Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

MJB Design

Download as pdf or txt
Download as pdf or txt
You are on page 1of 41

CLIENT:

AMARAVATI DEVELOPMENT CORPORATION

PROJECT TITLE:

SMART INTEGRATED INFRASTRUCTURE MASTER PLAN


AND DETAILED PROJECT REPORTS FOR PHASE-II
INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL
CITY

CONTRACTORS:

BSR INFRATECH INDIA LTD.


Plot No. 90, Sri Vasavi Nagar, Patamata, Vijaywada-530003, Andhra Pradesh

TITLE OF CALCULATION:

DESIGN OF PSC T GIRDER SUPERSTRUCTURE OF 37m SPAN, DECK SLAB, END


CROSS GIRDER & PARAPET WALL FOR BRIDGES @ CH: 2+582 & CH: 9+130

Note No: BSEC/MJ18-02/DN-102 Prepared By: Satyam


Rev. No.: R0 No. of Sheet 1 + Checked By: SKJ
Date: 10.09.2018 Approved By: A.B

Date Rev. No. Revision By

CONSULTANT:
B&S ENGINEERING CONSULTANTS PVT. LTD.
315-316, VISHAL CHAMBERS SECTOR-18, NOIDA-201301
TEL: 0120-4570703, Fax: 0120-4310433, E-mail: admin@bsecpl.in
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED
Prepared By
PROJECT REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI Rev:
CAPITAL CITY Satyam

Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet R0
SKJ
Wall

CONTENTS

1 GENERAL

2 STRUCTURAL MODEL FOR ANALYSIS

3 COMPUTATION OF BENDING MOMENT AND SHEAR FORCE

4 CALCULATION OF FRICTION AND SLIP LOSS IN CABLES

5 CALCULATION OF CREEP & SHRINKAGE STRAINS

6 CALCULATION OF STRESSES DUE TO DIFF SHRINKAGE

7 CALULATION OF STRESSES DUE TO TEMP GRADIENT

8 CALCULATION OF FLEXURAL STRESSES UNDER SLS

9 ULTIMATE STAGE CHECK FOR FLEXURE

10 DESIGN FOR ULTIMATE SHEAR & PROVISION OF SHEAR REINFORCEMENT

11 DESIGN OF INTERFACE SHEAR & SHEAR CONNECTORS

12 DESIGN OF DECK SLAB

13 DESIGN OF END CROSS GIRDER

14 DESIGN OF PARAPET WALL


Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED
Prepared By
PROJECT REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI Rev:
CAPITAL CITY
Satyam

Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet R0
SKJ
Wall

INTRODUCTION

The project is construction of water pipe Carrying Bridge Under the smart integrated infrastructure master plan & detailed
project Report for Phase-II Infrastructure Works for Amaravati capital city. The total length of the bridge is 100m. This
bridge is designed for 2 m diameter Steel pipes for water carryng purpose. Two bridges contains 3 simply supported
spans of having length 37m,37m and 26m @ Ch:2+528 & 37mx4 + 22mx1 @ ch:9+130 respectively . The overall width
of the proposed bridge is 4m with clear width of 3.6m. The superstructure comprises of one PSC girders, with cast in-situ
RCC deck slab on top. At deck slab level pedestal and saddle is provided for pipe.The superstructure is supported on
ELASTOMERIC bearings.

This design note deals with the design of superstructure (PSC T girder), Deck Slab & End Cross Girder. Following loads
have been considered for the analysis:
(a) Self wt. of the girder & load of deck slab
(b) Superimposed Dead Load which includes parapet wall, pedestal, pipe & water
(c) Temperature Load due to non linear temperature rise/fall

The superstructure is analyzed longitudinally in two stages. First stage analysis is carried out for ‘girder alone’ section,
simply supported, with non-composite precast post-tensioned beam properties, for self weight of girder and self-weight of
cast-in-situ deck slab with cross-girders.
g In the second stage,
g when the deck slab gains
g strength,
g the section properties
for the composite girder and deck slab are considered and global Grillage Analysis of the deck has been carried out for
finding out the distribution of loads from SIDL.

The superstructure is modeled as a space frame & analyzed in STAAD Pro.

The girders are prestressed in single stage.

CONSTRUCTION PROGRAM & PRESTRESSING STAGES:


Activity Day after Casting fcj (Mpa)
(i) Completion of casting of PSC Girder 0 day
(ii) 1st Stage Prestress 28 day 50.0
(iii) Casting of Deck Slab & Diaphragm 35 day 50.0
(v) Completion of SIDL 90 day 50.0

The design of Deck Slab, End Cross Girder & Parapet Wall are also presented in this design note.

References Codes:
1. IRC: 6-2014
2. IRC: 112-2011
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'20
18
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
p
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

1.0 GENERAL
Superstructure has been idealised as simply supported independent T beams for self wt & weight of deck slab and
composite Section for SIDL. Computation of Section properties of beam alone and beam and in situ slab composite
Section are done below. The bending moment, shear force are computed subsequently.

SECTION PROPERTIES
Overall Span (C/C spacing of exp. joint) 37.000 m
Effective Span (C/C spacing of Bearing) = 34.600 m
No. of Longitudinal Girders = 1.000
C/C spacing of Cross Girder = 34.600 m
Thickness of End Cross Girder (Except Pin/Guide location) = 0.500 m
Thickness of End Cross Girder (Pin/Guide location) = 0.500 m
Is Int. X Girder provided ? (Press '1' for yes, '0' for no.) = 0
Thickness of Intermediate Cross Girder, if provided = 0.0 m
Distance between C/L of Brg. and C/L of Exp. Joint = 1.200 m
Transverse Cantilever length for Outer Girder = 2.000 m
Depth of Outer T-Girder = 2.600 m
Depth of Inner T-Girder = 2.600 m
Thickness of Deck slab = 0.225 m
Distance from C/L of bearing for uniform web near support = 1.800 m
Length of portion with variable web thickness = 2.500 m
Grade of Concrete of Deck Slab = 40 Mpa
Modulus of Elasticity of Deck Slab Concrete = 3.33E+04 Mpa
Grade of Concrete of Girder = 50 Mpa
Modulus of Elasticity of Girder Concrete = 3.52E+04 Mpa
Age of concrete for girder at transfer (1st Stage Stressing) = 28 days
Maturity of concrete for girder at transfer = 100 %
Strength of girder concrete at the time of transfer = 50.00 Mpa
Age of girder at the time of Casting of deck slab = 35 days
Maturity of girder at the time of Casting of deck slab = 100 %
Age of girder at the time of casting of SIDL = 90 days
Maturity of girder at the time of casting of SIDL = 100 %
Precast Girder Length = 35.400 m
Span Length (c/c temp. support) for Girder during erection 34.600
Distance between C/L of Brg. and C/L of Temporary Support 0.000 m

Section Properties of Longitudinal Girders

T - Girder at the Span


4 000 m
4.000 beff,i = (0 2bi + 0.1l
(0.2b 0 1lo ≤ 0.2l
0 2lo & ≤ bi)
1.000 m b1 = 1.850 m b2 = 1.850 m
0.225 beff,1 = 1.850 m beff,2 = 1.850 m
0.150 0.30 beff = Σbeff,i + bw ≤ b 4.000 m [ Cl. 7.6.1.2 of IRC:112]
Half c/c dist. of L-girder + cant. proj = 4.000 m

2.600 0.300

Y Modulus of Elasticity of Deck Slab = 33345.76 MPa


0.2 Modulus
M d l off Elasticity
El ti it off Girder
Gi d = 35220.46
35220 46 MPa
MP
0.3
0.800
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'20
18
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
p
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

2
SL.No. A y Ay Ay Io Io + Ay2

1. Deck Slab 0.85210 2.71250 2.31131 6.26942 0.003595 6.27302


2. Rctangular top Flange 0.15000 2.52500 0.37875 0.95634 0.000281 0.95663
3. Triangular top Flange 0.05250 2.40000 0.12600 0.30240 0.000066 0.30247
4. Web + top & bottom rec. Haunch 0.64500 1.37500 0.88688 1.21945 0.248459 1.46791
5. Bottom Bulb, Triangle 0.05000 0.36667 0.01833 0.00672 0.000111 0.00683
6. Bottom Bulb, Rectangle 0.24000 0.15000 0.03600 0.00540 0.001800 0.00720

Composite Section Σ 1.9896 3.75727 8.7597 0.25431 9.01406


Girder Only Σ 1.1375 1.44596 2.4903 0.251 2.74104
ΣA ΣAy ΣAy2 Σ Io Σ (Io + Ay2)
Section Properties of Composite Section
2
Area ΣA = 1.9896 m
Distance of cg from bottom fibre (Y) Yb =Σ(A.y) / ΣA = 1.8885 m
4
Moment of inertia of Outer Composite Girder (Iz) = Σ(Io+A.y2)-ΣA.Y2 = 1.91862 m

Section Properties of Girder


2
Area ΣA = 1.1375 m
Distance of cg from bottom fibre (Y) Yb =Σ(A.y) / ΣA = 1.2712 m
4
Moment of inertia of Outer Girder (Iz) = Σ(Io+A.y2)-ΣA.Y2 = 0.90297 m

T - Girder at the Support


4.000 m beff,i = (0.2bi + 0.1lo ≤ 0.2lo & ≤ bi)
1.000 m b1 = 1.600 m b2 = 1.600 m
0.225
0 225 beff,1
ff 1 = 1.600
1 600 m ff 2 =
beff,2 1.600
1 600 m
0.150 0.193 beff = Σbeff,i + bw ≤ b 4.000 m [ Cl. 7.6.1.2 of IRC:112]
Half c/c dist. of L-girder + cant. proj = 4.000 m

2.600 0.800

Y Modulus of Elasticity of Deck Slab = 33345.76 MPa


0.000 Modulus of Elasticity of Girder = 35220.46 MPa
0.3
0.800

2
SL.No. A y Ay Ay Io Io + Ay2

1. Deck Slab 0.85210 2.71250 2.31131 6.26942 0.003595 6.27302


2. Rctangular top Flange 0.15000 2.52500 0.37875 0.95634 0.000281 0.95663
3. Triangular top Flange 0.00429 2.43571 0.01044 0.02543 0.000000 0.02543
4. Web + top & bottom rec. Haunch 1.72000 1.37500 2.36500 3.25188 0.662558 3.91443
5. Bottom Bulb, Triangle 0.00000 0.30000 0.00000 0.00000 0.000000 0.00000
6. Bottom Bulb, Rectangle 0.24000 0.15000 0.03600 0.00540 0.001800 0.00720

Composite Section Σ 2.9664 5.1015 10.5085 0.6682 11.1767


Girder Only Σ 2.1143 2.7902 4.2390 0.6646 4.9037
ΣA ΣAy ΣAy2 Σ Io Σ (Io + Ay2)
Section Properties of Composite Section
2
Area ΣA = 2.9664 m
Distance of cg from bottom fibre (Y) Yb =Σ(A.y) / ΣA = 1.7198 m
4
Moment of inertia of end intermediate girder (Iz) = Σ(Io+A.y2)-ΣA.Y2 = 2.40329 m

p
Section Properties of Girder
2
Area ΣA = 2.1143 m
Distance of cg from bottom fibre (Y) Yb =Σ(A.y) / ΣA = 1.3197 m
4
Moment of inertia of end intermediate girder (Iz) = Σ(Io+A.y2)-ΣA.Y2 = 1.22152 m
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'20
18
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
p
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

Section Properties of Longitudinal Girder

A. Section Properties of Composite Section at the Span

2
Area 1.9896 m Yb = 1.8885 m YtS = 0.9365 m
4 3
IZ = 1.9186 m Zb = 1.0160 m ZtS = 2.0486 m3
YtG = 0 7115
0.7115 m
ZtG = 2.6964 m3
B. Section Properties of Girder at the Span

2
Area 1.1375 m Yb = 1.2712 m Yt = 1.3288 m
4 3 3
IZ = 0.9030 m Zb = 0.7103 m Zt = 0.6795 m

C. Section Properties of Composite Section at the Support

2
Area
A 9664 m
2.9664
2 Yb = 1.7198
1 7198 m YtS = 1.1052
1 1052 m
4 3
IZ = 2.4033 m Zb = 1.3974 m ZtS = 2.1745 m3
YtG = 0.8802 m
ZtG = 2.7303 m3
D. Section Properties of Girder at the Support

2
Area 2.1143 m Yb = 1.3197 m Yt = 1.2803 m
4 3 3
IZ = 1.2215 m Zb = 0.9256 m Zt = 0.9541 m
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'20
18
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
p
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

CALCULATION OF 1ST MOMENT OF AREA ABOVE COMPOSITE C.G

A. AT MID SPAN, GIRDER


Distance of cg of Composite Section from bottom fibre (Yb) = 1.888 m
Distance of cg of Composite Section from top of Deck (Yt) = 0.937 m
AREA Y A.Y
S N
S. No. COMPONENT 2 3
(m ) (m) (m )
1 Deck Slab 0.852 0.824 0.702
2 Rctangular top Flange 0.150 0.637 0.095
3 Triangular top Flange 0.053 0.512 0.027
4 Web 0.123 0.206 0.025
Composite Section ΣΑ 1.178 ΣA.Y 0.850

Girder Only ΣΑ 0.326 ΣA.Y 0.148

B. AT SUPPORT, GIRDER
Distance of cg of Composite Section from bottom fibre (Yb) = 1.720 m
Distance of cg of Composite Section from top of Deck (Yt) = 1.105 m
AREA Y A.Y
S. No. COMPONENT
(m2) (m) 3
(m )
1 Deck Slab 0.852 0.993 0.846
2 Rctangular top Flange 0.150 0.805 0.121
3 Triangular top Flange 0.004
0 004 0.716
0 716 0.003
0 003
4 Web 0.550 0.344 0.189
Composite Section ΣΑ 1.556 ΣA.Y 1.159

