Khai Mabu
Khai Mabu
Khai Mabu
THESIS
Laern about the water
treatment process of the
unit 31 Dung Quat oil
refinery
HANOI - 04/2019
ACKNOWLEDGMENT
I sincerely thank Dr. Cong Ngoc Thang who has dedicated guidance and help me.
Thanks to the teacher's guidance, I understood the necessary issues and completed
this thesis in due time.
However, with the large of workload and in a limited time, so during the process
of compeleted this thesis I can not avoid mistakes and shortcomings. I hope all of
our beloved teachers would review and help me perfect my project.
Once again, I would like to express my deep gratitude to Dr. Cong Ngoc Thang
and all the teachers of Oil and Gas Faculty - major in Oil refining and
Petrochemistry - (Hanoi University of Mining and Geology) have helped me
during 5 years of studying and finishing this thesis.
Hanoi, 4-2019
Student
Page 49 of 79
LIST OF SYMBOLS, ABBREVIATIONS
No. Abbreviation Meaning of symbol, abbreviation Page
1 BSR Binh Son Refining 3
2 DQR Dung Quat Refinery 5
3 TK TANK 7
4 CCC Central Control Complex 9
5 20
Page 50 of 79
LIST OF TABLES
No. Name of table Content of table Page
Page 51 of 79
LIST OF DRAWINGS, GRAPHS
No. Name of graph Content of drawing, graph Page
1 Figure 1.1 Process units and Offsites of Dung Quat 3
refinery
INTRODUCTION
Page 52 of 79
Page 53 of 79
CHAPTER 1 : An overview of Dung Quat refinery
Page 54 of 79
1.1.1Natural Conditions
>Topographic:
- Dung Quat Economic Zone or Binh Son Refining is located in the flat terrain of Quang Ngai Province,
between the coast are low mountain range and sand dunes.
+ Highest altitude: + 20m.
+ Medium altitude: 4 ÷ 10m.
+ Lowest alitude: 0.1 ÷ + 3.0m.
- The terrain has the shape of sloping from West to East and from South to North with an average slope
of 0.4 ÷ 8%.
> Climate:
- Dung Quat refinery is in the South Central climate region. So there are two separated seasons.
+ Winter: Not so cold, the average winter temperature is 19 oC and absolute minimum temperature does
not fall below than 12 oC.
+ Summer: Temperature are fairly high in about 4 months which have the average temperature of 28 oC.
Other elements:
+ Sunshine: Quang Ngai Province has the avarage sunny hours of 1,800 ÷ 2,000 hours per year.
+ Wind: Quang Ngai province has a hot dry West wind in the summer, but not as powerful as the North
Central Region. It has long-lasting hot season, sometimes accompanied with the strong southwest winds
causes drought in the area. Northeast Monsoon: Often causes gusts, whirlwinds and often causes heavy
rain, while temperatures drop sharply.
+ Average wind speed : 2.9 m / s.
+ Maximum wind speed : 40m / s.
+ Typhoons: Quang Ngai as well as all the other central region which are sea coastal provinces are
affected by tropical storms. On average per year, storms directly affects Quang Ngai province, caused
heavy rain and very strong winds of level 6 or higher. There are also three to four tornados along with
heavy rain and strong winds, sometimes accompanied by sea level rise.
1.1.2 The importance of Dung Quat refinery
Over the years the world has witnessed major fluctuations and needs in the oil and refined oil markets.
Unstable situation in the major oil-supplying regions and the rise in demand of oil-supply have helped the
price of oil and gasoline increased to the record levels. Especially, in the year 2008, the world crude oil
market was constantly fluctuating unnormally. It was the reason pushing the crude oil price to the record
of $150/barrel, and then fell down magnificently to below $45/barrel.
