-?018 Rec NHAI Reg.Compliancesreportreplies g 23-10-18 Attached
Sr. Date of
Date of Issue Letter Reference No. Issued To Subject of Letter Enclosure Remarks
No. Reeds ing
113 19-12-2018 AKRARLKBA NH-2.2018-19.6419 19-Dec-7.018 NI IA1 Reg. Request to appoint Safety Consultant 19-12-18 NA
114 19-12-2018 AKBARLKBA NH-2.2018:19.6420 19-Dec:2018 NI IA I Reg. Request to appoint Independent Engineer 19-12-18 N 'A
Reg. Submission of Soil Test Report for Approval of Borrow Area No.04 at Ch.371+550 RHS, Borrow
Area No.05 at Ch.361+350 RHS, Borrow Area No.06 at Ch.378+800 LHS, Borrow Area No.07 at
115 21-12-2018 AKBARL.KBA.NH-2.2018-19.0S2 21-Dec-2018 NHAI 21-12-18 Attached
Ch.37 I +000 LHS, Borrow Area No.08 at Ch.365+500 LHS, Borrow Area No.09 at Ch.393+450 LHS,
Borrow Area No. I0 at Ch.397+400 LHS
116 21-12-2018 AKBARL.KBA NH-2.2018-19.053 21-Dec-2018 1 NHAI Reg. List of Lab Equipments (Km386+700 RHS Base Camp) 21-12-18 Attached
Reg. Request for distribution of payments / compensation to the owners of Structural encroachments
117 21-12-2018 AIWARL.K8A.NH-2.2018-19.054 21-Dec-2018 NHAI 21-12-18 Attached
obstructing construction of Project Highway
118. 24-12-2018 AKBARL.KBA,NH-2.2018 19.055 24-Dec-2018 NHAI Reg_ Cleaning of Drain for pass out Stagnate water in Topchanchi 24-12-18 Attached
119 24-12-2018 AKBARL.KBA.NH-2.2018-19.056 24 -PeC-2018 NHAI Reg. Revised List for Shilling of Tube wells 26-12-18 Attached
120 28-12-2018 AKBARL.KBA NH-2.2018.19.6440 11-Dec-2018 NHAI Reg. Commencement of Concession period and appointed date of the project. 28-12-18 N 'A
121 29-12-2018 AKBARL.KBA.NH-2.2018-19.057 29-Dec-2018 NHAI Reg. Submission of Concrete Mix Design (M-35) for RE Block & Concrete Mix Design PCC (M-10) 29-12-18 Attached
Reg. Submission of Soil Test Report for Approval of Borrow Area No.11 at Ch.377+750 RHS, Borrow
122 29-12-2018 AKBARL.KBA.NH-2.2018-19.058 29-Dec-2018 NHAI 29-12-18 Attached
Area No.12 at Ch.366+450 RHS
Reg. Submission of Concrete Mix Design (M-35) for RE Block & Concrete Mix Design (M-30) for
123 02-01-2019 AKBARL.K8A.NH-2.2018-19.060 02 !an-2019 NHAI 02-01-19 Attached
Structures
Reg. Submission of Soil Test Report for Approval of Borrow Area No.13 at Ch.363+430 LHS, Borrow
124 02-01-2019 AKBARL.KBA.NH-2.2018-19.061 02-Jan-2019 NHAI Attached
Area No.I4 at Ch.367+350 LHS, Borrow Area No.15 at Ch.377+750 RHS
125 02-01-2019 AKBARL.KBA.NH-2.2018-19.062 02 tan-2019 NHAI Reg. Submission of Concrete Mix Design(M-25) for Structure 03-01-19 Attached
126 02-01-2019 AKBARL.KBA.NH-2.2018-19.054 02-Jan-2019 NHAI Reg. Construction of Project 03-01-19 N/A
FRO,
Reg. Trees falling at NH-2 from Khairatunda to Banva Adda under six laning construction in Dhanbad
127 04-01-2019 AKBARL.KBA.NH-2.2018-19.067 04-tan-2019 Topchachi 05-01-19 Attached
District
Range
Reg. Submission of Soil Test Report for Approval of Borrow Area No.16 at Ch.3814-090 LHS, Borrow
128 11-01-2019 AKBARL.KBA.NH-2.2018-19.069 11-Ian-2019 NHAI 15-01-19
Area No.17 at Ch.374+200 LHS Attached
129 14-01-2019 AKBARL.KBA.NH-2.2018-19.070 14-1an-2019 NI IA I Reg. Permission for mobilization the equipment/ plant at site 15-01-19 N/A
130 16-01-2019 AKBARL.KBA.NH-2.2018-19.071 16-)an-2019 NIL\ I Reg. Submission of test results of NP-4 Hume Pipe (Dia.900 mm, 1000 nn. 1200 mm) 16-01-19 Attached
131 18-01-2019 AKBARL.KBA.NH-2.2018-19.072 18.Jan-2019 NHAI Reg. Tree Transplantation 18-01-19 Attached