Girder Only ΣΑ 0.704 ΣA.Y 0.313


Document Noo: D
Date:
B&S ENGIINEERING CONSULTANT
C TS PVT. LTD
D.
BSEC
C/MJ18-02/DN-102 Sep
p’ 2018
Prroject: SMAR
RT INTEGRAATED INFRASSTRUCTUREE MASTER PL LAN
AN ND DETAILE ED PROJECTT REPORTS FOR
F PHASE--II Prepaared Checked R
Rev.
IN
NFRASTRUC CTURE WORK KS FOR/AT AMARVATI
A C
CAPITAL CIITY
Sttructure:
DE ESIGN OF PSSC T GIRDER
R SUPERSTR
RUCTURE, DECK
D SLAB, END
E Sattyam S
SKJ R0
CR ROSS GIRDE ER & PARAP
PET WALL

2.0
2 STAAD MODEL

STAAD
S SPACE
START
S JOB IN
NFORMATION
ENGINEER
E DAT
TE 28-Aug-1
18
END
E JOB INFO
ORMATION
PAGE
P LENGTH 10000000
INPUT
I WIDTH 79
UNIT
U METER MTON
M
JOINT
J COORDI
INATES
1 0 0 0; 2 1.2 0 0; 3 2 0 0; 4 3 0 0; 5 5.5 0 0; 6 9.85 0 0; 7 14.175 0 0; 8 18.5
5 0 0; 9
22.825
2 0 0; 10 27.15 0 0; 11 31.5
5 0 0; 12 3
34 0 0; 13 35
3 0 0; 14 35.8 0 0; 15
1 37 0 0; 16 1.2 0
1.25;
1 17 1.2
2 0 -1.25; 18 35.8 0 1.25;
1 19 35
5.8 0 -1.25;
; 20 0 0 2; 21 1.2 0 2;
2 22 2 0 2
2; 23 3 0
2;
2 24 5.5 0 2; 25 9.85
5 0 2; 26 14.175
1 0 2; 27 18.5 0 2; 28 22.82
25 0 2; 29 27.15 0 2; 30 31.5
0 2; 31 34 0 2; 32 35 0 2; 33 35
5.8 0 2; 34 37 0 2; 35
5 0 0 -2; 36
6 1.2 0 -2;
; 37 2 0 -2; 38 3 0
-2;
- 39 5.5 0 -2; 40 9.
.85 0 -2; 41
4 14.175 0 -2; 42 18.
.5 0 -2; 43
3 22.825 0 -2; 44 27.15 0 -2;
45
4 31.5 0 -2
2; 46 34 0 -2; 47 35 0 -2; 48 35
5.8 0 -2; 49
9 37 0 -2; 50 1.3 0 0;
; 51 6 0 0; 52 11 0
0;
0 53 16 0 0;
0 54 21 0 0; 55 26 0 0; 56 31 0 0; 57 35.7
7 0 0;
MEMBER
M INCID
DENCES
1 1 2; 2 2 50; 3 3 4; 4 4 5; 5 5 51; 6 6 52;
5 7 7 53; 8 8 54; 9 9 55; 10 10
1 56; 11 11 12; 12
12
1 13; 13 13
1 57; 14 14 15; 15 17
7 2; 16 2 1
16; 17 19 14;
1 18 14 1
18; 19 35 36;
3 20 36 37; 21 37
38;
3 22 38 39
9; 23 39 40
0; 24 40 41;
; 25 41 42; 26 42 43; 27 43 44; 28 44 45; 29
2 45 46; 3
30 46 47;
31
3 47 48; 32
2 48 49; 33
3 20 21; 34 21 22; 35 22 23; 36 23 24; 37 2
24 25; 38 25
2 26; 39 26 27; 40
27
2 28; 41 28
2 29; 42 29 30; 43 30
0 31; 44 31
1 32; 45 32
2 33; 46 33
3 34; 47 35 1; 48 1 20; 49 36
17;
1 50 16 21; 51 37 3;
; 52 3 22; 53 38 4; 5
54 4 23; 55 39 5; 56 5 24; 57 40
0 6; 58 6 25; 59 41
7;
7 60 7 26; 61 42 8; 62
6 8 27; 63 43 9; 64 9 28; 65 44 10; 66 10 29; 67 45 11;
1 68 11 30;
3 69 46
12;
1 70 12 31; 71 47 13
3; 72 13 32
2; 73 48 19
9; 74 18 33;
; 75 49 15;
; 76 15 34; 77 50 3; 78 51 6;
79
7 52 7; 80 53 8; 81 54
5 9; 82 55 10;
83
8 56 11; 84
4 57 14;
DEFINE
D MATER
RIAL START
ISOTROPIC
I CO
ONCRETE
E 3.468e+006
6
POISSON
P 0.15
5
DENSITY
D 2.5
ALPHA
A 1e-005
5
Document Noo: D
Date:
B&S ENGIINEERING CONSULTANT
C TS PVT. LTD
D.
BSEC
C/MJ18-02/DN-102 Sep
p’ 2018
Prroject: SMAR
RT INTEGRAATED INFRASSTRUCTUREE MASTER PL LAN
AN ND DETAILE ED PROJECTT REPORTS FOR
F PHASE--II Prepaared Checked R
Rev.
IN
NFRASTRUC CTURE WORK KS FOR/AT AMARVATI
A C
CAPITAL CIITY
Sttructure:
DE ESIGN OF PSSC T GIRDER
R SUPERSTR
RUCTURE, DECK
D SLAB, END
E Sattyam S
SKJ R0
CR ROSS GIRDE ER & PARAP
PET WALL

END
E DEFINE MATERIAL
M
CONSTANTS
C
MATERIAL
M CON
NCRETE ALL
MEMBER
M PROPE
ERTY AMERIC
CAN
1 TO 3 12 TO
O 14 77 84 PRIS AX 1.9
9896 IX 0.001 IY 0.102
2 IZ 1.9186
5 TO 10 78 TO
T 83 PRIS AX 1.1375 IX
I 0.001 IY 0.0366 IZ 0.903
4 11 PRIS AX
X 1.5636 IX
X 0.001 IY 0.0693
0 IZ 1.411
*****COMPOSI
* ITE
1 TO 3 12 TO
O 14 77 84 PRIS AX 2.9
9664 IX 0.001 IY 1.302
2 IZ 2.4033
5 TO 10 78 TO
T 83 PRIS AX 2.1143 IX
I 0.001 IY 1.2856 IZ 1.2215
4 11 PRIS AX
X 2.5404 IX
X 0.001 IY 1.2692
1 IZ 1.8124
19
1 TO 48 75 76 PRIS AX
X 0.0001 IX 0.0001 IY 0.0001 IZ 0.0001
0
15
1 TO 18 49 50 73 74 PRIS
P YD 0.22
25 ZD 1.6
51
5 52 71 72 PRIS YD 0.225 ZD 0.9
53
5 54 69 70 PRIS YD 0.225 ZD 1.75
5
55
5 56 67 68 PRIS YD 0.225 ZD 3.42
25
57
5 58 65 66 PRIS YD 0.225 ZD 4.33
375
59
5 TO 64 PRI
IS YD 0.225
5 ZD 4.325
SUPPORTS
S
17
1 PINNED
19
1 FIXED BUT
T FX MX MY MZ
16
1 FIXED BUT
T FZ MX MY MZ
18
1 FIXED BUT
T FX FZ MX MY MZ
LOAD
L 1 WT OF
F GIRDER
MEMBER
M LOAD
2 13 77 84 UNI
U GY -4.9
974
5 TO 10 78 TO
T 83 UNI GY
G -2.84375
3 TRAP GY -4
4.974 -3.90
0888
12
1 TRAP GY -3.90888
- -4
4.974
4 TRAP GY -3
3.90888 -2.84375
11
1 TRAP GY -2.84375
- -3
3.90888
1 UNI GY -4.
.974 0.8
14
1 UNI GY -4
4.974 0 0.4
4
LOAD
L 2 WT OF
F SLAB + DI
IAPHRAGMS
MEMBER
M LOAD
15
1 TO 18 UNI
I GY -2.324
4
FLOOR
F LOAD
YRANGE
Y 0 0 FLOAD
F -0.57
7 XRANGE 0 37
3 ZRANGE -2 2 GY
LOAD
L 3 LOADT
TYPE None TITLE WT OF
F PARAPET
MEMBER
M LOAD
1 TO 14 77 TO
T 84 UNI GY
G -0.061
19
1 TO 46 UNI
I GY -0.579
95
LOAD
L 4 LOADT
TYPE N TITLE WT OF
F PEDESTAL+PIPE+SADDLE
E+WATER
Document Noo: D
Date:
B&S ENGIINEERING CONSULTANT
C TS PVT. LTD
D.
BSEC
C/MJ18-02/DN-102 Sep
p’ 2018
Prroject: SMAR
RT INTEGRAATED INFRASSTRUCTUREE MASTER PL LAN
AN ND DETAILE ED PROJECTT REPORTS FOR
F PHASE--II Prepaared Checked R
Rev.
IN
NFRASTRUC CTURE WORK KS FOR/AT AMARVATI
A C
CAPITAL CIITY
Sttructure:
DE ESIGN OF PSSC T GIRDER
R SUPERSTR
RUCTURE, DECK
D SLAB, END
E Sattyam S
SKJ R0
CR ROSS GIRDE ER & PARAP
PET WALL

JOINT
J LOAD
51
5 TO 56 FY -24.7
50
5 57 FY -17
7.8
LOAD
L 5 LOADT
TYPE None TITLE WIND
MEMBER
M LOAD
1 TO 14 77 TO
T 84 UNI GZ
G 1.976
FLOOR
F LOAD
YRANGE
Y 0 0 FLOAD
F -0.17
76 XRANGE 0 37 ZRANGE -2 2 GY
LOAD
L 6 LOADT
TYPE None TITLE COS
JOINT
J LOAD
2 14 FY -111
1
PERFORM
P ANAL
LYSIS
PRINT
P JOINT DISPLACEME
ENTS LIST 2 14 16 TO 19
FINISH
F
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
g of PSC T Girder for 37m Span,
Design p , Deck Slab,, End Cross Girder & Parapet
p Wall R0
SKJ
3.0 COMPUTATION OF BENDING MOMENT AND SHEAR FORCE
Summary of Bending Moments at various sections (in T.m) - Girder [unfactored]
Component Support 0.0520L 0.1243L 0.2500L 0.3750L 0.5000L
Distance From Left (m.) 0 1.800 4.300 8.650 12.975 17.300
Self Wt. Of Precast Girder 0.0 88.9 191.0 324.9 404.6 431.2
Self Wt. Of Deck Slab & c. girder 0.0 66.3 148.5 255.8 319.8 341.1
Self Wt. Of Deck Slab & c. girder - COS 0.0 0.0 0.0 0.0 0.0 0.0
SIDL-1 (Parapet+Pedestal+Pipe+Water) 0.0 171.4 400.7 685.4 854.8 911.3
Wind load 0.0 20.5 45.8 79.0 98.7 105.3
TOTAL DESIGN B.M (t.m) 0.0 347.0 786.0 1345.1 1678.0 1789.0

Summary of Shear Forces at various sections (in T) - Girder


Ultimate Load Factor :
DL & SIDL-1 1.35
WL = 1.5
Component Support 0.052L 0.124L 0.250L 0.375L 0.500L
Distance From Left (m.) 0.000 1.800 4.300 8.650 12.975 17.300
Self Wt. Of Precast Girder 43.5 45.1 37.0 24.6 12.3 0.0
Self Wt. Of Deck Slab & c. girder 30.0 33.1 26.6 16.7 6.8 3.0
Self Wt. Of Deck Slab & c. girder - COS 0.0 0.0 0.0 0.0 0.0 0.0
SIDL-1 (Parapet+Pedestal+Pipe+Water) 91.2 91.0 87.4 57.5 27.5 2.5
Wind load 9.5 10.2 8.2 5.2 2.1 0.9
TOTAL ULT.
ULT DESIGN S
S.F
F (t) 231 238 211 138 65 8
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN- Sep'2
102 018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

4.0 CALCULATION OF FRICTION AND SLIP LOSS IN CABLES

4.1 Calculation of Prestressing Force & Its Effects at Various Sections of Girder

A. CONSTRUCTION PROGRAM & PRESTRESSING STAGES


ACTIVITY DAY AFTER CASTING fcj (MPa) Ecj (MPa)
i) Completion of casting of PSC Girder 0 day
ii) 1st Stage prestress 28 day 50.0 35220.5 Mpa
iii) Casting of deck slab & diaphragm 35 day 50.0 35220.5
iv) 2nd stage prestress (If there) 35 day 50.0 35220.5
v) Completion of wearing coat, crash barrier 90 day 50.0 35220.5

B. TENDON PARTICULARS

1) Nominal Diameter (12.9 / 12.7 / 15.2 / 15.7) D 12.7 mm


2) Nominal Area A 98.7 sq.mm
3) Nominal Mass Pu 0.775 Kg/m
4) Yield Strength Fy 1670 MPa
5) Tensile Strength Fu 1860 MPa
6) Minimum Breaking Load Pn 183.7 KN
7) Young's Modulus of Elasticity Eps 195 Gpa
8) Jacking Force at Transfer (% of Breaking Load) Pj 78.3 %
9) Slip at Jacking end s 6 mm
10) Coefficient of Friction μ 0.17 per radian
11) Wobble Friction Coefficient k 0.002 per metre
12) 1000h Relaxation of p
p. steel at 78.3% uts Re1 36.4 Mpa
p
13) Relaxation of prestressing steel at 50% uts Re2 0 MPa
14) Age of concrete for 1st Stage prestressing td1 28 days
15) Age of concrete for 2nd Stage prestressing td2 35 days
16) Dia of Prestressing Duct qd 100 mm
17) Concrete Grade Fcu 50 MPa
18) Modulus of Elasticity of Concrete (28 days) Ec 35220.5 Mpa
19) Extra marking length Le 0.0 m