Page 55 of 79
Fluctuations in crude oil prices have had a negative impact on many economies, leading to many
consequences, affecting the growth rate of many countries, including our country Vietnam. To reduce the
negative impact of oil price fluctuations and ensure our national energy security, Vietnam needs to be
proactive in satisfying domestic demand of oil-supplying. Building refineries will create a precondition
for the chemical industry to develop. Refined products are the main raw material for polymerization
production, lubricant additives and some cosmetic products . Nowaday, more than 99% of the oil exports,
50% of the imported oil products are due to Foreign transport. The production and consumption of oil in
the country make the domestic transporting service increase, especially the shipbuilding industry grow
rapidly. These are two important sectors that are capable of generating great added value and a lot of
potential for development. So after all, Vietnam has decided to invest in building the first oil refinery in
Dung Quat - Quang Ngai called Dung Quat the first oil refinery . Dung Quat is located in Quang Ngai
province, in central region of Vietnam where has the lowest economic growth in the country. The refinery
plant located here do not directly create jobs or contribute to local budgets. But with the development of
infrastructure including deep-water ports, roads, electricity, telecommunication networks ... serving
refineries (without those factories) Open policies will attract domestic and foreign investment projects in
Dung Quat economic zone in particular and in the central region. Dung Quat has attractive comparative
advantages: located in the midst of Vietnam and the region; There is Chu Lai International Airport, deep
sea port; Has a new city with a full range of high quality amenities and services; To enjoy the highest
privileges in Vietnam and to apply the regime and mechanism of open management in line with
international practices and adaptation to the nature of economic globalization today.
Dung Quat refinery has a designed capacity of 6.5 million tons of crude oil annually, or 140 thousand
barrels per day (22×103 m3/d). The capacity would be expanded to 10 million tons per year by 2013–2014. In
addition to fuels, the refinery will also produce petro-chemical products. The refinery complex area comprises:
overall refinery Process, Utility and Offsites Facilities: about 110 ha;
Crude Tank Farm and Flare Area: about 42 ha;
Product Tank Farm: about 36 ha;
Seawater intake, Waste Water and Crude Oil Pipelines: about 4 ha;
Interconnecting Pipelines, road and right of Way: about 40 ha;
Page 56 of 79
Product Harbor Service Area: about 135 ha.
Main contractors of the refinery were Technip, JGC Corporation, and Técnicas Reunidas. The refinery cost
US$3 billion, up from $2.5 billion previously and more than double an original cost estimate of about
$1.4 billion in 1994. It may need another $1 billion to build a desulphurising unit targeted for 2013.
A consortium of foreign firms stepped in (LG Group, Petronas, Conoco, Stone and Webster and PRC -
Chinese Petroleum Company and China Development) but withdrew two years later for the same reasons.
In 1999, Prime Minister Phan Van Khai took steps to speed up construction of the country's first oil
refinery. The rekindled project was a joint venture between Vietsovpetro (a Vietnam-Russia joint venture
responsible for the bulk of Vietnam's oil exports) and Russia's External Economic Federation (Zarubeznheft).
The joint venture was dissolved in December 2002 by the Russians who claimed the refinery was not
economically viable at the intended site. In February 2003 Vietnam decided to go it alone and continue with
the refinery construction. Phase I operations began in February 2009.
The Dung Quat refinery has cost an estimated at $3bn for construction and equipment. The original
front-end engineering and design contractor for the project was Foster Wheeler Energy of the UK (this was
superseded by a FEED agreement signed with Technip in 2004). The refinery was built on a site consisting of
338ha of land and 473ha of sea in the Dung Quat Economic Zone.
One of the consortia, TPC Complex, which consists of Technip, Technip Geoproduction and Technicas
Reunidas, was awarded the engineering, procurement and construction turnkey contracts No.1 and No.4 for
Page 57 of 79
the refinery in May 2005. In June 2006 the refinery selected the SmartPlant Enterprise as its standard software
for management of plant design, maintenance and operations of the plant.
- Refinery processing, utility and offsite facilities (110ha) Crude oil tank farm and gas flare-off area
(42ha)
- Product tank farm (36ha)
- Seawater intake, waste water processing and crude oil pipelines (4ha) Interconnecting
pipelines and road access (40ha);
- Harbour product export area (135ha);
Crude Supply:
The refinery is designed to process crudel from Bach Ho crude oil field, which is expected to run out before
2020. Petrovietnam has a preliminary agreement with BP for supplies of similar quality to use exclusively
until 2011.