132 18-01-2019 AKBARI.KBA,NH-2.2018-19.6611 18-1an-2019 NHAI Reg. Maintenance obligations prior to Appointed date 28-01-19 N/A
133 28-01-2019 AKBARL.KBA.NH-2.2018-19.073 2$-tan-2019 NHAI Reg. Source Approval of Bitumen Emulsion 28-01-19 Attached
134 28-01-2019 AKBARL.KBA.NH-2.2018-19.074 28-Jan-2019 Omega Reg. Testing of Material (Cement) N/A
135 .23-01-2019 AKBARL.KBA.NH-2.2018-19.6632 73.1an-2019 NHAI Reg. Provision of execution of construction of works and declaration of Appointed Date 29-01-19 N/A
137 28-01-2019 AKBARL.KBA.NH-2.2018-19.076 28-1an-2019 NHAI Reg. Submission of test results of NP-4 Hume Pipe (Diamater 1000 mm, 1200 mm) 30-01-19 Attached
139 30-01-2019 AKBARL.KBA NH-2.201819.077 30-1an-2019. NHAI Reg. Submission of 28 Days Compressive Strength of Concrete Cubes 31-01-19 Attached
140 31-01-2019 AKBARL.KBA NH-2.2018.1.079 31-Ian-2019 NHAI Reg. Request to appoint Independent Engineer 01-02-19 N/A
141 31-01-2019 AKBARL.KBA211-1-2.2018.-19.080 31.1an-201* NHAI Reg. Request to appoint Safety Consultant 01-02-19 N/A
142 02-02-2019 AKBARL.KBA.NH-2.201319.081 02-Feb-2019 NHAI Reg. Request for the issuance of COS order for Incidental Management 02-02-19 Attached
143 02-02-2019 AKBARL.KBA..NH-2.2018:19.032 02-Feb-2019 NHAI Reg. Maintenance of Existing Road 04-02-19 N/A
144 04-02-2019 AKBARL.KBA .NH-2.2018-19.083 04-Feb-2019 NHAI Reg. Request for Language of communication as English 04-02-19 N/A
145 04-02-2019 AKBARL.KBAr NH-2 2018-19.084 04 Feb 2019 NHAI Reg. Declaration of Appointed date 05-02-19 N/A
146 12-02-2019 AKBARL.KBA.NH-2.2011.08S 05 ;Feb-2019 NHAI Reg. Request for issuance of suitable instructions for the tree transplantation 14-02-19 Attached
Reg. Submission of soil test report for approval of Borrow area no.18 at Ch.3804600 LHS, Borrow area
147 06-02-2019 AKBARL.KBA.NH-2.2018 -19.086 06-Feb-2019 NHAI 08-02-19 Attached
no.19 at Ch.37I +920 LHS & Borrow area no.20 at Ch.37I +920 LHS
148 06-02-2019 AKBARL.KBA.NH-2.2018-19.087 06-Feb-2019 NHAI Reg. Submission of test results of materials 08-02-19 Attached
149 07-02-2019 AKBARL.KBA.NH-2.2018-19.6717 0710-2019 NHAI Reg. No conflict of Interest reg. appointment of Independent Engineer 08-02-19 Attached
150 09-02-2019 AKBARL.KBA.NH-2.2018-19.088 09-Feb-2019 NHAI Reg. Source Approval of Geo Grid & Admixture 09-02-19 N/A
151 12-02-2019 AKBARL.KBA NH-2 2018-19.090 1 _
2 Feb-2019 NHAI Reg. Request for change of scope instructions for the execution of culverts 12-02-19 N/A
152 12-02-2019 AKBARL.KBA NH-2.2018-19.091 12-Feb-2019 NHAI Req. Temperory diversion plan for VUP at Ch.368+545 & Ch.370+450 12-02-19 Attached
153 14-02-2019 AKBARLKBA,NH-2.2018-19.092 13-Feb-2019 NHAI Reg. Plantation of Hedge in the extreme edge of ROW 14-02-19 N/A
154 14-02-2019 AKBAK.KBA.NH-2.2018-19.093 14-Feb-7019 NHAI Reg. Minor Bridge at Design Ch.365+120 14-02-19 N/A
155 15-02-2019 AKBARLKBA.NH-2.2018-19.095 152121;t2012 NHAI Reg. Source Approval of Hume Pipe 16-02-19 Attached
156 15-02-2019 AKBARIABA.NH-2.2018-19.096 15-Feb-2019 NHAI Reg. Factory visit & RCC Hume pipe testing for Source Approval 16-02-19 N/A
157 15-02-2019 AKBARL.KBA NH-2.2018-19.078 31-Jan-2019 NHAI Reg. Revised List for Shilling of Tube wells 16-02-19 N/A
158 19-02-2019 AKBARL.K8A.NH-2.2018-19.09/1 19-Feb-2019 NHAI Reg. Rate Analysis of Existing Structure/Enroachmcnt 19-02-19 Attached
