Note :
Catatan :
(1) The new steam turbine units at a load 50%, 75%, 100% and for the old unit to the maximum load that can be acheved
(2) if the system is unable to escape test load 100% of the capacity of the unit, there mush be statement of :
a. Regulation network / PLN system
b. Turbine and generator manufacturer that operates safety in case of loose load up to 100%
(3) New steam turbine for 72 hours uniterupted 24 hours old and unit with load 80% up to 100%