Ownership:
The refinery is owned and operated by Petrovietnam. Petrovietnam negotiates with foreign oil companies,
including Royal Dutch Shell, Essar Group and SK Energy, toupgrade and sell part of the refinery.
To run any kind of plants, how the organization chart is will somehow reflect the effective or the
feasibility of the project. Unlike many other companies, BSR has built up its own organization chart to run their
specific refinery configuration
Page 58 of 79
Figure 1.2 : Organization chart of Binh Son refinery and petrochemical plant
Page 59 of 79
Figure 1.3: Organization chart of BSR
Page 60 of 79
Figure 2.2 : Dung Quat refinery’s Process Unit
The project site is comprised of four main areas: process units and utilities, product tank farm, cargo
terminals and wharf oil refueling and marine plateharge and plateharge systems. These areas are connected by
pipeline systems with adjacent roads.
Total area of the project is approximately 338 hectares, including the following:
Page 61 of 79
The main process units and utilities of Dung Quat refinery is shown in the table below:
Page 62 of 79
Unit 100: RO Silica Seperating
Unit 032: Steam
- LPS (Low Pressure Steam): 3–6 kg/cm2
Section Hot - MPS(Medium Pressure Steam): 14-16 kg/cm2
Utility - HPS(High Pressure Steam): 40-42 kg/cm2
Unit 040: Power Station
- There are four transmitters.While 3 of those generators run at 50%,
50%, 100%, and the remaining machines are redundant
Unit 038: Fuel oil
Unit 051: Intermediate tankge
Unit 054: Blending Unit
Unit 055: Flushing oil
Offsite P1 - Using LGO from CDU to clean pipes system.
Unit 056: Slops oil
- Collect oil from units, provide for CDU, RFCC unit.
Unit 060: Crude oil tankge
- Included 8 tanks, each tank has the capacity of 65.000 m3, 22.4 m
height, diameter 69m
Page 63 of 79
Unit 072: Interconnecting Pipleline ( P3 Jetty)
- 15 pipelines: 10 product pipelines, 5 waste oil extraction
lines and ballast water, 3km long.
- Types of products:
+ PropyleneLiquefied;
+ Petroleum Gas (LPG);
+ Gasoline Mogas(A-90/92/95 RON gasoline);
+ Kerosene;
+ Automotive diesel fuel (DO);
+ Fuel oil (FO);
- Product’s Capacity:
Page 64 of 79
Table 1.2 Product’s Capacity
Product quality:
For products consumed domestically in accordance with product quality standards of Vietnam. For
export products must reach the requirements of export quality.
When reached the maximum capacity, Dung Quat refinery will produce 150,000 tons of petrol, 240,000
tons of diesel, about 23,000 tons of LPG and other products such as propylene over 8,000 tons, Jet-A1
gasoline (about 30,000 tons) and FO (about 25,000 tons). Dung Quat refinery will meet about 30% of
petroleum demand in the country, step by step ensure the number one spot of national energy providing
Page 65 of 79
Figure 3 : PFD U 31 Water system
The water system receives clean water from a water treatment plant outside the refinery after the production
and distribution of three different types of water to the premises used in the plant and storage area of the
product:
-Clean water
- Demineralized water
-Water
+Clean water tank TK-3101A / B : A clean water tank with a capacity of 7849 m3 per tank and can provide
approximately 3 days in normal factory operation. Storage tanks are designed when each tank can drain water
for maintenance but does not affect the operation
+Living water tank TK-3102: Daily water tank with a capacity of 100 m3 corresponding to 24 hours in normal
operation.
+Demineralized water tank TK-3103A / B: Demineralized water tank with capacity of 5472 m3 each tank and
each tank can provide 2 days of normal consumption. Storage tanks are designed as each tank can be drained
for maintenance as not affecting the operation
The demineralised water treatment unit consists of 2 lines, each with a designed capacity of 175 m3 / hr. Two
demineralized conveyors can be operated at the same time to provide the required capacity of the plant. Two
perfect lines can supply up to 350m3 / h of demineralized water. Running each line at 50% capacity is the
recommended operating condition in the design. While the plant operates normally, each demineralized water
line produces approximately 110 m3 / h
In order to produce 175 m3 / hr of demineralized water, the required amount of clean water is 205 m3 / h.