159 20-02-2019 AKSIARLKBA.NH-2.2018-19.100 20-Feb-2019 NHAI Reg. Source Approval of Geo Grid 20-02-19 Attached
160 25-02-2019 AK8ARLK8A.NH-2.2018-19.102 25-Feb-2019 NHAI Reg. Proposal for Declaration of Appointed Date 26-02-19 N/A
161 28-02-2019 AK8ARI.K8A.NH-2.2018-19.103 28-Feb-2019 NHAI Reg. Submission of Concrete Mix Design (M-35) for Structure 28-02-19 Attached
Reg. Submission of Soil Test Report for approval of Borrow Area No.53 at Ch.380+440 RHS, Borrow
162 28-02-2019 AKBARLK8A.NH-2.2018-19.105 28-Feb-2019 NHAI Area No.54 at Ch.383+480 LHS, Borrow Area No.55 at Ch.378+820 RHS & Borrow Area No.62 at 02-03-19 Attached
Ch.393+360 LHS
163 06-03-2019 AKBARL.KBA.NH-2.2018-12.106 28-Fek-2019 NHAI Reg. Source Approval of Steel 06-03-19 Attached
164 06-03-2019 AKBARL.KBA.NH-22018-19.107_06-Mar-2019 NHAI Reg. Submission of utility shifting RA Bill Attached
165 06-03-2019 AKBARL.KBA.NH-2.2018-19.108 06-Mar-2019 NHAI Reg. Submission of utility shifting RA Bill Attached
166 07-03-2019 AKBARLKBA.NH-2.2018-19.110 07-Mar-2019 NHAI Reg. Request for Enclosure 08-03-19 N/A
Reg. Establishment of Stone crusher for NH-2 Road work at Vill-Surjodih, P.S-Nimiyaghat, Mauja No-
167 08-03-2019 AKBARL.K8A.NH-2.2018-19,111 08-Mar-2019 NHAI 09-03-19 Attached
177, Dist-Giridih, Pin-825I67 (Tharkhand)
168 09-03-2019 AKBARL.K8A.NH7 2.2018-19.112 09-Mar-2019 NHAI Reg. Submission of Mix Design of Filter Media 09-03-19 Attached
169 09-03-2019 AKBARL.KBA.NH-2.2018-19.113 09•Mar-2019 NHAI Reg. Submission of Mix Design of GSB 09-03-19 Attached
170 09-03-2019 AKBARL.KBAAH-2.2018,19.115 09-Mar-2019 NHAI Reg. Request for issuance of Incident Management 09-03-19 N/A
171 08-03-2019 AK8ARL.KBA...NH-2.2018-19.6868 08-Mar-2019 NHAI Reg. Request to appoint Safety Consultant 12-03-19 N/A
Reg. Submission of Emergency Response Plan, Environment Management Plan & Traffic Safety
Reg
172 09-03-2019 AKBARL.KBA.NH-2.2018-19.116 09-Mar-2019 NHAI Attached
Management Plan
173 15-03-2019 AKBARL.KBA.NH-2.2018-19.118 15-Mar-2012 NHAI Reg. Request for Issuance of Measurement Book & Abstract Book 16-03-19 N/A
174 19-03-2019 AKBARL.K8A.NH-2.2018-19.119 19-Mar-2019 NHAI Reg. Revised list of Borrow Area 22-03-19 Attached
175 19-03-2019 AKBARLKBA.NH-2.2018•19.121 19-Ma0111.2 NHAI Reg. Submission of Borrow Area No.61, 63,67 22-03-19 Attached
176 19-03-2019 AKBARL.K8A.NH-7.2018-19.122 19-Mar-2019 NHAI Reg. Testing of Material N/A
177 19-03-2019 AKBARL.K8A.NH-2.201?-124123 19-Mar-21242 NIIAI Reg. Submission of 28 Days Compressive Strength of Concrete Cubes (M-35) 22-03-19 Attached
178 19-03-2019 AKBARL.KBA.NH-2.2018-19.124 19-Mar•2019 NHAI Reg. Submission of Concrete Mix Design (M-40) for Structures 22-03-19 Attached
Reg. Permission of mining lease of stone quarry for NH-2 road work at Mauza Gandnawadih & Mauza
179 18-03-2019 AKBARL.KBA.NH-2.2018-19.127 18-Mar-2019 NHAI N/A
— Khurdih
180 27-03-2019 AKBARLABA NH-2.2018-19.128 27-Mar-2019 NHAI Reg. Request for Issuance of Measurement Book & Abstract Book 27-03-19 N/A
181 27-03-2019 AKBARL.KBA.NH-2.2018-19.129 27-Mar-2019 NIIAI Reg. Submission of utility shifting RA Bill 02-04-19 Attached
182 30-03-2019 AKBARLKBA.NH•2.2018-19.130 30-Mar-2012 NHAI Rcg. Request for an approval to contract price weightages as per Annexure-I of Schedule-G 30-03-19 Attached
183 31-03-2019 AKBARL.KBA.NH-2.2018-19.131 31-Mar-2019 NIIAI Reg. Submission of R.A Bill No.01 for Incidental Management Service 02-04-19 Attached