X0 X1 X2 X3 X4

Circular
V. Curve
Y4
Y3
Yo

ELEVATION

Zo
C.L of span
Horiz. 'S' curve
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN- Sep'2
102 018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

C. CABLE CO-ORDINATES (in metres)

cable no. 1 2 3 4 5 6 7 8

No. of strands per


19 19 19 19 10 0 0
cable
Xo 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
At Xo Yo 0.1250 0.1250 0.1250 0.3250 0.5250 0.7250 0.9250
Zo 0.2000 0.2000 0.0000 0.0000 0.0000 0.0000 0.0000
X1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
At X1 Y1 0.1250 0.1250 0.1250 0.3250 0.5250 0.7250 0.9250
Z1 0.2000 0.2000 0.0000 0.0000 0.0000 0.0000 0.0000
X2 12.0000 12.0000 6.0000 4.0000 2.0000 2.8800 2.8800
At X2 Y2 0.1250 0.1250 0.1250 0.3250 0.5250 0.7250 0.9250
Z2 0.2000 0.2000 0.0000 0.0000 0.0000 0.0000 0.0000
X3 14.0000 14.0000 8.0000 6.0000 4.0000 4.8800 4.8800
At X3 Y3 0.1633 0.1633 0.2759 0.4630 0.6537 0.8400 0.8574
Z3 0.2000 0.2000 0.0000 0.0000 0.0000 0.0000 0.0000
X4 17.5700 17.5700 17.5700 17.5700 17.5700 17.5700 17.5700
At X4 Y4 0.3000 0.3000 1.7200 2.0600 2.400 2.300 0.000
Z4 0.2000 0.2000 0.0000 0.0000 0.0000 0.0000 0.0000

exit angle (rad) 0.0383 0.0383 0.1498 0.1372 0.1280 0.1145 -0.0675
Circular
exit angle (deg) 2.193 2.193 8.581 7.859 7.333 6.563 -3.865
Curve
Radius of curve 52.267 52.267 13.404 14.627 15.669 17.499 -29.667

exit angle (rad) 0.0383 0.0383 0.1498 0.1372 0.1280 0.1145 -0.0675
exit angle (deg) Circular
2.193 2.193 8.581 7.859 7.333 6.563 -3.865
Curve
Radius of curve 52.267 52.267 13.404 14.627 15.669 17.499 -29.667
exit angle (rad) 0.0000 0.0000 0.0000 0.0000 0.0000 0.000 0.000
exit angle (deg) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Curve in
Plan
Radius of curve 0.000 0.000 0.000 0.000 0.000 0.000 0.000

D. CABLE FORCES AFTER FRICTION & SLIP AT CARDINAL POINTS

Nodal Points of the Cable Cable


Component (*) Cable No. Elongation
4 3 2 1 0 (mm)
Σx (m) 0.000 3.570 5.570 17.570 17.570
Y (m) 0.3000 0.1633 0.1250 0.1250 0.1250
Σθ (rad) 0.00000 0.00000 0.03827 0.03827 0.03827
128.4

1
Z= ( exp )-(μΣθ+kΣx) 1.00000 0.99289 0.98251 0.95921 0.95921
Px = Po * Z (KN) 2732.90 2713.46 2685.10 2621.43 2621.43
Px1 2487.63 2507.08 2535.44 2599.11 2599.11
Σx (m) 0.000 3.570 5.570 17.570 17.570
Y (m) 0.3000 0.1633 0.1250 0.1250 0.1250
Σθ (rad) 0.00000 0.00000 0.03827 0.03827 0.03827
128.4

2
Z= ( exp )-(μΣθ+kΣx) 1.00000 0.99289 0.98251 0.95921 0.95921
Px = Po * Z (KN) 2732.90 2713.46 2685.10 2621.43 2621.43
Px1 2487.63 2507.08 2535.44 2599.11 2599.11
Σx (m) 0.000 9.570 11.570 17.570 17.570
Y (m) 1.7200 0.2759 0.1250 0.1250 0.1250
Σθ (rad) 0.00000 0.00000 0.14977 0.14977 0.14977
127.8

3
Z= ( exp )-(μΣθ+kΣx) 1.00000 0.98104 0.95256 0.94120 0.94120
Px = Po * Z (KN) 2732.9 2681.1 2603.3 2572.2 2572.2
Px1 2469.1 2520.9 2598.8 2572.2 2572.2
Σx (m) 0.000 11.570 13.570 17.570 17.570
Y (m) 2.0600 0.4630 0.3250 0.3250 0.3250
Σθ (rad) 0.00000 0.00000 0.13716 0.13716 0.13716
128.2

4
Z= ( exp )-(μΣθ+kΣx) 1.00000 0.97713 0.95079 0.94322 0.94322
Px = Po * Z (KN) 2732.9 2670.4 2598.4 2577.7 2577.7
Px1 2489.2 2551.7 2598.4 2577.7 2577.7
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN- Sep'2
102 018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

Σx (m) 0.000 13.570 15.570 17.570 17.570


Y (m) 2.4000 0.6537 0.5250 0.5250 0.5250
Σθ (rad) 0.00000 0.00000 0.12799 0.12799 0.12799

128.6
5
Z= ( exp )-(μΣθ+kΣx) 1.00000 0.97322 0.94848 0.94469 0.94469
Px = Po * Z (KN) 1438.37 1399.86 1364.26 1358.82 1358.82
Px1 1316.81 1355.33 1364.26 1358.82 1358.82

E. CABLE ORDINATES & CABLE FORCES AT DESIGN SECTIONS


Face Of End Of Solid End of Web
Cable No. Section 1/4th span 3/8th span Mid Span
Diaphragm Part Widening
Distance, x (in m) 0.000 1.800 4.300 8.650 12.975 17.300
x1 0.000 0.000 3.570 5.570 5.570 5.570
x2 3.570 3.570 5.570 17.570 17.570 17.570
y1 0.300 0.300 0.163 0.125 0.125 0.125
y2 0.163 0.163 0.125 0.125 0.125 0.125
yord (in m) 0.3000 0.2311 0.1404 0.1250 0.1250 0.1250
1 θ (radians) 0.0383 0.0383 0.0243 0.0000 0.0000 0.0000
pf1 2732.9 2732.9 2713.5 2685.1 2685.1 2685.1
pf2 2713.5 2713.5 2685.1 2621.4 2621.4 2621.4
ps1 2487.6 2487.6 2507.1 2535.4 2535.4 2535.4
ps2 2507.1 2507.1 2535.4 2599.1 2599.1 2599.1
Pf (KN) 2732.90 2723.10 2703.11 2668.76 2645.81 2622.86
Ps (KN) 2487.6 2497.4 2517.4 2551.8 2574.7 2597.7
Distance, x (in m) 0.000 1.800 4.300 8.650 12.975 17.300
x1 0.000 0.000 3.570 5.570 5.570 5.570
x2 3.570 3.570 5.570 17.570 17.570 17.570
y1 0.300 0.300 0.163 0.125 0.125 0.125
y2 0.163 0.163 0.125 0.125 0.125 0.125
yord (in m) 0.3000 0.2311 0.1404 0.1250 0.1250 0.1250
θ (radians) 0.0383 0.0383 0.0243 0.0000 0.0000 0.0000
2
pf1 2732.9 2732.9 2713.5 2685.1 2685.1 2685.1
pf2 2713.5 2713.5 2685.1 2621.4 2621.4 2621.4
ps1 2487.6 2487.6 2507.1 2535.4 2535.4 2535.4
ps2 2507.1 2507.1 2535.4 2599.1 2599.1 2599.1
Pf (KN) 2732.90 2723.10 2703.11 2668.76 2645.81 2622.86
Ps (KN) 2487.6 2497.4 2517.4 2551.8 2574.7 2597.7
Distance, x (in m) 0.000 1.800 4.300 8.650 12.975 17.300
x1 0.000 0.000 0.000 0.000 11.570 11.570
x2 9.570 9.570 9.570 9.570 17.570 17.570
y1 1.720 1.720 1.720 1.720 0.125 0.125
y2 0.276 0.276 0.276 0.276 0.125 0.125
yord (in m) 1.7200 1.4484 1.0711 0.4147 0.1250 0.1250
θ (radians) 0.1498 0.1498 0.1498 0.1498 0.0000 0.0000
3
pf1 2732.9 2732.9 2732.9 2732.9 2603.3 2603.3
pf2 2681.1 2681.1 2681.1 2681.1 2572.2 2572.2
ps1 2469.1 2469.1 2469.1 2469.1 2598.8 2598.8
ps2 2520.9 2520.9 2520.9 2520.9 2572.2 2572.2
Pf (KN) 2732.90 2723.16 2709.62 2686.08 2595.99 2573.60
Ps (KN) 2469.1 2478.9 2492.4 2516.0 2592.6 2573.4
Distance, x (in m) 0.000 1.800 4.300 8.650 12.975 17.300
x1 0.000 0.000 0.000 0.000 11.570 13.570
x2 11.570 11.570 11.570 11.570 13.570 17.570
y1 2.060 2.060 2.060 2.060 0.463 0.325
y2 0.463 0.463 0.463 0.463 0.325 0.325
yord (in m) 2.0600 1.8116 1.4665 0.8661 0.3371 0.3250
θ (radians) 0.1372 0.1372 0.1372 0.1372 0.0407 0.0000
4
pf1 2732.9 2732.9 2732.9 2732.9 2670.4 2598.4
pf2 2670.4 2670.4 2670.4 2670.4 2598.4 2577.7
ps1 2489.2 2489.2 2489.2 2489.2 2551.7 2598.4
ps2 2551.7 2551.7 2551.7 2551.7 2598.4 2577.7
Pf (KN) 2732.9 2723.2 2709.7 2686.2 2619.8 2579.1
Ps (KN) 2489.2 2498.9 2512.4 2535.9 2584.5 2579.1
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN- Sep'2
102 018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

Distance, x (in m) 0.000 1.800 4.300 8.650 12.975 17.300


x1 0.000 0.000 0.000 0.000 0.000 15.570
x2 13.570 13.570 13.570 13.570 13.570 17.570
y1 2.400 2.400 2.400 2.400 2.400 0.525
y2 0.654 0.654 0.654 0.654 0.654 0.525
yord (in m) 2.4000 2.1684 1.8466 1.2868 0.7303 0.5250
θ (radians) 0.1280 0.1280 0.1280 0.1280 0.1280 0.0000
5
pf1 1438.4 1438.4 1438.4 1438.4 1438.4 1364.3
pf2 1399.9 1399.9 1399.9 1399.9 1399.9 1358.8
ps1 1316.8 1316.8 1316.8 1316.8 1316.8 1364.3
ps2 1355.3 1355.3 1355.3 1355.3 1355.3 1358.8
Pf (KN) 1438.4 1433.3 1426.2 1413.8 1401.5 1359.6
Ps (KN) 1316.8 1321.9 1329.0 1341.4 1353.6 1359.6

E. SUMMARY OF DESIGN FORCES AT VARIOUS SECTIONS FOR OUTER GIRDER

Yord θ Ps.cosθ. Yord Ps.sinθ Effective c.g of


Stage of
Section Cable No. Ps.cosθ (KN) Prestress force
Prestressing (m) (rad) (KN.m) (KN) 'e' (m)
1 1 0.3000 0.0383 2485.8 745.7 95.2 0.300
Face Of Diaphragm

2 1 0.3000 0.0383 2485.8 745.7 95.2 0.300


3 1 1.7200 0.1498 2441.5 4199.4 368.4 1.720
4 1 2.0600 0.1372 2465.8 5079.6 340.4 2.060
5 1 2.4000 0.1280 1306.0 3134.5 168.1 2.400
Total Stage 1 11185.0 13905.0 1067.2 1.243
Total Stage 2 0.0 0.0 0.0 0.0000
TOTAL 11185.0 13905.0 1067.2 1.2432
1 1 0.2311 0.0383 2495.6 576.7 95.6 0.231
End Of Solid Part

2 1 0.2311 0.0383 2495.6 576.7 95.6 0.231


3 1 1.4484 0.1498 2451.1 3550.2 369.9 1.448
4 1 1.8116 0.1372 2475.5 4484.4 341.7 1.812
5 1 2.1684 0.1280 1311.1 2843.0 168.7 2.168
Total Stage 1 11228.9 12030.9 1071.4 1.0714
Total Stage 2 0.0 0.0 0.0 0.0000
TOTAL 11228.9 12030.9 1071.4 1.0714
1 1 0.1250 0.0000 2551.8 319.0 0.0 0.125
2 1 0.1250 0.0000 2551.8 319.0 0.0 0.125
1/4th span

3 1 0.4147 0.1498 2487.8 1031.8 375.4 0.415


4 1 0.8661 0.1372 2512.1 2175.7 346.7 0.866
5 1 1.2868 0.1280 1330.4 1712.0 171.2 1.287
Total Stage 1 11433.9 5557.4 893.4 0.4860
Total Stage 2 0.0 0.0 0.0 0.0000
TOTAL 11433.9 5557.4 893.4 0.4860
1 1 0.1250 0.0000 2574.7 321.8 0.0 0.125
2 1 0.1250 0.0000 2574.7 321.8 0.0 0.125
3/8th span

