Flange Management Procedure Fix
Flange Management Procedure Fix
Flange Management Procedure Fix
18 June
0A IFC Issued for Comment AR FAD AGN MER / HS
2012
Printed initials in the approval boxes confirm that the document has been signed.
The originals are held within Document Management.
Flange Management Procedure ID-G-BU-xxxxx-xxxxx-xxxxx
Piping /piping
ConocoPhillips Indonesia Page 2 of 13
Revision Sheet
ConocoPhillips Indonesia Inc. Ltd
Contents
1. Purpose
2. Scope
3. Reference
4. Safety Precautition
5. Equipment and man power
5.1. Equipment
5.2. Man power
6. Bolt Tightening
6.1. Tightening Preparation
6.2. Recommended Bolt Tightening Procedure
6.3. Table for Bolt Tightening
7. Appendix
Flange Management Procedure ID-G-BU-xxxxx-xxxxx-xxxxx
Piping /piping
ConocoPhillips Indonesia Page 4 of 13
1 PURPOSE
1.1. This procedure describes the requirement for bolt tightening for piping system perform
by Wika in accordance with Company in the scope of contract of Suban Condensate
Tank.
2 SCOPE
2.1. The procedure defines the method for bolt tightening using manual/hand torque wrench,
hydraulic torque wrench and hydraulic stud bolt tensioner.
2.2. Application of bolts tightening tool shall be done as per the following scope :
Bolt Diameter < 2” : General torque wrench (Manual/hand Torque Wrench or Hydraulic
torque wrench if applicable)
3 REFERENCE
4 SAFETY PRECAUTIONS
Special attention shall be paid to this work as it utilizes high-pressure hydraulic oil (maximum
15,000 psi). Supervisor must be present at location to supervise the worker prior to bolt
tightening activity. Tools and equipment should be inspected before use to ensure good
working condition. The working area shall be roped off and warning notices shall be displayed.
For high elevation or remote area work, adequate scaffolding shall be erected for safety.
Operators shall handle components during placing or removing the bolt tightening equipment
as per manufacturers recommendation. Operators shall also be equipped with safety glasses,
hard hats, gloves and safety shoes.
Additional safety equipment shall be worn as advised by the Project HSE Department.
Flange Management Procedure ID-G-BU-xxxxx-xxxxx-xxxxx
Piping /piping
ConocoPhillips Indonesia Page 5 of 13
5.1 Equipment
a. Hi-Force Including Accessories.
b. Manual/Hand Torque Wrench
c. Hand Tools
5.2 Manpower
a. Mechanical Supervisor
b. Safety man
c. Mechanic/Helper
6 BOLT TIGHTTENING
BOLT
TORQUE
STAGE SETTING
SEQUENCE REMARKS
TIGHTENING
I 30% 1-2-3-4
II 60% 4-3-2-1
IV 100% 3-4-1-2
I 30% 1-2-3-4;5-6-7-8
II 60% 8-7-6-5;4-3-2-1
IV 100% 2-6;1-5;4-8;3-7
Flange Management Procedure ID-G-BU-xxxxx-xxxxx-xxxxx
Piping /piping
ConocoPhillips Indonesia Page 7 of 13
1-2-3-4;5-6-7-8;9-10-
I 30%
11-12;13-14-15-16
16-15-14-13;12-11-
II 60%
10-9:8-7-6-5-;4-3-2-1
1-2-3-4;5-6-7-8;9-10-
III 100%
11-12;13-14-15-16
1-12-8-13;2-11-7-
IV 100%
14;3-9-5-15;4-10-6-16
1-2-3-4;5-6-7-8;9-
I 30% 10-11-12;13-14-15-
16;17-18-19-20
20-19-18-17;16-15-
II 60% 14-13;12-11-10-
9;8-7-6-5;4-3-2-1
1-2-3-4;5-6-7-8;9-
III 100% 10-11-12;13-14-15-
16;17-18-19-20
8-1-20-12;7-2-19-
IV 100% 11;6-4-18-10;5-3-
17-9;16-15-14-13
Flange Management Procedure ID-G-BU-xxxxx-xxxxx-xxxxx
Piping /piping
ConocoPhillips Indonesia Page 8 of 13
BOLT
TORQUE
STAGE SEQUENCE REMARKS
SETTING
TIGHTENING
1-2-3-4;5-6-
7-8;9-10-11-
12;13-14-15-
16;17-18-19-
I 30%
20;21-22-23-
24;25-26-27-
28,29-30-31-
32
32-31-30-
29;28-27-26-
25;24-23-22-
21;20-19-18-
II 60%
17;16-15-14-
13;12-11-10-
9;8-7-6-5;4-3-
2-1
1-2-3-4;5-6-
7-8;9-10-11-
12;13-14-15-
16;17-18-19-
III 100%
20;21-22-23-
24;25-26-27-
28,29-30-31-
32
32-6-24-
14;31-5-23-
13;30-7-22-
15;29-8-21-
IV 100% 16;28-4-18-
10;27-3-20-
9;26-1-17-
12;25-2-18-
11
Flange Management Procedure ID-G-BU-xxxxx-xxxxx-xxxxx
Piping /piping
ConocoPhillips Indonesia Page 11 of 13
7 APPENDIX
Appendix 7.1.