Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Form 15 A Checklist

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Consent For Establishment (CFE)

Karnataka State Pollution Control Board


Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions
Consent Order CTE-312751 PCB ID: 78106 Date. 20/05/2019
No.
To,
The Occupier,
Vaasa Ventures
Attikolla, Dharwad.

Sir,

Sub: Consent to Establish new activity under Water (Prevention & Control of Pollution) Act, 1974 & Air
(Prevention & Control of Pollution) Act, 1981
Ref:   1.   CFE application submitted by the industry/organization on 03/05/2019 at regional Office

2.   Inspection of the project site by Regional Officer Dharwad on 15/05/2019

With reference to the above, it is to be informed that, the Board hereby accords Consent for Establishment for new
Activity under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981
at the location indicated below subject to the following terms & conditions.
Location:
Name of the Industry: Vaasa Ventures
Address: Sy.No. 70,, Attikolla, Dharwad.
Industrial Area: Not In I.A, Attikola,
Taluk: Dharwad, District: Dharwad
1.   This consent for establishment is valid up to 09/05/2024 from the date of issue.
2.   The applicant shall not undertake expansion/diversification without the prior consent of the Board.
3.   The applicant shall obtain necessary license/clearance from other relevant statutory agencies as required under the 
law.
4. This consent is granted considering the following activities:
Sr Product Name Applied Qty/Month Unit
1 plots 84.0000 NOS

Page-1 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions
I.    WATER CONSUMPTION:
1.      The source of water shall be from Corporation Water and total water consumption shall be as below.
and Bore Well

Particulars Water consumption(KLD)


Domestic Purpose 60.0
II.   WATER POLLUTION CONTROL:

1.      The industry shall treat the domestic wastewater from the factory in septic tank with soak pit. No overflow from
the soak pit is allowed. The septic tank and soak pit shall be designed as per IS 2470 Part – I and Part – II.

2.      The industry shall treat the domestic wastewater in the Sewage Treatment Plant (STP) as per the proposal
submitted. It shall meet the standards specified in Annexure-I & shall be used on land for gardening/greenbelt
within the factory premises.

3. Domestic Sewage shall be discharged to Underground drainage System/ Sewers owned by Local body.

4. The trade effluent shall be treated in the Effluent treatment Plant (ETP) to the stipulated standards and the treated
trade effluent shall be discharged to the Underground drainage System (UGD) owned by Local body.

STP & ETP details


SlNo ETP/STP ETP Code Category Name Capacity (Meter Units Remarks
NO Cubic)
1 ETP1 BS- Bar Screen 0.75 1
2 ETP1 GC- Grit Chamber 6.00 1
3 ETP1 C+E P-Collection cum 54.00 1
Equalization
4 ETP1 PA- Primary Areation tank 108.00 1
5 ETP1 SET S-SETTLING TANK 14.00 1
6 ETP1 SDB S-Sludge Dry Beds 9.00 6
7 ETP1 STP Sewage Treatment Plants 250.00 1
8 ETP1 STP Sewage Treatment Plants 250.00 1
9 ETP1 CFL T-CARBON FILTER 15.00 1
10 ETP1 SFL T-SAND FILTER 15.00 1

Discharge of effluents under the Water Act:


Sl. No. Description Permitted Quantity of Mode/Place of disposal
discharge in KLD
1 Domestic Purpose 56.700 STP

Page-2 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions
III. AIR POLLUTION CONTROL:

1.      The Source of emission, Stack height & Air Pollution Control (APC) measures shall be as specified in
ANNEXURE-II.
2. The occupier shall provide port holes for sampling of emission, access platforms for carrying out stack
sampling, electrical points and all other necessary arrangements including ladder as indicated in Annexure-II.

3. The Occupier shall upgrade/modify/replace the control equipment with prior permission of the Board.

IV.   NOISE POLLUTION CONTROL:

1.      The industry shall ensure that the ambient noise levels within its premises shall not exceed the limits i.e. 75 dB(A)
Leq during day time and 70 dB(A) Leq during night time as specified in the Environment (Protection) Rules.

V. SOLID WASTE (OTHER THAN HAZARDOUS WASTE) DISPOSAL:

1.      The industry shall collect, treat and dispose off all solid waste generated from the process other than wastes covered
under the Hazardous & other Wastes (Management & Transboundry Movement) Rules 2016, in such manner so as
not to cause environmental pollution.

2.      The details of solid waste generated from the proposed plant and mode of disposal shall be as below.

VI. HAZARDOUS AND OTHER WASTES (MANAGEMENT & TRANSBOUNDRY MOVEMENT)


RULES 2016:

1.      The industry shall apply and obtain authorization under Hazardous and Other Wastes (Management &
Transboundry Movement) Rules 2016, and comply with the conditions of the authorization.  The applicant shall
apply for authorization along with the consent for operation (CFO) application under the Rules in Form-I to obtain
authorization and comply with conditions.
VII. GENERAL:

1.      The industry shall transport and store the raw materials in a manner so as not to cause any damage to environment,
life and property. The applicant shall be solely responsible for any damages to environment.

2.      The industry shall not commission the proposed plant for trial or regular production unless necessary Water & air
pollution control equipments are installed as specified in the Consent Order.