3 1 0.1250 0.0000 2592.6 324.1 0.0 0.125


4 1 0.3371 0.0407 2582.4 870.5 105.1 0.337
5 1 0.7303 0.1280 1342.6 980.4 172.8 0.730
Total Stage 1 11667.0 2818.7 277.9 0.2416
Total Stage 2 0.0 0.0 0.0 0.0000
TOTAL 11667.0 2818.7 277.9 0.2416
1 1 0.1250 0.0000 2597.7 324.7 0.0 0.125
2 1 0.1250 0.0000 2597.7 324.7 0.0 0.125
3 1 0.1250 0.0000 2573.4 321.7 0.0 0.125
Mid Span

4 1 0.3250 0.0000 2579.1 838.2 0.0 0.325


5 1 0.5250 0.0000 1359.6 713.8 0.0 0.525
Total Stage 1 11707.4 2523.1 0.0 0.2155
Total Stage 2 0.0 0.0 0.0 0.0000
TOTAL 11707.4 2523.1 0.0 0.2155
1 1 0.1404 0.0243 2516.7 353.4 61.2 0.140
End of Web Widening

2 1 0.1404 0.0243 2516.7 353.4 61.2 0.140


3 1 1.0711 0.1498 2464.5 2639.8 371.9 1.071
4 1 1.4665 0.1372 2488.8 3649.8 343.5 1.466
5 1 1.8466 0.1280 1318.1 2434.1 169.6 1.847
Total Stage 1 11304.9 9430.6 1007.4 0.8342
Total Stage 2 0.0 0.0 0.0 0.0000
TOTAL 11304.9 9430.6 1007.4 0.8342
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

6.0 CALCULATION OF STRESSES DUE TO DIFFERENTIAL SHRINKAGE


6.1 GIRDER

At Span At Support
Total Height of the girder h = 2.825 2.825 m
C.G. of Girder from bottom Y = 1.888 1.720 m
M.O.I. of the Section I = 1.919 2.403 m4
Area of the Section A = 1.9896 2.966 m2
Modulus of Elasticity of Concrete Ecd Ec = 3.52E+07 KN/m2
Coefficient of shrinkage of concrete εdiff = 0.0000504
creep factor = 0.542 (Refer Eq. 7.3)
Section Modulus at the top of Slab ZTS = 2.0486 2.1745 m3
Section Modulus at the top of Girder ZTG = 2.6964 2.7303 m3
Section Modulus at the bottom of Girder ZBG = 1.0160 1.3974 m3

h1 = 0.225 m
σ = ediff *0.542* Ec
1.0 COMPUTATION OF STRESSES DUE TO DIFFERENTIAL SHRINKAGE

4.000 m 4.000 m
1 0.225 Stress 1.000 m 1.000 m
2 -962.0 0.225 0.225
3 0.150 0.3 0.150 0.1929

2.600 0.3 2.600 0.8


26
2.6
Y 1.888 1.720
0.2
3 0.300
0.800 0.8
final stress distribution
Section of Girder at Span Section of Girder at Support
1.1 STRESSES AT SPAN SECTION

Stresses
Stress due
Assuming Stress due
y to release
Height Stress b Force e Moment End to release Final Stress
Segment from top of Axial
Restrained of Moment
Force
m KN/m2 m KN m m KNm KN/m2 KN/m2 KN/m2 KN/m2
1 0.225 -962.0 4.000 -865.84 0.113 0.824 -713.49 -962.04 435.18 348.28 -178.6
2 0.000 -962.0 4.0 -865.84 0.1 0.8 -713.5 -962.0 435.2 264.61 -262.3
3 0.000 0.0 1.000 0.00 0.000 0.000 0.00 0.00 435.18 264.61 699.8
4 0.000 0.0 0.800 0.00 0.000 0.000 0.00 0.00 435.18
5 0.000 0.0 0.800 0.00 0.000 0.000 0.00 0.00 435.18 -702.27 -267.1
-865.84 -713.49

1.2 STRESSES AT SUPPORT SECTION


Stresses
Stress due
Assuming Stress due
y to release
Height Stress b Force e Moment End to release Final Stress
Segment from top of Axial
Restrained of Moment
Force
m KN/m2 m KN m m KNm KN/m2 KN/m2 KN/m2 KN/m2
1 0.225 -962.0 4.000 -865.84 0.075 1.030 -892.01 -962.04 291.88 410.22 -259.9
2 0.000 -962.0 4.0 -865.8 0.1 1.0 -892.0 -962.0 291.9 326.71 -343.5
3 0.000 0.0 1.000 0.00 0.000 0.000 0.00 0.00 291.88 326.71 618.6
4 0.000 0.0 0.800 0.00 0.000 0.000 0.00 0.00 291.88
5 0.000 0.0 0.800 0.00 0.000 0.000 0.00 0.00 291.88 -638.31 -346.4
-865.84 -892.01
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ
7.0 CALCULATION OF STRESSES DUE TO TEMPERATURE GRADIENT
7.1 GIRDER
At Span At Support
Total Height of the girder h = 2.825 2.825 m
C.G. of Girder from bottom Y = 1.888 1.720 m
M.O.I. of the Section I = 1.9186 2.4033 m4
Area of the Section A = 1.9896 2.9664 m2
Modulus of Elasticity of Concrete Ec = 3.52E+07 KN/m2
o
Coefficient of thermal expansion of concrete α = 0.000012 C

Section Modulus at the top of Slab ZTS = 2.0486 2.1745 m3


Section Modulus at the top of Girder ZTG = 2.6964 2.7303 m3
Section Modulus at the bottom of Girder ZBG = 1.0160 1.3974 m3
o
T1 = 17.8 C h1 = 0.15 m
o
T2 = 4.0 C h2 = 0.25 m
o
T3 = 2.1 C h3 = 0.15 m

1.0 COMPUTATION OF STRESSES DUE TO RISE IN TEMPERATURE


For differential temperature gradient, refer clause 215.3 of IRC:6-2010
17.8 4.000 m 4.000 m
0.15 Stress 1.000 m 1.000 m
1 7523.1 0.225 0.225

2 4.0 0.25 1690.6 0.150 0.3 0.150 0.1929


0.400
b = 0.883
2.600 0.3 2.600 0.8
2.275
Y Y
0.2
3 0.15 887.6 0.3
2.1 0.80 0.80

Section of Girder at Span Section of Girder at Support

1.1 STRESSES AT SPAN SECTION


Stresses
Stress due
Assuming Stress due
y to release
Height Stress b Force e Moment End to release Final Stress
Segment from top of Axial
Restrained of Moment
Force
m KN/m2 m KN m m KNm KN/m2 KN/m2 KN/m2 KN/m2
1 0.150 7523.1 4.000 2764.10 0.059 0.877 2425.13 7523.09 -1681.73 -1325.18 4516.2
2 0.075 1690.6 4.000 431.10 0.185 0.751 323.86 1183.41 -1681.73 -1006.81 -1505.1
3 0.175 1183.4 0.942 97.51 0.283 0.653 63.69 1183.41 -1681.73
4 0.150 887.6 0.800 53.25 2.775 -1.838 -97.90 887.56 -1681.73 2672.11 1877.9
3345.96 2714.79

2.0 COMPUTATION OF STRESSES DUE TO FALL IN TEMPERATURE

10.6 Stress h = 2.825 m


1 0.25 -4480.0
o
2 0.7 0.25 -295.9 h1 = 0.250 m T1 = 10.6 C
o
h2 = 0.250 m T2 = 0.7 C
o
h3 = 0.250 m T3 = 0.8 C
o
h4 = 0.250 m T4 = 6.6 C
1.825

3 0.8 0.25 -338.1


4 0.250 -2789.5
6.6
2.1 STRESSES AT SPAN SECTION
Stresses
Stress due
Assuming Stress due
y to release
Height Stress b Force e Moment End to release Final Stress
Segment from top of Axial
Restrained of Moment
Force
m KN/m2 m KN m m KNm KN/m2 KN/m2 KN/m2 KN/m2
1 0.225 -4480.0 4.000 -2337.44 0.085 0.851 -1989.70 -4480.04 1354.11 695.73 -2430.2
2 0.025 -714.3 0.900 -11.36 0.236 0.701 -7.96 -714.27 1354.11 528.59 1168.4
3 0.250 -295.9 0.495 -18.31 0.333 0.603 -11.04 -295.85 1354.11
4 0.000 0.0 0.300 0.00 0.500 0.437 0.00 0.00 1354.11
5 0.250 -338.1 0.300 -12.68 2.492 -1.555 19.72 -338.12 1354.11
6 -0.050 152.2 0.460 2.14 2.872 -1.935 -4.14 152.15 1354.11
7 0.300 -2789.5 0.800 -316.477 2.731 -1.794 567.83 -2789.46 1354.11 -1402.89 -2838.2
-2694.13 -1425.29
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

8.0 CALCULATION OF FLEXURAL STRESSES UNDER SLS

8.1.1 Longitudinal Flexural Stresses for Girder


A) Summary of Flexural Stresses
Concrete Grade 50 MPa

Allowable stresses in concrete :


Temporary compressive stress after 28days 24.00 MPa
Temporary tensile stress after 28days 2.44 MPa
Temporary compressive stress after 35days 24.00 MPa
Temporary tensile stress after 35days 2.44 MPa
Temporary compressive stress after 28 days 24.00 MPa
Temporary tensile stress after 28 days 2.44 MPa
Service Stage compressive stress 24.00 MPa
Mean Tensile Strength of Concrete, fctm 2.44 MPa

LOAD FACTORS UNDER SLS


DEAD LOAD 1.0
SIDL 1.0
SURFACING 1.2

CASE 1 : CHECK WITH γsup / γinf = 1.1

S. No. SECTION Unit Support 0.052 L 0.124 L 0.250 L 0.375 L 0.500 L

Length of Segment m 1.800 2.500 4.350 4.325 4.325


1 Section Properties, Girder alone
2 A
Area, A m2 2 1143
2.1143 2 1143
2.1143 1 1375
1.1375 1 1375
1.1375 1 1375
1.1375 1 1375
1.1375
3 c.g from soffit, Yb m 1.3197 1.3197 1.2712 1.2712 1.2712 1.2712
4
4 M.O.I m 1.2215 1.2215 0.9030 0.9030 0.9030 0.9030
3
5 Zt m 0.9541 0.9541 0.6795 0.6795 0.6795 0.6795
3
6 Zb m 0.9256 0.9256 0.7103 0.7103 0.7103 0.7103
7
8 B.M due to self wt. Of girder tm 0.0 88.9 191.0 324.9 404.6 431.2
9 top stress due to DL t/m2 0.0 93.2 281.0 478.1 595.5 634.6
10 bottom stress due to DL t/m2 0.0 -96.0 -268.9 -457.3 -569.6 -607.1
11 Stage 1 Prestressing at 28 days after casting
12 Stage 1 P. Force after friction & slip t 1254.2 1259.1 1267.6 1282.1 1308.2 1312.8
13 Av. Initial Force in Cables t 1285.3
14 Eccentricty of cables from bottom m 1.2432 1.0714 0.8342 0.4860 0.2416 0.2155
2
15 top stress due to P t/m 493 268 299 -354 -832 -885
16 bottom stressdue to P t/m2 697 933 1894 2544 3046 3105
17 Total Stress after prestress
2
18 top stress t/m 493 361 580 124 -237 -251
19 bottom stress t/m2 697 837 1625 2087 2477 2498
20 Immediate Losses in Stage 1 Cables
21 Stress at C.G of Cables t/m2 599.2 641.0 1290.0 1719.9 2224.5 2270.1
22 Av. Stress at c.g of Tendon t/m2 1637.3
23 Elastic Shortening Loss (Total in t) t 38.47
24 Force in Prestressing Cables after ES t 1215.7 1220.6 1229.1 1243.6 1269.8 1274.3
25 Av. Force in Cables after Elastic Short. Loss t 1246.8
26 % of Av. Force in Cables wrt UTF 0.774
27 Relaxation Loss (Total in t) t 150.62
28 % of Relxation Loss in 4 hours % 15.13
Stress due to Losses in Prestress on account of E.
29 Shortening & Immediate Relaxation "P"
30 top stress t/m2 -24.07 -13.04 -14.46 16.93 38.97 41.32
31 bottom stress t/m2 -34.04 -45.41 -91.55 -121.58 -142.67 -144.92
32 Stress at C.G of Cables due to loss t/m2 -29.3 -32.1 -66.8 -95.7 -125.8 -129.5
33 Av. Stress at c.g of Tendon due to loss t/m2 -90.4
34 Stress at Transfer after 1st stage Prestress
2
35 top stress t/m 469 348 566 141 -198 -209
36 bottom stress t/m2 663 792 1534 1965 2334 2353
37 OK OK OK OK OK OK
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