184 30-03-2019 AKBARL.KBA NH-2201?-19.132 3Q-Mar-2019 NHAI Rcg. Supply of Fly Ash 30-03-19 N/A
183 01-04-2019 AKBARL.KBA.NH-2.2018-19.136 01-Apr-2019 NHAI Reg. Source approval of Steel (Round Steel) 01-04-19 Attached
184 02-04-2019 AKBARk.KBA,.NH-2.2018-19.137 02.:Apr-2019 NIIAI Reg. Request for suitable instructions (COS) for the execution of Culverts. 02.04-19 N/A
185 02-04-2019 AKBARL.KBA.NH-2.2018-19.138 02-Apr-2019 NHAI Reg. Minor Bridge at Design Ch.365+120 02-04-19 N/A
186 04-04-2019 AKBARIABA.NH-2.2019-20.140 04-Apr-2019 NHAI Reg. Source Approval of flume Pipe 04-04-19 Attached
187 04-04-2019 AKBARL.KBA NH-2.2019-20.141 04-Apr-2019 NHAI Reg Source Approval of Third party laboratory (NABL Approved) 04-04-19 Attached
188 04-04-2019 AKBARI.KBA.NH-2.2019-20.142 Oa-Apr-2019 NHAI Reg. Submission of Mix Design of DI.0 04-04-19 Attached
189 04-04-2019 AKBARL.KBA NH-2.2019-20.143 04-Apr-2019 NHAI Reg. Submission of Mix Design (M-10,M-I5,M-20,M-25,M-30) with fly ash for structure 09-04-19 Attached
190 04-04-2019 AKBARI.KBA.NH-2.2019-20.145 04•Apr-2019 NHAI Submission of Video recording for the quarter ending 31.03.2019 04-04-19 Attached
191 04-04-2019 AKBARL.KBA NH-2.2019-2.0.14_9.4-A,p1:2Q12 NIIAI Reg. Issuance of CoS order for Incident Management 04-04-19 N/A
192 08.04-2019 AKBARI .KBA NH-2.2019-20.149 08-Apr-2019 NIIAI Reg. Submission of Mix Design of WMM 08-04-19 Attached
193 08.04-2019 AKBARLKBA.NH-2.2019-20.151 08-Apr-2019 NHAI Reg. Shifting of religious structures 08-04-19 N/A
Sr. Date of
Date of Woe Letter Reference No. Issued To Subject of Letter Enclosure Rema rks
No. Receiving
194 09-04-2019 AKBARL.K8A.NH-2.201120.154 09-Apr-2019 NHAI Reg. Agreement for depot to deposit the cut tree logs 09-04-19 NiA
195 09-04-2019 AKBARLKBA.NH-2.2019-20.155 09-Apr-2019 NHAI Reg. Information required on Pangolin animal in Topchachi forest 11-04-19 N/A
196 09-04-2019 AKBARL.I NHAI Reg. Submission of quality assurance procedures and construction methodology 09-04-19 Attached
197 09-04-2019 AKBARLKBA.NH-2.2019-20.158 09-Apr-2019 NHAI Reg. Submission of monthly progress report 01 (till february 2019) 10-04-19 Attached
Reg. Status of non-availability of vacant access to sitefland for conrumstruction as on 90 days from the
198 13-04-2019 AKBARL.KBA.NH-2.2019-20.7003 09-Apr-2019 13-04-19 Attached
NHAI date of Appointed Date
199 12-04-2019 AKBARL.KBA NH-2.2019-20.161 12-Apr-2019 NHAI Reg. Source Approval of Steel (SRMB) 12-04-19 Attached
—
200 12-04-2019 AKBARL.KBA„NH-2.2019-20.162 12 Apr-2019 NHAI Reg. Submission of soil test report of BA No-66,68,69,70,72 12-04-19 Attached
201 12-04-2019 AKBARLKBA NH-2 2019-20.164 12-Apr-2019 NHAI Reg. Submission of utility shifting RA Bill 12-04-19 Attached
202 13-04-2019 AKBARLKBA..NH-2.2019-20.165 13-Apr-2019 NHAI Reg. Submission of Mix Design of filter media for RE Wall 15-04-19 Attached
203 16-04-2019 AKBARLKBA.NH-2.2019-20.167 16-Apr-2019 NHAI Reg. Maintenance of road 16-04-19 N/A
204 16-04-2019 AKBARt .KBA.NH-2.2019-20.168 16-Apr-2019 NHAI Reg. Submission of Escrow Account Details 16-04-19 Attached
205 10-04-2019 AKBARL.KBA,NH-2201.9.:20.79.26 1.02ffe-.2012 NHAI Reg. Submission of Amendment to Financing Documents 16-04-19 Attached
206 16-04-2019 AKBARt .KBA NH-2_2019-20.166 16-Apr-2019 NHAI Reg. Black spot at Ch.391-I-05 18-04-19 N/A
