Apcas Appendices
Apcas Appendices
Apcas Appendices
WORK EXPERIENCE
Name of Company Position Date of Employment
LGU-Balanga City Volunteer May 2015 – June 2015
Asia Pacific College of Student Assistant April 2016 – January 2017
Advanced Studies
City Engineering Office – Clerk May 2017 – June 2017
National Building Code
Section
City Engineering Office – Engineering Assistant May 2018 – June 2018
Planning and Supervising
Section
Philippine National Oil Service Crew April 2019 – May 2019
Company – Canteen
CHARACTER REFERENCES
Name Profession Company
Engr. Jesusa DM Section Head – City Engineering
Villanueva National Building Office
Code Section
Jessete V. Jota Certified Public Wok N’ Roll
Accountant Canteen
Engr. Armando O. Registered Civil Asia Pacific College
Abejar Engineer of Advanced Studies
Engr. Reymark R. Registered Civil Asia Pacific College
Garfin Engineer of Advanced Studies
Mrs. Mary Ann G. Licensed City of Balanga
Balajo Professional Teacher National High
School
This is to certify that all information in this form are true and correct.
EDUARD JOSEPH M. DELA CRUZ April 30, 2019
Student’s Signature Over Printed Name Date
APCASPractForm002
STUDENT INFORMATION:
Greetings!
Respectfully yours
Engr. Armando O. Abejar
Dean/Practicum Coordinator
APCASPractForm004
I, Resurrecion M. Dela Cruz, parent of Eduard Joseph M. Dela Cruz, BSCE-IV, who
is currently enrolled this Summer Semester SY 2018-2019, on my free will do hereby
execute this full consent allowing him to conduct On-The-Job Training of Asia Pacific
College of Advanced Studies on TEN Construction and Trading Corporation, from
May 2019 to June 2019 and further, do hereby declare and manifest that:
Please State the Relationship of the Signatory Guardian of the Student: MOTHER
______________________________ ______________________________
APCASPractForm006
Signature
No. of
Date Time In Time Out Department of
Hours
Supervisor
05/01/2019 7:55 5:04 8 Engineering
05/02/2019 7:53 5:02 8 Engineering
05/03/2019 7:41 5:00 8 Engineering
05/06/2019 7:39 5:18 8 Engineering
05/07/2019 7:57 5:06 8 Engineering
05/08/2019 7:56 5:15 8 Engineering
05/09/2019 7:43 5:22 8 Engineering
05/10/2019 7:41 5:20 8 Engineering
05/11/2019 7:42 5:01 8 Engineering
05/14/2019 7:54 5:13 8 Engineering
05/15/2019 7:55 5:14 8 Engineering
05/16/2019 7:46 5:15 8 Engineering
05/20/2019 7:27 5:06 8 Engineering
05/22/2019 7:39 5:08 8 Engineering
05/23/2019 7:58 5:27 8 Engineering
05/24/2019 7:29 5:30 8 Engineering
05/25/2019 7:26 5:17 8 Engineering
05/27/2019 7:51 5:12 8 Engineering
05/28/2019 7:37 5:08 8 Engineering
05/29/2019 7:42 5:02 8 Engineering
05/30/2019 7:41 5:31 8 Engineering
06/03/2019 7:56 5:14 8 Engineering
06/04/2019 7:54 5:16 8 Engineering
06/05/2019 7:43 5:12 8 Engineering
06/06/2019 7:31 5:00 8 Engineering
06/07/2019 7:32 5:02 8 Engineering
06/10/2019 7:51 5:10 8 Engineering
06/11/2019 7:53 5:12 8 Engineering
06/12/2019 7:58 5:17 8 Engineering
06/13/2019 7:46 5:25 8 Engineering
This application must be accompanied by a certification from the school attended by the
apprentice stating the number of hours of On-The-Job Training required the curriculum
course being taken. Attach recent photo of apprentice. Application not fully accomplished
shall not be entertained.
The undersigned certifies that the information given above is true and correct
and that the employment of the above-named apprentice will not prejudice the existing
office personnel of the establishment and that the picture attached is that of apprentice; and
that the said practice/training will not be a ground for employment on any position that
may become vacant in the future.
________________________________________
Signature of the Employer over Printed Name
________________________________
Designation/Date
_________________________
Signature of Apprentice
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Levelling using transit, office orientation
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Observing a road construction, doing some office works
DAY 5
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Reviewing structural designs and computations
DAY 1
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Doing some office works, learning cost estimates
DAY 2
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Learning cost estimates, editing a PowerPoint presentation
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Preparing a program proper for the launch, assisting guests at
the venue
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Inspecting the construction of a resort, learning new ideas in
construction and in civil engineering profession with our
trainer,
DAY 5
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Laying out plans with AutoCAD and SketchUP
DAY 6
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Measuring a piece of land using transit, plotting the results in
Autocad
DAY 2
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Estimating bill of materials, learning different construction
materials.
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Site visiting a finished house, estimating bill of materials
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Listening to the discussions of our trainer about the National
Building Code of the Philippines, brainstorming ideas about
house construction
DAY 1
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Observing the construction of a resort, making stirrups
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Observing the construction of a resort, learning the purpose of
hooks.
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Revising the bill of materials of a fully furnished house to get
the actual cost
DAY 5
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Assisting the guests in the relaunching of a project, meeting
with an Engineer IV at Shakey’s Bataan.
DAY 6
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Inspecting a cabin type office, helping my trainer in making a
new design for the office of the village.
DAY 1
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Learning how plumbing works and endorsing my actual
estimate to the client
DAY 2
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Finalizing official documents for the client, meeting with a
building official in City of Balanga.
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Observing how hollow block maker works, meeting with a
building official in City of Balanga.
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Making coffee for the office staff, creating my manuscript
APCASPractForm009
ASIA PACIFIC COLLEGE OF ADVANCED STUDIES
WEEKLY REPORT
Week 6
DAY 1
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Going to Heart N Mind to print layouts and blueprint
thereafter, meeting with a sales agent in Wawa, Pilar
DAY 2
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Creating an inventory at the hardware for the month of June,
updating the pricelist with my co-trainee.
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Going to Color Me Crazy Orani to print the tarpaulin for the
promotional purposes of the company’s project.
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Discussing sales with Ma’am Grace, doing some practices in
computing simple business mathematics.
DAY 5
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Making a business letter for a zoning administrator
DAY 1
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Learning electrical layouts and specifications, enhancing my
skills in AutoCAD by learning new shortcuts.
DAY 2
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Revising the feasibility study made for the company’s project
with my co-trainee, Ms. Tagorio.
DAY 3
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Observing concrete pouring of a slab in Brgy. Mabuco,
Hermosa, making C-bars and stirrups with Ms. Tagorio
DAY 4
Time in: 7:55 a.m. Time out: 5:04 p.m.
ACTIVITIES: Getting the actual measurements of the resort for the planning
of the reception hall, finalizing my manuscript.