Av. Stress at c.g of Tendon after Immediate Loss t/m2 1547.0


38
39 Losses in Stage 1 Cables,28-35 days
40 % of Relxation Loss in 28-35 days % 17.38
41 Res. Shrinkage Strain between 28-35 days 0.000008
42 Shrinkage Loss (28-35 days) t 1.36
43 Res. Creep Strain between 28-35 days 0.000092
44 Losses due to Creep (28-35 days) t 24.10
Total Loss (Shrinkage+Creep+Relaxation), 28-35
t 51.63
45 days
top stress : losses due to creep + shrinkage + 2
t/m -20.28 -10.98 -12.19 14.26 32.84 34.82
46 Relaxation
bottom stress : losses due to creep + shrinkage +
t/m2 -28.69 -38.27 -77.15 -102.45 -120.22 -122.11
47 Relaxation
48 Stress at C.G of Cables due to loss t/m2 -24.7 -27.0 -56.3 -80.6 -106.0 -109.1
49 Av. Stress at c.g of Tendon due to loss t/m2 -76.1
50 Av. Stress at c.g of Tendon after Loss t/m2 1470.8
51 Total Losses in Prestress at 35 days t 112.9
52 B.M due to Wt. D. Slab + X girder at 28 days tm 0.0 66.3 148.5 255.8 319.8 341.1
53 top stress due to DL t/m2 0.0 69.5 218.5 376.4 470.6 501.9
54 bottom stress due to DL t/m2 0.0 -71.6 -209.0 -360.1 -450.1 -480.2
55 Stress after casting of deck slab
56 top stress t/m2 448 407 772 531 306 327
57 bottom stress t/m2 634 682 1248 1503 1764 1751
58 OK OK OK OK OK OK
2
Stress at C.G of Cables t/m 545.3 568.4 1095.1 1321.1 1628.1 1632.7
59 Av. Stress at c.g of Tendon after 28 days t/m2 1258.2
60 Losses in Stage 1 Cables,35-35 days
61 % of Relxation Loss in 35-35 days % 0.00
62 Res. Shrinkage Strain between 35-35 days 0.000000
63 Shrinkage Loss (35-35 days) t 0.00
64 Res. Creep Strain between 35-35 days 0.000000
65 Losses due to Creep (35-35 days) t 0.00
Total Loss (Shrinkage+Creep+Relaxation), 35-35
t 0.00
66 days
top stress : losses due to creep + shrinkage +
0.00 0.00 0.00 0.00 0.00 0.00
67 Relaxation
bottom stress : losses due to creep + shrinkage +
0.00 0.00 0.00 0.00 0.00 0.00
68 Relaxation
69 Stress at C.G of Cables due to loss 0.0 0.0 0.0 0.0 0.0 0.0
70 Av. Stress at c.g of Tendon due to loss 0.0
71 Av. Stress at c.g of Tendon after Loss 1258.2
72 Total Losses in Prestress at 35 days 112.9
73 Stress before stage 2 prestressing
74 top stress t/m2 448 407 772 531 306 327
75 bottom stress t/m2 634 682 1248 1503 1764 1751
76 OK OK OK OK OK OK
77 Section Properties, Composite Section
2
78 Area, A m 2.9664 2.9664 1.9896 1.9896 1.9896 1.9896
79 c.g from soffit, Yb m 1.7198 1.7198 1.8885 1.8885 1.8885 1.8885
4
80 M.O.I m 2.4033 2.4033 1.9186 1.9186 1.9186 1.9186
3
81 Ztg m 2.7303 2.7303 2.6964 2.6964 2.6964 2.6964
3
82 Zts m 2.1745 2.1745 2.0486 2.0486 2.0486 2.0486
3
83 Zb m 1.3974 1.3974 1.0160 1.0160 1.0160 1.0160
84 Stage 2 Prestressing Details
85 Stage 2 P. Force after friction 0.0 0.0 0.0 0.0 0.0 0.0
86 Av. Initial Force in Cables t 0.0
87 Eccentricty of cables from bottom 0.000 0.000 0.000 0.000 0.000 0.000
88 top slab stress due to Prestress t/m2 0 0 0 0 0 0
89 Girder top stress due to Prestress t/m2 0 0 0 0 0 0
90 bottom stressdue to Prestress t/m2 0 0 0 0 0 0
91 Total Stress after Stage 2 prestress
92 top slab stress t/m2 0 0 0 0 0 0
2
93 top girder stress t/m 448 407 772 531 306 327
94 bottom stress t/m2 634.1 681.9 1247.6 1502.7 1763.6 1750.7
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

95 Stress at C.G of S1 cables after S2 prestress t/m2 545.3 568.4 1095.1 1321.1 1628.1 1632.7
96 Stress at C.G of S2 cables after S2 prestress t/m2 634.1 681.9 1247.6 1502.7 1763.6 1750.7
97 Av. Stress at c.g of Tendon, S1 t/m2 1258.2
98 Av. Stress at c.g of Tendon, S2 t/m2 1401.2
99 Immediate Losses in Stage 1 & Stage 2 Cables
100 Elastic Shortening Loss in S1 t 0.0
101 Elastic Shortening Loss in S2 t 0.0
102 Force in Stage 2 Prestressing Cables after ES t 0.0 0.0 0.0 0.0 0.0 0.0
103 Av.Force in St.2 Cables after Elastic Short.Loss 0.0
104 Av. Force in S-2 Cables in UTF 0.000
105 Relaxation Loss in S2 t 0.0
106 % of Relxation Loss in 4 hours % 15.13
107 Immediate Losses in Cables
108 Losses in S1 Prestress on account of ES t 0.0
109 Losses in S2 Prestress on account of ES + RL t 0.0
Stress due to Losses in Prestress on account of E.
110 Shortening & Immediate Relaxation "P"
111 top slab stress t/m2 0.00 0.00 0.00 0.00 0.00 0.00
112 top girder stress t/m2 0.00 0.00 0.00 0.00 0.00 0.00
113 bottom stress t/m2 0.00 0.00 0.00 0.00 0.00 0.00
114 Stress at C.G of S1 cables after loss t/m2 0.0 0.0 0.0 0.0 0.0 0.0
115 Stress at C.G of S-2 Cables due to loss t/m2 0.0 0.0 0.0 0.0 0.0 0.0
116 Av. Stress at c.g of S1 cables due to loss t/m2 0.0
117 Av. Stress at c.g of S2 cables due to loss t/m2 0.0
118 Av. Stress at c.g of Tendon, S1 t/m2 1258.2
119 Av. Stress at c.g of Tendon, S2 t/m2 1401.2
120 St
Stress att T
Transfer
f after
ft 2nd
2 d stage
t Prestress
P t
121 top slab stress t/m2 0 0 0 0 0 0
122 top girder stress t/m2 448 407 772 531 306 327
123 bottom stress t/m2 634 682 1248 1503 1764 1751
124 OK OK OK OK OK OK
125 Losses in Cables, 35-90 days
126 % of RL Loss in S2 cables, 35-90 days % 19.55
127 % of RL Loss in S1 cables, 35-90 days % 4.70
128 Relaxation Loss in S1 cables, 35-90 days t 7.08
129 Relaxation Loss in S2 cables, 35-90 days t 0.00
130 Res. Shrinkage Strain between 35-90 days 0.000042
131 Shrinkage Loss, S1 cables, ( 35-90 days) t 7.14
132 Shrinkage Loss, S2 cables, ( 35-90 days) t 0.00
133 Res. Creep Strain between 35-90 days 0.00008
134 Creep Loss, S1 cables, ( 35-90 days) t 17.42
135 Creep Loss, S2 cables, ( 35-90 days) t 0.00
Total Loss in S1 Cables t 31.64
Total Loss in S2 Cables t 0.00
Stress due to Losses in Stage 1 & Stage 2
136 Prestress on account of Creep & Shrinkage
top slab stress t/m2 -3.7 -1.2 0.4 5.8 9.5 9.9
137 top girder stress t/m2 -5.1 -3.2 -3.5 0.6 3.4 3.7
138 bottom stress t/m2 -21.5 -25.3 -48.7 -59.6 -67.2 -68.0
139 Total Stress before SIDL at 90 days
top slab stress t/m2 -4 -1 0 6 10 10
140 top girder stress t/m2 443 403 769 532 309 331
141 bottom stress t/m2 613 657 1199 1443 1696 1683
142 OK OK OK OK OK OK
143 Change of Support + SIDL Bending Moment tm 0.0 171.4 400.7 685.4 854.8 911.3
144 top slab stress due to SIDL t/m2 0.0 78.8 195.6 334.6 417.3 444.8
145 top girder stress due to SIDL t/m2 0.0 62.8 148.6 254.2 317.0 338.0
146 bottom stress due to SIDL t/m2 0.0 -122.7 -394.4 -674.6 -841.4 -897.0
147 Total Stress after SIDL
2
148 top slab stress t/m -4 78 196 340 427 455
149 top girder stress t/m2 443 466 917 786 626 669
150 bottom stress t/m2 613 534 804 768 855 786
151 OK OK OK OK OK OK
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

152 Stress at C.G of S1 cables after SIDL t/m2 531.6 506.0 840.6 771.8 833.7 776.1
153 Stress at C.G of S2 Cables after SIDL 612.7 533.9 804.5 768.5 855.0 785.7
154 Av. Stress at c.g of S1 cables t/m2 755.9
155 Av. Stress at c.g of S2 cables t/m2 762.1
156 Losses in Stage 1 prestress,90days to infinity
157 % Residual Relaxation Loss 62.79
158 Relaxation Loss in S1,90days to infinity t 94.57
159 Residual Shrinkage Strain at 90 days 0.00014
160 Shrinkage Loss in S1,90days to infinity t 23.42
161 Res. Creep Strain beyond 90- days 0.00022
162 Creep Loss in S1,90 days to infinity t 27.75
163 Losses in Stage 2 prestress,90days to infinity
164 % Residual Relaxation Loss 65.32
165 Relaxation Loss in S2,90days to infinity t 0.00
166 Shrinkage Loss in S2,90days to infinity t 0.00
167 Creep Loss in S2,90days to infinity t 0.00
Stress due to Losses in Stage 1 & Stage 2
168 Prestress on account of CR+SH+RL
2
169 top slab stress t/m -17.2 -5.7 1.7 26.5 43.9 45.8
170 top girder stress t/m2 -23.7 -14.5 -16.3 2.5 15.8 17.2
171 bottom stress t/m2 -98.8 -116.8 -224.5 -274.4 -309.5 -313.3
172
173 Total Stress after SIDL & all Losses
174 top slab stress t/m2 -21 72 198 367 471 501
175 top girder stress t/m2 419 452 901 789 642 686
176 bottom stress t/m2 514 417 580 494 545 472
177 OK OK OK OK OK OK
190 STRESS DUE TO DIFFERENTIAL SHRINKAGE
191 top slab stress due to D. Shrinkage t/m2 -26.5 -26.5 -18.2 -18.2 -18.2 -18.2
192 top girder stress due to D. Shrinkage t/m2 63.1 63.1 71.3 71.3 71.3 71.3
193 bottom stress due to D. Shrinkage t/m2 -35.3 -35.3 -27.2 -27.2 -27.2 -27.2

191 Total Stress after SIDL & all Losses + Differential Shrinkage
192 top slab stress t/m2 -47 45 180 349 453 482
193 top girder stress t/m2 483 515 972 860 713 758
194 bottom stress t/m2 479 382 553 467 518 445
195 OK OK OK OK OK OK

178 LL + FPLL Bending Moment tm 0.0 0.0 0.0 0.0 0.0 0.0
179 top slab stress due to LL t/m2 0.0 0.0 0.0 0.0 0.0 0.0
180 top girder stress due to LL t/m2 0.0 0.0 0.0 0.0 0.0 0.0
181 bottom stress due to LL t/m2 0.0 0.0 0.0 0.0 0.0 0.0
182 STRESS DUE TO TEMP RISE
183 top slab stress due to temp-rise t/m2 460.4 460.4 460.4 460.4 460.4 460.4
184 top girder stress due to temp-rise t/m2 -153.4 -153.4 -153.4 -153.4 -153.4 -153.4
185 bottom stress due to temp-rise t/m2 191.4 191.4 191.4 191.4 191.4 191.4
186 STRESS DUE TO TEMP FALL
187 top slab stress due to temp-fall t/m2 -247.7 -247.7 -247.7 -247.7 -247.7 -247.7
188 top girder stress due to temp-fall t/m2 119.1 119.1 119.1 119.1 119.1 119.1
189 bottom stress due to temp-fall t/m2 -289.3 -289.3 -289.3 -289.3 -289.3 -289.3
179 Wind Load Bending Moment tm 0.0 20.5 45.8 79.0 98.7 105.3
180 top slab stress due to LL t/m2 0.0 9.4 22.4 38.6 48.2 51.4
181 top girder stress due to LL t/m2 0.0 7.5 17.0 29.3 36.6 39.1
182 bottom stress due to LL t/m2 0.0 -14.6 -45.1 -77.7 -97.2 -103.7
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

LOAD FACTORS UNDER SLS Rare Comb Frequent Comb


Leading 1.0 0.75
Live Load
Accompanying 0.75 0.2
Leading 1.0 0.6
Diff. Temp
Accompanying 0.6 0.5
Leading 1.0 0.6
Wind Load
Accompanying 0.6 0.5