207 17-04-2019 AKBARL.KBA.NH-2.2019-20.170 17-Apr-2019 NHAI Reg. Submission of RA Bill of Utility Shifting from Ch.360+300 to Ch.369+100 18-04-19 Attached
208 20-04-2019 AKBARt.KBA.NH-2.2015-20.171 20-Apr-7019 NHAI Reg. Submission of Monthly progress report 02 for the month of March 2019 20-04-19 Attached
209 22-04-2019 AKBARt KBA.NH-2.2019-20.173 22-Apr-2019 NHAI Reg. Request for release of first and second installament of Mobilization Advance 22-04-19 Attached
210 25-04-2019 AKBAR1.KBA.NH-2.2019-20.174 25-Apr-2019 NHAI Reg. Submission of Insurance documents 26-04-19 Attached
211 25-04-2019 AKBARL.KBA.NH-2.2019-20.176 25-Apr-2019 NHAI Reg. Request to provide desired details required by International Finance Corporation 26-04-19 N/A
212 26-04-2019 AKBARL.KBA.NH-2.2019-20.177 26-Apr-2011 NHAI Reg. Submission of Construction Time Schedule/Program 27-04-19 Attached
213 27-04-2019 AKBARLKBkNH-2.2019: 20.179 2721pL72912 NHAI Reg. Submission of Estimate for tree transplantation 29-04-19 Attached
3 19-04-2018 11015.5.PD.OHN.NH-2.51X-Laning.ABL.157 19-Apr-2018 Request to grant permission for the conducting Traffic & Engineering surveys. NHAI
4 23-04-2018 11015.5.PD.DHN.NH-2.Six lanIng.ABL.188 23-Apr-2018 Request to witness Video recording of the Project Highway (LHS) NHAI
Reg. Request to grant permission for the conducting Axle load
5 03-05-2018 11015.5.PD.DHN.NH-2.Six laning.ABL.222 03-May-2018 NHA1
survey/requirement of Police protection for survey work. \ .•\
6 05-05-2018 11015.5.PD.DHN.NH-2.Six-Laning.ABL.260 05-Mav-2018 Maintenance obligations prior to Appointed Date NIIAI
7 14-05-2018 11015.5.PD.DHN.NH-2.Six-Laning.ABL.307 14-May-2018 Maintenance of stretch in view of scheduled visit of Hon'ble Prime Minister NIIAI
8 18-05-2018 11015.5.PD.DNH.Inf.NQ.337 18-May-2018 Availability of preparedness for maintenance during monsoon. NI IA1
9 04-06-2018 11015.5.PD.DHN.FLT.NH-2.425 04-June-2018 Rcg. Land Handover for six laning (Area=51.766 Ha) NIIAI
Review meeting for all ongoing projects of NHAI/MoRT&H/NHIDCL on 11th
& 12th June 2018 at Goa to be chaired by Flon'ble Minister (Road
10 04-06-2018 NHAI.RO.MuM.Admn.2018-19.540 04-Jun-2018 NHAI
Transportation and Highway, Shiping and Water Resources, River
Development & Ganga Rejuvenation)
11 13-06-2018 110155 PD DHN.FL7 NH2.482 13-June-201S Tree Marking & Cutting under Dist. Giridih N/A NHAI
12 13-06-2018 11015.5.PD.OHN.FLT.NH2.483 13 June 2018 Tree Marking & Cutting under Dist. Dhanbad N/A NIIAI
13 15-06-2018 11015.5.PD.DI-IN.LA.NH2.5ix.Lan.n 504 15-June-2018 Forwarding of the Possession Certificate of Land Attached NHAI
14 29-06-2018 11015.5.PD.DHN.Labour.580 29-June-2018 Issuance of Form-Ill reg. NHAI
15 04-07-2018 NHAL1101211-1.Pkg-111.V.2010.01.120515 04-Jun-2018 Re.. R:. uest to furnish an amendment in PBG NHAI
16 13-07-2018 Dayabansapahar Issue Rcg. Not permitted for issuance of NOC N/A CO, Topchanchi
17 18-07-2018 11015.5.PD.OHN.Labour.764 18-July-2018 Issuance of Form-Ill reg. NHAI
18 18-07-2018 110155.PD.DHN.I.A.NH2.A81.767 18-Jul -2018 Reg. Progress made in satisfying the condition precedent Attached NHAI
19 26-07-2018 NHAI.110121H.Pk -111 V 2010.01121496 26 -Jul -2018 Release of Bid Security Bank Guarantee. NHAI
Reviese Estimate of Erection of 33kv,I I kv,LT Line & Installation of D/S/S
20 01-08-2018 1947.ESE.Chas 01-Aug-2018 along 6 lane (NH-02) Dayabans Pahad to Golden Petrol Pump on the basis of BVNL, Chas
current SOR.
