Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Bestec Oil Interceptors

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 83

PLUMBING SYSTEM

CALCULATION SHEETS
1-WATER SUPPLY NETWORK
2-WATER RISERS & DRAIN STACKS
3-ELECTRIC WATER HEATERS
4-SUMP & EJECTOR PUMPS
ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department ‫ادارة الميكانيكا‬
PROJECT NAME :
PROJECT NO. :
REVISION :
PREPARED BY : M Fawzi ElHarmeel DATE :
CHECKED BY : Awad Abd-Allah DATE :

TITLE : Sump Pits & Ejector Basin Sizing


Ejector Sump
Basin 1 Pit 1
1 Qin =Peak Inflow (l/s) = 0.50 15.80

2 Qout =Pump Discharge Rate (l/s) = 3.50 15.00

3 Height between invert pipe level and bottom of the sump (m) = 1.10 1.20

4 Height between low water level and bottom of the sump (m) = 0.30 0.30

5 Height between hight water level and invert pipe level (m) = 0.10 0.10

6 Effective Height (m) [(3)-(4)-(5)] = 0.70 0.80

7 Sump length (m) = 1.40 1.50

8 Sump width (m) = 1.80 2.00

9 V =Effective volume (m3) [(6)*(7)*(8)] = 1.76 2.40

10 tin=V/(0.06*Qin) Filling time (min) [(9)/(0.06*(1))] = 58.80 2.53


11 tout=V/(0.06*Qout) Discharge time [(9)/(0.06*(2))] = 8.40 2.67
12 T=tin+tout Cycle time (min) [(10)+(11)] = 67.20 5.20

13 n= 60/T No. off start and stop per hour [60/(12)] = 0.89 11.54
No. off start and stop per hour is less than 12
hence, DESIGN IS ……………………………....> SAFE SAFE

SUMP PITS PROJECT No.972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME :
PROJECT NO. :
REVISION :
PREPARED BY : M.F.ElHarmeel DATE :
CHECKED BY : Awad Abd-Allah DATE :

TITLE : SUMP PUMP CALCULATION


Case -1 :
Rain Water Load
Assuming Rain Water Intensity = 35 mm/hr
Projected Area = 1350 m2
Flow = Rain Water Intensity * Projected Area * Coefficient
Flow (m3/hr) = 47.25 x 1.1 = 52.0
Flow (GPM) = 228.80
Flow (l/s) = 14.44
Case -2 :
Floor Cleaning Load
Assuming 3 Hose Bibbs load used to cleaning the Floor @ 5 GPM each
Flow (GPM) = 15
Flow (l/s) = 0.95
Case -3 :
Fire Water Load
Sprinkler System = 310
Total Flow (l/s) = 19.6
Case 3 Is The Worst Case
Our Design Shall Be Based On Worst Case. Use Duplex Pump Set Each One Having 50% Of The Load
From Engineered Plumbing design Book
Pipe
Diameter Length Flow Velocity Friction Friction
(in) (ft) (GPM) (ft/s) (psi/100') (ft/100')
3" 0 0 0 0 0
4" 100 310 8 4.1 9.43
6" 0 0 0 0 0

Fittings Friction
Diameter Check Valve Gate Valve Tee Branch Flow 90 Elbow Total Head
(in) No. E.L T E.L No. E.L T E.L No. E.L T E.L No. E.L T E.L Fitting E.L (ft)
3" 0 19.8 0 0 1.6 0 0 15.5 0 0 7.7 0 0 0.000
4" 1 26 26 1 2.1 2.1 1 20.3 20.3 2 10.2 20.4 68.8 15.918
6" 0 39 0 0 3.2 0 0 31 0 0 15.3 0 0 0.000
15.918
Friction Loss (ft) = 15.92
Residual Head (ft) = 3.00
Static Head (ft) = 17.00
Total Head (ft) [(1)+(2)+(3)] = 35.92
Total Head (m) = 10.95
Peak Inflow (GPM ) = 310.00
Peak Inflow (l/s) = 19.56
Selected Pump Characteristic as Following
Actual Discharge Rate (l/s) 10
Actual Head (m) 13
Pump Manufacture Flygt
Pump Model C 3085
Impeller Code
Pump Power (kW) 3
Pump Speed (rpm) 2900
Pump Efficiency 45%

SUMP PUMP PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972


REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###

CHECKED BY : AWAD ABD-ALLAH DATE : ###

TITLE : EJECTOR PUMP CALCULATION


From Engineered Plumbing design Book
Fixture WSFU QTY Total WFU
Water Closet 5.5 2 11
Urinal 4 0 0
Lavatory 1 5 5
Shower 2 0 0
Bathtub 2 0 0
Service Sink 3 0 0
Kitchen Sink 3 0 0
Total FU 16
Peak Inflow (GPM ) =
Peak Inflow (l/s)= 0.00
EJECTOR PUMP 1
From Engineered Plumbing design Book
Pipe
Diameter Length Flow Velocity Friction Friction
(in) (ft) (GPM) (ft/s) (psi/100') (ft/100')
3" 170 55 3 0.9 2.07
4" 0 0 0 0 0
6" 0 0 0 0 0

Fittings Friction
Diameter Check Valve Gate Valve Tee Branch Flow 90 Elbow Total Head
(in) No. E.L T E.L No. E.L T E.L No. E.L T E.L No. E.L T E.L Fitting E.L (ft)
3" 1 19.8 19.8 1 1.6 1.6 2 15.5 31 5 7.7 38.5 90.9 5.401
4" 0 26 0 0 2.1 0 0 20.3 0 0 10.2 0 0 0.000
6" 0 39 0 0 3.2 0 0 31 0 0 15.3 0 0 0.000
5.401
Friction Loss (ft) = 5.40
Residual Head (ft) = 3.00
Static Head (ft) = 15.00
Total Head (ft) [(1)+(2)+(3)] = 23.40
Total Head (m) = 7.13
Peak Inflow (GPM ) = 0.00
Peak Inflow (l/s) = 0.00
Selected Pump Characteristic as Following
Actual Discharge Rate (l/s) 4
Actual Head (m) 8
Pump Manufacture Flygt
Pump Model C 3057
Impeller Code
Pump Power (kW) 2.3
Pump Speed (rpm) 2900
Pump Efficiency

EJECTOR PUMP PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE


PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B105-Mar-05

TITLE : BOOSTER PUMP CALCULATIONS


Type Of Fixture Other Than Dwelling Units
From NSPC Table 10.14.2A,B & 11.4.1
FLUSH TANK SYSTEM
Fixture CW HW WS QTY CW HW WS
Type FU FU FU Total FU Total FU Total FU
Water Closet 5.5 0 5.5 77 423.5 0 423.5
Urinal 5 0 5 33 165 0 165
Lavatory 0.75 0.75 1 131 98.25 98.25 131
Shower 2 2 3 5 10 10 15
Kitchen Sink 2 2 3 18 36 36 54
Janitor Sink 2 2 3 10 20 20 30
Ablution 1.5 1.5 2 16 24 24 32
TOTAL FU ……….…..…...….……….…= 776.8 188.3 850.5
Water Supply Fixture Unit Factor …….= 0.8
AT 80 % OF TOTAL WSFU = 621.4 150.6 680.4
DEMAND AT 80 % OF TOTAL WSFU (GPM) = 160
Demand required for cooling tower make-up water = 55
Demand required for (Hose , Irrigation, Cleaning…etc) = 10
Total Required Demand By Pump (GPM) = 225.0
Total Required Demand By Pump (L/S) = 14.2