184 Service stage check : Case 1 : With Live Load (Leading) + Temperature Fall (Accompanying) - Rare Combination
185 Live load Factor 1.0 Diff. Temp Factor 0.6
186 top slab stress t/m2 -196 -103 31 200 304 334
187 top girder stress t/m2 554 586 1044 932 785 829
188 bottom stress t/m2 305 208 379 293 345 272
189 OK OK OK OK OK OK
190 Service stage check : Case 2 : With Live Load (Leading) + Temperature Rise (Accompanying) - Rare Combination
191 Live load Factor 1.0 Diff. Temp Factor 0.6
192 top slab stress t/m2 229 322 456 625 729 759
193 top girder stress t/m2 390 423 880 768 621 666
194 bottom stress t/m2 593 497 668 582 633 560
195 OK OK OK OK OK OK
196 Service stage check : Case 3 : With Live Load (Accompanying) + Temperature Fall (Leading) - Rare Combination
197 Live load Factor 0.75 Diff. Temp Factor 1.0
198 top slab stress t/m2 -295 -202 -68 101 205 235
199 top girder stress t/m2 602 634 1091 979 832 877
200 bottom stress t/m2 189 93 263 177 229 156
201 CHECK OK OK OK OK OK
202 Service stage check : Case 4 : With Live Load (Accompanying) + Temperature Rise (Leading) - Rare Combination
203 Live load Factor 0.75 Diff. Temp Factor 1.0
204 top slab stress t/m2 413 506 640 809 913 943
205 top girder stress t/m2 674 706 1164 1052 905 949
206 bottom stress t/m2 670 573 744 658 710 637
207 OK OK OK OK OK OK
208 Service stage check : Case 5 : With Live Load (Leading) + Wind Load (Accompanying) - Rare Combination
209 Live load Factor 1.0 Wind Load Factor 0.6
2
210 top slab stress t/m -47 51 193 372 481 513
2
211 top girder stress t/m 483 519 982 878 735 781
212 bottom stress t/m2 479 373 526 420 460 383
213 OK OK OK OK OK OK
214 Service stage check : Case 6 : With Live Load (Accompanying) + Wind Load (Leading) - Rare Combination
215 Live load Factor 0.75 Wind Load Factor 1.0
2
216 top slab stress t/m -47 55 202 387 501 534
217 top girder stress t/m2 483 522 989 889 750 797
218 bottom stress t/m2 479 367 508 389 421 342
219 OK OK OK OK OK OK

220 Service stage check : Case 1 : With Live Load (Leading) + Temperature Fall (Accompanying) - Frequent Combination
221 Live load Factor 0.75 Diff. Temp Factor 0.5
222 top slab stress t/m2 -171 -78 56 225 329 358
223 top girder stress t/m2 542 574 1032 920 773 817
224 bottom stress t/m2 334 237 408 322 374 301
225 OK OK OK OK OK OK
226 Service stage check : Case 2 : With Live Load (Leading) + Temperature Rise (Accompanying) - Frequent Combination
227 Live load Factor 0.75 Diff. Temp Factor 0.5
2
228 top slab stress t/m 183 276 410 579 683 713
229 top girder stress t/m2 578 610 1068 956 809 853
230 bottom stress t/m2 574 478 648 563 614 541
231 OK OK OK OK OK OK
232 Service stage check : Case 3 : With Live Load (Accompanying) + Temperature Fall (Leading) - Frequent Combination
233 Live load Factor 0.2 Diff. Temp Factor 0.6
234 top slab stress t/m2 -196 -103 31 200 304 334
235 top girder stress t/m2 554 586 1044 932 785 829
236 bottom stress t/m2 305 208 379 293 345 272
237 OK OK OK OK OK OK
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ
238 Service stage check : Case 4 : With Live Load (Accompanying) + Temperature Rise (Leading) - Frequent Combination
239 Live load Factor 0.2 Diff. Temp Factor 0.6
2
240 top slab stress t/m 229 322 456 625 729 759
2
241 top girder stress t/m 597 630 1087 975 828 872
2
242 bottom stress t/m 593 497 668 582 633 560
243 OK OK OK OK OK OK
244 Service stage check : Case 5 : With Live Load (Leading) + Wind Load (Accompanying) - Frequent Combination
245 Live load Factor 0.75 Wind Load Factor 0.5
246 top slab stress t/m2 -47 50 191 368 477 508
247 top girder stress t/m2 483 518 981 875 732 777
248 bottom stress t/m2 479 375 530 428 470 393
249 OK OK OK OK OK OK
250 Service stage check : Case 6 : With Live Load (Accompanying) + Wind Load (Leading) - Frequent Combination
251 Live load Factor 0.2 Wind Load Factor 0.6
252 top slab stress t/m2 -47 51 193 372 481 513
253 top girder stress t/m2 483 519 982 878 735 781
254 bottom stress t/m2 479 373 526 420 460 383
255 OK OK OK OK OK OK
NOTE :
1. TENSION IS PERMITTED IN DECK SLAB AS WELL AS GIRDER, FOR WHICH UNTENSIONED STEEL CAN BE PROVIDED.
2. SINCE THE TENSILE STRESSES ARE WITHIN THE MODULUS OF RUPTURE OF CONCRETE, THERE IS NO NEED TO CHECK CRACK WIDTH.
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT REPORTS Prepared By
FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

8.0 CALCULATION OF FLEXURAL STRESSES UNDER SLS

8.1.2 Longitudinal Flexural Stresses for Girder


A) Summary of Flexural Stresses
Concrete Grade 50 MPa

Allowable stresses in concrete :


Temporary compressive stress after 28days 24.00 MPa
Temporary tensile stress after 28days 2.44 MPa
Temporary compressive stress after 35days 24.00 MPa
Temporary tensile stress after 35days 2.44 MPa
Temporary compressive stress after 28 days 24.00 MPa
Temporary tensile stress after 28 days 2.44 MPa
Service Stage compressive stress 24.00 MPa
Mean Tensile Strength of Concrete, fctm 2.44 MPa

LOAD FACTORS UNDER SLS


DEAD LOAD 1.0
SIDL 1.0
SURFACING 1.2

CASE 1 : CHECK WITH γsup / γinf = 0.9


S. No. SECTION Unit Support 0.052 L 0.124 L 0.250 L 0.375 L 0.500 L

Length of Segment m 1.800 2.500 4.350 4.325 4.325

1 Section Properties, Girder alone


2 Area,, A m2 2.1143 2.1143 1.1375 1.1375 1.1375 1.1375
3 c.g from soffit, Yb m 1.3197 1.3197 1.2712 1.2712 1.2712 1.2712
4
4 M.O.I m 1.2215 1.2215 0.9030 0.9030 0.9030 0.9030
3
5 Zt m 0.9541 0.9541 0.6795 0.6795 0.6795 0.6795
3
6 Zb m 0.9256 0.9256 0.7103 0.7103 0.7103 0.7103
7
8 B.M due to self wt. Of girder tm 0.0 88.9 191.0 324.9 404.6 431.2
9 top stress due to DL t/m2 0.0 93.2 281.0 478.1 595.5 634.6
10 bottom stress due to DL t/m2 0.0 -96.0 -268.9 -457.3 -569.6 -607.1
11 Stage 1 Prestressing at 28 days after casting
12 Stage 1 P. Force after friction & slip t 1026.1 1030.2 1037.1 1049.0 1070.4 1074.1
13 Av. Initial Force in Cables t 1051.6
14 Eccentricty of cables from bottom m 1.2432 1.0714 0.8342 0.4860 0.2416 0.2155
2
15 top stress due to P t/m 403 219 245 -290 -681 -724
16 bottom stressdue to P t/m2 570 764 1550 2082 2492 2540
17 Total Stress after prestress
18 top stress t/m2 403 312 526 188 -85 -90
2
19 bottom stress t/m 570 668 1281 1624 1923 1933
20 Immediate Losses in Stage 1 Cables
2
21 Stress at C.G of Cables t/m 490.3 521.2 1038.7 1355.8 1736.1 1765.7
22 Av. Stress at c.g of Tendon t/m2 1290.6
23 Elastic Shortening Loss (Total in t) t 30.33
24 Force in Prestressing Cables after ES t 995.8 999.9 1006.8 1018.7 1040.0 1043.8
25 Av. Force in Cables after Elastic Short. Loss t 1021.3
26 % of Av. Force in Cables wrt UTF 0.634
27 Relaxation Loss (Total in t) t 63.40
28 % of Relxation Loss in 4 hours % 15.13
Stress due to Losses in Prestress on account of E.
29 Shortening & Immediate Relaxation "P"
30 top stress t/m2 -15.68 -8.49 -9.42 11.03 25.39 26.92
31 bottom stress t/m2 -22.18 -29.59 -59.65 -79.22 -92.96 -94.42
32 Stress at C.G of Cables due to loss t/m2 -19.1 -20.9 -43.5 -62.3 -82.0 -84.4
33 Av. Stress at c.g of Tendon due to loss t/m2 -58.9
34 Stress at Transfer after 1st stage Prestress
35 top stress t/m2 387 304 516 199 -60 -63
36 bottom stress t/m2 548 638 1221 1545 1830 1839
37 OK OK OK OK OK OK
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT REPORTS Prepared By
FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

Av. Stress at c.g of Tendon after Immediate Loss t/m2 1231.7


38
39 Losses in Stage 1 Cables,28-35 days
40 % of Relxation Loss in 28-35 days % 17.38
41 Res. Shrinkage Strain between 28-35 days 0.000008
42 Shrinkage Loss (28-35 days) t 1.36
43 Res. Creep Strain between 28-35 days 0.000092
44 Losses due to Creep (28-35 days) t 19.19
Total Loss (Shrinkage+Creep+Relaxation), 28-35
t 31.56
45 days
top stress : losses due to creep + shrinkage + 2
t/m -12.40 -6.71 -7.45 8.72 20.07 21.28
46 Relaxation
bottom stress : losses due to creep + shrinkage +
t/m2 -17.54 -23.39 -47.16 -62.63 -73.49 -74.65
47 Relaxation
48 Stress at C.G of Cables due to loss t/m2 -15.1 -16.5 -34.4 -49.3 -64.8 -66.7
49 Av. Stress at c.g of Tendon due to loss t/m2 -46.5
50 Av. Stress at c.g of Tendon after Loss t/m2 1185.2
51 Total Losses in Prestress at 35 days t 71.5
52 B.M due to Wt. D. Slab + X girder at 28 days tm 0.0 66.3 148.5 255.8 319.8 341.1
53 top stress due to DL t/m2 0.0 69.5 218.5 376.4 470.6 501.9
54 bottom stress due to DL t/m2 0.0 -71.6 -209.0 -360.1 -450.1 -480.2
55 Stress after casting of deck slab
56 top stress t/m2 375 367 727 584 431 460
57 bottom stress t/m2 530 543 965 1122 1306 1284
58 OK OK OK OK OK OK
2
Stress at C.G of Cables t/m 456.1 470.3 888.9 1021.8 1224.8 1215.9
59 Av. Stress at c.g of Tendon after 28 days t/m2 972.5
60 Losses in Stage 1 Cables,35-35 days
61 % of Relxation Loss in 35-35 days % 0.00
62 Res. Shrinkage Strain between 35-35 days 0.000000
63 Shrinkage Loss (35-35 days) t 0.00
64 Res. Creep Strain between 35-35 days 0.00000
65 Losses due to Creep (35-35 days) t 0.00
Total Loss (Shrinkage+Creep+Relaxation), 35-35
t 0.00
66 days
top stress : losses due to creep + shrinkage +
0.00 0.00 0.00 0.00 0.00 0.00
67 Relaxation
bottom stress : losses due to creep + shrinkage +
0.00 0.00 0.00 0.00 0.00 0.00
68 Relaxation
69 Stress at C.G of Cables due to loss 0.0 0.0 0.0 0.0 0.0 0.0
70 Av. Stress at c.g of Tendon due to loss 0.0
71 Av. Stress at c.g of Tendon after Loss 972.5
72 Total Losses in Prestress at 35 days t 71.5
73 Stress before stage 2 prestressing
74 top stress t/m2 375 367 727 584 431 460
75 bottom stress t/m2 530 543 965 1122 1306 1284
76 OK OK OK OK OK OK
77 Section Properties, Composite Section
2
78 Area, A m 2.9664 2.9664 1.9896 1.9896 1.9896 1.9896
79 c.g from soffit, Yb m 1.7198 1.7198 1.8885 1.8885 1.8885 1.8885
4
80 M.O.I m 2.4033 2.4033 1.9186 1.9186 1.9186 1.9186
3
81 Ztg m 2.7303 2.7303 2.6964 2.6964 2.6964 2.6964
3
82 Zts m 2.1745 2.1745 2.0486 2.0486 2.0486 2.0486
3
83 Zb m 1.3974 1.3974 1.0160 1.0160 1.0160 1.0160
84 Stage 2 Prestressing Details
85 Stage 2 P. Force after friction 0.0 0.0 0.0 0.0 0.0 0.0
86 Av. Initial Force in Cables t 0.0
87 Eccentricty of cables from bottom 0.000 0.000 0.000 0.000 0.000 0.000
88 top slab stress due to Prestress t/m2 0 0 0 0 0 0
89 Girder top stress due to Prestress t/m2 0 0 0 0 0 0
90 bottom stressdue to Prestress t/m2 0 0 0 0 0 0
91 Total Stress after Stage 2 prestress
92 top slab stress t/m2 0 0 0 0 0 0
2
93 top girder stress t/m 375 367 727 584 431 460
94 bottom stress t/m2 530 543 965 1122 1306 1284
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT REPORTS Prepared By
FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