This is because during the 14 hours of operation, A-3102 takes two hours to regenerate. In the regeneration
mode of 63 m3 of demineralized water for the regeneration of cations, anions and mixed beds .
Therefore, when more than 14hrs, the A-3102 needs to produce demineralized water equivalent to 16hrs to
use
We have capacity:
16hr 63 3
A 3102 net production 175 m3 /hr m /hr
14hr 14
205 m3 /hr
Page 67 of 79
-Sodium bisulphite tank with a capacity of 0.05 m3 for soluble chemical storage
-Two metering pumps with a maximum capacity of 5.5 l / hr each, at 4.6 kg / cm2.g, will be added to the
drinking water system at the injection site.
-In a sodium bisulphite tank a stirrer is used to dissolve sodium bisulphite in powder form.
The quality of clean water from the foreign station fence factory supply to the refinery water system:
ph 6,85 6,7
Suspended solids content mg/l 2,95 15
Insoluble solids content mg/l 115 40
Total Solids mg/l 118 83
Total Hardness of Water CaCO3 (Ca2+ mg/l 37,66 33,4
Mg2+)
+Clean water
The quality of clean water is the same as the quality of water supplied from the fodder plant (see above).
3. Demineralizes water:
Page 69 of 79
We have Battery limit condition of U-31:
System activity
In too process processing for water, active operation is set 031-AIC-001 in Manual manual and install the
first value is 100% to the maximum speed speed for the Cloidity at the start into the tank contains water
activities
Road bypass the valve manually from the network water network running water so that in case there
is no water in the tank and the pump, the road will open and provide a sufficient amount of water
required for the throat washing for a while short time. In this case, no chemical processing.
To improve user safety, this bypass road design characteristics are as follows:
• Road bypass will always play to isolate between the two systems. It will open only when a part of
the water system are in the processing stage. Isolated bypass valves are equipped with 'Lock
Closed'de ensure that it not be opened when there is no work permit
• The tap-off is set to the output of water purification equipment F-3101A / B to optimize water
quality standards normal drinking water.
Page 70 of 79
Therefore,
• The households using clean water (the administrative building, control room, home guards) will be
told not to allow to drink during chemical management.
Clean water tank TK-3101A / B and demineralized water tank TK-3103A / B is used for regeneration
of demineralized water clusters A-3102
TK-3101B
TK-3101A
TK-3101A tanks and installed TK3101B related to water supply and receiving clean water. This
approach avoids deposits in both pools.
TK-3101B
TK-3101A
TK-3101A tanks and special TK3101B fitted to receive and provide clean water in the same
time. This choice improve water supply when this request.
Installation of pump: The pump and motor, are designed for open valve condition at startup
Page 71 of 79
2.2.4 Oil and liquid contamination.
Water from the tank to neutralize and wastewater during backwashing of cluster
demineralized water and water from workshops provide alkaline discharged workshop
sewage treatment (ETP) via the degradation of oil (OWS) .
The water system receives clean water from outside the fence of the plant into the tank TK3101A or
TK3101B through the tank control valve. The P-3101A / B / C pumps provide water to households used in
the plant including demineralized A-3102, domestic water system (F-3101A / B) and distribution to sub-
stations and technology workshops in the plant and product containment area. A minimum flow is extracted
to maintain the network pressure and prevent leakage.
Page 72 of 79
placed at the input water tank TK-3102 and test set Cl is located at the outlet of domestic water tank TK-
3102 so that Cl content reaches 0.2 ppm
The P-3102A / B will distribute domestic water in tank TK-3102 to households in the plant and have a
minimum flow of extracted water to maintain the network pressure and prevent the pump from operating.
OK. Bypass from clean water to the distribution network of the domestic water is connected to the
domestic water purifier to provide water in the shortest time to the safety equipment in the case of pumps
and water tanks are not. Provided when handling chemicals
A-3102 demineralized water is supplied by the P-3101A / B / C pump. There are two ways of operating
in the demineralised water: The filling (tank TK-3101A or TK-3101B from the start), clean water flow to the
passage of the demineralisation A-3102 is controlled on the flow controller at the input of A -3102.