STATIC HEAD = 42
RESUDIAL PRESSURE = 10
FRICTION LOSS = 10
Total Pump Head (m) = 62.0

System Requirement Q=14.2 l/s H=62 m


Select booster pump set have three (3) pumps
Two (2) pumps operate and one (1) pump stand-by, Each pump has 55% of total flow

Pump Characteristic
MFG GRUNDFOS
Model CRN 32 - 4
Q = 7.8 l/s
H = 62 m
Inlet = 80 mm
Outlet = 80 mm
Power = 7.5 kw

BOOSTER PUMP PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B116-Mar-05

TITLE : PRESSURE VESSEL CALCULATION


Pressure vessels shall be sized based on one pump operate data:
Q(l/s)= 7.8 H(m)= 62
Cut in Pressure = 620.0 kpa = 89.9 psi
Cut out pressure = 720.0 kpa = 104.4 psi
Take cut in pressure 80 psi
Take cut out pressure 100 psi
From EPD Book Withdrawal water Percent = 17 %
From EPD Book water capacity Percent = 20 %
By equating half pump capacity to 17 % withdrawal capacity
At 100 --------> 80 psi and 17 %

Consider pumping (cph) = 6 10 12 20


Pump on duty (60/(cph*2)) T(min) = 5 3 2.5 1.5
Tank size (m3) = 0.5*Q(l/s)*T(s)/ withdrawal percent = 6.88 4.13 3.44 2.06

Water capacity = Tank volume * Water capacity = 1.38 0.83 0.69 0.41
Withdrawal capacity = Tank capacity * Withdrawal capacity = 1.17 0.70 0.59 0.35
Seal = water capacity - withdrawal capacity = 0.21 0.12 0.10 0.06

Air capacity (m3) = Tank Capacity - Water Capacity = 5.51 3.30 2.75 1.65
Time to Fill Tank by Air = 60 min
PinVin =PoutVout
Air capacity * Cut out Press.
Compressor Capacity (m3/hr) = 39.6 23.8 19.8 11.9
Filling Time*Atmospheric Press.

Take tank capacity 3 m3


Divide capacity to 2 Tanks each tank 1.5 m3
The Tank capacity is small therefore Air Compressor not mandatory
Form Armstrong Catalogue Select
Model Asx1500
Volume 1500 liters
Connection size 65 mm

Legend cph=Cycle Per Hour

PRESSURE VESSEL PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION BASEMENT FLOOR GROUND FLOOR


Based on Flush Tank Water Closets Riser No. ---- -----
And Flush Valve Urinals Feeding Branch For DRIVERS TOILETS MALE & FEMALE TOILETS AND PANTRY
Type Of Fixture Other Than Dwelling Units ---- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 2 11 0 11 12 4 22 0 22 24
Urinal 4 0 4 4 1 4 0 4 4 1 4 0 4 4
Lavatory 0.75 0.75 1 1 4 3 3 4 4 5 3.75 3.75 5 5
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 0 0 0 0 0 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 20 5 22 22 31.75 5.75 34 35
DEMAND (GPM) ……….…..…...….……….…= 36 44
DEMAND (l/s) ……….…..…...….……….…= 2.271 2.77567
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.18 1.42
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 2.9 4
PIPE SIZE (mm) ……….…..…...….……….…= 75 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 11 of 83 PROJ. NO. 972


R=Riser ,S=Stack ,L=Low Zone ,H=High Zone

WATER & DRAIN 12 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION GROUND FLOOR


Based on Flush Tank Water Closets Riser No. R2L R3L
And Flush Valve Urinals Feeding Branch For FEMALE TOILET MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 6 33 0 33 36 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 9 6.75 6.75 9 9 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 0 0 0 0 0 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 41.75 8.75 45 47 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 18.5 3 27 42
DEMAND (l/s) ……….…..…...….……….…= 18.5 3 1.70325 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 4.87 4.4 1.2 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 4.3 9.61 4 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 35 15 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 13 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION FIRST FLOOR FIRST FLOOR


Based on Flush Tank Water Closets Riser No. R2L R3L
And Flush Valve Urinals Feeding Branch For FEMALE TOILET AND VENDING MALE TOILET AND W.C
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 3 16.5 0 16.5 18
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 5 3.75 3.75 5 5
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 32.25 3.75 33.5 35
DEMAND (GPM) ……….…..…...….……….…= 23 44
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.77567
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.42
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 4
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 14 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION SECOND FLOOR SECOND FLOOR


Based on Flush Tank Water Closets Riser No. R2L R3L
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 23 43
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.71258
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.39
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 15 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION THIRD FLOOR THIRD FLOOR


Based on Flush Tank Water Closets Riser No. R2L R3L
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 23 42
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 16 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION FOURTH FLOOR FOURTH FLOOR


Based on Flush Tank Water Closets Riser No. R2H R3H
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 23 42
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 17 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION FIFTH FLOOR FIFTH FLOOR


Based on Flush Tank Water Closets Riser No. R2H R3H
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 23 42
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 18 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION SIXTH FLOOR SIXTH FLOOR


Based on Flush Tank Water Closets Riser No. R2H R3H
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 23 42
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 19 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION SEVENTH FLOOR SEVENTH FLOOR


Based on Flush Tank Water Closets Riser No. R2H R3H
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 5 3.75 3.75 5 5
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 28.75 5.75 31 31
DEMAND (GPM) ……….…..…...….……….…= 23 42
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 20 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION SEVENTH FLOOR


Based on Flush Tank Water Closets Riser No. R3H
And Flush Valve Urinals Feeding Branch For FEMALE AND MALE ABLUTION
Type Of Fixture Other Than Dwelling Units -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL
Fixture CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 0 0 0 0 0
Urinal 4 0 4 4 0 0 0 0 0
Lavatory 0.75 0.75 1 1 0 0 0 0 0
Ablution 1.5 1.5 2 2 16 24 24 32 32
Shower 1.5 1.5 2 2 0 0 0 0 0
Kitchen Sink 2 2 3 2 0 0 0 0 0
Janitor Sink 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 24 24 32 32
DEMAND (GPM) ……….…..…...….……….…= 22
DEMAND (l/s) ……….…..…...….……….…= 1.38783
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3
PIPE SIZE (mm) ……….…..…...….……….…= 63 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 21 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION EIGHTH FLOOR EIGHTH FLOOR


Based on Flush Tank Water Closets Riser No. R2H R3H
And Flush Valve Urinals Feeding Branch For FEMALE TOILET, JANITOR AND VENDING MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 31.25 9.25 35 35 26 3 27 28
DEMAND (GPM) ……….…..…...….……….…= 23 40
DEMAND (l/s) ……….…..…...….……….…= 1.45092 2.52333
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.25
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.1
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 22 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION NINTH FLOOR


Based on Flush Tank Water Closets Riser No. R1H
And Flush Valve Urinals Feeding Branch For TOILET , PANTRY AND CHAIRMAN TOILET
Type Of Fixture Other Than Dwelling Units -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL
Fixture CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0
Lavatory 0.75 0.75 1 1 2 1.5 1.5 2 2
Ablution 1.5 1.5 2 2 0 0 0 0 0
Shower 1.5 1.5 2 2 1 1.5 1.5 2 2
Kitchen Sink 2 2 3 2 1 2 2 3 2
Janitor Sink 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 16 5 18 18
DEMAND (GPM) ……….…..…...….……….…= 18.8
DEMAND (l/s) ……….…..…...….……….…= 1.18597
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.39
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 6.35
PIPE SIZE (mm) ……….…..…...….……….…= 50 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 23 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION NINTH FLOOR NINTH FLOOR


Based on Flush Tank Water Closets Riser No. R2H R3H
And Flush Valve Urinals Feeding Branch For FEMALE TOILET AND JANITOR MALE TOILET AND VENDING
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 4 22 0 22 24 2 11 0 11 12
Urinal 4 0 4 4 0 0 0 0 0 3 12 0 12 12
Lavatory 0.75 0.75 1 1 7 5.25 5.25 7 7 4 3 3 4 4
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Kitchen Sink 2 2 3 2 0 0 0 0 0 1 2 2 3 2
Janitor Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 29.25 7.25 32 33 28 5 30 30
DEMAND (GPM) ……….…..…...….……….…= 22 42
DEMAND (l/s) ……….…..…...….……….…= 1.38783 2.6495
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.07 1.4
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 3 3.9
PIPE SIZE (mm) ……….…..…...….……….…= 63 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 24 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B104-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE :

TITLE : PLUMBING FIXTURE LOAD CACULATION NINTH FLOOR ROOF FLOOR


Based on Flush Tank Water Closets Riser No. R4H R3H
And Flush Valve Urinals Feeding Branch For TOILET AND PANTRY TOILET AND PANTRY
Type Of Fixture Other Than Dwelling Units ----- -----
From NSPC Table 10.14.2A,B & 11.4.1 TOTAL TOTAL
Fixture CW HW WS D QTY CW HW WS D QTY CW HW WS D
Type FU FU FU FU FU FU FU FU FU FU FU FU
Water Closet 5.5 0 5.5 6 2 11 0 11 12 4 22 0 22 24
Urinal 4 0 4 4 0 0 0 0 0 2 8 0 8 8
Lavatory 0.75 0.75 1 1 2 1.5 1.5 2 2 6 4.5 4.5 6 6
Ablution 1.5 1.5 2 2 0 0 0 0 0 0 0 0 0 0
Shower 1.5 1.5 2 2 0 0 0 0 0 4 6 6 8 8
Kitchen Sink 2 2 3 2 1 2 2 3 2 0 0 0 0 0
Janitor Sink 2 2 3 2 0 0 0 0 0 0 0 0 0 0
SUB-TOTAL FU ……….…..…...….……….…= 14.5 3.5 16 16 40.5 10.5 44 46
DEMAND (GPM) ……….…..…...….……….…= 12 48
DEMAND (l/s) ……….…..…...….……….…= 0.757 3.028
PIPE VELOCITY (m/s) ……….…..…...….……….…= 1.35 1.5
PIPE FRICTION LOSS (mBar/m) ……….…..…...….……….…= 8 4.6
PIPE SIZE (mm) ……….…..…...….……….…= 40 100 75 100
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

WATER & DRAIN 25 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###

TITLE : RISER & STACK LOAD CALCULATION


R1H, R1L & S1

FIXTURE UNIT DATA COLD WATER DATA PIPE SIZE (mm)


FLOOR WATER(R1H) WATER(R1L) DRAIN(S1) Q(l/s) V(m/s) hf(mBar/m) WATER RISER DRAIN
FU(B) FU(R ) FU(B) FU(R ) FU(B) FU(R ) R1H R1L R1H R1L R1H R1L R1H R1L STACK *
ROOF 160 0 5 75 0 100
NINTH 18 0 18 32 0 100
NINTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
EIGHTH 0 0 0
EIGHTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
SEVENTH 0 0 0
SEVENTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
SIXTH 0 0 0
SIXTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
FIFTH 0 0 0
FIFTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
FOURTH 0 0 0
FOURTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
THIRDTH 0 0 0
THIRDTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
SECOND 0 0 0
SECOND AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
FIRST 0 0 0
FIRTH AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100
GROUND 0 0 0
GROUND AND ABOVE 178 0 23 3.85 0 1.34 0 2.9 0 90 0 100

RISERS & STACKS 26 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###
* Minimum pipe size
Legend R=Riser , S=Stack ,B=Branch ,L=Low Zone ,H=High Zone

RISERS & STACKS 27 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###

TITLE : RISER & STACK LOAD CALCULATION


R2H, R2L & S2

FIXTURE UNIT DATA COLD WATER DATA PIPE SIZE (mm)


FLOOR WATER(R2H) WATER(R2L) DRAIN(S2) Q(l/s) V(m/s) hf(mBar/m) WATER RISER DRAIN
FU(B) FU(R ) FU(B) FU(R ) FU(B) FU(R ) R1H R1L R1H R1L R1H R1L R1H R1L STACK *
ROOF 2.5 0 2.5 25 0 100
NINTH 32 0 33 0 100
NINTH AND ABOVE 34.5 0 35.5 2.78 0 1.43 0 4 0 63 0 100
EIGHTH 35 0 35
EIGHTH AND ABOVE 69.5 0 70.5 3.66 0 1.3 0 2.8 0 75 0 100
SEVENTH 35 0 35
SEVENTH AND ABOVE 104.5 0 105.5 4.3 0 1.5 0 3.7 0 90 0 100
SIXTH 35 0 35
SIXTH AND ABOVE 139.5 0 140.5 4.86 0 1.16 0 2.3 0 90 0 100
FIFTH 35 0 35
FIFTH AND ABOVE 174.5 0 175.5 5.25 0 1.34 0 2.92 0 90 0 100
FOURTH 35 0 35
FOURTH AND ABOVE 209.5 0 210.5 5.8 0 1.49 0 3.5 0 90 0 100
THIRDTH 0 35 35
THIRDTH AND ABOVE 209.5 35 245.5 5.8 2.78 1.49 1.43 3.5 4 90 63 100
SECOND 0 35 35
SECOND AND ABOVE 209.5 70 280.5 5.8 3.66 1.49 1.3 3.5 2.8 90 75 100
FIRST 0 35 35
FIRTH AND ABOVE 209.5 105 315.5 5.8 4.3 1.43 1.5 3.5 3.7 90 75 100
GROUND 0 45 47
GROUND AND ABOVE 209.5 150 362.5 5.8 5 1.49 1.57 3.5 5 90 75 100

RISERS & STACKS 28 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###
* Minimum pipe size
Legend R=Riser , S=Stack ,B=Branch ,L=Low Zone ,H=High Zone

RISERS & STACKS 29 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###

TITLE : RISER & STACK LOAD CALCULATION


R3H, R3L & S3
Based on Flush Valve System
FIXTURE UNIT DATA COLD WATER DATA PIPE SIZE (mm)
FLOOR WATER(R2H) WATER(R2L) DRAIN(S2) Q(l/s) V(m/s) hf(mBar/m) WATER RISER DRAIN
FU(B) FU(R ) FU(B) FU(R ) FU(B) FU(R ) R1H R1L R1H R1L R1H R1L R1H R1L STACK *
ROOF 44 0 46 25 0 100
NINTH 30 0 30 0 100
NINTH AND ABOVE 74 0 76 2.02 0 1.44 0 5.14 0 75 0 100
EIGHTH 27 0 28
EIGHTH AND ABOVE 101 0 104 2.5 0 1.24 0 3.1 0 75 0 100
SEVENTH 63 0 63
SEVENTH AND ABOVE 164 0 167 3.5 0 1.25 0 2.5 0 90 0 100
SIXTH 30 0 30
SIXTH AND ABOVE 194 0 197 3.85 0 1.35 0 2.93 0 90 0 100
FIFTH 30 0 30
FIFTH AND ABOVE 224 0 227 4.25 0 1.55 0 3.8 0 100 0 100
FOURTH 30 0 30
FOURTH AND ABOVE 254 0 257 4.6 0 1.63 0 4.12 0 100 75 100
THIRDTH 0 30 30
THIRDTH AND ABOVE 254 30 287 4.6 1.47 1.63 1.1 4.12 3 100 75 100
SECOND 0 30 30
SECOND AND ABOVE 254 60 317 4.6 2.02 1.63 1.44 5.13 4.12 100 75 100
FIRST 0 33.5 35
FIRTH AND ABOVE 254 93.5 352 4.6 2.6 1.63 1.32 4.12 3.55 100 90 100
GROUND 0 30 30
GROUND AND ABOVE 254 123.5 382 4.6 3.1 1.63 1.57 4.12 4.7 100 90 100

RISERS & STACKS 30 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###
* Minimum pipe size
Legend R=Riser , S=Stack ,B=Branch ,L=Low Zone ,H=High Zone

RISERS & STACKS 31 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###

TITLE : RISER & STACK LOAD CALCULATION


R4H, R4L & S4

FIXTURE UNIT DATA COLD WATER DATA PIPE SIZE (mm)


FLOOR WATER(R2H) WATER(R2L) DRAIN(S2) Q(l/s) V(m/s) hf(mBar/m) WATER RISER DRAIN
FU(B) FU(R ) FU(B) FU(R ) FU(B) FU(R ) R1H R1L R1H R1L R1H R1L R1H R1L STACK *
ROOF 0 0 0 100
NINTH 30 0 30 100
NINTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
EIGHTH 0 0 0
EIGHTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
SEVENTH 0 0 0
SEVENTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
SIXTH 0 0 0
SIXTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
FIFTH 0 0 0
FIFTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
FOURTH 0 0 0
FOURTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
THIRDTH 0 0 0
THIRDTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
SECOND 0 0 0
SECOND AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
FIRST 0 0 0
FIRTH AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100
GROUND 0 0 0
GROUND AND ABOVE 30 0 30 1.14 0 1.4 0 6.3 0 50 0 100

RISERS & STACKS 32 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department
PROJECT NAME : HSBC BANK NEW HEAD OFFICE
PROJECT NO. : 972
REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###
CHECKED BY : AWAD ABD-ALLAH DATE : ###
* Minimum pipe size
Legend R=Riser , S=Stack ,B=Branch ,L=Low Zone ,H=High Zone

RISERS & STACKS 33 of 83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department ‫ادارة الميكانيكا‬
PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR BASEMENT FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME DRIVERS TOILET

Fixture Demand TYPE EWH 2


US GPH No. Off Total GPH
Private Lavatory 2 0 0
Public Lavatory 6 5 30
Shower 30 0 0
Kitchen Sink 20 0 0
Janitor Sink 10 0 0
Possible Max. Demand (GPH) = 30
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 9
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.9777
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 18
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 68

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80
Numbers of EWH 1
Element Power (kw) 3
Dimensions (Diameter x Height) mm 460x750

EWH(S) 34 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR GROUND FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILETS MEN TOILETS
& JANITOR & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 9 54 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 0 0 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 64 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 19.2 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.2190 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 38.4 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 145 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 35 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR GROUND FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME M&W TOILETS
& PANTRY
Fixture Demand TYPE EWH 3
US GPH No. Off Total GPH
Private Lavatory 2 0 0
Public Lavatory 6 5 30
Shower 30 0 0
Kitchen Sink 20 1 20
Janitor Sink 10 0 0
Possible Max. Demand (GPH) = 50
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 15
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 3.2961
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 30
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 114

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 100
Numbers of EWH 1
Element Power (kw) 3
Dimensions (Diameter x Height) mm 460x940

EWH(S) 36 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR FIRST FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& JANITOR & TOILET
Fixture Demand TYPE EWH 2 EWH 2
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 5 30
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 0 0
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 30
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 9
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 1.9777
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 18
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 68

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH(S) 37 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SECOND FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 38 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR THIRD FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 39 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR FORTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 40 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR FIFTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 0 0 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 52 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 15.6 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 3.4279 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 31.2 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 118 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 41 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SIXTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 42 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SEVENTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & CLINIC
Fixture Demand TYPE EWH 2 EWH 2
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 5 30
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 0 0
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 30
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 9
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 1.9777
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 18
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 68

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH(S) 43 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SEVENTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN & MEN
ABLUTION
Fixture Demand TYPE EWH 3
US GPH No. Off Total GPH
Private Lavatory 2 0 0
Public Lavatory 6 16 96
Shower 30 0 0
Kitchen Sink 20 0 0
Janitor Sink 10 0 0
Possible Max. Demand (GPH) = 96
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 28.8
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 6.3285
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 57.6
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 218

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 100
Numbers of EWH 2
Element Power (kw) 3
Dimensions (Diameter x Height) mm 460x940

EWH(S) 44 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR EIGHTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING
Fixture Demand TYPE EWH 2 EWH 2
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 1 20 0 0
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 72 24
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 21.6 7.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 4.7464 1.5821
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 43.2 14.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 164 55

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH(S) 45 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR NINTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& JANITOR & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 7 42 4 24
Shower 30 0 0 0 0
Kitchen Sink 20 0 0 1 20
Janitor Sink 10 1 10 0 0
Possible Max. Demand (GPH) = 52 44
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 15.6 13.2
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 3.4279 2.9006
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 31.2 26.4
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 118 100

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH(S) 46 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR NINTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME KITCHEN / PANTRY CHAIRMAN TOILET,
& TOILET PANTRY & TOILET
Fixture Demand TYPE EWH 2 EWH 2
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 1 2
Public Lavatory 6 2 12 1 6
Shower 30 0 0 1 30
Kitchen Sink 20 1 20 1 20
Janitor Sink 10 0 0 0 0
Possible Max. Demand (GPH) = 32 58
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 9.6 17.4
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 2.1095 3.8235
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 19.2 34.8
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 73 132

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 1 2
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH(S) 47 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR ROOF
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
ROOF ROOF
Fixture Demand TYPE EWH 3 EWH 3
US GPH No. Off Total GPH No. Off Total GPH
Private Lavatory 2 0 0 0 0
Public Lavatory 6 3 18 3 18
Shower 30 2 60 2 60
Kitchen Sink 20 0 0 0 0
Janitor Sink 10 0 0 0 0
Possible Max. Demand (GPH) = 78 78
Demand Factor = 0.3
Storage Factor = 2
Probable Max.Demand (GPH)= Demand Factor * Possible Max. Demand 23.4 23.4
C F
Tout = 60 140
Tin = 12 53.6
T rise = 48 86.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 96 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 5.1419 5.1419
Storage Tank Capacity (Gallons) = Prob. Max.Demand * Storage Factor 46.8 46.8
Storage Tank Capacity (Litters) = Prob. Max.Demand * Storage Factor 177 177

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 100 100
Numbers of EWH 2 2
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x940 460x940

EWH(S) 48 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department ‫ادارة الميكانيكا‬
PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR BASEMENT FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME DRIVERS TOILET

Fixture Demand TYPE EWH 2


US GPM No. Off Total GPM
Lavatory 0.5 2 1
Shower 2.5 0 0
Pantry Sink 1.5 0 0
Janitor Sink 1.5 0 0
Bathtub 3 0 0
Possible Max. Demand (GPM) = 1
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 0.8
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 8.1797

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80
Numbers of EWH 1
Element Power (kw) 3
Dimensions (Diameter x Height) mm 460x750

EWH (I) 49 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR GROUND FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILETS MEN TOILETS
& JANITOR & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 9 22.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 0 0 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 25.5 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 20.4 9.2
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 3.4764 1.5678

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 50 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR GROUND FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME M&W TOILETS
& PANTRY
Fixture Demand TYPE EWH 3
US GPM No. Off Total GPH
Lavatory 0.5 0 0
Shower 2.5 5 12.5
Pantry Sink 1.5 0 0
Janitor Sink 1.5 1 1.5
Bathtub 3 0 0
Possible Max. Demand (GPM) = 14
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 11.2
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.9086

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 100
Numbers of EWH 1
Element Power (kw) 3
Dimensions (Diameter x Height) mm 460x940

EWH (I) 51 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR FIRST FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& JANITOR & TOILET
Fixture Demand TYPE EWH 2 EWH 2
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 5 12.5
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 0 0
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 12.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3.75
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.6390

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH (I) 52 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SECOND FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3.45
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.5879

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 53 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR THIRD FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3.45
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.5879

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 54 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR FORTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3.45
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.5879

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 55 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR FIFTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 0 0 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 20.5 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.15 3.45
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.0480 0.5879

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 56 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SIXTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3.45
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.5879

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 57 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SEVENTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING & CLINIC
Fixture Demand TYPE EWH 2 EWH 2
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 5 12.5
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 0 0
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 12.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3.75
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.6390

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH (I) 58 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR SEVENTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN & MEN
ABLUTION
Fixture Demand TYPE EWH 3
US GPM No. Off Total GPH
Lavatory 0.5 0 0
Shower 2.5 16 40
Pantry Sink 1.5 0 0
Janitor Sink 1.5 0 0
Bathtub 3 0 0
Possible Max. Demand (GPM) = 40
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 12
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 2.0449

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 100
Numbers of EWH 2
Element Power (kw) 3
Dimensions (Diameter x Height) mm 460x940

EWH (I) 59 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR EIGHTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& VENDING
Fixture Demand TYPE EWH 2 EWH 2
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 1 1.5 0 0
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 22 10
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.6 3
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.1247 0.5112

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH (I) 60 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR NINTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
& JANITOR & VENDING
Fixture Demand TYPE EWH 2 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 7 17.5 4 10
Pantry Sink 1.5 0 0 0 0
Janitor Sink 1.5 0 0 1 1.5
Bathtub 3 1 3 0 0
Possible Max. Demand (GPM) = 20.5 11.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 6.15 3.45
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 1.0480 0.5879

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 100
Numbers of EWH 2 1
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x940

EWH (I) 61 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR NINTH FLOOR
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME KITCHEN / PANTRY CHAIRMAN TOILET,
& TOILET PANTRY & TOILET
Fixture Demand TYPE EWH 2 EWH 2
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 1 0.5
Shower 2.5 2 5 1 2.5
Pantry Sink 1.5 0 0 1 1.5
Janitor Sink 1.5 1 1.5 1 1.5
Bathtub 3 0 0 0 0
Possible Max. Demand (GPM) = 6.5 6
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 1.95 1.8
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 0.3323 0.3067

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 80 80
Numbers of EWH 1 2
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x750 460x750

EWH (I) 62 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : M EL-HARMEL DATE : B117-Feb-05

CHECKED BY : AWAD ABD-ALLAH DATE : B117-Mar-05

TITLE : HOT WATER DEMAND CALCULATION


Occupancy : Office Building FLOOR ROOF
From ASPE Data BookTable 4-6 page 4-15 ROOM NAME WOMEN TOILET MEN TOILET
ROOF ROOF
Fixture Demand TYPE EWH 3 EWH 3
US GPM No. Off Total GPH No. Off Total GPH
Lavatory 0.5 0 0 0 0
Shower 2.5 3 7.5 3 7.5
Pantry Sink 1.5 2 3 2 3
Janitor Sink 1.5 0 0 0 0
Bathtub 3 0 0 0 0
Possible Max. Demand (GPM) = 10.5 10.5
Demand Factor = 0.8
Probable Max.Demand (GPM)= Demand Factor * Possible Max. Demand 3.15 3.15
C F
Tout = 50 122
Tin = 12 53.6
T rise = 38 68.4
Pi = Heater input kW
m = Probable Max.Demand (L/S)
p = Density of water =1 Kg/L 1 Kg/L
n = Thermal Efficiency = 98 %
Cp = Specific heat of water = 4.18 4.18 kJ/(kg.K)
Pi (kW) = (m x Cp x Trise)/n 0.5368 0.5368

Heater selection based on GMC Catalogue


Available Storage Tank Capacity (Liters) 100 100
Numbers of EWH 2 2
Element Power (kw) 3 3
Dimensions (Diameter x Height) mm 460x940 460x940

EWH (I) 63 OF 83 PROJECT No. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : HSBC BANK NEW HEAD OFFICE

PROJECT NO. : 972

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : B119-Sep-04

CHECKED BY : AWAD ABD-ALLAH DATE : B120-Sep-04

TITLE : ELECTRIC LOAD CALCULATION

Location Capacity Normal Emergency


Device Symbol VOLT(V)
Floor Room Name Room No. Liter Power (kW) Power (kW)
Fire Pump P 2 Basement Mechanical Room 380 115 115
Water Pump P 1 Basement Mechanical Room 380 11 11
Fuel Pump P 3 Basement Fuel Oil Room 220 1 1
Sump Pump S.P 1 Basement Mechanical Room 380 4 4
Ejector Pump E.P 1 Basement Mechanical Room 380 2 2
Heater EWH 3 Basement Drivers Toilet 220 100 3 x
Heater EWH 3 Ground Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Ground Women Toilet & KS 220 80 3 x
Heater EWH 2 Ground Men Toilet & KS 220 80 3 x
Heater EWH 3 First Men Toilet,KS & JS 220 100 3 x
Heater EWH 1 First Women Toilet 220 50 2 x
Heater EWH 1 First Catering Toilet 220 50 2 x
Heater EWH 1 First Vending 220 50 1.5 x
Heater EWH 3 Second Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Second Women Toilet & KS 220 80 3 x
Heater EWH 1 Second Vending 220 50 1.5 x
Heater EWH 3 Thrid Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Thrid Women Toilet & KS 220 80 3 x
Heater EWH 1 Thrid Vending 220 50 1.5 x
Heater EWH 3 Forth Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Forth Women Toilet & KS 220 80 3 x
Heater EWH 1 Forth Vending 220 50 1.5 x
Heater EWH 3 Fifth Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Fifth Women Toilet & KS 220 80 3 x
Heater EWH 1 Fifth Vending 220 50 1.5 x
Heater EWH 3 Sixth Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Sixth Women Toilet & KS 220 80 3 x
Heater EWH 1 Sixth Vending 220 50 1.5 x
Heater EWH 3 Seventh Men Toilet,KS & JS 220 100 3 x
Heater EWH 1 Seventh Women Toilet & KS 220 80 3 x
Heater EWH 3 Seventh Male Ablution 220 100 3 x
Heater EWH 3 Seventh Female Ablution 220 100 3 x
Heater EWH 1 Seventh Vending & Clinic 220 50 2 x
Heater EWH 3 Eighth Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Eighth Women Toilet & KS 220 80 3 x
Heater EWH 1 Eighth Vending 220 50 1.5 x
Heater EWH 3 Ninth Men Toilet,KS & JS 220 100 3 x
Heater EWH 2 Ninth Women Toilet & KS 220 80 3 x
Heater EWH 0 Ninth Chairman Toilet 220 35 1.5 x
Heater EWH 1 Ninth Men Toilet 220 50 2 x
Heater EWH 1 Ninth Kitchen 220 50 2 x
Heater EWH 1 Ninth Kitchen 220 50 2 x
Total Power = 226 133

Electric Loads 64of83 PROJ. NO. 972


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : EL KUREIMAT - POWER STATION / CONSTRUCTION OFFICES (93)

PROJECT NO. : 980

REVISION :0
PREPARED BY : MOHAMED EL-HARMEL DATE : ###

CHECKED BY : AWAD ABD-ALLAH DATE : ###

TITLE : RAIN WATER CALCULATIONS

Roof Projected Area = 21.6 x 34


= 734.4 m2
= 7901.0 ft2
Rain Water Load
Rain Water Intensity = 50 mm/hr
Flow Rate = Rain Water Intensity * Projected Area * Coefficient
Flow Rate = 0.05 x 734.4 x 1.1
Flow Rate = 36.7 m3/hr
Flow Rate = 161.64 GPM
Flow Rate = 10.20 l/s

No. of Rain Water Stacks Nos 3 4 5 6


m2 244.8 183.6 146.9 122.4
Calculated Area Per Rain Water Stack
ft2 2633.7 1975.2 1580.2 1316.8

From UPC Table D-1


At Rain Water Fall 50 mm/hr & 1% Slop
Rain Water Stack Diameter mm 80 100 125 150
m2 408.8 854.7 1607.2 2508.3
Maximum Projected Roof Area Per Stack
ft2 4398.0 9195.2 17290.9 26985.3

From UPC Table D-2


At Rain Water Fall 50 mm/hr & 1% Slop
Horizontal Rain Water Pipe Diameter mm 80 100 125 150
m2 152.7 349.3 620.6 994.0
Maximum Projected Roof Area
ft2 1642.8 3757.9 6676.7 10693.8

At 4 Nos Rain Water Stacks And 100 mm Stack Diameter


The Calculated Area Per Rain Water Stack Is 183.6 m2
Less Than Max. Projected Roof Area Per Stack 854.7 m2
Hence :
- 100mm Horizontal Rain Water Pipe Diameter Is Rreseanable.
- 100mm Rain Water Stack Diameter is Rreseanable.

RAIN WATER PROJ. NO. 980


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department ‫قسم الميكانيكا‬
PROJE
: AL-ARABI SPORTS CLUB

PROJECT NO. : 925

REVISION :0
PREPARED BY : A.E DATE : 23/2/2004

CHECKED BY : AA DATE :

SUBJECT: Calculation of Domestic Water Storage Capacity

The calculation based on sanitary application requirement cover 24 hours as following:

Water Consumption in
Sanitary appliances =
liters/day
1 Water Closet = 180
2 Wash basin = 285
3 Shower = 300
4 Kitchen Sink = 300
5 Janitor Sink = 300
6 Hose Bibbs = 570

Domestic Water Daily


Sanitary appliances daily consumptions
Consumptions in M³
1 Water Closet 56x180 = 10.08
2 Wash basin 62x285 = 17.67
3 Shower 49x300 = 14.70
4 Kitchen Sink 6x300 = 1.80
5 Janitor Sink 2x300 = 0.60
6 Hose Bibbs 10x570 = 5.70
Total Consumption in M³ 50.55

Swimming & Diving Pools Daily Consumption

1 Make up for Evaporation


Consider Evaporation rate is 13 mm/m² /day
Surface area for the pool is 1673 m²
Make up daily consumption = 0.013x1673 = 21.7 M³
2 Make up for Backwash cycles
Consider that each filter needs three backwash cycles per week and the backwash
cycles period is 12 minutes
Filter backwash rate is 150 m³ /hour
No of Filters is 5 filters
Daily water quantities for make-up = 5x150x3x12 / 7x60 64.3 M³

Required Daily storage water = 50.55+21.7+64.3 136.6 M³

Two days storage capacity = 2x136.6 273.2 M³

The Tank Capacity is 2x(7x7.7x3) 323 M³

i.e Storage Capacity is ok.


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : RAS LAFFAN PIPELINE

PROJECT NO. : 895

REVISION :0
PREPARED BY :M EL-HARMEL DATE : B107-Jun-05

CHECKED BY :A ABD-ALLAH DATE : B107-Jun-05

TITLE : WATER TANK CALCULATIONS


Method -1 :Based on Sanitary appliances

This calculaton based on number of sanitary fixtures


From ip The Institute of Plumbing Book
Fixture Water Consumption QTY Water Consumption
Type Liters/Day/Fixture Liters/Day
Water Closet 180 4 720
Lavatory 130 5 650
Shower 150 4 600
Kitchen Sink 135 4 540
Hose Bibbs(Garden)* 80 6 480
Hose Bibbs(Building)* 70 3 210
Total Water Consumption Per Day 3200
Number of Days which coverd by water storage tank = 3
Total Water Consumption (Liters) = 9600

Method -2 :Based on Number of Resident


From ASPE Data Book
Number of Resident per Shift = 6
Number of Shifts = 3
From ASPE Data Book
Water Consumption per resident = 100
Water Consumption per Day = 1800
Period of Storage( Days ) = 3
Water consumption for residents (Liters) = 5400
Water consumption for Irrigation (Liters)* = 4000

Total Water Consumption (Liters) = 9400

Case - 1 Is The Worst Case and Our Design Shall Be Based On Worst Case.

Take Tank Capacity (Liters) = 10000


* Assumption value

WATER TANK PROJ. NO. 895


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : RAS LAFFAN PIPELINE


PROJECT NO. : 895

REVISION :0
PREPARED BY :M EL-HARMEL DATE : B107-Jun-05

CHECKED BY :A ABD-ALLAH DATE : B107-Jun-05

TITLE : TRANSFER PUMP CALCULATIONS


Method -1 :
Based on Sanitary appliances
Type Of Fixture Other Than Dwelling Units
From NSPC Table 10.14.2A,B & 11.4.1
FLUSH TANK SYSTEM
Fixture CW HW WS QTY CW HW WS
Type FU FU FU Total FU Total FU Total FU
Water Closet 5.5 0 5.5 4 22 0 22
Lavatory 0.75 0.75 1 5 3.75 3.75 5
Shower 2 2 3 4 8 8 12
Kitchen Sink 2 2 3 4 8 8 12
Ablution 1.5 1.5 2 0 0 0 0
TOTAL FU ……….…..…...….……….…= 41.8 19.8 51.0
Water Supply Fixture Unit Factor …….= 0.8
AT 80 % OF TOTAL WSFU = 33.4 15.8 40.8
DEMAND AT 80 % OF TOTAL WSFU (GPM) = 25
Demand required for (Hoses , Irrigation,…etc)(GPM)* = 10
Total Required Demand By Pump (GPM) = 35.0
Total Required Demand By Pump (L/S) = 2.2

Method -2 :
Based on table (4-12) in Church Book, Table of factors for sizing house pump
No. of Plumbing Fixtures = 17
For Industrial building @ 1 – 25 fixtures, GPM per fixture = 1.5
GPM For Plumbing Fixtures = 17 x 1.5 = 25.5
Demand required for (Hoses , Irrigation,…etc)(GPM)* = 10
Total GPM = 25.5 + 10 = 35.5

Static Head (m) = 7


Residual Pressure (m) = 10
Friction Loss (m) = 10
Total Pump Head (m) = 27.0

Pump Characteristic
Selecte Two pumps one (1) operate and one (1) stand-by, Each pump has 100% of total flow
Q = 2.0 l/s
H = 30.0 m
* Assumption value

FILLING PUMP PROJ. NO. 895


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : CALL CENTER & MASRYA IT HEADQUARTERS

PROJECT NO. : 861/01

REVISION :0
PREPARED BY :MF DATE :

CHECKED BY : DATE :

TITLE : HOT WATER DEMAND CALCULATION


Based on ASPE Pages 4-10, 4-11& 4-22
No.of ROOMS = 288
No.of SUITES = 54

HOT WATER DEMAND PROJ. NO. 861/01


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department

PROJECT NAME : CALL CENTER & MASRYA IT HEADQUARTERS

PROJECT NO. : 861/01

REVISION :0
PREPARED BY :MF DATE :

CHECKED BY : DATE :

TITLE : PUMP CALCULATIONS


RISER NO.
Type Of Fixture Other Than Dwelling Units
From NSPC Table 10.14.2A,B & 11.4.1
FLUSH TANK SYSTEM
Fixture CW HW WS No.of ROOMS
Type FU FU FU No.of SUITES
Water Closet 5.5 0 5.5
Urinal 4 0 4
Lavatory 0.75 0.75 1
BathTub 2 2 3
Kitchen Sink 2 2 3
Janitor Sink 2 2 3
Bidet 2 2 3
TOTAL FU ……….…..…...….……….…=
DEMAND (GPM) ……….…..…...….……….…=
PIPE VELOCITY (fps) ……….…..…...….……….…=
PIPE FRICTION LOSS (psi/100') ……….…..…...….……….…=
PIPE SIZE (mm) ……….…..…...….……….…=
Legend CW=Cold Water HW=Hot Water
WS= Water Supply D=Drain

PUMPS PROJ. NO. 861/01


ECG ENGINEERING CONSULTANTS GROUP
Mechanical Department ‫قسم الميكانيكا‬
PROJECT NAME : AL-ARABI SPORTS CLUB

PROJECT NO. : 925

REVISION :0
PREPARED BY : A.E DATE : 23/2/2004

CHECKED BY : AA DATE :

Calculation of sump pit dimensions

Data of Backwash flow


1 Backwash for each filter = 2 times/week
2 Backwash period = 10 minutes
3 Number of filters = 5 Nos
4 Backwash rate for each filter = 132 M3/hr
5 Backwash volume = 22 M3

Swimming & Diving Pools Daily Consumption

Sump pump effective volume (Veff )

By selecting a sump pump with 20 l/sec rate


Veff = [ Backwash flow rate (l/s) - Sump pump flow rate (l/s) ] x [Backwash peiod]
Veff = [ 36.66 - 20 ] x 10 x 60 = 10 M3
Sump pit projected area = 2 x 4 = 8 M2
Required effective height = 10 / 8 = 1.25 M

Supposed Sump height from inlet pipe to sump bottom = 1.7 M3

Uneffective volume above the sump bottom = 0.3 M

∴ 1.25 M effective height is ok


Friction Losses in Pipes
Metric Unit bar/m Britch Unit psi/foot
C 120 C 120
d 40.894 mm d 1.61 inch
Q 369 l/min Q 229 gpm

P=6.05*10^5*((q^1.85)/((C^1.85)*(D^4.87))) P=4.52*((q^1.85)/((C^1.85)*(D^4.87)))

P= 0.06847 bar/m P= 1.46929 psi/foot

Sch-40 1" 1 1/4" 1 1/2" 2" 2 1/2" 3" 3 1/2"


I.Dia.(in) 1.049 1.380 1.610 2.067 2.469 3.250 3.548
I.Dia.(mm) 26.645 35.052 40.894 52.502 62.713 82.550 90.119
1 gpm = 3.7854 l/min
1 gpm = 0.0631 l/s
1 l/s= 15.8503 gpm
1 psi/foot= 0.2262 bar/m
1 bar/m= 4.42075 psi/foot
^1.85)*(D^4.87)))

4" 5" 6"


3.938 5.047 5.937
100.025 128.194 150.800
ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

DIVISION 14 : CONVEYING SYSTEM

1 Manual Operator monorail 2 Tons capacity LS 1 15,000.00 15,000.00


0.00

TOTAL 15,000.00

425905513.xls sheet 74 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

DIVISION 15 : MECHANICAL

Water Supply System 0.00


Polypropylene Pipe (PP) 0.00
1 90 mm m 177 210.00 37,170.00
0.00
2 75 mm m 72 140.00 10,080.00
0.00
3 63 mm m 39 84.00 3,276.00
0.00
4 50 mm m 148 75.00 11,100.00
0.00
5 40 mm m 12 65.00 780.00
0.00
6 32 mm m 162 56.00 9,072.00
0.00
7 25 mm m 760 42.00 31,920.00
0.00
8 20 mm m 1,620 35.00 56,700.00
0.00
Ductile Iron Pipe U/G 0.00
9 80 mm m 8 300.00 2,400.00
0.00
Ductile Iron Pipe A/G 0.00
10 150 mm m 6 520.00 3,120.00
0.00
11 100 mm m 117 400.00 46,800.00
0.00
12 80 mm m 40 300.00 12,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

425905513.xls sheet 75 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TOTAL 224,418.00

DIVISION 15 : MECHANICAL

Water Supply System (CONT'D)


Gate Valves
1 150 mm No. 2 2,300.00 4,600.00
0.00
2 100 mm No. 2 1,700.00 3,400.00
0.00
4 80 mm No. 11 1,200.00 13,200.00
0.00
1 65 mm No. 13 940.00 12,220.00
0.00
4 50 mm No. 12 280.00 3,360.00
0.00
3 40 mm No. 1 190.00 190.00
0.00
4 32 mm No. 5 110.00 550.00
0.00
5 25 mm No. 23 85.00 1,955.00
0.00
6 20 mm No. 13 85.00 1,105.00
0.00
7 15 mm No. 7 85.00 595.00
0.00
Check Valves 0.00
14 80 mm No. 1 1,500.00 1,500.00
0.00
Pressure Reducing Valve Station 0.00
5 80 mm No. 1 22,000.00 22,000.00
0.00
Automatic Air relief Valves 0.00
8 15 mm No. 6 380.00 2,280.00
0.00
Drain Valves 0.00
7 20 mm No. 6 95.00 570.00
0.00
Water Meter 0.00
15 80 mm No. 1 8,000.00 8,000.00
0.00
Strainer 0.00
10 150mm No. 1 2,200.00 2,200.00
0.00
11 80mm No. 1 1,700.00 1,700.00

425905513.xls sheet 76 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TOTAL 79,425.00

DIVISION 15 : MECHANICAL (CONT'D)


Water Supply System (CONT'D)
Water Hammer Arrestors 0.00
1 Type A No. 2 220.00 440.00
0.00
2 Type B No. 11 280.00 3,080.00
0.00
Water Filters 0.00
6 15 mm Inlet No. 20 850.00 17,000.00
0.00
Hose Bibs 0.00
6 20 mm No. 19 250.00 4,750.00
0.00
Skid Mounted Booster Pump Set 0.00
9 P1(A,B&B) set 1 80,000.00 80,000.00
0.00
Pressure Vessel (Bladder Type) 0.00
15 1.5 m3(capacity) No. 2 13,000.00 26,000.00
0.00
Water Tanks 0.00
12 80 mm, float valve No. 2 3,200.00 6,400.00
0.00
13 Automatic level indicators No. 2 13,000.00 26,000.00
0.00
13 100mm GooseNeck vent pipe No. 5 13,000.00 65,000.00
0.00
Electrical Water Heaters 0.00
10 EWH2 No. 27 750.00 20,250.00
0.00
11 EWH3 No. 14 900.00 12,600.00

425905513.xls sheet 77 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

0.00
TOTAL 353,415.00

DIVISION 15 : MECHANICAL (CONT'D)


Fuel Oil System 0.00
1 10m3 Steel Fabricated Fuel Oil tanks No. 1 35,000.00 35,000.00
0.00
1 Pumps P4(A&B),Control Panel & Accessories No. 2 28,500.00 57,000.00
0.00
1 Hand Pump No. 1 3,000.00 3,000.00
0.00
Gate Valves 0.00
2 80 mm No. 1 1,500.00 1,500.00
0.00
3 25 mm No. 2 85.00 170.00
0.00
Check Valves 0.00
2 80 mm No. 1 1,100.00 1,100.00

Black Steel Pipe A/G 0.00


4 80 mm m 78 200.00 15,600.00
0.00
5 50 mm m 5 120.00 600.00
0.00
6 25 mm m 4 45.00 180.00

425905513.xls sheet 78 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TOTAL 729,085.00
DIVISION 15 : MECHANICAL (CONT'D)
Drainage System
uPVC Pipes U/G
1 200 mm m 12 245.00 2,940.00
0.00
5 160 mm m 390 185.00 72,150.00
0.00
6 110 mm m 35 150.00 5,250.00
0.00
4 50 mm m 5 75.00 375.00
0.00
uPVC Pipe A/G 0.00
7 160 mm m 280 165.00 46,200.00
0.00
2 110 mm m 1,750 125.00 218,750.00
0.00
9 90 mm m 160 95.00 15,200.00
0.00
4 50 mm m 1,151 60.00 69,060.00
0.00
Perforated uPVC Pipes 0.00
7 110 mm m 15 105.00 1,575.00
0.00
Ductile Iron Pressure Main 0.00
12 100 mm m 30 400.00 12,000.00
0.00
13 80 mm m 50 300.00 15,000.00
0.00
Gate Valves 0.00
14 100 mm No. 2 1,700.00 3,400.00
0.00
15 80 mm No. 2 1,200.00 2,400.00
0.00
Check Valves 0.00
16 100 mm No. 2 1,900.00 3,800.00
0.00
17 80 mm No. 2 1,500.00 3,000.00
0.00
0.00

425905513.xls sheet 79 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00

TOTAL 471,100.00

DIVISION 15 : MECHANICAL

Drainage System (CONT'D)


Submersible Pumps 0.00
16 Sump Pump set SP1(A&B) set 1 65,000.00 65,000.00
0.00
17 Ejector Pump set EP1(A&B) set 1 45,000.00 45,000.00
0.00
4 Oil interceptor (OI 1) No. 1 14,000.00 14,000.00
0.00
5 Waste oil storage tank (300L) No. 1 6,000.00 6,000.00
0.00
6 Sand trap No. 1 3,500.00 3,500.00
0.00
7 Sump pit No. 1 9,000.00 9,000.00
0.00
8 Ejector basin No. 1 6,000.00 6,000.00
0.00
Plumbing Specialties 0.00
Floor Cleanout 0.00
2 100 mm (FCO1) No. 4 980.00 3,920.00
0.00
1 100 mm type (FCO2) No. 9 1,100.00 9,900.00
0.00
Floor Drain 0.00
9 150 mm, type (FD2) No. 12 1,100.00 13,200.00
0.00
10 100 mm, type (FD1) No. 83 1,100.00 91,300.00
0.00
11 100 mm, type (FD3) No. 2 3,500.00 7,000.00
0.00
Area Drain 0.00
10 100 mm, type (AD1) No. 12 1,400.00 16,800.00
0.00
Planter Drain 0.00
10 100 mm, type (PD1) No. 4 1,350.00 5,400.00
0.00
Roof Drain 0.00
2 100 mm (RD1) No. 6 900.00 5,400.00
425905513.xls sheet 80 of 83 BOQ (Total)
ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

0.00
2 100 mm (RD2) No. 3 900.00 2,700.00
0.00
3 80 mm (RD2) No. 3 900.00 2,700.00
0.00
Trench Drain 0.00
13 100 mm, type (TD1) No. 2 900.00 1,800.00
0.00
Trench Grating 0.00
14 300 mm wide TG m 6 1,800.00 10,800.00

TOTAL 319,420.00

DIVISION 15 : MECHANICAL

Drainage System (CONT'D)


12 Manhole (MH1) No. 5 3,700.00 18,500.00
0.00
12 Catch Basin (CB1) No. 2 4,300.00 8,600.00
0.00
12 Retarding Chamber (RCH1) No. 1 4,500.00 4,500.00
0.00
Plumbing Fixtures 0.00
1 Water closet type (WC1) No. 55 2,300.00 126,500.00
0.00
2 Water closet type (WC2) No. 20 2,600.00 52,000.00
0.00
4 Lavatory type (LAV1) No. 104 1,750.00 182,000.00
0.00
5 Lavatory type (LAV2) No. 21 1,450.00 30,450.00
0.00
5 Lavatory type (LAV3) No. 7 1,700.00 11,900.00
0.00
5 Shower (SH1) No. 4 2,600.00 10,400.00
0.00
5 Shower (SH2) No. 1 2,000.00 2,000.00
0.00
6 Urinal(UR1) No. 33 2,100.00 69,300.00
0.00
7 Kitchen sink (KS1) No. 13 1,600.00 20,800.00
0.00
8 Janitor sink (JS1) No. 10 1,600.00 16,000.00
0.00
8 Ablution Mixer (AB1) No. 16 1,100.00 17,600.00
0.00
0.00
0.00
0.00

425905513.xls sheet 81 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL 570,550.00

DIVISION 15 : MECHANICAL (CONT'D)

Division Summary Page


Page 1 224,418.00

Page 2 79,425.00

Page 3 729,085.00

Page 4 471,100.00

Page 5 319,420.00

Page 5 570,550.00

425905513.xls sheet 82 of 83 BOQ (Total)


ENGINEERING CONSULTANTS GROUP

CLIENT : HSBC BANK NEW HEAD OFFICE


PROJECT : HSBC DATE : MARCH, 2005
PROJECT NO. : 972 REV. : 0

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TOTAL 2,393,998.00

425905513.xls sheet 83 of 83 BOQ (Total)