95 Stress at C.G of S1 cables after S2 prestress t/m2 456.1 470.3 888.9 1021.8 1224.8 1215.9
96 Stress at C.G of S2 cables after S2 prestress t/m2 530.4 542.9 965.1 1122.3 1306.1 1284.1
97 Av. Stress at c.g of Tendon, S1 t/m2 972.5
98 Av. Stress at c.g of Tendon, S2 t/m2 1054.6
99 Immediate Losses in Stage 1 & Stage 2 Cables
100 Elastic Shortening Loss in S1 t 0.0
101 Elastic Shortening Loss in S2 t 0.0
102 Force in Stage 2 Prestressing Cables after ES t 0.0 0.0 0.0 0.0 0.0 0.0
103 Av.Force in St.2 Cables after Elastic Short.Loss 0.0
104 Av. Force in S-2 Cables in UTF 0.000
105 Relaxation Loss in S2 t 0.0
106 % of Relxation Loss in 4 hours % 15.13
107 Immediate Losses in Cables
108 Losses in S1 Prestress on account of ES t 0.0
109 Losses in S2 Prestress on account of ES + RL t 0.0
Stress due to Losses in Prestress on account of E.
110 Shortening & Immediate Relaxation "P"
111 top slab stress t/m2 0.00 0.00 0.00 0.00 0.00 0.00
112 top girder stress t/m2 0.00 0.00 0.00 0.00 0.00 0.00
113 bottom stress t/m2 0.00 0.00 0.00 0.00 0.00 0.00
114 Stress at C.G of S1 cables after loss t/m2 0.0 0.0 0.0 0.0 0.0 0.0
115 Stress at C.G of S-2 Cables due to loss t/m2 0.0 0.0 0.0 0.0 0.0 0.0
116 Av. Stress at c.g of S1 cables due to loss t/m2 0.0
117 Av. Stress at c.g of S2 cables due to loss t/m2 0.0
118 Av. Stress at c.g of Tendon, S1 t/m2 972.5
119 Av. Stress at c.g of Tendon, S2 t/m2 1054.6
120 St
Stress att T
Transfer
f after
ft 2nd
2 d stage
t Prestress
P t
121 top slab stress t/m2 0 0 0 0 0 0
122 top girder stress t/m2 375 367 727 584 431 460
123 bottom stress t/m2 530 543 965 1122 1306 1284
124 OK OK OK OK OK OK
125 Losses in Cables, 35-90 days
126 % of RL Loss in S2 cables, 35-90 days % 19.55
127 % of RL Loss in S1 cables, 35-90 days % 4.70
128 Relaxation Loss in S1 cables, 35-90 days t 2.98
129 Relaxation Loss in S2 cables, 35-90 days t 0.00
130 Res. Shrinkage Strain between 35-90 days 0.000042
131 Shrinkage Loss, S1 cables, ( 35-90 days) t 7.14
132 Shrinkage Loss, S2 cables, ( 35-90 days) t 0.00
133 Res. Creep Strain between 35-90 days 0.00008
134 Creep Loss, S1 cables, ( 35-90 days) t 13.46
135 Creep Loss, S2 cables, ( 35-90 days) t 0.00
Total Loss in S1 Cables t 23.59
Total Loss in S2 Cables t 0.00
Stress due to Losses in Stage 1 & Stage 2
136 Prestress on account of Creep & Shrinkage
top slab stress t/m2 -2.8 -0.9 0.3 4.3 7.1 7.4
137 top girder stress t/m2 -3.8 -2.4 -2.6 0.4 2.6 2.8
138 bottom stress t/m2 -16.0 -18.9 -36.3 -44.4 -50.1 -50.7
139 Total Stress before SIDL at 90 days
top slab stress t/m2 -3 -1 0 4 7 7
140 top girder stress t/m2 371 364 725 585 433 463
141 bottom stress t/m2 514 524 929 1078 1256 1233
142 OK OK OK OK OK OK
143 Change of Support + SIDL Bending Moment tm 0.0 171.4 400.7 685.4 854.8 911.3
144 top slab stress due to SIDL t/m2 0.0 78.8 195.6 334.6 417.3 444.8
145 top girder stress due to SIDL t/m2 0.0 62.8 148.6 254.2 317.0 338.0
146 bottom stress due to SIDL t/m2 0.0 -122.7 -394.4 -674.6 -841.4 -897.0
147 Total Stress after SIDL
2
148 top slab stress t/m -3 78 196 339 424 452
149 top girder stress t/m2 371 427 873 839 750 801
150 bottom stress t/m2 514 401 534 403 415 336
151 OK OK OK OK OK OK
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT REPORTS Prepared By
FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

152 Stress at C.G of S1 cables after SIDL t/m2 445.9 412.0 643.2 484.7 445.8 375.0
153 Stress at C.G of S2 Cables after SIDL 514.4 401.4 534.4 403.3 414.7 336.5
154 Av. Stress at c.g of S1 cables t/m2 481.6
155 Av. Stress at c.g of S2 cables t/m2 429.3
156 Losses in Stage 1 prestress,90days to infinity
157 % Residual Relaxation Loss 62.79
158 Relaxation Loss in S1,90days to infinity t 39.81
159 Residual Shrinkage Strain at 90 days 0.00014
160 Shrinkage Loss in S1,90days to infinity t 23.42
161 Res. Creep Strain beyond 90- days 0.00022
162 Creep Loss in S1,90 days to infinity t 17.68
163 Losses in Stage 2 prestress,90days to infinity
164 % Residual Relaxation Loss 65.32
165 Relaxation Loss in S2,90days to infinity t 0.00
166 Shrinkage Loss in S2,90days to infinity t 0.00
167 Creep Loss in S2,90days to infinity t 0.00
Stress due to Losses in Stage 1 & Stage 2
168 Prestress on account of CR+SH+RL
2
169 top slab stress t/m -9.5 -3.2 1.0 14.7 24.4 25.4
170 top girder stress t/m2 -13.2 -8.1 -9.0 1.4 8.8 9.5
171 bottom stress t/m2 -54.9 -64.8 -124.6 -152.4 -171.8 -173.9
172
173 Total Stress after SIDL & all Losses
174 top slab stress t/m2 -12 75 197 354 449 478
175 top girder stress t/m2 358 419 864 840 759 811
176 bottom stress t/m2 460 337 410 251 243 163
177 OK OK OK OK OK OK
190 STRESS DUE TO DIFFERENTIAL SHRINKAGE
191 top slab stress due to D. Shrinkage t/m2 -26.5 -26.5 -18.2 -18.2 -18.2 -18.2
192 top girder stress due to D. Shrinkage t/m2 63.1 63.1 71.3 71.3 71.3 71.3
193 bottom stress due to D. Shrinkage t/m2 -35.3 -35.3 -27.2 -27.2 -27.2 -27.2

191 Total Stress after SIDL & all Losses + Differential Shrinkage
192 top slab stress t/m2 -39 48 179 335 431 459
193 top girder stress t/m2 421 482 936 912 830 882
194 bottom stress t/m2 424 301 383 224 216 135
195 OK OK OK OK OK OK

178 LL + FPLL Bending Moment tm 0.0 0.0 0.0 0.0 0.0 0.0
179 top slab stress due to LL t/m2 0.0 0.0 0.0 0.0 0.0 0.0
180 top girder stress due to LL t/m2 0.0 0.0 0.0 0.0 0.0 0.0
181 bottom stress due to LL t/m2 0.0 0.0 0.0 0.0 0.0 0.0
182 STRESS DUE TO TEMP RISE
183 top slab stress due to temp-rise t/m2 460.4 460.4 460.4 460.4 460.4 460.4
184 top girder stress due to temp-rise t/m2 -153.4 -153.4 -153.4 -153.4 -153.4 -153.4
185 bottom stress due to temp-rise t/m2 191.4 191.4 191.4 191.4 191.4 191.4
186 STRESS DUE TO TEMP FALL
187 top slab stress due to temp-fall t/m2 -247.7 -247.7 -247.7 -247.7 -247.7 -247.7
188 top girder stress due to temp-fall t/m2 119.1 119.1 119.1 119.1 119.1 119.1
189 bottom stress due to temp-fall t/m2 -289.3 -289.3 -289.3 -289.3 -289.3 -289.3
179 Wind Load Bending Moment tm 0.0 20.5 45.8 79.0 98.7 105.3
180 top slab stress due to LL t/m2 0.0 9.4 22.4 38.6 48.2 51.4
181 top girder stress due to LL t/m2 0.0 7.5 17.0 29.3 36.6 39.1
182 bottom stress due to LL t/m2 0.0 -14.6 -45.1 -77.7 -97.2 -103.7
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT REPORTS Prepared By
FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ

LOAD FACTORS UNDER SLS Rare Comb Frequent Comb


Leading 1.0 0.75
Live Load
Accompanying 0.75 0.2
Leading 1.0 0.6
Diff. Temp
Accompanying 0.6 0.5
Leading 1.0 0.6
Wind Load
Accompanying 0.6 0.5

184 Service stage check : Case 1 : With Live Load (Leading) + Temperature Fall (Accompanying) - Rare Combination
185 Live load Factor 1.0 Diff. Temp Factor 0.6
186 top slab stress t/m2 -187 -100 30 187 282 311
187 top girder stress t/m2 493 553 1007 983 902 953
188 bottom stress t/m2 251 128 209 50 42 -38
189 OK OK OK OK OK OK
190 Service stage check : Case 2 : With Live Load (Leading) + Temperature Rise (Accompanying) - Rare Combination
191 Live load Factor 1.0 Diff. Temp Factor 0.6
192 top slab stress t/m2 237 324 455 612 707 736
193 top girder stress t/m2 329 390 844 820 738 790
194 bottom stress t/m2 539 416 497 339 330 250
195 OK OK OK OK OK OK
196 Service stage check : Case 3 : With Live Load (Accompanying) + Temperature Fall (Leading) - Rare Combination
197 Live load Factor 0.75 Diff. Temp Factor 1.0
198 top slab stress t/m2 -287 -199 -69 88 183 212
199 top girder stress t/m2 540 601 1055 1031 949 1001
200 bottom stress t/m2 135 12 93 -66 -74 -154
201 CHECK OK OK OK OK OK
202 Service stage check : Case 4 : With Live Load (Accompanying) + Temperature Rise (Leading) - Rare Combination
203 Live load Factor 0.75 Diff. Temp Factor 1.0
204 top slab stress t/m2 422 509 639 796 891 920
205 top girder stress t/m2 612 673 1127 1103 1022 1073
206 bottom stress t/m2 616 493 574 415 407 327
207 OK OK OK OK OK OK
208 Service stage check : Case 5 : With Live Load (Leading) + Wind Load (Accompanying) - Rare Combination
209 Live load Factor 1.0 Wind Load Factor 0.6
2
210 top slab stress t/m -39 54 192 359 459 490
2
211 top girder stress t/m 421 487 946 929 852 905
212 bottom stress t/m2 424 292 355 177 157 73
213 OK OK OK OK OK OK
214 Service stage check : Case 6 : With Live Load (Accompanying) + Wind Load (Leading) - Rare Combination
215 Live load Factor 0.75 Wind Load Factor 1.0
2
216 top slab stress t/m -39 58 201 374 479 511
217 top girder stress t/m2 421 490 953 941 867 921
218 bottom stress t/m2 424 287 337 146 118 32
219 OK OK OK OK OK OK

220 Service stage check : Case 1 : With Live Load (Leading) + Temperature Fall (Accompanying) - Frequent Combination
221 Live load Factor 0.75 Diff. Temp Factor 0.5
222 top slab stress t/m2 -163 -76 55 212 307 336
223 top girder stress t/m2 481 542 995 971 890 942
224 bottom stress t/m2 280 157 238 79 71 -9
225 OK OK OK OK OK OK
226 Service stage check : Case 2 : With Live Load (Leading) + Temperature Rise (Accompanying) - Frequent Combination
227 Live load Factor 0.75 Diff. Temp Factor 0.5
2
228 top slab stress t/m 191 278 409 566 661 690
229 top girder stress t/m2 517 578 1031 1008 926 978
230 bottom stress t/m2 520 397 478 319 311 231
231 OK OK OK OK OK OK
Document No:
Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-
Sep'2018
102
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT REPORTS Prepared By
FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY Rev:
Satyam
Component Structure: Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall R0
SKJ
232 Service stage check : Case 3 : With Live Load (Accompanying) + Temperature Fall (Leading) - Frequent Combination
233 Live load Factor 0.2 Diff. Temp Factor 0.6
2
234 top slab stress t/m -187 -100 30 187 282 311
2
235 top girder stress t/m 493 553 1007 983 902 953
2
236 bottom stress t/m 251 128 209 50 42 -38
237 OK OK OK OK OK OK
238 Service stage check : Case 4 : With Live Load (Accompanying) + Temperature Rise (Leading) - Frequent Combination
239 Live load Factor 0.2 Diff. Temp Factor 0.6
240 top slab stress t/m2 237 324 455 612 707 736
241 top girder stress t/m2 536 597 1051 1027 945 997
242 bottom stress t/m2 539 416 497 339 330 250
243 OK OK OK OK OK OK
244 Service stage check : Case 5 : With Live Load (Leading) + Wind Load (Accompanying) - Frequent Combination
245 Live load Factor 0.75 Wind Load Factor 0.5
246 top slab stress t/m2 -39 53 190 355 455 485
247 top girder stress t/m2 421 486 944 926 849 902
248 bottom stress t/m2 424 294 360 185 167 83
249 OK OK OK OK OK OK
250 Service stage check : Case 6 : With Live Load (Accompanying) + Wind Load (Leading) - Frequent Combination
251 Live load Factor 0.2 Wind Load Factor 0.6
252 top slab stress t/m2 -39 54 192 359 459 490
253 top girder stress t/m2 421 487 946 929 852 905
254 bottom stress t/m2 424 292 355 177 157 73
255 OK OK OK OK OK OK
NOTE :
1. TENSION IS PERMITTED IN DECK SLAB AS WELL AS GIRDER, FOR WHICH UNTENSIONED STEEL CAN BE PROVIDED.
2. SINCE THE TENSILE STRESSES ARE WITHIN THE MODULUS OF RUPTURE OF CONCRETE,, THERE IS NO NEED TO CHECK CRACK WIDTH.
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018

Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED


Prepared By
PROJECT REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI Rev:
Satyam
CAPITAL CITY
Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet R0
SKJ
Wall