Supplementation (based on the balance between consumption and production in normal operation), the
proportion of demineralized water produced is based on normal consumption requirements. The tank level
TK-3103A or TK-3103B is controlled by the corresponding controller when installed. When selecting a tank
for level control, set the tank level and adjust the level controller.
The P-3103A / B pumps distribute demineralized water to the consumers in the plant and have a minimum
flow of water extracted to maintain the network pressure and prevent pump failure.
The demineral water has 2 lines, each designed to have a clean water capacity of 205 m3 / hr and produce 175
m3 / hr, reducing the regeneration and backwashing operation of the reducing water minerals
3 target item
The description descriptor and shutdown is applied for transport for system
Final preparation
Open the inlet valve of the tank
Insert fresh water into either tank TK-3101A / B or both from outside the factory fence
Select operating mode from tank to suction of pump
Make sure the smallest pump controller of the pump will install a pump and a pump in ready mode
Make sure that the backup pump is automatically started in standby mode
When the LAL is low in the tank, we start the pump P-3101A or B or C.
Automatically start up the pump
Page 74 of 79
Open control valve LV-009 when tank TK-3102 is filled with water
Make sure that the backup pump is automatically started in standby mode
When the LAL is low in the tank, we start the pump P-3101A or B
Start the A-3101 water treatment set and make sure the AIC-001 is in online mode
Observation of chlorine concentration with analyzer AL-002
When the level of TK-3102 at 50%, the value of chlorine concentration is 0.02 ppm (seen by AL-
002), and the valve
Set the automatic mode to control the level in the tank
Backup pumps will start automatically
Note :
Stop TK-3101A or TK-3101B when filling in water Isolation of backup pumps Stop running pumps P-3101A
/ B / C Isolation of tank TK-3101A / B Drain the tank and bomb if necessary
Page 75 of 79
Stop the production of demineralized water from the A-3102 and TK-3103A or TK-3103B water tanks.
Isolate the backup pumps Stop the pump running P3103A / B Isolation of water tank TK-3103A / B Drain the
tank and pump if necessary Isolate and stop A-3102 demineralized water according to equipment supplier
Stop TK-3102 is filling the water Isolate the backup pumps Stop the pumps running Closure of chlorine into
water treatment cluster A-3101 Isolation tank TK-3102 Drain the tank and pump if necessary
Initial conditions
The bypass will be granted with a work permit
Households that use domestic water (administrative buildings, control rooms, security gates) will know that
drinking water can not be mixed with dechlorinated water at the time of operation.
- Isolation tank TK-3102 by valve LV-009 and header block valve. Pump P3102A / B will operate on its
circulation.
- Increase the setting value of AIC-001 up to 5ppm
- Observation of the increase in chlorine concentration in the tank via analyzer AL-002
- When the chlorine analyzer reaches 5ppm, stop chlorine spraying into the tank
- Keep the pump running with the isolated tank at least 24hr
- Start the dechlorination system
- Bring the analyzer to chlorine content AL-002 into the tank
- When chlorine analyzer AL-002 reaches 0.02 ppm, dechlorination is stopped
- Stop pumping
- Drain the tank out of the drain valve
- Continue to stop under the shutdown section of the water system
Loss of energy
In case of energy loss, clean water system, demineralized water and drinking water will not be provided to the
users because the supply pump will shut down.
• Loss of breath
The water system continues to operate
• Loss of control
Page 76 of 79
Clean water, demineralized water and drinking water continue to operate Additional clean water from outside
the fence will be interrupted when the control valve is closed due to lack of control air The production of
demineralized water will stop when the controlled gas permits the demineralization of the A-3102
demineralized water Replenishment of drinking water from the water network will be interrupted when the
control valve is closed due to lack of control air
4.1.1 Service water pumps and back wash pumps protection (031-US-102)
In the event of 031-LALL-003 (low low level) in the tank TK-3101A, then service water pumps
P-3101A/B/C and backwash pumps A-3102-P-01A/B are shut down. Backwash pumps A-
3102-P-01A/B are part of A-3102 package (demineralised water package).