21 07-08-2018 NHAI.11033.CGM FA .FC.2018-19 07-Au -2018 Review of Draft Copies of Financing Agreements NHAI
22 20-08-2018 11015.5.PD.DHN.LA.NH-2.1034 20-Au:-2018 Reg. Dismentaling Structure felling in PROW N/A NIIAI
23 21-08-2018 11015.5.PD.DHN.LA.NH-2.1059 21-Aug-2018 Reg.Govt. Land & Religion place Dismentaling Structure felling in PROW Attached NHAI
24 23-08-2018 11015.5.PD.DHN.FLT NH-2.1062 23-Aug-2018 Reg. Tree Cutting under PROW, Dist- Dhanbad Attached NIIAI
25 23-08-2018 11015.5.PD.DHN.FLT.NH-2.1063 23-Au.-2018 Reg. Tree Cutting under PROW, Dist- Giridih Attached NI IAI
Reg. Estimate for shifting of Topchanchi Water supply scheme and shifting of
26 23-08-2018 11015.5.PD.DIIN.US.PHED.N11-2.1064_23-Aug-2018 NHAI
62 numbers of India Mark-2 Hand Pumps Attached
27 30-08-2018 11015.5.PD.DHN.LA.NH-2.1091 30-Aug-2018 Recruitment of Magistrate for Land equation Attached NHAI
Regarding the execution of the complaint received from the center of Chief
28 31-08-2018 NHAI
11015.5.PD DHN.PC&Others.1103 31-AL18-2018 Minister's Public Dialogue Attached
29 31-08-2018 110155.PD:pHN.FLT. NH-2.1109. 31-Au.-2018 Regarding the tree cutting in acquired land Attached NHAI
Month y Progress Report-April-2019 Page 1 of 4
v- V- rf r f a 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Sr. Date of
Letter Reference No, Subject Enclosure Received From Remarks
No. Received
30 04-09-2018 11015.5.PD.DHN.US.EIectric.NH-2.1123 04-Sep-2018 Regarding Submission of Revised estimate of Electrical work Attached NHAI
31 04-09-20I8 11015.5.PD.DHN.LA.NH-2.1124 04-Sep-2018 Request for Provide information as desired by lenders. Attached NHAI
32 04-09-2018 11015.5.PD.DHN.LA.NH-2.1125 04-Sep-2018 CALA Possession Certificate Attached NHAI
33 04-09-2018 11015.5.PD.OHN.US.Electric.NH-2.1127 04-Sep-2018 Reg. Submission of Revised estimate of Electrical work Attached NHAI
34 12-09-2018 NHAI.11033.CGMjFA).pC.2018-19 12-Sep-2018 Reg. Submission of Review report of Draft Financing Documents Attached NHAI
Sr. Date of
Letter Reference No. Subject Enclosure Received From Remarks
No. Received
71 19-12-2018 11015 S.PD DHN.NH-2.5ix-Laninp.A81.1930 19-Dec-2018 Reg. Demarcation of ROW Boundaries for Green Highways Projects. Attached NHAI
72 19-12-2018 11015.5.PD pHN.NH-2.5ix-laning.ABL.1933 19-Dec-2018, Reg. Construction of thc Project N/A NHAI
Reg. Observance of Swachhata Pakhwada during 1st January 2019 to 15th
73 22-12-2018 11015.5.PD.DHN.Swachh Bharat.1981 22-Dec-2018 Attached NHAI
January 2019
74 20-12-2018 Forest Letter No.3030 20-Dec-2018 Reg. Tree cutting (Giridih District) Attached DFO,Giridih
75 24-12-2018 Forest Letter No.3078 24-Dec-2018 Reg. Tree cutting (Giridih District) N/A DFO,Giridih
76 26-12-2018 11015.S.PD.DHN.FLT.NH-2.2003 26-Dec-2018 Reg. Tree cutting N/A NHAI
77 28-12-2018 DFO Letter No.392 26-Dec-2018 Reg. Tree cutting ,Dist. Dhanbad Attached DFO.Dhanhad
78 29-12-2018 11015.5.PD 01-IN.NH-2.5ix-Laniniz.ABL.2006 27-Dec-2018 Reg. Declaration of Appointed Date Attached NIIAI
79 09-01-2019 11015.5.PD.OHN.FLT.NI-1-2.2079p9-Jan-2019 Reg. Tree cutting, Dumri Attached NIIAI
80 11-01-2019 11015.5.PD.DHN.FLT.NH-2.7115 11-Jan-2019 Reg. Tree cutting, Dumri Attached NIIAI
81 12-01-2019 11015.5.PD.OHN.NH-2.5ix-Laninp_ABL.2124 17-Jan-2019 Reg. Declaration of Appointed Date Attached MIA!
82 16-01-2019 11015.5.PD.DHN.Road Safety.2140 16-Jan-2019 Reg. Speed Limit Signages Attached NHAI
83 16-01-2019 11015.5.PD.DHN.NH•2.5ix-Laning Al3L.2161 16-tan 2019 Reg. Maintenance obligations prior to Appointed Date N/A NIIAI
84 19-01-2019 11015.5.PD.DHN.NH-2.5ix-Laning.ABL.2216 19-Jan-2019 Reg. Undertaking construction work of the project N/A NHAI
85 21-01-2019 11015.5.PD.OHN.Rolicyffech).2227 21-Jan-2019 Reg-Maintanance of site records. Attached NIIAI
86 21-01-2019 11015.5.PD.OHN.Road safety.2228 21-Jan-2019 Reg-Training on road safety Engineer and construction Safety. Attached NHAI
87 25-01-2019 11015.5.PD.DHN.NH-2.5ix-Laning.A8L.2250 25-Jan-2019 Reg. Maintenance obligations prior to Appointed Date N/A NHAI
88 25-01-2019 11015.5.PD.DHN.NH-2.5ix-Laning.ABL.2253 25-Jan-2019 Reg. Tree Transplantation N/A NHAI
89 25-01-2019 11015.5.PD.DHN.NH•23ix-LaninzABL.2258 25-Jan-2019 Reg. Submission of RFI N/A NHAI
90 28-01-2019 11015.5.PD.DHN.US.PHED.NH-2.2270 28-Jan-2019 Reg. Revised list for shifting of Tube wells N/A NHAI
Reg. Motor rally to commemorate 150 years of Mahatma Gandhi's Birth
91 29-01-2019 11015.5.PD.DHN.Road Safetv.2284 28-Jan-2019 N/A NHAI
Anniversary
92 29-01-2019 11015 S PD DHN NH-2 Six-LaninR.ABL 2285 28-Jan-2019 Reg. request for suitable instructions (CoS) for execution of citheri, N/A NHAI
93 29-01-2019 11015.5.PD DHN.ETC.2289 28-Jan-2019 Reg. Circulation of Plicy documents Attached NHAI
94 02-02-2019 1
_1015.5.P0 Dt-IN.Toll_ETC.2323 01-Feb-2019 Reg. FASTag for all NHAI vehicles/hired vehicles Attached NHAI
95 04-02-2019 1
_1015.5.PD.DHN.NH-7.ABL.2355 01-Feb-2019 Reg. Proposal for Declaration of Appointed Date Attached NHAI
96 09-02-2019 NHALRO.RNC..1H.6-Lane.6763 07-Feb-2019 - Reg. Declaration of Appointed Date N/A RO,Ranchi
Reg. Estimate for shifting of 11KV,LT & 33KV Line at GT road side from
100 01-03-2019 11015.5.PD.OHN.US.Electric.NH-2.2571 01-Mar-2019 Attached NHAI
Khairatunda to Madhupur Maur under Electric Supply Section,Isri
101 08-03-2019 NHAI.11012.11-1.Pkg-3.5.2010.01 08.03.2019 Reg. Declaration of Appointed date N/A NFIAI
102 09-03-2019 11015.5.PD.DHN.NH-2.5ix-Lanine.ABL.2688 09-Mar-2019 Reg. Declaration of Appointed Date Attached NHAI
103 15-03-2019 11015.5.PD.DHN.Policy(Terh).2715 15-Mar-2019 Reg.Utilintion of utility ducts along the National Highways in Urban areas Attached NHAI
Reg. Estimate for shifting of Topehachi water supply scheme & shining of 62
104 15-03-2019 11015.5.PD.DHN.US.PHED.NH-2.2723 15-Mar-2019 Attached NHAI
no's of India Mark Hand pumps
105 16-03-2019 11015.5.PD,DHN.NH-2,Six-Laning.ABL.2760 16-Mar-2019 Request for issuance of CoS order for Incident Management N/A NHAI
106 18-03-2019 11015.5.PD.DHN.NH-2 Six-Lanip8.A81..2773 18-Mar-2019 Reg. Issuance of M.B & A.B N/A NHAI
Rcg. Transportation of Fly Ash/Pond Ash from CTPS & BTPS to be used in
107 18-03-2019 11015.5.PD.DHN.NH-2& NH-32.ABL.2784 18-Mar-2019 Attached NHAI
road construction work
108 27-03-2019 11015.5.PD.DHN.NH-2.5ix-Laninp, ABL.2833 27-Mar-2019 Reg. Issuance of M.B & A.B Attached NHAI
109 29-03-2019 11015.5.PD.DHN.Road Safety.2865 29-Mar-7019 Reg. Black spot at Ch.391+05 N/A NHAI
Month y Progress Report-April-2019 Page 3 of 4
r If f fit fri I 4 I I I
Sr. Date of
Letter Reference No. Subject Enclosure Recei% ed From Remarks
No. Received
Reg. Booking of expenditure in final accounts of NHAI for work executed /
110 30-03-2019 11015.5.PD.DHN.ACC.2877 30-Mar-2019 Attached NHAI
completed upto 31.03.2019 pertaining to F.Y 2018-19.