9.0 ULTIMATE STAGE CHECK FOR FLEXURE


Ultimate Stress in Cables, fpk = 1860 Mpa
0.1% Proof Stress in Cables, fp,0.1k = 0.87 x fpk = 1618.2 Mpa
fpd = fp,0.1k/1.15 = 1407.13 Mpa
Strain at design stress in strands , εpd = 0.007216

9.1 Girder Composite Section At Midspan:

Ultimate Moment at Mid Span 2368 tm


Concrete Grade for Deck Slab 40 Mpa
Y
2.000 2.000
εc
0.225

1.00
0.15
0.15

Z Z
1.800
0.300

εps1 Tu1
5
εps2 0.20 0.200 Tu2
εps3 4 0.20
1 3 2
0.15 0.3 Tu3
Strain Diagram Stress Diagram
0.8

Cables
Component Cable 4 Cable 5 TOTAL
1+2+3
1 Area of Cables, As (mm2) 5625.9 1875.3 987.0 8488.2
2 C.G of cables from soffit (mm) 125 325 525
3 Total Force after friction and Slip (KN) 7768.8 2579.1 1359.6
4 Total Losses due to ES+SH+CR+REL (%) 22.1 22.1 22.1
5 Final Force in Cables, Fs (KN) 6050.9 2008.8 1058.9 9118.6
6 Prestrain in cables = Fs/(As x Es) = 0.0055 0.0055 0.0055
7 Total Force in Steel, Tu = As x fpd (KN) = 7916.4 2638.8 1388.8 11944.0
8 Depth of Cable Layer from top (d1, d2,d3) (m) = 2.675 2.48 2.28
9 Depth of n. axis from top, n1 = Tu / (b x 0.446 x fck) 0.167 m
(assuming rectangular stress block)
9 Actual neutral axis depth, n = n1/0.8 = 0.209 m
(Neutral axis is within the deck slab depth)
10 Strain in Concrete & Prestressing Steel due to bending :
εc = 0.0035
εps1 = 0.0346
εps2 = 0.0379
εps3 = 0.0412

11 Total strain in cables 1,2 & 3 at Layer 1 = 0.0412 + 0.0055 = 0.0468

12 Total strain in cable 4 at Layer 2 0.0379 + 0.0055 = 0.0434

13 Total strain in cables 5 at Layer 3 0.0346 + 0.0055 = 0.0401


Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018

Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED


Prepared By
PROJECT REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI Rev:
Satyam
CAPITAL CITY
Component Structure:
Checked By
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet R0
SKJ
Wall
Since strain in all cables is more than εpd, hence stress in cables can be taken as fpd

13 M. O. R = TU1 x (d1-n1/2) + TU2 x (d2-n1/2) + TU3 x (d3-n1/2) = 29867.3 KN.m


= 3044.6 tm
OK

As the moment of resistance is much higher than the ultimate moment therefore only the Outer Girder Mid Span
(Most Ciritcal Section) is considered for design check.
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018

Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY
Rev:
Satyam
Component Structure: Checked By
R0
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall SKJ
10.0 DESIGN FOR ULTIMATE SHEAR & PROVISION OF SHEAR REINFORCEMENT
Outer Girder considered for design. Same reinforcement provided for Inner Girder also
A. For Girder
Location Support 0.052 L 0.124 L 0.250 L 0.375 L 0.500 L
S.no
Distance from Support 0.000 1.800 4.300 8.650 12.975 17.300
A. SHEAR FORCE & CORRESPONDING MOMENTS

1 Ultimate Shear Force, Vu KN 2265.2 2331.6 2072.3 1352.9 635.8 81.7

2 Effect of Vertical Prestress, Vpr KN -820.2 -824.4 -776.7 -691.1 -216.2 0.0

Ultimate Design Shear acting on


3 KN 973.1 1036.0 841.8 546.6 253.3 40.1
precast section alone Vpc1
Ultimate Design Moment acting on
4 KN.m 0.0 2055.0 4495.2 7690.1 9593.6 10228.2
precast section alone Mpc1
Addl. Ult. Design Shear acting on
5 KN 1292.0 1295.6 1230.5 806.3 382.4 41.5
Comp. section Vcomp1
Addl. Ultimate Design Moment
6 KN.m 0.0 2450.6 5711.7 9774.4 12192.7 12998.8
acting on Comp. section Mcomp1
B. CHECK WHETHER SECTION IS CRACKED OR UNCRACKED ?
Maximum Allowable Tensile Stress,
7 Mpa 1.629 1.629 1.629 1.629 1.629 1.629
fctd = fctm,0.05/γc =
Horizontal Component of prestress
8 KN 10176.9 10220.9 10296.8 10425.8 10658.9 10699.4
after all losses
Eccentricity of Cables from c.g of
9 m 0.077 0.248 0.437 0.785 1.030 1.056
Girder Section
Average Comp. Stress due to
10 Mpa 5.655 7.576 15.386 20.689 24.819 25.307
prestress, fcp
Average Comp. Stress due to axial
10 (a) Mpa 4.280 4.301 8.257 8.370 8.575 8.611
force, σcp

11 fcd = 0.67 x fck / γc Mpa 22.33 22.33 22.33 22.33 22.33 22.33

12 σcp = Min. of (NED/Ac, 0.2 fcd) Mpa 4.28 4.30 4.47 4.47 4.47 4.47

Stress at bottom fibre due to


13 Prestress and Flexural Moment on Mpa 5.65 5.36 9.06 9.86 11.31 10.91
Precast Section alone
Addl. stress at bottom fibre due
14 to Addl. Flexural Moment & Mpa -1.072 -3.020 -8.057 -12.598 -15.359 -16.193
prestress losses on Comp. Section
TOTAL tensile stress at bottom
15 Mpa 4.6 2.3 1.0 -2.7 -4.0 -5.3
fibre
Is Section "Cracked" or
16 UNCRACKED UNCRACKED UNCRACKED CRACKED CRACKED CRACKED
"Uncracked" ?

16(a) Net Design Shear Force, VED KN 1445.0 1507.2 1295.6 1352.9 635.8 81.7
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018

Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY
Rev:
Satyam
Component Structure: Checked By
R0
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall SKJ

C. CHECK FOR SHEAR CAPACITY OF SECTION WITHOUT SHEAR REINFORCEMENT

17 Overall Width, bo m 0.800 0.800 0.300 0.300 0.300 0.300

18 Outer Dia of Sheathing Duct, φ m 0.120 0.120 0.120 0.120 0.120 0.120

19 Effective Width, bw m 0.680 0.680 0.180 0.180 0.180 0.180

20 Overall Depth, d m 2.825 2.825 2.825 2.825 2.825 2.825

21 C.G of Strands from soffit, yb m 1.243 1.071 0.834 0.486 0.242 0.216

22 Effective Depth , db = d - yb m 1.582 1.754 1.991 2.339 2.583 2.609

S = A.x = Moment of the area


23 above C.G of composite Section m3 1.159 1.159 0.850 0.850 0.850 0.850
about C.G
24 I.bwc / S m2 1.410 1.410 0.406 0.406 0.406 0.406

25 k1 1.0 1.0 1.0 1.0 1.0 1.0

26 K=1+Sqrt (200/d) <= 2 1.356 1.338 1.317 1.292 1.278 1.277

3/2  1/2
27 Vmin= 0.031 K fck  Mpa 0.35 0.34 0.33 0.32 0.32 0.32

28 VRd.c,min =[Vmin+(0.15σcp)]bwd] KN 1062.71 1173.69 358.80 417.67 458.87 463.26

29 Area of Tension Steel, Asl mm2 8488.20 8488.20 8488.20 8488.20 8488.20 8488.20

30 ρ1 = Asl / (bw.d) ≤ 0.02 0.008 0.007 0.020 0.020 0.018 0.018

VRdc (For sections uncracked) NOT NOT NOT


31 KN 4375.66 4383.35 1280.43
I.bwc/S x ((fctd)2+k1.σcp.fctd)0.5 APPLICABLE APPLICABLE APPLICABLE

VRdc (For Cracked Sections)


32 KN - - - 675.58 662.07 660.66
VRd.c =[0.12 K(80ρ1fck)0.33+(0.15σcp)]bwd

33 Is Shear Reinforcement Reqd ? NOT REQD. NOT REQD. REQD. REQD. NOT REQD. NOT REQD.

D. CHECK FOR SHEAR CAPACITY OF SECTION AGAINST WEB CRUSHING (WITH SHEAR REINFORCEMENT)

34 αcw 1.19 1.19 1.25 1.25 1.25 1.25

35 Assumed angle of variable strut degrees 21.8 21.8 21.8 21.8 21.8 21.8

36 Lever Arm, z m 2.83 2.83 2.83 2.11 2.33 2.35

37 v1 = 0.6 x [1-fck/310] 0.50 0.50 0.50 0.50 0.50 0.50

VR,dmax =
38 KN 8870.96 8877.89 2463.18 1835.45 2027.28 2047.75
αcw.bw.z.v1.fcd/(cotθ+tanθ)

SHEAR CAPACITY OF
39 KN 8871.0 8877.9 2463.2 1835.5 2027.3 2047.7
SECTION

SECTION SECTION SECTION SECTION SECTION SECTION


40 Check adequacy of section
ADEQUATE ADEQUATE ADEQUATE ADEQUATE ADEQUATE ADEQUATE
Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018

Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED PROJECT Prepared By
REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI CAPITAL CITY
Rev:
Satyam
Component Structure: Checked By
R0
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall SKJ

D. CALCULATION OF SHEAR REINFORCEMENT

41 fywd = fyk / γm Mpa 434.8 434.8 434.8 434.8 434.8 434.8

Minimum Shear Reinft. Ratio =


42 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
ρw,min = 0.072 x (fck)0.5 / fyk

Min. Reinft.
Asw,min / S = ρw. bw. Sinα mm2/m 814.6 814.6 305.5 305.5 305.5 305.5

Reinforcement Required, MINIMUM MINIMUM MINIMUM MINIMUM


34
Asw / S = VED / (z x fywd x cotθ) mm2/m 421.9 591.2
R/F R/F R/F R/F

35 Dia. of Shear reinforcement mm 10 10 10 10 10 10

No. of Links 4 4 2 2 2 2

36 Spacing of Links required mm - - 372.3 265.7 - -

37 Spacing of Links provided mm 200 200 200 200 200 200


Document No: Date:
B&S ENGINEERING CONSULTANTS PVT. LTD. BSEC/MJ18-02/DN-102 Sep'2018
Project: SMART INTEGRATED INFRASTRUCTURE MASTER PLAN AND DETAILED
Prepared By
PROJECT REPORTS FOR PHASE-II INFRASTRUCTURE WORKS FOR/AT AMARVATI Rev:
CAPITAL CITY
Satyam

Component Structure: Checked By


R0
Design of PSC T Girder for 37m Span, Deck Slab, End Cross Girder & Parapet Wall SKJ
11.0 DESIGN OF INTERFACE SHEAR & SHEAR CONNECTORS
Since the deck slab will be cast by taking supports from the erected girders, the design shear force for interface
shall be taken as the total external shear due to dead load added after the concrete has attained a strength
compatible to the composite action assumed and the live load with impact. Hence only shear due to SIDL and
Live Load needs to be considered for the interface design.

Vertical Shear forces (in Tonnes), VED


(*) Design SF = 1.35 x SIDL-1 + 0.9 X WL
Location
Support 0.052 L 0.124 L 0.250 L 0.375 L 0.500 L
Item
0.000 1.800 4.300 8.650 12.975 17.300

SIDL-1 91.24 91.00 87.44 57.45 27.47 2.51

WL 9.48 10.24 8.21 5.15 2.11 0.94

Design SF, VED (t)* 131.7 132.1 125.4 82.2 39.0 4.2

bi (mm) 1000.0 1000.0 1000.0 1000.0 1000.0 1000.0

z (mm) 1423.6 1578.2 1791.7 2105.1 2325.1 2348.5

β (assumed safely) 1.0 1.0 1.0 1.0 1.0 1.0


vEdi = β x VED / (z.bi)
0.93 0.84 0.70 0.39 0.17 0.02
(Mpa)
μ 0.6 0.6 0.6 0.6 0.6 0.6

ν = 0.6 x [1-fck/310] (Mpa) 0.503 0.503 0.503 0.503 0.503 0.503

fcd 22.3 22.3 22.3 22.3 22.3 22.3

vRdi,max = 0.5 x ν x fcd (Mpa) 5.6 5.6 5.6 5.6 5.6 5.6

Details of Reinforcement provided at the interface

Dia of Bar-1 (mm) 12 12 12 10 10 10

No. of Links, Bar-1 4 4 4 4 4 4

Spacing of Bar-1 (mm) 200 200 200 200 200 200

Dia of Bar-2 (mm) 10 10 10 10 10 10

No. of Links, Bar-2 4 4 2 2 2 2

Spacing of Bar-3 (mm) 200 200 200 200 200 200


Area of R/F crossing Joint =
3832.7 3832.7 3047.3 2356.2 2356.2 2356.2
As (mm2/m)
Minimum Area of R/F
1500.0 1500.0 1500.0 1500.0 1500.0 1500.0
crossing Joint = 0.15%
Status OK OK OK OK OK OK
Interface area of Joint
1000000.0 1000000.0 1000000.0 1000000.0 1000000.0 1000000.0
= Aj (mm2/m)

ρ = As/Aj = 0.004 0.004 0.003 0.002 0.002 0.002

vRdi = ρ.fyd.μ (Mpa) 1.000 1.000 0.795 0.615 0.615 0.615

Status OK OK OK OK OK OK
NOTE :
1 Effect of 'μ.σn' neglected conservatively while assessing the resistance.
2 Angle of reinforcement to the interface, 'α' is taken as 90 degrees

You might also like