In the event of 031-LALL-004 (low low level) in the tank TK-3101B, then service water pumps
P-3101A/B/C and backwash pumps A-3102-P-01A/B are shut down.
In the event of 031-LAHH-007 (high high level) in the tank TK-3103A, then valves 031-FV-
009 / 031-FV-012 are closed.
In the event of 031-LAHH-008 (high high level) in the tank TK-3103B, then valves 031-FV-
009 / 031-FV-012 are closed.
Page 77 of 79
4.1.3 Demineralised water pumps and regeneration pumps protection (031-US-105)
When TK-3103A is selected by 031-LHS-005, in the event of 031-LALL-007 (low low level) in
the tank TK-3103A, then demineralised water pumps P-3103A/B and regeneration pumps A-
3102-P-02A/B are shut down.
When TK-3103B is selected by 031-LHS-005, in the event of 031-LALL-008 (low low level) in
the tank TK-3103B, then demineralised water pumps P-3103A/B and regeneration pumps A-
3102-P-02A/B are shut down.
In the event of 031-LAHH-010 (high high level) in TK-3102, then valve 031-LV-009 is closed.
In the event of 031-LALL-010 (low low level) in TK-3102, then potable water pumps P-
3102A/B are shut down.
Page 78 of 79
4.1.6 ADP Alarms
The following alarms to be initiated on the anunciator display panel (ADP) if the respective
DCS alarms remain active for a variable duration of approximately fifteen seconds (time to
be adjusted if necessary).
Overflow line to protect against liquid overpressure. Vent line to prevent against
overpressure/vacuum. High level alarms 031-LAH-001/002 will warn the operator that a
manual action is required to stop fresh water filling.
Low low level in TK-3101A/B will trip the pumps via DCS logic 031-US-102.
Overflow line to protect against liquid overpressure. Vent line to prevent against
overpressure/vacuum. High high level in TK-3102 will close the inlet valve 031-LV-009 via
DCS logic 031-US-108 to prevent over flowing.
Low low level in TK-3103A/B will trip the pumps via DCS logic 031-US-108.
Overflow line to protect against liquid overpressure. Vent line to prevent against
overpressure/vacuum. High high level in TK-3103A/B will close inlet valve 031-FV-009/012
via DCS logic 031-US-104 to prevent overflowing.
Page 79 of 79
4.2.6 Demineralised Water Pumps P-3103A/B
Low low level in TK-3102A/B will trip the pumps via DCS logic, 031-US-105.
A level transmitter, LIT 751 with four set points is mounted to level gauge, LG751 for level
control.
A high level alarm is an indication of liquid high level and at high high level, the acid
unloading pump shall stop immediately.
A low level warning is an indication of liquid low level and at low-low level the acid dosing
pumps shall stop immediately and annunciate.
Two level transmitters, LIT 762 for level control are provided. A high level alarm is an
indication of liquid high level.
A low level warning is an indication of liquid low level and at low-low level the acid dosing
pumps shall stop immediately and annunciate.
Page 50 of 79
4.3 Safeguarding Equipment
It is provided to allow line from downstream of TK-3102 level control valve 031-LV-009
manifold to be designed for 3.5 kg/cm²g, compatible with design of Potable Water Treatment
Package A 3101.
It is provided to avoid back flow from Demineralised Water Tanks TK-3103A/B to the
Demineralised Water Package trains in case of their depressurisation.
It is provided to avoid back flow from Service Water Tanks TK-3103A/B to the fresh water
supply network outside of the Refinery fence.
Page 51 of 79
4.3.4 Demineralised Water Package A-3102
Page 52 of 79
Page 53 of 79
CONCLUSIONS AND RECOMMENDATIONS
1. Conclusions : Process Water and Cooling water are two important plants in
the petrochemical refinery used to provide water for domestic use and to cool
the plant.
2. Recommendations:
Regular maintenance of water pipes and the pump tank water pump
controller. Regular inspection of pumping equipment Stabilizers
1
REFERENCES
1. ARAMIS Development Ltd
2.
2
ATTACHMENTS AND APPENDICES
1. ACKNOWLEDGMENT
2. CHAPTER
3. CONCLUSIONS AND RECOMMENDATIONS
Thank you !