I11 09-04-2019 11015.5.PD.OHN.NH-2.Six Lanin • ABL.65 09 A•r-2019 Reg. Maintenance of Road Attached NHAI
Reg. Request to reserve test section for field trial of Neoloy Geocell from
112 11-04-2019 11015.5.P0.DFIN.N1-1-2.5ix Laning.ABL.72 11-Apr-2019 Attached NI TAI
chainage 399+100 to Ch.399+600
113 1204-2019 NHAI.RO.RNCJH.DHN.6-lane(iii).7176 12-Apr-2019 Reg. Interim Arrangement Attached NI IA1
Reg. Submission of various structural design & drawing of MNB,Culverts &
114 12-04-2019 11015.5.PD.DHN.NH-2.5ix-Laning.ABL.95 12 Apr-2019 N/A NI A1
VUPs for review & approval
115 15-04-2019 11015.5.PD.OHN.N1-1-2.ABLAcc.123 15-Aor-2019 Reg. Submission of Escrow Account Details N/A NI A1 _
116 16-04-2019 11015.5.PD.DHN.Acct.137 16-Apr-2019 Reg. Remittance of payment through RTGS to Escrow Account N/A NI TAI
117 16-04-2019 11015.5.PD.OHN.Acct.138 16-Apr-2019 Reg. Remittance of payment through RTGS to Escrow Account N/A NI lAl
118 16-04-2019 NHAI.RO.RNCJH.OHN.6-lane(i).7206 16-Apr-2019 Reg. Site Inspection Note Attached RO.Ranchi
119 18-04-2019 11015 S.PD DHN.Acct.153 18-Apr-2019 Reg. Remittance of payment through RTGS to Escrow Account Attached NI
Reg. Submission of various structural design & drawing of MNB,Culverts &
120 22-04-2019 11015.5.PD.OHN.NH- 2.51x -Laning.ABL.156 22-Apr-2019 Attached NI 1A1
VUPs for review & approval
121 24-04-2019 e11015.5.PODFINAH-2.ABLAcctt.169 24-Apr-2019 Reg. Submission of Insurance documents N/A NHAI
122 24-04-2019 11015.5.PD.DHN.NH-2.5ix-Laning.ABL.161 24-Apr-2019 Reg. CoS proposal for Incident Management Service Attached NI 1A1
123 24-04-2019 11015.5.PD 01-IN.NH-2.Six-Laning.ABL.189 24-Apr-2019 Reg. CoS for the execution of culverts N/A NI 1A1
Reg. Transportation of Fly Ash from thermal power station to road construction
124 25-04-2019 11015.5.PD.DHN.NH-2&NH-32.ABL.164 24-Apr-2019 N/A NHAI
sites
Reg. Request for the release of mobilization advance against the 10% of the
30-04-2019 NHALRO.RNC.IH.DHN,NH-02(111).7269 30-Apr-2019 N/A RO.Ranchi
contract value
30-04-2019 11015.5.PD.DHN.NH 2.ABL.223 30-Apr-2019 Reg. Information on utility ducts along National Highways Attached NI
•
•
•
•
•
•
•
•
• Accident Data
%IF
ler
Annexure-XIV
II- t 4 4 4404 4 i 4444
ambulance / private
lelp providedby
Timc of Accident
Nos of animals
Acc ident Location
tE
killed if any
C-• ...--. u -2
`"
Non injured
vehicle
.. pm /am t tE !:-..:. ., ,- _
--,
:
— 1 - _-.•
— s
•.i.
'
...,. 7. ,: =
L., v a'
73 '5
I
-?..
Ir. ..., .?.
CL
9 311-09G-6283,
5 13-Apr Not Found 366.72 I 2
111-10BM-1887 6"
.11.1-MS3037,
6 17-Apr 07:30 AM 385.55 9
DR-016-0395
7 22-Apr 08:15 AM 365.3 9 .111-10AZ-5750
8 22-Apr 08:30 AM 367.9 9 BR-02AA-9820
9 28-Apr Not Found 382.18 9 W11-1114-2629 2
10 30-Apr Not Found 370.16 9 JH-24D-2217
Total 10 2 1 9
B: l) Overturning 2) Head on collision 3) Rear end collision 4) Collision brush side sw ift 5) Right turn collision 6) Skidding 7) Others (I'L Specific)
C: I) Fatal 2) Grievous injury 3) Minor injured 4) Non injury.
D: I) Drunken 2) Overspeeding 3) Vehicle out of control 4) Fault of driver of motor vehicle/ driver of other vehicle 5) Defect in mechanical condition of motor vehicle.
E : I) Single lane; 2) 1 sso Lane; 3) Three Lane or more uithout central divider (median); 4) four lanes or more uith central divider.
F : I) Straight road 2) Slight curse 3) Sharp curse 4) Flat road 5) Gentle incline 6) Steep incline 7) Hump & dip.
G : I) T Junction 2) V Junction 3) Four arm junction 4) Staggered junction 5) Junction is ith more than four arms 6) Round about junction 7) !Shinned rail crossing 8) Unmanned rail crossing.
II : I) Fog 2) Mist/fog 3) Cloudy 4) Light Rain 5) I leans Rain 6) I lail or sleet 7) Sniw and strong vi. inil M Dust strum 9) N'ers: Hot 101 Other estraordinary weather condition.
Nlanagemcnt Kcpresentat IS e
Issued By
S
6
4
6
6
6
6
Photographs Of On-Going Work At Site
•
6
S
imp
Annexure-XV
Six-laning of Khairatunda to Barwa Adda Section of NH-2 from km.360.300 to km. 400.132 in the state of
Jharkhand under NHDP Phase-V on Hybrid Annuity Mode
-• -
Tree cutting at ch. 3974300km 2019 04 2
•. ,
:171..4 01110 VD 37 4- 1190 S. 20149. 03- 1
Geo textile fixing at weep hole box culvert at Ch. 377+436I an (RHS) 201941S-07
lie ti vsz
rtL
,•„1
I
Reinforcement placing for Raft of MNB LHS at ch-383+653