Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

RENCANA & REALISASI PEMELIHARAAN PERIODIK MESIN PEMBANGKIT

TAHUN 2018
PLN UPDK TELLO
MESIN JENIS PEMELIHARAAN PERIODIK
NO. SEKTOR/PLTU/A/D SUBRANTING THN DAYA DAYA TRW I TRW II TRW III TRW IV
MEREK TYPE NO.SERI
OPERASI TPSNG MAMPU RENC REAL RENC REAL RENC REAL RENC REAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

I PEMBANGKITAN TELLO
A. PLTD
1 MITSUBISHI-1 18V 52/55A D 155120 1985 12.600 8.000
2 MITSUBISHI-2 18V 52/55A D 155121 1985 12.600 8.000
PLTD TELLO
3 SWD-1 9TM 620 54480 1990 12.396 8.000
4 SWD-2 9TM 620 54490 1990 12.396 8.000

5 DEUTZ-1 BV 8M 628 7106459 1987 1.224 0.850


6 DEUTZ-2 BV 8M 628 7300748 1987 1.224 0.900 SO 10/2018 SO 10/2018
7 DEUTZ-3 BV 8M 628 7106458 1987 1.224 0.900
8 DEUTZ-4 BV 8M 628 7300397 1987 1.224 0.950 SO 10/2018 SO 10/2018
9 DEUTZ-5 BV 8M 628 7300390 1987 1.224 0.900
10 PLTD TANGKALA-SLY DEUTZ-6 BV 8M 628 6264176 1987 1.224 -
11 MITS-1 S16R-PTA-S 22009 2017 1.100 1.100
12 MITS-2 S16R-PTA-S 21999 2017 1.100 1.100
13 MITS-3 S16R-PTA-S 22022 2017 1.100 1.100
14 CMS-1 KTA 50-G8 A17E198390 2017 1.000 1.000
15 CMS-2 KTA 50-G8 A17E198386 2017 1.000 1.000

11 PLTD BENTENG-SLY DAIHATSU 6 PSHTc 6264176 1985 0.500 0.500

B. PLTU
12 NANJING TURBIN 1 200902004 2012 50.000 50.000
13 PLTU BARRU NANJING TURBIN 2 200901003 2012 50.000 50.000 ME 06/2018 SE 11/2018

C. PLTG
14 WESTCAN W 191 G 66S6031 1976 14.466 -
15 ALSTHOM 1 PG 5341 P TURCO 181 1982 21.350 16.000
16 ALSTHOM 2 PG 5341 P TURCO 119 1982 20.100 -
PLTG TELLO
17 GE#1 MS 6001 B 296850 1997 33.400 26.000
18 GE#2 MS 6001 B 296851 1997 33.400 28.000

JUMLAH PEMBANGKITAN TELLO 285.85 212.30

Makassar, 9 Januari 2019

You might also like