3. The industry shall ensure that the treatment plant and control equipments are completed and commissioned
simultaneously along with construction of the factory and erection of machineries.

4.      The industry shall not change or alter (a) raw materials or manufacturing process, (b) change the products or
product mix (c) the quality, quantity or rate of discharge/emissions and (d) install/replace/alter the water or air
pollution control equipments without the prior approval of the Board.

Page-3 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions
5.      The industry shall immediately report to the Board of any accident or unforeseen act or event resulting in
release of discharge of effluents or emissions or solid wastes etc. in excess of the standards stipulated. And the
industry shall immediately take appropriate corrective and preventive actions under intimation to the Board.

6.      The Board reserves the right to review, impose additional condition or conditions, revoke, change or alter the
terms and conditions.

7.      This CFE does not give any right to the Party/Project Authority/Industry to forego any other legal requirement, that
is necessary for setting/operation of the plant.

8.      The industry shall furnish pointwise compliance to the conditions given under this consent for establishment along
with the application for Consent to operate.

9.      The applicant is liable to reinstate or restore, damaged or destroyed elements of environment at his cost, failing
which, the applicant/occupier as the case may be shall be liable to pay the entire cost of remediation or
restoration and pay in advance an amount equal to the cost estimated by Competent Agency or Committee.

10.  The Project authorities shall apply and obtain prior consent of the Board for any new air pollution sources in future.

Please note that this is only consent for establishment issued to you to proceed with the formalities  for 
establishment  of   the  industry  and   does  not  give  any  right  to  proceed  with  trial/regular  production. For     
this purpose, separate consents of the Board for discharge of liquid effluent and the emissions to the air shall have
to be obtained by remitting prescribed consent fee. The application for consent has to be made 45 days in advance
of commissioning for trial production of the plant.

The receipt of this letter may please be acknowledged.

Consent Fee paid : Rs. 12500

Note:
The following Conditions Nil mentioned above are not applicable.

Page-4 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions

COPY TO:
1.   The Environmental Officer, KSPCB, Regional Office, Dharwad for information and to inspect the
industry during your next visit to the area.
2.      Master copy (Dispatch).
3.      Office copy.

Note: All efforts should be made to remove colour and unpleasant odour as far as practicable. 

ANNEXURE- II
Chi Chimney KVA Rating/ Minimum Constituents to be Tolerance Air pollution Date of which air
m.N attached to Capacity chimney controlled in the limits Control pollution control
o. height to be emission mg/NM3 equipment to equipments shall
provided be be provided to
above installed,in achieve the
ground addition to stipulated
level chimney tolerance limits
(in Mtr) height as per and chimney
col.(4) heights
conforming to
stipulated
heights.

1 Any NO air 0 PM(mg/NM3),SO2 0 GRB Before


Other........ pollution (PPM),NOx(PPM) commissioning.
source
Note:
GRB : Green Belt

Page-5 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions
Additional Conditions:

1. The P/P shall construct the STP as per the proposal submitted and it shall be operated to treat the sewage to the standards
stipulated vide Annexure-I.
2. The P/P shall install the organic converter for composting of organic waste and shall not be handed over to corporation
Dharwad.
3. The p/p shall completely utilise the treated effluent for urban reuse and there shall not be any discharge of effluent outside.
4. The Hon'ble NGT direction w.r.t. distan

Page-6 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions

Page-7 e_outwardno21031--20/05/2019 Printed from XGN


Consent For Establishment (CFE)
Karnataka State Pollution Control Board
Consent No. CTE-312751 Valid Zonal Office : Dharwad,
upto: 09/05/2024 Ground Floor, Plot No.4, Lakkamanahalli Industrial
Area,P.B.Road,Dharwad-580004
Tele : 0836-2462918
Industry Colour: Industry Scale: SMALL
ORANGE

(This document contains 8 pages including annexure & excluding additional conditions
LOCATION OF SAMPLING PORTHOLES, THE PLATFORMS, THE ELECTRICAL OUTLET.

1.      Location of Portholes and approach platform:

Portholes shall be provided for all chimneys, stacks and other sources of emission.  These shall serve as the 
sampling points.  The sampling point should be located at a distance equal to atleast eight times the stack or 
duct diameters downstream and two diameters upstream from source of low disturbance such as a Bend, 
Expansion, Construction Valve, Fitting or Visible Flame for rectangular stacks, the equivalent diameter can be
calculated from the following equation.

                                                       2 (Length x Width)
             Equivalent Diameter   =     -----------------------
                                                          (Length + Width)

2.      The diameter of the sampling port should not be less than 3”. Arrangements should be made so that
the porthole is closed firmly during the period when it is not used for sampling.

3.      An easily accessible platform to accommodate 3 to 4 persons to conveniently monitor the stack
emission from the portholes shall be provided.  Arrangements for an Electric Outlet Point off 230 V 15 
A with suitable switch control and 3 Pin Point shall be provided at the Porthole location.

FOR AND ON BEHALF OF


KARNATAKA POLLUTION CONTROL BOARD

Signature Not Verified


Digitally signed by
Date: 2019.05.20 15:46:12
+05:30

Page-8 e_outwardno21031--20/05/2019 Printed from XGN

You might also like