WELL PLANNING
1) Well Trajectory:
PANDA-1 is planned as a vertical exploration well with the following Surface / Bottom Hole
Coordinates and Target Radius:
Latitude : 00° 44’ 01.96” S
Longitude : 118° 20’ 31.09” E
Datum : WGS-84 UTM Zone 50S
Target Radius : ±150 feet
3) Cement Planning:
The cementing program for PANDA-1 is summarized below with further details included in the
attached Well Summary Sheet.
DRILLING PROGRAM
1) Drilling Program Worksheet:
Well Type : Exploration
Well Deviation : Vertical
Rig Name / Type : Ocean Monarch / Moored Semi-Submersible
Surface Location : Latitude: 000° 44’ 01.96” S
Longitude: 118° 20’ 31.09” E
Casing Program
Preliminary Design SF
Mud Program
20”, 13 5/8”, 11¾”,9 5/8”, 7” 21 ¼”, 15k psi, Annular, Double & Single Rams