CHECKLIST 012

Electrical installations

Electrical installations: construction and demolition sites


b

Inspected by:

Inspection date:

Clause AS/NZS 3012 Requirements

1.2 All wiring installed according to AS3000 Wiring rules in addition to AS3012 requirements.  Yes  No
2.1.2 All electrical equipment and lighting supplied from a 30mA RCD protected circuit  Yes  No
breaker(s).
2.1.3 Source of supply identified.  Yes  No
2.3.1.1 Switchboard readily accessible.  Yes  No

2.3.2.1(ab) Switchboard of robust construction with a minimum IP23 rating.  Yes  No

2.3.2.1 (c) Live parts effectively protected and warning sign attached along an electric shock  Yes  No
symbol.
2.3.2.1 (d) Insulated tie bar for extension leads to prevent strain on socket /outlet  Yes  No
2.3.2.1 (e) Switchboard door is lockable, non-removable without a tool and
fitted with a retention device to stay in open position.
2.3.2.1 (e) Switchboard has means of safe entry of leads and label: KEEP CLOSED –RUN LEADS  Yes  No
THROUGH BOTTOM

2.3.3 Switchboard mounted on a polo, structure, wall or suitably designed free standing design.  Yes  No

2.4.1 Switchboard gas a main isolation switch capable of isolation all downstream circuits.  Yes  No

2.4.2 Main switch capable of being locked or within a lockable space.  Yes  No

2.4.3 Main switch labelled appropriately: MAIN SWITCH or DISTRIBUTION BOARD ISOLATION SWITCH  Yes  No
or similar.

2.5.3 Construction wiring installed in appropriate conduit to protect against mechanical damage.  Yes  No

2.5.4 Construction wiring labelled with yellow tape with words ‘construction wiring’ at distances not  Yes  No
longer than 5m.

2.6.9 Extension leads supported by stands or insulated hooks.  Yes  No

2.7.1 Adequate lighting provided for safe work.  Yes  No

2.7.2 Lighting is mechanically protected.  Yes  No

www.act.gov.au/accesscbr
Electrical installations

2.7.3 Emergency lighting adequate for safe exit of workers (if applicable).  Yes  No

2.8.1 If a lift shaft is present, the final sub-circuit feeding it is locked and tagged to prevent inadvertent  Yes  No
isolation of supply.

2.9 Socket outlets in site sheds and other transportable structures are RCD protected.  Yes  No

3.8.3 Portable equipment including power leads are inspected at three-monthly intervals.  Yes  No

3.8.3 Portable RCD’s trip time is tested every 3 months.  Yes  No

3.8.3 Switchboards, wiring and site sheds are inspected at six-monthly intervals.  Yes  No

3.10 Register available for equipment and includes records of testing and tagging. RCD trip time results  Yes  No
and list of repaired equipment.

Action required:

Re-inspected by:

Compliance date: