Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Standard Form of Bidding Documents FOR Procurement of Works (Civil Works)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 99

STANDARD FORM OF BIDDING DOCUMENTS

FOR

PROCUREMENT OF WORKS

(CIVIL WORKS)

(For Large Contracts)


Over Rs.45 Million

2015

(Harmonized with KPPRA & PEC Rules)

KHYBER PAKHTUNKHWA PUBLIC PROCUREMENT


REGULATORY AUTHORITY (KPPRA)

(0 )
TABLE OF CONTENTS

Description Page

No. INVITATION FOR BIDS 4

Form 6

INSTRUCTIONS TO BIDDERS 7

A. General

IB.1 Scope of Bid 8


IB.2 Source of Funds 8
IB.3 Eligible Bidders 8
IB.4 One Bid Per Bidder 8
IB.5 Cost of Bidding 8
IB.6 Site Visit 8

B. Bidding Documents

IB.7 Contents of Bidding Documents 9


IB.8 Clarification of Bidding Documents 9
IB.9 Amendment of Bidding Documents 10

C. Preparation of Bids

IB.10. Language of Bid 10


IB.11 Documents Accompanying the Bid 10
IB.12 Bid Prices 12
IB.13 Currencies of Bid and Payment 12
IB.14 Bid Validity 13
IB.15 Bid Security 13
IB.16 Alternate Proposals by Bidder 14
IB.17 Pre-Bid Meeting 14
IB.18 Format and Signing of Bid 15

D. Submission of Bids

IB.19 Sealing and Marking of Bids 15


IB.20 Deadline for Submission of Bids 16
IB.21 Late Bids 16
IB.22 Modification, Substitution and Withdrawal of Bids 17

(1 )
E. Bid Opening and Evaluation
IB.23 Bid Opening 17
IB.24 Process to be Confidential 18
IB.25 Clarification of Bids 18
IB.26 Examination of Bids and Determination of Responsiveness 18
IB.27 Correction of Errors 19
IB.28 Evaluation and Comparison of Bids 19

F. Award of Contract

IB.29 Award 20
IB.30 Procuring Entity’s Right to Accept any Bid and to Reject any or all 20
Bids
IB.31 Notification of Award 21
IB.32 Performance Security 21
IB.33 Signing of Contract Agreement 21
IB.34 General Performance of the Bidders 22
IB.35 Integrity Pact 22
IB.36 Instructions Not Part of Contract 22

BIDDING DATA 23

FORM OF BID AND APPENDICES TO BID 29

FORM OF BID 30
Appendix-A to Bid : Special Stipulations 32
Appendix-B to Bid : Foreign Currency Requirements 33
Appendix-C to Bid : Price Adjustment (Under Clause 70) 34
Appendix-D to Bid : Bill of Quantities 35
Appendix-E to Bid : Proposed Construction Schedule 51
Appendix-F to Bid : Method of Performing the Work 52
Appendix-G to Bid : List of Major Equipment – Related 53
Items
Appendix-H to Bid : Construction Camp and Housing 54
Facilities
Appendix-I to Bid : List of Subcontractors 56
Appendix-J to Bid : Estimated Progress Payments 57
Appendix-K to Bid : Organization Chart of the Supervisory 58
Staff and Labour
Appendix-L to Bid : Integrity Pact 59

FORMS
BID SECURITY 61
PERFORMANCE SECURITY 63
CONTRACT AGREEMENT 65
MOBILIZATION ADVANCE GUARANTEE/BOND 67

(2 )
PART-I: GENERAL CONDITIONS OF CONTRACT 69

PART-II: PARTICULAR CONDITIONS OF CONTRACT

SPECIFICATIONS - SPECIAL PROVISIONS

SPECIFICATIONS - TECHNICAL PROVISIONS

DRAWINGS

(3 )
INVITATION
FOR BIDS

(4 )
INVITATION FOR BIDS

Date:
Loan / Credit No. ____
Bid Reference No.:

1. The (the
(Name of Procuring Entity)
“Procuring Entity”) has applied for/received a
loan/creditfrom the
(Name of Funding Agency/GOP/Provincial Govt/Any Other)
towards the cost of _______________________________________________________
(Name of Project)
and it is intended that part of the proceeds of the loan/credit will be applied to eligible
payments under the Contract for the .Bidding
(Brief description of the Works)
is open to all eligible Bidders.

2. The Procuring Entity invites sealed bids from eligible firms or persons licensed by
the Pakistan Engineering Council, registered / enrolled with the Procuring Entity’s
Department / Authority or prequalified for the respective work(s) registered/enrolled with
the Procuring Entity Department / Authority or prequalified for the respective in
the appropriate category for the Works. A foreign bidder is also entitled to bid only
in a joint venture with a Pakistani constructor in accordance with the relevant
provisions of PEC/KP-PPRA Bye-laws.

3. Bidders may obtain further information from, inspect at and acquire the Bidding
Documents from the office of the Procuring Entity, at

(Mailing address)
4. A complete set of Bidding Documents may be purchased by an interested bidder
on submission of a written application to the above office and upon payment of a
non- refundable fee of Rs.
(Insert Amount)
5. All bids must be accompanied by a Bid Security in the shape of Deposit at Call
or Pay Order from a Scheduled Bank of Pakistan, in the amount of Rs.
(Rupees_______________) or an equivalent amount in a freely convertible
currency, and must be delivered to

(Indicate Address
(5 ) and Exact Location)
at or before_______hours, on (Date). Bids will be opened at hours
on the same day, in the presence of bidders’ representatives who choose to attend at the
same address. (Indicate address and exact location if it differs).
The bid must also be accompanied by a separate non-refundable Tender form fee at the
prevailing rates (0.05% of the estimated cost) in shape of Demand Draft / Deposit at Call
or Pay order favouring ___________________________ to be issued by a scheduled bank.

[Note: the bids shall be opened at least thirty minutes after the deadline for submission of bids]

(6 )
INSTRUCTIONS TO
BIDDERS

(7 )
I-1
INSTRUCTIONS TO BIDDERS

(Note: These Instructions to Bidders along with Bidding Data will not be part of the Contract
and will cease to have effect once the contract is signed.)

A. GENERAL

IB.1 Scope of Bid

1.1 The Procuring Entity as defined in the Bidding Data hereinafter called “the Procuring
Entity” invites bids for the construction and completion of works as described in
these Bidding Documents, and summarized in the Bidding Data hereinafter referred to
as the “Works”.

1.2 The successful bidder will be expected to complete the Works within the time
specified in Appendix-A to Bid.

1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder / tenderer, bid / tender, bidding / tendering etc.) are synonymous.

IB.2 Source of Funds

2.1 The expenditure on this project will be met from the Public Funds of the Provincial
Government of Khyber Pakhtunkhwa (GoKP), as defined in Rule-2(l) of KPPRA
Procurement Rules or through a loan/credit from the source (s) as indicated in the
Bidding Data in various currencies towards the cost of the Project specified in the
Bidding Data and it is intended that part of these Public Funds or proceeds of this
loan/credit will be applied to eligible payments under the Contract for which these
Bidding Documents are issued.

IB.3 Eligible Bidders

3.1 This Invitation for Bids is open to all bidders meeting the following requirements:

a. Duly licensed by the Pakistan Engineering Council (PEC) in the category relevant
to the value of the Works.

b. Duly prequalified / enlisted with the Procuring Entity in the category relevant to the
value of the Works

c. Is neither associated, nor has been associated, directly or indirectly, with the Consultants
or any other entity that has prepared the design, specifications and other documents for
the Project or being proposed for any position in the Project Management.

3.2 A bidder having a conflict of interest will be declared as non-responsive if the bidder has
a close business relationship with the Procuring Entity’s professional personnel, who
directly or indirectly involved in any part of: (i) the preparation of the bidding
documents for the Works, (ii) the Bid evaluation or (iii) the supervision of such Works.

(8 )
IB.4 One Bid per Bidder

4.1 Each bidder shall submit only one bid either by himself, or as a partner in a joint
venture. A bidder who submits or participates in more than one bid (other than
alternatives pursuant to Clause IB.16) will be disqualified.

IB.5 Cost of Bidding

5.1 The bidders shall bear all costs associated with the preparation and submission of their
respective bids and the Procuring Entity will in no case be responsible or liable for
those costs, regardless of the conduct or outcome of the bidding process.
I-2
IB.6 Site Visit

6.1 The bidders are advised to visit and examine the site of Works and its surroundings
and obtain for themselves on their own responsibility all information that may be
necessary for preparing the bid and entering into a contract for construction of the
Works. All cost in this respect shall be at the bidder’s own expense.

6.2 The bidders and any of their personnel or agents will be granted permission by the
Procuring Entity to enter upon his premises and lands for the purpose of such
inspection, but only upon the express condition that the bidders, their personnel
and agents, will release and indemnify the Procuring Entity, his personnel and
agents from and against all liability in respect thereof and will be responsible for
death or personal injury, loss of or damage to property and any other loss, damage,
costs and expenses incurred as a result of such inspection.

(9 )
B. BIDDING DOCUMENTS

IB.7 Contents of Bidding Documents

7.1 The Bidding Documents, in addition to invitation for bids, are those stated below and
should be read in conjunction with any Addenda issued in accordance with Clause
IB.9.
1. Instructions to Bidders.
2. Bidding Data.
3. General Conditions of Contract, Part-I (GCC).
4. Particular Conditions of Contract, Part-II (PCC).
5. Specifications – Special Provisions.
6. Specifications - Technical Provisions.
7. Form of Bid & Appendices to Bid.
8. Bill of Quantities (Appendix-D to Bid).
9. Form of Bid Security.
10. Form of Contract Agreement.
11. Forms of Performance Security and Mobilization Advance Guarantee/Bond.
12. Drawings.

7.2 The bidders are expected to examine carefully the contents of all the above
documents. Failure to comply with the requirements of bid submission will be at the
Bidders own risk. Pursuant to Clause IB.26, bids which are not substantially
responsive to the requirements of the Bidding Documents will be rejected.

IB.8 Clarification of Bidding Documents

8.1 Any prospective bidder requiring any clarification (s) in respect of the Bidding
Documents may notify the Procuring Entity in writing at the Procuring Entity’s
address indicated in the Invitation for Bids. The Procuring Entity will respond to any
request for clarification which he receives earlier than 28 days prior to the deadline for
submission of bids.
I-3
Copies of the Procuring Entities response will be forwarded to all purchasers of the
Bidding Documents, including a description of the enquiry but without identifying it’s
source.

IB.9 Amendment of Bidding Documents

9.1 At any time prior to the deadline for submission of bids, the Procuring Entity may,
for any reason, whether at his own initiative or in response to a clarification
requested by a prospective bidder, modify the Bidding Documents by issuing
addendum.

9.2 Any addendum thus issued shall be part of the Bidding Documents pursuant to Sub-
Clause 7.1 hereof and shall be communicated in writing to all purchasers of the
Bidding Documents. Prospective bidders shall acknowledge receipt of each addendum
in writing to the Procuring Entity.

9.3 To afford prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Procuring Entity may extend the deadline for
submission of bids in accordance with Clause IB.20
(10
)
C. PREPARATION OF BIDS

IB.10 Language of Bid

10.1 The bid and all correspondence and documents related to the bid exchanged by a
bidder and the Procuring Entity shall be in the bid language stipulated in the
Bidding Data and Particular Conditions of Contract. Supporting documents and
printed literature furnished by the bidders may be in any other language
provided the same are accompanied by an accurate translation of the relevant parts
in the bid language, in which case, for purposes of evaluation of the bid, the
translation in bid language shall prevail.

IB.11 Documents Accompanying the Bid

11.1 Each bidder shall:

(a) submit a written power of attorney authorizing the signatory of the bid to act
for and on behalf of the bidder;

(b) update the information indicated and listed in the Bidding Data and previously
submitted with the application for prequalification, and continue to meet the
minimum criteria set out in the prequalification documents which as a
minimum, would include the following :

(i) Evidence of access to financial resources along with average annual


construction turnover;
(ii) Financial predictions for the current year and the two following years
including the effect of known commitments;
(iii) Work commitments since prequalification;
(iv) Current litigation information; and
(v) Availability of critical equipment.
and
(c) furnish a technical proposal taking into account the various Appendices to Bid
specially the following:
Appendix-E to Bid Proposed Construction Schedule
Appendix-F to Bid Method of Performing the Work
Appendix-G to Bid List of Major Equipment
Appendix-K to Bid Organization Chart for Supervisory Staff
and other pertinent information such as mobilization program etc;

11.2 Bids submitted by a joint venture of two (2) or more firms shall comply with the
following requirements:

(a) the bid and in case of a successful bid, the Form of Contract Agreement shall
be signed so as to be legally binding on all partners;
(b) one of the joint venture partners shall be nominated as being in charge; and
this authorization shall be evidenced by submitting a power of attorney signed
by legally authorized signatories of all the joint venture partners;
(c) the partner-in-charge shall always be duly authorized to deal with the
Procuring Entity regarding all matters related with and/or incidental to the
(11
)
execution of Works as per the terms and Conditions of Contract and in this
regard to incur any and all liabilities, receive instructions, give binding
undertakings and receive payments on behalf of the joint venture;
(d) all partners of the joint venture shall at all times and under all circumstances
be liable jointly and severally for the execution of the Contract in accordance
with the Contract terms and a statement to this effect shall be included in the
authorization mentioned under Sub-Para(b) above as well as in the Form of
Bid and in the Form of Contract Agreement (in case of a successful bid); and
(e) a copy of the agreement entered into by the joint venture partners shall be
submitted with the bid stating the conditions under which it will function, its
period of duration, the persons authorized to represent and obligate it and
which persons will be directly responsible for due performance of the
Contract and can give valid receipts on behalf of the joint venture, the
proportionate participation of the several firms forming the joint venture, and
any other information necessary to permit a full appraisal of its functioning.
No amendments / modifications whatsoever in the joint venture agreement
shall be agreed to between the joint venture partner without prior written
consent of the Procuring Entity.

11.3 Bidders shall also submit proposals of work methods and schedule, in sufficient detail
to demonstrate the adequacy of the Bidders’ proposals to meet the technical
specifications and the completion time referred to in Sub-Clause 1.2 hereof.

(12
)
I-5
IB.12 Bid Prices

12.1 Unless stated otherwise in the Bidding Documents, the Contract shall be for
the whole of the Works as described in Sub-Clause 1.1 hereof, based on the
unit rates and / or prices submitted by the bidder.

12.2 The bidders shall fill in rates and prices for all items of the Works described in
the Bill of Quantities. Unit rate offered for an item shall be considered upto
two significant decimals places for evaluation purposes. Items against which
no rate or price is entered by a bidder will not be paid for by the Procuring
Entity when executed and shall be deemed covered by rates and prices for
other items in the Bill of Quantities. Corrections in rates and prices, if any,
shall be made by crossing out, initialing, dating and re-writing.

12.3 All duties, taxes and other levies payable by the Contractor under the Contract,
or for any other cause, as on the date 28 days prior to the deadline for
submission of bids shall be included in the rates and prices and the total Bid
Price submitted by a bidder.

Additional / reduced duties, taxes and levies due to subsequent additions or


changes in legislation shall be reimbursed / deducted as per Sub-Clause 70.2
of the General Conditions of Contract Part-I.

12.4 The rates and prices quoted by the bidders are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 70 of
the Conditions of Contract. The Procuring Entity shall furnish the
prescribed information for the price adjustment formulae in Appendix-C to
Bid, and shall submit with their bids such other supporting information as
required under the said Clause.

IB.13 Currencies of Bid and Payment

13.1 The unit rates and the prices shall be quoted by the bidder entirely in Pak rupees.
A bidder expecting to incur expenditures in other currencies for inputs to the
Works supplied from outside the Procuring Entity's country (referred to as the
“Foreign Currency Requirements”) shall indicate the same in Appendix-B to Bid.
The proportion of the Bid Price (excluding Provisional Sums) needed by him
for the payment of such Foreign Currency Requirements either (i) entirely in the
currency of the Bidder’s home country or, (ii) at the bidder’s option, entirely in
Pak rupees provided always that a bidder expecting to incur expenditures in
a currency or currencies other than those stated in (i) and (ii) above for a
portion of the foreign currency requirements, and wishing to be paid
accordingly, shall indicate the respective portions in his bid.

13.2 The rates of exchange to be used by the bidder for currency conversion shall
be the TT&OD Selling Rates published or authorized by the State Bank of
Pakistan prevailing on the date 28 days prior to the deadline for submission of
bids.

(13
)
I-6

For the purpose of payments, the exchange rates used in bid preparation shall
apply for the duration of the Contract.

IB.14 Bid Validity

14.1 Bids shall remain valid for the period stipulated in the Bidding Data after the
Date of Bid Opening specified in Clause IB.23.

14.2 In exceptional circumstances, prior to expiry of the original bid validity period,
the Procuring Entity may request that the bidders extend the period of
validity for a specified additional period which shall in no case be more than
the original bid validity period. The request and the responses thereto shall be
made in writing. A bidder may refuse the request without forfeiting his Bid
Security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his Bid Security
for the period of the extension, and in compliance with Clause IB.15 in all
respects. The bidder shall bear all costs to be incurred on such extensions.

IB.15 Bid Security

15.1 Each bidder shall furnish, as part of his bid, a Bid Security in the amount
stipulated in the Bidding Data in Pak Rupees or an equivalent amount in a
freely convertible currency.

15.2 The Bid Security shall be, at the option of the bidder, in the form of Deposit at
Call or a Bank Guarantee issued by a Scheduled Bank in Pakistan or from a
foreign bank duly counter guaranteed by a Scheduled Bank in Pakistan in
favour of the Procuring Entity valid for a period 28 days beyond the Bid
Validity date.

15.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by
the Procuring Entity as non-responsive.

15.4 The bid securities of unsuccessful bidders will be returned as promptly as


possible, but not later than 28 days after the expiration of the period of Bid
Validity.

15.5 The Bid Security of the successful bidder will be returned when the bidder has
furnished the required Performance Security and signed the Contract
Agreement. The Bid Security may be adjusted by the Procuring Entity as part
of the Performance Security.

15.6 The Bid Security may be forfeited:

(a) if the bidder withdraws his bid except as provided in Sub-Clause 22.1;

(b) if the bidder does not accept the correction of his Bid Price pursuant to
Sub-Clause 27.2 hereof; or

(14
)
I-7

(c) In the case of successful bidder, if he fails within the specified time
limit to:

(i) furnish the required Performance Security; or


(ii) sign the Contract Agreement.

IB.16 Alternate Proposals by Bidder

16.1 Should any bidder consider that he can offer any advantages to the Procuring
Entity by a modification to the designs, specifications or other conditions, he
may, in addition to his bid to be submitted in strict compliance with the
Bidding Documents, submit any Alternate Proposal(s) containing (a) relevant
design calculations; (b)technical specifications; (c)proposed construction
methodology; and (d) any other relevant details / conditions, provided always
that the total sum entered on the Form of Bid shall be that which represents
complete compliance with the Bidding Documents.

16.2 Alternate Proposal(s), if any, of the lowest evaluated responsive bidder only
may be considered by the Procuring Entity as the basis for the award of
Contract to such bidder.

IB.17 Pre-Bid Meeting

17.1 The Procuring Entity may, on his own motion or at the request of any
prospective bidder(s), hold a pre-bid meeting to clarify issues and to answer
any questions on matters related to the Bidding Documents or any other matter
that may be raised at that stage. The date, time and venue of pre- bid meeting,
if convened, is as stipulated in the Bidding Data. All prospective bidders or
their authorized representatives shall be invited to attend such a pre- bid
meeting.

17.2 The bidders are requested to submit questions, if any, in writing so as to reach
the Procuring Entity not later than seven (7) days before the proposed
pre-bid meeting.

17.3 Minutes of the pre-bid meeting, including the text of the questions raised and
the replies given, will be transmitted without delay to all purchasers of the
Bidding Documents. Any modification of the Bidding Documents listed in
Sub-Clause 7.1 hereof which may become necessary as a result of the pre-bid
meeting shall be made by the Procuring Entity exclusively through the issue
of an Addendum pursuant to Clause IB.9 and not through the minutes of the
pre-bid meeting.

17.4 Absence at the pre-bid meeting will not be a cause for disqualification of a
bidder.

(15
)
I-8

IB.18 Format and Signing of Bid

18.1 Bidders are particularly directed that the amount entered on the Form of Bid
shall be for performing the Contract strictly in accordance with the Bidding
Documents.

18.2 All appendices to Bid are to be properly completed and signed.

18.3 No alteration is to be made in the Form of Bid nor in the Appendices thereto
except in filling up the blanks as directed. If any such alterations be made or if
these instructions be not fully complied with, the bid may be rejected.

18.4 Each bidder shall prepare by filling out the forms completely and without
alterations one (1) original and number of copies, specified in the Bidding
Data, of the documents comprising the bid as described in Clause IB.7 and
clearly mark them “ORIGINAL” and “COPY” as appropriate. In the event of
discrepancy between them, the original shall prevail.

18.5 The original and all copies of the bid shall be typed or written in indelible ink
(in the case of copies, photostats are also acceptable) and shall be signed by a
person or persons duly authorized to sign on behalf of the bidder pursuant to
Sub- Clause 11.1(a) hereof. All pages of the bid shall be initialed and stamped
by the person or persons signing the bid.

18.6 The bid shall contain no alterations, omissions or additions, except to comply
with instructions issued by the Procuring Entity, or as are necessary to correct
errors made by the bidder, in which case such corrections shall be initialed
by the person or persons signing the bid.

18.7 Bidders shall indicate in the space provided in the Form of Bid their full and
proper addresses at which notices may be legally served on them and to which
all correspondence in connection with their bids and the Contract is to be sent.

18.8 Bidders should retain a copy of the Bidding Documents as their file copy.

D. SUBMISSION OF BIDS

IB.19 Sealing and Marking of Bids

19.1 Each bidder shall submit his bid as under:

(a) ORIGINAL and each copy of the Bid shall be separately sealed and
put in separate envelopes and marked as such.

(b) The envelopes containing the ORIGINAL and copies will be put in one
sealed envelope and addressed / identified as given in Sub- Clause 19.2
hereof.

(16
)
I-9
19.2 The inner and outer envelopes shall:

(a) be addressed to the Procuring Entity at the address provided in the


Bidding data;

(b) bear the name and identification number of the contract as defined in
the Bidding Data; and

(c) provide a warning not to open before the time and date for bid opening,
as specified in the Bidding Data.

19.3 In addition to the identification required in Sub- Clause 19.2 hereof, the inner
envelope shall indicate the name and address of the bidder to enable the bid to
be returned unopened in case it is declared “late” pursuant to Clause IB.21

19.4 If the outer envelope is not sealed and marked as above, the Procuring
Entity will assume no responsibility for the misplacement or premature
opening of the Bid.

IB.20 Deadline for Submission of Bids

20.1 (a) Complete Bids must be received by the Procuring Entity at the address
specified no later than the time and date stipulated in the Bidding Data
In the event of the specified date for the submission of bids declared a
holiday for the Procuring Entity, the Bids will be received up to the
appointed time on the next working day.
(b) Bids with charges payable will not be accepted, nor will arrangements
be undertaken to collect the bids from any delivery point other than that
specified above. Bidders shall bear all expenses incurred in the
preparation and delivery of bids. No claims will be entertained for
refund of such expenses.

(c) Where delivery of a bid is by mail and the bidder wishes to receive an
acknowledgment of receipt of such bid, he shall make a request for
such acknowledgment in a separate letter attached to but not included
in the sealed bid package.

(d) Upon request, acknowledgment of receipt of bids will be provided to


those making delivery in person or by messenger.

20.2 The Procuring Entity may, at his discretion, extend the deadline for
submission of bids by issuing an amendment in accordance with Clause IB.9,
in which case all rights and obligations of the Procuring Entity and the bidders
previously subject to the original deadline will thereafter be subject to the
deadline as extended.

IB.21 Late Bids

21.1 (a) Any bid received by the Procuring Entity after the deadline for
submission of bids prescribed in Clause IB.20 will be returned
(17
unopened to such bidder.
)
I-10

(b) Delays in the mail, delays of person in transit, or delivery of a bid to


the wrong office or due to any other reason, shall not be accepted as
an excuse for failure to deliver a bid at the proper place and time.
It shall be the bidder’s responsibility to determine the manner in
which timely delivery of his bid will be accomplished either in person,
by messenger or by mail.

IB.22 Modification, Substitution and Withdrawal of Bids

22.1 Any bidder may modify, substitute or withdraw his bid after bid submission
provided that the modification, substitution or written notice of withdrawal is
received by the Procuring Entity prior to the deadline or the extended deadline
pursuant to clause IB.20.2, for submission of bids.

22.2 The modification, substitution or notice for withdrawal of any bid shall be
prepared, sealed, marked and delivered in accordance with the provisions of
Clause IB.19 with the outer and inner envelopes additionally marked
“MODIFICATION”, “SUBSTITUTION” or “WITHDRAWAL” as
appropriate.

22.3 No bid may be modified by a bidder after the deadline for submission of bids
except in accordance with Sub-Clauses 22.1 and 27.2.

22.4 Withdrawal of a bid during the interval between the deadline for submission
of bids and the expiration of the period of bid validity specified in the Form of
Bid may result in forfeiture of the Bid Security in pursuance to Clause IB.15.

E. BID OPENING AND EVALUATION

IB.23 Bid Opening

23.1 The Procuring Entity will open all the bids received (except those received
late), including withdrawals, substitution and modifications made pursuant to
Clause IB.22, in the presence of bidders’ or their representatives who choose
to attend, at the time, date and location stipulated in the Bidding Data. In the
event of the specified date for the opening of bids being declared a holiday for
the Procuring Entity, the Bids will be opened at the appointed time and
location on the next working day. The bidders’ representatives who are present
shall sign a register evidencing their attendance.

23.2 Envelopes marked “MODIFICATION”, “SUBSTITUTION” or


“WITHDRAWAL” shall be opened and read out first. Bids for which an
acceptable notice of withdrawal has been submitted pursuant to Clause IB.22
shall not be opened.

23.3 The bidder’s name, total Bid Price and price of any Alternate Proposal(s), any
discounts, bid modifications, substitution and withdrawals, the presence or
absence of Bid Security and such other details as the Procuring Entity may
consider appropriate, will be announced by the Procuring Entity at the opening
of bids.
(18
)
I-11

23.4 Procuring Entity shall prepare minutes of the bid opening including the
information disclosed to those present in accordance with the Sub-Clause 23.3.

IB.24 Process to be Confidential

24.1 Information relating to the examination, clarification, evaluation and


comparison of bid and recommendations for the award of a contract shall not
be disclosed to bidders or any other person not officially concerned with such
process before the announcement of the final result of the bid evaluation
which shall be done at least ten (10) days prior to issue of Letter
of Acceptance and place the same on its and Authority’s Website (KP-PPRA
Rule-45). The announcement to all Bidders will include table(s) comprising
read out prices, discounted prices, price adjustments made, final
evaluated prices and recommendations against all the bids evaluated. Any
effort by a bidder to influence the Procuring Entity’s processing of bids or
award decisions may result in the rejection of such bidder’s bid. Whereas any
bidder feeling aggrieved may lodge a written complaint not later than
fifteen (15) days after the announcement of the bid evaluation report;
however mere fact of lodging a complaint shall not warrant suspension of the
procurement process.

IB.25 Clarification of Bids

25.1 To assist in the examination, evaluation and comparison of bids, the Procuring
Entity may, at his discretion, ask any bidder for clarification of his bid,
including breakdowns of unit rates. The request for clarification and the
response shall be in writing but no change in the price or substance of the bid
shall be sought, offered or permitted except as required to confirm the
correction of arithmetic errors discovered by the Procuring Entity in the
evaluation of the bids in accordance with Clause IB.28.

IB.26 Examination of Bids and Determination of Responsiveness

26.1 Prior to the detailed evaluation of bids, the Procuring Entity will determine
whether each bid is substantially responsive to the requirements of the
Bidding Documents.

26.2 A substantially responsive bid is one which (i) meets the eligibility criteria;
(ii) has been properly signed; (iii) is accompanied by the required Bid
Security and (iv) conforms to all the terms, conditions and specifications of
the Bidding Documents, without material deviation or reservation. A material
deviation or reservation is one (i) which affect in any substantial way the
scope, quality or performance of the Works; (ii) which limits in any
substantial way, inconsistent with the Bidding Documents, the Procuring
Entity’s rights or the bidder’s obligations under the Contract; or (iii)
adoption/rectification whereof would affect unfairly the competitive position
f other bidders presenting substantially responsive bids.

(19
)
I-12

26.3 If a bid is not substantially responsive, it will be rejected by the Procuring


Entity and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.

IB.27 Correction of Errors

27.1 Bids determined to be substantially responsive will be checked by the


Procuring Entity for any arithmetic errors. Errors will be corrected by the
Procuring Entity as follows:

(a) where there is a discrepancy between the amounts in figures and in


words, the amount in words will govern and

(b) where there is a discrepancy between the unit rate and the line item
total resulting from multiplying the unit rate by the quantity, the unit
rate as quoted will govern, unless in the opinion of the Procuring
Entity there is an obviously gross misplacement of the decimal point
in the unit rate, in which case the line item total as quoted will govern
and the unit rate will be corrected.

27.2 The amount stated in the Form of Bid will be adjusted by the Procuring
Entity in accordance with the above procedure for the correction of errors and
with the concurrence of the bidder, shall be considered as binding upon the
bidder. If the bidder does not accept the corrected bid price, his bid will be
rejected and the Bid Security shall be forfeited in accordance with Sub-
Clause 15.6(b) hereof.

IB.28 Evaluation and Comparison of Bids

28.1 The Procuring Entity will evaluate and compare only the bids determined
to be substantially responsive in accordance with Clause IB.26.

28.2 In evaluating the bids, the Procuring Entity will determine for each bid the
evaluated Bid Price by adjusting the Bid Price as follows:

(a) making any correction for errors pursuant to Clause IB.27;


(b) excluding Provisional Sums and the provision, if any, for contingencies
in the Summary Bill of Quantities, but including competitively priced
Day work; and
(c) making an appropriate adjustment for any other acceptable variation or
deviation, including discounts or other price modification in the bids.

28.3 The estimated effect of the price adjustment provisions of the Conditions of
Contract, applied over the period of execution of the Contract, shall not be
taken into account in Bid evaluation.

(20
)
I-13

28.4 If the Bid of the successful bidder is seriously unbalanced in relation to the
Procuring Entity’s estimate of the cost of work to be performed under the Contract, the
Procuring Entity may require the bidder to produce detailed price analyses for
any or all items of the Bill of Quantities to demonstrate the internal
consistency of those prices with the construction methods and schedule
proposed. After evaluation of the price analyses, the Procuring Entity may
require that the amount of the Performance Security set forth in Clause IB.32
be increased at the expense of the successful bidder to a level sufficient to
protect the Procuring Entity against financial loss in the event of default
of the successful bidder under the Contract.

F. AWARD OF CONTRACT

IB.29 Award

29.1 Subject to Clauses IB.30 and IB.34, the Procuring Entity will award the
Contract to the bidder whose bid has been determined to be substantially
responsive to the Bidding Documents and who has offered the lowest
evaluated Bid Price, provided that such bidder has been determined to be
eligible in accordance with the provisions of Clause IB.3 and qualify pursuant
to Sub-Clause IB 29.2.

29.2 The Procuring Entity, at any stage of the bid evaluation, having credible
reasons for or prima facie evidence of any defect in supplier’s or contractor’s
capacities, may require the suppliers or contractors to provide information
concerning their professional, technical, financial, legal or managerial
competence whether already pre-qualified or not:

Provided that such qualification shall only be laid down after recording
reasons therefore in writing. They shall form part of the records of that bid
evaluation report.

IB.30 Procuring Entity’s Right to Accept any Bid and to Reject any or all Bids

30.1 Notwithstanding Clause IB.29, the Procuring Entity reserves the right to
accept or reject any Bid, and to annul the bidding process and reject all bids,
at any time prior to award of Contract, without thereby incurring any
liability to the affected bidders or any obligation except that the grounds for
rejection of all bids shall upon request be communicated to any bidder who
submitted a bid, without justification of grounds. Rejection of all bids shall
be notified to all bidders promptly.

(21
)
I-14

IB.31 Notification of Award

31.1 Prior to expiration of the period of bid validity prescribed by the Procuring
Entity, the Procuring Entity will notify the successful bidder in writing (“Letter
of Acceptance”) that his Bid has been accepted. This letter shall name the sum
which the Procuring Entity will pay the Contractor in consideration of the
execution and completion of the Works by the Contractor as prescribed by
the Contract (hereinafter and in the Conditions of Contract called the
“Contract Price”).

31.2 No Negotiation with the bidder having evaluated as lowest responsive or any
other bidder shall be permitted, however, Procuring Entity may have
clarification meetings to get clarify any item in the bid evaluation report.

31.3 The notification of award and its acceptance by the bidder will constitute the
formation of the Contract, binding the Procuring Entity and the bidder till
signing of the formal Contract Agreement.

31.3 Upon furnishing by the successful bidder of a Performance Security, the


Procuring Entity will promptly notify the other bidders that their Bids have
been unsuccessful and return their bid securities.

IB.32 Performance Security

32.1 The successful bidder shall furnish to the Procuring Entity a Performance
Security in the form and the amount stipulated in the Bidding Data and the
Conditions of Contract plus additional security for unbalanced bids in
accordance with Clause IB.28.4 within a period of 28 days after the receipt of
Letter of Acceptance.

32.2 Failure of the successful bidder to comply with the requirements of Sub-
Clause IB.32.1 or Clauses IB.33 or IB.35 shall constitute sufficient grounds
for the annulment of the award and forfeiture of the Bid Security.

IB.33 Signing of Contract Agreement

33.1 Within 14 days from the date of furnishing of acceptable Performance


Security under the Conditions of Contract, the Procuring Entity will
send the successful bidder the Contract Agreement in the form provided in
the Bidding Documents, incorporating all agreements between the parties.

33.2 The formal Agreement between the Procuring Entity and the successful
bidder shall be executed within 14 days of the receipt of the Contract
Agreement by the successful bidder from the Procuring Entity.

(22
)
I-15

IB.34 General Performance of the Bidders

The Procuring Entity reserves the right to obtain information regarding performance
of the bidders on their previously awarded contracts/works. The Procuring Entity
may in case of consistent poor performance of any Bidder as reported by the
Procuring Entity’s of the previously awarded contracts, inter alia, reject his bid
and/or refer the case to the Pakistan Engineering Council (PEC) and KPPRA. Upon
such reference, PEC / K P P R A in accordance with its rules, procedures and
relevant laws of the land take such action as may be deemed appropriate under the
circumstances of the case including black listing of such Bidder and debarring him
from participation in future bidding for similar works.

IB.35 Integrity Pact

The Bidder shall sign and stamp the Integrity Pact provided at Appendix-L to Bid in
the Bidding Documents for all procurement contracts exceeding Rupees ten million.
Failure to provide such Integrity Pact shall make the bidder non- responsive.

IB.36 Instructions not Part of Contract

Bids shall be prepared and submitted in accordance with these Instructions which are
provided to assist bidders in preparing their bids, and do not constitute part of the
Bid or the Contract Documents.

(23
)
BIDDING
DATA

(23 )
(24 )
BD-1
[NOTES ON BIDDING DATA

This Section is intended to assist the Procuring Entity in providing the specific
information in relation to corresponding clauses in Instructions to Bidders (IB) and should
be prepared to suit each individual contract.

The Procuring Entity should provide in the Bidding Data information and requirements
specific to the circumstances of the Procuring Entity, the processing of the Bid, the
applicable rules regarding Bid Price and currency, and the Bid evaluation criteria that
will apply to the Bids. In
preparing this section, the following aspects should be checked:

(a) Information that specifies and complements the provisions of section; Instruction to
Bidders must be incorporated.

(b) Amendments and/or supplements, if any, to the provisions of Instructions to Bidders,


necessitated by the circumstances of each individual contract, can be introduced only
in this section since Instructions to Bidders will remain unchanged.

(25 )
BD-2
Bidding Data

(This section should be filled in by the Procuring Entity before issuance of the Bidding
Documents.) The following specific data for the Works to be bid shall complement,
amend, or supplement the provisions in the Instructions to Bidders. Wherever there is a
conflict, the provisions herein shall prevail over those in the Instructions to Bidders.
[Instructions are provided, as needed, in italics.]
Instructions to Bidders
Clause Reference

1.1 Name and address of the Procuring


Entity:

1.1 Name of the Project & Summary of the Works:

[Insert brief summary, including relationship to other contracts under the Project. If
the Works are to be tendered in separate contracts, describe all the contracts.]

2.1 Name of the Borrower/Source of Financing/Funding Agency:

[Insert name of Borrower and statement of relationship with the Procuring Entity, if
different from the Borrower. This insertion should correspond to the information
provided in the Invitation for Bids.]

8.1 Time limit for clarification:

[Minimum number of days to seek clarification by the prospective bidder may be


inserted as 28 days.]

10.1 Bid language:

[The same language in which the Bidding Documents are written. English, should be
used in National/ International Competitive Bidding.]

11.1 (b) Prequalification Information to be updated:

[Indicate what items of information submitted with application for prequalification is


to be updated. It may include: Evidence of access to financial resources, latest status
of financial resources commitment for two years (including the current year). Works
awarded during the interim period, availability of essential critical equipment and
information about litigation presently in process.]

11.1(c) Furnish Technical Proposal:

The bidder to submit a technical proposal in sufficient detail to demonstrate the


adequacy of the bid in meeting requirements for timely completion of the Works.

(26 )
BD-3
13.1 Bidders to quote entirely in Pak. rupees but specify the percentages of foreign
currency they require.

14.1 Period of Bid Validity:

[Insert number of days after the deadline for Bid submission. This period should be
realistic, allowing sufficient time to evaluate the Bids, bearing in mind the complexity
of the Works, and the time required for obtaining references, clarifications,
clearances, and approvals (including the Financing Agency's "No Objection" if it is a
bilateral or multilateral funding agency financed project) and for notification of the
award. Normally the validity period should not exceed 182 days.]

15.1 Amount of Bid Security:

[This amount should be the same as also quoted in the Invitation for Bids. To avoid
disclosure of bidders’ prices originating in the financial institution issuing the
security, a fixed sum should be specified, in preference to a percentage of the Bid
Price. The sum should be the equivalent of 1 percent of the estimated cost of the
Works, for very large contracts of over Rs. 1,000 million, ranging to 3 percent of the
estimated cost, for small contracts. Alternatively, if the Procuring Entity wishes to
specify a percentage of the Bid Price, it should be indicated as a "minimum of
percent", to
enable bidders to provide in excess of the minimum and thus conceal their price.]

17.1 Venue, time, and date of the pre-Bid meeting:

[Insert address of venue, or indicate that the meeting will not take place. The meeting
should take place not later than four weeks before the deadline for Bid submission. It
should take place concurrently with the Site visit, if any (see Sub-Clause IB-6).]

18.4 Number of copies of the Bid to be completed and returned:


[Usually one original and two copies]

19.2(a) Procuring Entity's address for the purpose of Bid submission:

[Should match the receiving address provided in the Invitation for Bids.]

19.2(b)Name and Number of the Contract:

20.1(a)Deadline for submission of bids:

[The time and date should be the same as that given in the Invitation for Bids unless
subsequently amended pursuant to Sub Clause 20.2.]

(27 )
BD-4
23.1 Venue, time, and date of Bid opening:

[Date should be the same as that given for the deadline for submission of Bids
[Clause IB 20] but time for opening of bids shall be at least thirty minutes after the
time for the deadline for submission of bids].

32.1 Standard form and amount of Performance Security acceptable to the Procuring Entity:

[Select the kind of Performance Security (bank guarantee and / or bond), and indicate
the amount.

A bank guarantee can be conditional or unconditional on demand (Standard Form at


PS-1 & 2). An amount equal to 10 percent of the Contract Price is commonly
specified for bank guarantees, which %age should match with that stipulated in
Appendix-A to Bid.

A performance bond is an undertaking by an insurance company to complete the


construction in the event of default by the Contractor, or to pay the amount of bond to
the Procuring Entity.]

(28 )
FORM OF BID
AND
APPENDICES TO BID

(29 )
FB-1
FORM OF BID

Bid Reference No.


(Name of Contract/Works)
To:

Gentleman,

1. Having examined the Bidding Documents including Instructions to Bidders, Bidding


Data, Conditions of Contract. Specifications, Drawings and Bill of Quantities and
Addenda Nos. for the execution of the
above-named Works, we, the undersigned, offer to execute and complete such Works
and remedy any defects therein in conformity with the Conditions of Contract.
Specifications, Drawings, Bill of Quantities and Addenda for the sum of Rs.
(Rupees
) or such
other sum as may be ascertained in accordance with the said conditions.

2. We understand that all the Appendices attached hereto form part of this Bid.

3. As security for due performance of the undertakings and obligations of this Bid, we
submit herewith a Bid Security in the amount of Rupees
(Rs. ) drawn in your favour or made payable to you and
valid for a period of days beginning from the date Bids are opened.

4. We undertake, if our Bid is accepted, to commence the Works and to complete the
whole of the Works comprised in the Contract within the time stated in Appendix-A
to Bid.

5. We agree to abide by this Bid for the period of days from the date fixed for
receiving the same and it shall remain binding upon us and may be accepted at any
time before the expiration of that period.

6. Unless and until a formal Agreement is prepared and executed, this Bid, together with
your written acceptance thereof, shall constitute a binding contract between us.

7. We do hereby declare that the Bid is made without any collusion, comparison of
figures or arrangement with any other bidder for the Works.

(30 )
FB-2

8. We understand that you are not bound to accept the lowest or any Bid you may
receive.

Dated this day of 20

Signature:

in the capacity of duly authorized to sign Bids for and on behalf of

(Name of Bidder in Block Capitals)


(Seal)

Address:

Witness:

Signature:
Name:
Address.

Occupation

(31 )
BA-1
Appendix-A to Bid
SPECIAL STIPULATIONS
Clause
Conditions of Contract
1. Engineer’s Authority to issue Variation in 2.1 2% of the Contract Price stated in the
Emergency Letter of Acceptance.
2. Amount of Performance Security 10.1 10% of Contract Price stated in the Letter
of Acceptance.
3. Time for Furnishing Program 14.1 Within 42 days from the date of receipt of
Letter of Acceptance.
4. Minimum amount of Third Party Insurance 23.2 Rs. per occurrence with
number of occurrences unlimited.
5. Time for Commencement 41.1 Within 14 days from the date of receipt of
Engineer’s Notice to Commence which
shall be issued within fourteen (14) days
after signing of Contract Agreement.
6. Time for Completion 43.1, days from the date of receipt of
48.2 Engineer’s Notice to Commence.
7. a) Amount of Liquidated Damages 47.1 Rs. for each day of delay in
completion of the Works subject to a
maximum of 10% of Contract Price stated
in the Letter of Acceptance.
b) Amount of Bonus 47.3 Rs. for each day the Works are
completed before the specified completion
date of the Works subject to a maximum of
5% of Contract Price stated in the Letter of
Acceptance.
8. Defects Liability Period 49.1 days from the effective date of
Taking Over Certificate.
9. Percentage of Retention Money 60.2 10 % of the amount of Interim Payment
Certificate.
10. Limit of Retention Money 60.2 5 % of Contract Price stated in the Letter of
Acceptance.
11. Minimum amount of Interim Payment 60.2 Rs.
Certificates (Running Bills)
12 Time of Payment from delivery of Engineer’s 60.10 28 days in case of local currency or 42
Interim Payment Certificate to the Procuring days in case of foreign funded projects.
13 Entity.
Mobilization Advance * (Interest Free) 60.12 15 % of Contract Price stated in the Letter
of Acceptance.
* Delete if alternative one is not adopted.

(32 )
BB-1
Appendix-B to Bid

FOREIGN CURRENCY REQUIREMENTS

1. The Bidder may indicate herein below his requirements of foreign currency (if any),
with reference to various inputs to the Works.

2. Foreign Currency Requirement as percentage of the Bid Price excluding Provisional


Sums %.

3. Table of Exchange Rates

Unit of Currency Equivalent in Pak. Rupees

Australian Dollar --------------------------


Euro --------------------------
Japanese Yen --------------------------
U.K. Pound --------------------------
U.S. Dollars --------------------------
--------------------------- --------------------------
--------------------------- --------------------------

(33 )
BC-1
Appendix-C To Bid

PRICE ADJUSTMENT UNDER CLAUSE 70


OF CONDITIONS OF CONTRACT

The source of indices and the weightages or coefficients for use in the adjustment
formula under Clause 70 shall be as follows:

(To be filled by the Procuring Entity ).

Cost Description Weightages Applicable index


Element
1 2 3 4
(i) Fixed Portion 0.350
(ii) Local Labour Government of Pakistan (GP)
Federal Bureau of Statistics (FBS)
Monthly Statistical Bulletin.
(iii) Cement – in bags “ “ “
(iv) Reinforcing Steel “ “ “
(v) High Speed Diesel (HSD) “ “ “
(vi) Bricks “ “ “
(vii) Bitumen “ “ “
(viii)
Total 1.000

Notes:

1) Indices for “(ii)” to “(vii)” are taken from the Government of Pakistan Federal Bureau
of Statistics, Monthly Statistical Bulletin. The base cost indices or prices shall be
those applying 28 days prior to the latest day for submission of bids. Current indices
or prices shall be those applying 28 days prior to the last day of the billing period.

2) Any fluctuation in the indices or prices of materials other than those given above shall
not be subject to adjustment of the Contract Price.

3) Fixed portion shown here is for typical road project, Procuring Entity to
determine the weightage of Fixed Portion considering only those cost elements
having cost impact of seven (7) percent or more on his specific project.

(Procuring Entity’s using this price adjustment provisions may add or delete any elements as
deemed appropriate to the project.)

(34 )
BD-1

Appendix-D to Bid

BILL OF QUANTITIES
A. Preamble

1. The Bill of Quantities shall be read in conjunction with the Conditions of Contract,
Specifications and Drawings.

2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work executed and measured by the Contractor and verified by the
Engineer and valued at the rates and prices entered in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer may fix as
per the Contract.

3. The rates and prices entered in the priced Bill of Quantities shall, except insofar as it
is otherwise provided under the Contract include all costs of Contractor’s plant,
labour, supervision, materials, execution, insurance, profit, taxes and duties, together
with
all general risks, liabilities and obligations set out or implied in the Contract.
Furthermore all duties, taxes and other levies payable by the Contractor under the
Contract, or for any other cause, as on the date 28 days prior to deadline for
submission of Bids, shall be included in the rates and prices and the total Bid Price
submitted by the Bidder.

4. A rate or price shall be entered against each item in the priced Bill of Quantities,
whether quantities are stated or not. Unit rates must be offered in two decimal places
for an item. In case the bidder quotes rates for an item in more than two decimal
places, the same shall be considered upto two significant decimal places for evaluation
purposes. The cost of items against which the Contractor will have failed to enter a
rate or price shall be deemed to be covered by other rates and prices entered in the Bill
of Quantities.

5. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no items are provided,
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of the Works.

6. General directions and description of work and materials are not necessarily repeated
nor summarized in the Bill of Quantities. References to the relevant sections of the
Bidding Documents shall be made before entering prices against each item in the
priced Bill of Quantities.

7. Provisional sums included and so designated in the Bill of Quantities shall be


expended in whole or in part at the direction and discretion of the Engineer in
accordance with Sub-Clause 58.2 of Part I, General Conditions of Contract.

(35 )
(36 )
BD-2

Appendix-D to Bid

BILL OF QUANTITIES

B. Work Items (specimen)

1. The Bill of Quantities contains the following Bills and Schedule:


(by way of example)
Bill No. 1 - Earthworks
Bill No. 2 - Culverts and Bridges
Bill No. 3 - Subsurface Drains
Bill No. 4 - Tubewells and Pumphouses
Bill No. 5 - Miscellaneous Items

Daywork Schedule
Summary Bill of Quantities

2. Bidders shall price the Bill of Quantities in Pakistani Rupees only.

(37 )
BD-3

Appendix-D to Bid

BILL OF QUANTITIES

Bill No. 1 Earthworks

Item Description Unit Quantity Rate Amount

Rupees in Rupees in Rupees


figures words
1 2 3 4 5 6

101

102

103

104

105

106

Total for Bill No. 1


(Carried forward to Summary Page)

(38 )
BD-4

Appendix-D to Bid

BILL OF QUANTITIES

Bill No. 2 Culverts and Bridges

Item Description Unit Quantity Rate Amount

Rupees in Rupees in Rupees


figures words
1 2 3 4 5 6

201

202

203

204

205

206

Total for Bill No. 2


(Carried forward to Summary Page)

(39 )
BD-5

Appendix-D to Bid

BILL OF QUANTITIES Bill

No. 3 Subsurface Drains

Item Description Unit Quantity Rate Amount

Rupees in Rupees Rupees


figures in words
1 2 3 4 5 6

301

302

303

304

305

306

Total for Bill No. 3


(Carried forward to Summary Page)

(40 )
BD-6

Appendix-D to Bid

BILL OF QUANTITIES

Bill No. 4 Tubewells and Pump-houses

Item Description Unit Quantity Rate Amount

Rupees in Rupees Rupees


figures in words
1 2 3 4 5 6

401

402

403

404

205

406

Total for Bill No. 4


(Carried forward to Summary Page)

(41 )
BD-7

Appendix-D to Bid

BILL OF QUANTITIES

Bill No. 5 Miscellaneous Items

Item Description Unit Quantity Rate Amount

Rupees Rupees Rupees


in in words
figures
1 2 3 4 5 6

501 Mobilization/Demobilization
(Lumpsum1) Cost
502

503

504

505

506

Total for Bill No. 5


Carried forward to Summary Page )

1
Not to exceed 10 % of Bid Price. To be used only if Alternative Two of Sub-Clause 60.12 of Conditions of
Contract is adopted.

(42 )
BD-8

Appendix-D to Bid

BILL OF QUANTITIES

C. Daywork Schedule

General

1. Reference is made to Sub-Clause 52.4 of the General Conditions of Contract Part-I.


Work shall not be executed on a day work basis except by written order of the
Engineer. Bidders shall enter basic rates for Daywork items in the Schedules, which
rates shall apply to any quantity of Daywork ordered by the Engineer. Nominal
quantities have been indicated against each item of Daywork, and the extended total
for Daywork shall be carried forward to the Bid Price.

Daywork Labour

2. In calculating payments due to the Contractor for the execution of Daywork, the actual
time of classes of labour directly doing the Daywork ordered by the Engineer and for
which they are competent to perform will be measured excluding meal breaks and rest
periods. The time of gangers (charge hands) actually doing work with the gang will
also be measured but not the time of foreman or other supervisory personnel.

3. The Contractor shall be entitled to payment in respect of the total time that labour is
employed on Daywork, calculated at the basic rates entered by him in the Schedule of
Daywork Rates for labour together with an additional percentage, payment on basic
rates representing the Contractor’s profit, overheads, etc., as described below:

a) the basic rates for labour shall cover all direct costs to the Contractor,
including (but not limited to) the amount of wages paid to such labour,
transportation time, overtime, subsistence allowances and any sums paid to or
on behalf of such labour for social benefits in accordance with Pakistan law.
The basic rates will be payable in local currency only; and

b) the additional percentage payment to be quoted by the Bidder and applied to


costs incurred under (a) above shall be deemed to cover the Contractor’s
profit, overheads, superintendence, liabilities and insurances and allowances to
labour timekeeping and clerical and office work; the use of consumable stores,
water, lighting and power; the use and repair of stagings, scaffolding,
workshops and stores, portable power tools, manual plant and tools;
supervision by the Contractor’s staff, foremen and other supervisory
personnel; and charges incidental to the foregoing.

(43 )
BD-9

Appendix-D to Bid

SCHEDULE OF DAYWORK RATES

I. Labour

Item Description Unit Nominal Rate (Rs) Rate (Rs) Extended


No. Quantity in Figure in Words Amount
(Rs.)
1 2 3 4 5 6 7

D101 Ganger Hr 500

D102 Labourer Hr 5,000

D103 Brick layer Hr 500

D104 Mason Hr 500

D105 Carpenter Hr 500

D106 Steel work Erector Hr 500

------etc------- Hr 500

D113 Driver for vehicle up to 10 Hr 1,000


tons
D114 Operator for excavator, Hr 500
dragline, shovel or crane
D115 Operator for tractor, Hr 500
(tracked) with dozer blade or
ripper
D122 Sub Total
Allow percent of subtotal for Contractor’s overhead, profit, etc, in
accordance with Paragraph 3(b) of Daywork Schedule
Total for Daywork: Labour :
(Carried forward to Daywork Summary)

(44 )
BD-10

Appendix-D to Bid

Daywork Material

4. The Contractor shall be entitled to payment in respect of materials used for Daywork
(except for materials for which the cost is included in the percentage addition to
labour costs as detailed heretofore), at the basic rates entered by him in the Schedule
of Daywork Rates for materials together with an additional percentage payment on the
basic rates to cover overhead charges and profit, as follows:

a) the basic rates for materials shall be calculated on the basis of the invoiced
price, freight, insurance, handling expenses, damage, losses, etc., and shall
provide for delivery to store for stockpiling at the site. The basic rates shall be
stated in local currency but payment will be made in the currency or currencies
expended upon presentation of supporting documentation;

b) the additional percentage payment shall be quoted by the Bidder and applied to
the equivalent local currency payments made under Sub-Para(a) above; and

c) the cost of hauling materials used on work ordered to be carried out as


Daywork from the store or stockpile on the site to the place where it is to be
used will be paid in accordance with the terms for Labour and Constructional
Plant in this Schedule.

(45 )
BD-11

Appendix-D to Bid

SCHEDULE OF DAYWORK RATES

II. Materials

Item Description Unit Nominal Rate (Rs) Rate (Rs) Extended


No. Quantity in Figure in Words ) Amount
(Rs.)
1 2 3 4 5 6 7

D201 Cement, ordinary Portland or M.Ton 200


equivalent in bags
D202 Mild Steel reinforcing bar M.Ton 100
upto 16mm diameter to BS
4449 or equivalent
D203 Fine aggregate for concrete Cu.M 1,000
as specified in
Clause

D204 -------etc--------

D222 Gelignite (Noble Special M.Ton 10


Gelatine 60 % or equivalent)
including caps, fuse, wire
and requisite accessories
D223 Sub Total
Allow percent of subtotal for Contractor’s overhead, profit, etc., in
accordance with Paragraph 4(b) of Daywork Schedule
Total for Daywork: Materials
(Carried forward to Daywork Summary)

(46 )
BD-12

Appendix-D to Bid

Daywork Constructional Plant

5. The Contractor shall be entitled to payments in respect of constructional plant already


on Site and employed on Daywork at the basic rental rates entered by him in the
Schedule of Daywork Rates for constructional plant. The said rates shall be deemed to
include complete allowance for depreciation, interest, indemnity and insurance,
repairs, maintenance, supplies, fuel, lubricants, and other consumables, and all
overhead, profit and administrative costs related to the use of such equipment. The
cost of drivers, operators and assistants will be paid for separately as described under
the section on Daywork Labour.

6. In calculating the payment due to the Contractor for constructional plant employed on
Daywork, only the actual number of working hours will be eligible for payment,
except that where applicable and agreed with the Engineer, the travelling time from
the part of the Site where the constructional plant was located when ordered by the
Engineer to be employed on Daywork and the time for return journey thereto shall be
included for payment.

7. The basic rental rates for constructional plant employed on Daywork shall be stated in
Pakistani Rupees.

(47 )
BD-13

Appendix-D to Bid

SCHEDULE OF DAYWORK RATES

III. Constructional Plant

Item Description Unit Nominal Rate (Rs.) Rate Rs.) Extended


No. Quantity in Figure in Words Amount
(Rs.)
1 2 3 4 5 6

D301 Excavator ,face shovel or dragline:

1. Up-to and including 1


Cu.M. Hr 500
2. Over 1 Cu.M to 2 Cu. M.
3. Over 2 Cu. M Hr 400

Hr 100
D302 Tractor (tracked) including bull or
angle dozer:

1. Up-to and including 150 Hr 500


HP
2. Over 150 to 200 HP Hr 400
3. Over 200 to 250 HP Hr 200
D303 Tractor with ripper:

1. Up-to and including 200 Hr 400


HP
2. Over 200 to 250 HP Hr 200
D304 -----------etc----------
Total for Daywork: Constructional Plant _
(Carried forward to Daywork Summary)

(48 )
BD-14

Appendix-D to Bid

DAYWORK

Summary (Daywork)

Amount (Rs.)

(I) Total for Daywork: Labour


(II) Total for Daywork : Materials
(III) Total for Daywork: Constructional Plant

Total for Daywork


(Carried forward to Summary Page of Bill of Quantities)

(49 )
BD-15

Appendix-D to Bid

BILL OF QUANTITIES

SUMMARY

Amount (Rs.)

Bill No. 1: Earthworks


Bill No. 2: Culverts and Bridges
Bill No. 3: Subsurface Drains

Bill No. 4: Tubewells and Pump Houses


Bill No. 5: Miscellaneous Items

Sub-Total of Bills

Daywork

Bid Price

Note: All Provisional Sums are to be expended in whole or, in part at the direction and
discretion of the Engineer in accordance with Sub-Clauses 52.4 and 58.2 of the General
Conditions of Contract Part- I.

(50 )
BE-1

Appendix-E to Bid

PROPOSED CONSTRUCTION SCHEDULE

Pursuant to Sub-Clause 43.1 of the General Conditions of Contract, the Works shall be
completed on or before the date stated in Appendix-A to Bid. The Bidder shall provide as
Appendix-E to Bid, the Construction Schedule in the bar chart (CPM, PERT or any other to
be specified herein) showing the sequence of work items and the period of time during which
he proposes to complete each work item in such a manner that his proposed program for
completion of the whole of the Works and parts of the Works may meet Procuring
Entity’s completion targets in days noted below and counted from the date of receipt of
Engineer’s Notice to Commence (Attach sheets as required for the specified form of
Construction Schedule):

Description Time for Completion

a) Whole Works days

b) Part-A days

c) Part-B days

d) days

e) days

(51 )
BF-1

Appendix-F to Bid

METHOD OF PERFORMING THE WORK

[The Bidder is required to submit a narrative outlining the method of performing the Work.
The narrative should indicate in detail and include but not be limited to:

1. Organization Chart indicating head office and field office personnel involved in
management and supervision, engineering, equipment maintenance and purchasing.

2. Mobilization in Pakistan, the type of facilities including personnel accommodation,


office accommodation, provision for maintenance and for storage, communications,
security and other services to be used.

3. The method of executing the Works, the procedures for installation of equipment and
machinery and transportation of equipment and materials to the site.]

(52 )
BG-1

Appendix-G to Bid

LIST OF MAJOR EQUIPMENT – RELATED ITEMS

[The Bidder will provide on Sheet 2 of this Appendix a list of all major equipment and related
items, under separate heading for items owned, to be purchased or to be arranged on lease by
him to carry out the Works. The information shall include make, type, capacity, and
anticipated period of utilization for all equipment which shall be in sufficient detail to
demonstrate fully that the equipment will meet all requirements of the Specifications.]

(53 )
BG-2

Appendix-G to Bid

LIST OF MAJOR EQUIPMENT

Owned Description of Unit Capacity Condition Present Date of Period of


Purchased (Make, Model, HP Rating Location or Delivery at Work on
or Leased Year) Source Site Project
1 2 3 4 5 6 7

a. Owned

b. To be
Purchased

c. To be
arranged
on Lease

(54 )
BH-1

Appendix-H to Bid

CONSTRUCTION CAMP AND HOUSING FACILITIES

The Contractor in accordance with Clause 34 of the Conditions of Contract shall provide
description of his construction camp’s facilities and staff housing requirements.

The Contractor shall be responsible for pumps, electrical power, water and electrical
distribution systems, and sewerage system including all fittings, pipes and other items
necessary for servicing the Contractor’s construction camp.

The Bidder shall list or explain his plans for providing these facilities for the service of the
Contract as follows:

1. Site Preparation (clearing, land preparation, etc.).

2. Provision of Services.

a) Power (expected power load, etc.).


b) Water (required amount and system proposed).
c) Sanitation (sewage disposal system, etc.).

3. Construction of Facilities

a) Contractor’s Office. Workshop and Work Areas (areas required and proposed layout,
type of construction of buildings, etc.).
b) Warehouses and Storage Areas (area required, type of construction and
layout).
c) Housing and Staff Facilities (Plans for housing for proposed staff, layout, type
of construction, etc.).

4. Construction Equipment Assembly and Preparation (detailed plans for carrying out
this activity).

5. Other Items Proposed (Security services, etc.).

(55 )
BI-1

Appendix-I to Bid

LIST OF SUBCONTRACTORS

I/We intend to subcontract the following parts of the Work to subcontractors. In my/our
opinion, the subcontractors named hereunder are reliable and competent to perform that part
of the work for which each is listed.

Enclosed are documentation outlining experience of subcontractors, the curriculum vitae and
experience of their key personnel who will be assigned to the Contract, equipment to be
supplied by them, size, location and type of contracts carried out in the past.

Part of Works Subcontractor


(Give Details) (With Complete Address)
1 2

(56 )
BJ-1

Appendix-J to Bid

ESTIMATED PROGRESS PAYMENTS

Bidder’ estimate of the value of work which would be executed by him during each of the
periods stated below, based on his Program of the Works and the Rates in the Bill of
Quantities, expressed in thousands of Pakistani Rupees:

Quarter/ Year/ Period Amounts


(1,000 Rs.)
1 2

Ist Quarter

2nd Quarter

3rd Quarter

4th Quarter

5th Quarter

6th Quarter

7th Quarter

8th Quarter

9th Quarter

Bid Price

(57 )
BK-1

Appendix-K to Bid

ORGANIZATION CHART
FOR THE
SUPERVISORY STAFF AND LABOUR

(58 )
BL-1
Appendix-L to Bid
(INTEGRITY PACT)

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC.


PAID BY THE SUPPLIERS OF GOODS, SERVICES & WORKS IN
CONTRACTS WORTH RS. 10.00 MILLION OR MORE

Contract No. Dated


Contract Value:
Contract Title:

………………………………… [name of Supplier] hereby declares that it has not obtained


or induced the procurement of any contract, right, interest, privilege or other obligation or
benefit from Government of Pakistan (GoP) or any administrative subdivision or agency
thereof or any other entity owned or controlled by GoP through any corrupt business practice.

Without limiting the generality of the foregoing, [name of Supplier] represents and warrants
that it has fully declared the brokerage, commission, fees etc. paid or payable to anyone and
not given or agreed to give and shall not give or agree to give to anyone within or outside
Pakistan either directly or indirectly through any natural or juridical person, including its
affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or
subsidiary, any commission, gratification, bribe, finder’s fee or kickback, whether described
as consultation fee or otherwise, with the object of obtaining or inducing the procurement of
a contract, right, interest, privilege or other obligation or benefit in whatsoever form from
GoP, except that which has been expressly declared pursuant hereto.

[name of Supplier] certifies that it has made and will make full disclosure of all agreements
and arrangements with all persons in respect of or related to the transaction with GoP and has
not taken any action or will not take any action to circumvent the above declaration,
representation or warranty.

[name of Supplier] accepts full responsibility and strict liability for making any false
declaration, not making full disclosure, misrepresenting facts or taking any action likely to
defeat the purpose of this declaration, representation and warranty. It agrees that any
contract, right, interest, privilege or other obligation or benefit obtained or procured as
aforesaid shall, without prejudice to any other rights and remedies available to GoP under any
law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [name of Supplier]
agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt
business practices and further pay compensation to GoP in an amount equivalent to ten time
the sum of any commission, gratification, bribe, finder’s fee or kickback given by [name of
Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any
contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

Name of Buyer: ……………… Name of Seller/Supplier: …………


Signature: …………………… Signature: …………………………
[Seal] [Seal]

(59 )
FORMS

BID SECURITY
PERFORMANCE SECURITY
CONTRACT AGREEMENT
MOBILIZATION ADVANCE GUARANTEE/BOND

(60 )
BS-1
BID SECURITY
(Bank Guarantee)

Security Executed on
(Date)
Name of Surety (Bank) with Address:
(Scheduled Bank in Pakistan)
Name of Principal (Bidder) with Address

Penal Sum of Security Rupees . (Rs. )


Bid Reference No.
KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bid and at
the request of the said Principal (Bidder) we, the Surety above named, are held and firmly
bound unto
(hereinafter called the 'Procuring Entity') in the sum stated above for the payment of which
sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Bidder has
submitted the accompanying Bid dated for Bid No. for (Particulars
of Bid) to the said Procuring Entity; and

WHEREAS, the Procuring Entity has required as a condition for considering said Bid
that the Bidder furnishes a Bid Security in the above said sum from a Scheduled Bank in
Pakistan or from a foreign bank duly counter-guaranteed by a Scheduled Bank in
Pakistan, to the Procuring Entity, conditioned as under:

(1) that the Bid Security shall remain in force up to and including the date 28 days after
the deadline for validity of bids as stated in the Instructions to Bidders or as it may be
extended by the Procuring Entity, notice of which extension(s) to the Surety is
hereby waived;

(2) that the Bid Security of unsuccessful Bidders will be returned by the Procuring
Entity after expiry of its validity or upon signing of the Contract Agreement; and

(3) that in the event of failure of the successful Bidder to execute the proposed Contract
Agreement for such work and furnish the required Performance Security, the entire
said sum be paid immediately to the said Procuring Entity pursuant to Clause 15.6
of the Instruction to Bidders for the successful Bidder's failure to perform.

NOW THEREFORE, if the successful Bidder shall, within the period specified therefor, on
the prescribed form presented to him for signature enter into a formal Contract with the said
Procuring Entity in accordance with his Bid as accepted and furnish within twenty eight (28)
days of his being requested to do so, a Performance Security with good and sufficient surety,
as may be required, upon the form prescribed by the said Procuring Entity for the faithful
performance and proper fulfillment of the said Contract or in the event of non-withdrawal
of the said Bid within the time specified for its validity then this obligation shall be void and
of no effect, but otherwise to remain in full force and effect.

(61 )
BS-2

PROVIDED THAT the Surety shall forthwith pay the Procuring Entity the said sum upon
first written demand of the Procuring Entity (without cavil or argument) and without
requiring the Procuring Entity to prove or to show grounds or reasons for such demand,
notice of which shall be sent by the Procuring Entity by registered post duly addressed to
the Surety at its address given above.

PROVIDED ALSO THAT the Procuring Entity shall be the sole and final judge for
deciding whether the Principal (Bidder) has duly performed his obligations to sign the
Contract Agreement and to furnish the requisite Performance Security within the time stated
above, or has defaulted in fulfilling said requirements and the Surety shall pay without
objection the said sum upon demand from the Procuring Entity forthwith and without
any reference to the Principal (Bidder) or any other person.

IN WITNESS WHEREOF, the above bounden Surety has executed the instrument under its
seal on the date indicated above, the name and seal of the Surety being hereto affixed and
these presents duly signed by its undersigned representative pursuant to authority of its
governing body.
SURETY (Bank)

WITNESS: Signature

1. Name

Title

Corporate Secretary (Seal) Corporate Guarantor (Seal)

2.

Name, Title & Address

(62 )
PS-1

FORM OF PERFORMANCE SECURITY


(Bank Guarantee)

Guarantee No.
Executed on
Expiry date
[Letter by the Guarantor to the Procuring
Entity]

Name of Guarantor (Bank) with address:


(Scheduled Bank in Pakistan)
Name of Principal (Contractor) with address:

Penal Sum of Security (express in words and figures)

Letter of Acceptance No. Dated


KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding
Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the
request of the said Principal we, the Guarantor above named, are held and firmly bound unto
the (hereinafter called the
Procuring Entity) in the penal sum of the amount stated above for the payment of which
sum well and truly to be made to the said Procuring Entity, we bind ourselves, our
heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has
accepted the Procuring Entity's above said Letter of Acceptance for
(Name of Contract) for the
(Name of Project).

NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all
the undertakings, covenants, terms and conditions of the said Documents during the original
terms of the said Documents and any extensions thereof that may be granted by the Procuring
Entity, with or without notice to the Guarantor, which notice is, hereby, waived and shall
also well and truly perform and fulfill all the undertakings, covenants terms and
conditions of the Contract and of any and all modifications of said Documents that may
hereafter be made, notice of which modifications to the Guarantor being hereby waived,
then, this obligation to be void; otherwise to remain in full force and virtue till all
requirements of Clause 49, Defects Liability, of Conditions of Contract are fulfilled.

Our total liability under this Guarantee is limited to the sum stated above and it is a condition
of any liability attaching to us under this Guarantee that the claim for payment in writing
shall be received by us within the validity period of this Guarantee, failing which we shall be
discharged of our liability, if any, under this Guarantee.

(63 )
PS-2

We, (the Guarantor), waiving all objections and


defences under the Contract, do hereby irrevocably and independently guarantee to pay to the
Procuring Entity without delay upon the Procuring Entity's first written demand without cavil
or arguments and without requiring the Procuring Entity to prove or to show grounds or
reasons for such demand any sum or sums up to the amount stated above, against the
Procuring Entity's written declaration that the Principal has refused or failed to perform the
obligations under the Contract which payment will be effected by the Guarantor to
Procuring Entity’s designated Bank & Account Number.
PROVIDED ALSO THAT the Procuring Entity shall be the sole and final judge for
deciding whether the Principal (Contractor) has duly performed his obligations under the
Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without
objection any sum or sums up to the amount stated above upon first written demand from the
Procuring Entity forthwith and without any reference to the Principal or any other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under
its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto
affixed and these presents duly signed by its undersigned representative, pursuant to authority
of its governing body.

Guarantor (Bank)
Witness:
1. Signature

Name
Corporate Secretary (Seal)
Title

2.

Name, Title & Address Corporate Guarantor (Seal)

(64 )
CA-1
FORM OF CONTRACT AGREEMENT

THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the


day of (month) 20 between

(hereafter called the “Procuring Entity”) of the one part


and_____________________ (hereafter called the “Contractor”) of the other part.

WHEREAS the Procuring Entity is desirous that certain Works, viz should be
executed by the Contractor and has accepted a Bid by the Contractor for the execution and
completion of such Works and the remedying of any defects therein.
NOW this Agreement witnesseth as follows:

1. In this Agreement words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents after incorporating addenda, if any, except those parts
relating to Instructions to Bidders shall be deemed to form and be read and construed
as part of this Agreement, viz:

(a) The Contract Agreement;


(b) The Letter of Acceptance;
(c) The completed Form of Bid;
(d) Special Stipulations (Appendix-A to Bid);
(e) The Particular Conditions of Contract – Part II;
(f) The General Conditions – Part I;
(g) The priced Bill of Quantities (Appendix-D to Bid);
(h) The completed Appendices to Bid (B, C, E to L);
(i) The Drawings;
(j) The Specifications.
(k) (any other)

3. In consideration of the payments to be made by the Procuring Entity to the


Contractor as hereinafter mentioned, the Contractor hereby covenants with the
Procuring Entity to execute and complete the Works and remedy defects therein in
conformity and in all respects with the provisions of the Contract.
4. The Procuring Entity hereby covenants to pay the Contractor, in consideration
of the execution and completion of the Works as per provisions of the Contract, the
Contract Price or such other sum as may become payable under the provisions of the
Contract at the times and in the manner prescribed by the Contract.

(65 )
CA-2

IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on
the day, month and year first before written in accordance with their respective laws.

Signature of the Contactor Signature of Procuring Entity

(Seal) (Seal)

Signed, Sealed and Delivered in the presence of:

Witness: Witness:

(Name, Title and Address) (Name, Title and Address)

(66 )
MG-1
MOBILIZATION ADVANCE GUARANTEE

Guarantee No. Date

WHEREAS (hereinafter called the 'Procuring Entity') has entered into a


Contract for
(Particulars of Contract)
with (hereinafter called the "Contractor').

AND WHEREAS, the Procuring Entity has agreed to advance to the Contractor, at the
Contractor's request, an amount of Rupees (Rs ) which amount
shall be advanced to the Contractor as per provisions of the Contract.

AND WHEREAS, the Procuring Entity has asked the Contractor to furnish Guarantee to
secure the mobilization advance for the performance of his obligations under the said
Contract.

AND WHEREAS,
(Scheduled Bank in Pakistan acceptable to the Procuring Entity) (hereinafter called the
“Guarantor”) at the request of the Contractor and in consideration of the Procuring Entity agreeing to
make the above advance to the Contractor, has agreed to furnish the
said Guarantee.

NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the
advance for the purpose of above mentioned Contract and if he fails and commits default in
fulfillment of any of his obligations for which the advance payment is made, the
Guarantor shall be liable to the Procuring Entity for payment not exceeding the
aforementioned amount.

Notice in writing of any default, of which the Procuring Entity shall be the sole and final
judge, on the part of the Contractor, shall be given by the Procuring Entity to the Guarantor,
and on such first written demand, payment shall be made by the Guarantor of all sums
then due under this Guarantee without any reference to the Contractor and without any
objection.

This Guarantee shall remain in force until the advance is fully adjusted against payments from
the Interim Payment Certificates of the Contractor or until
whichever is earlier.
(Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of Rupees
(Rs ).

This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the
aforesaid date or earlier if the advance made to the Contractor is fully adjusted against
payments from Interim Payment Certificates of the Contractor provided that the Guarantor
agrees that the aforesaid period of validity shall be deemed to be extended if on the above
mentioned date the advance payment is not fully adjusted.

(67 )
MG-2

GUARANTOR (BANK)

1. Signature
2. Name
3. Title

WITNESS

1.

Corporate Secretary (Seal)

2.
(Name Title & Address) Corporate Guarantor(Seal)

(68 )
[Notes on the Conditions of Contract

The Conditions of Contract comprise two parts:

(a) Part I - General Conditions of Contract


(b) Part II - Particular Conditions of Contract

Over the years, a number of “model” General Conditions of Contract have evolved. The one
used in these Standard Bidding Documents was prepared by the International Federation of
Consulting Engineers (Federation Internationale des Ingenieurs-Conseils, or FIDIC), and is
commonly known as the FIDIC Conditions of Contract. (The used version is the fourth
edition, 1987, reprinted in 1992 with further amendments).

The FIDIC Conditions of Contract have been prepared for an ad measurement (unit price or
unit rate) type of contract, and cannot be used without major modifications for other types of
contract, such as lump sum, turnkey, or target cost contracts.

The standard text of the General Conditions of Contract chosen must be retained intact to
facilitate its reading and interpretation by bidders and its review by the Client. Any
amendments and additions to the General Conditions, specific to the contract in hand, should
be introduced in the Particular Conditions of Contract.

The use of standard conditions of contract for all civil Works will ensure comprehensiveness
of coverage, better balance of rights or obligations between Procuring Entity and Contractor,
general acceptability of its provisions, and savings in time and cost for bid preparation and
review, leading to more economic prices.

The FIDIC Conditions of Contract are copyrighted and may not be copied, faxed, or
reproduced. Without taking any responsibility of its being accurate, Pakistan Engineering
Council with prior consent of FIDIC Secretariat, has reproduced herein the FIDIC General
Conditions of Contract for reference purpose only which cannot be used by the users for
preparing their bidding documents. The bidding document may include a purchased copy, the
cost of which can be retrieved as part of the selling price of the bidding document.
Alternatively, the FIDIC Conditions of Contract can be referred to in the bidding documents,
and the bidders are advised to obtain copies directly from FIDIC.*

* Add the following text if the bidding documents, as issued, do not include a copy:
“Copies of the FIDIC Conditions of Contract can be obtained from:
FIDIC Secretariat
P.O. Box 86
1000 Lausanne 12
Switzerland
e-mail: fidic.pub@fidic.org – FIDIC.org/bookshop]

(69 )
FEDERATION INTERNATIONAL DES INGENIEURS-
CONSEILS

CONDITIONS OF CONTRACT
FOR WORKS OF CIVIL
ENGINEERING
CONSTRUCTION
PART I GENERAL CONDITIONS
WITH FORMS OF TENDER AND AGREEMENT

FOURTH EDITION 1987


Reprinted 1988 with editorial amendments
Reprinted in 1992 with further amendments

Copies of the FIDIC Conditions of Contract 4 th Edition, 1987 reprinted in 1992 with
further amendments can be obtained from:
FIDIC SECRETARIAT
P.O BOX NO. 86
1000 Lausanne 12
Switzerland
e-mail fidic.pub@fidic.org-FIDIC org/bookshop

(70 )
TABLE OF CONTENTS

PART II - PARTICULAR CONDITIONS OF CONTRACT

Clause Title Page

1.1 Definitions 147


2.1 Engineer’s Duties and Authority 147
2.2 Engineer’s Representative 149
2.7 Engineer Not Liable 149
2.8 Replacement of the Engineer 149
5.1 Language(s) and Law 149
5.2 Priority of Contract Documents 149
6.6 Shop Drawings 150
6.7 As-Built Drawings 150
10.1 Performance Security 150
10.4 Performance Security Binding on Variations and Changes 151
14.1 Program to be Submitted 151
14.3 Cash Flow Estimate to be Submitted 151
14.5 Detailed Program and Monthly Progress Report 151
15.2 Language Ability of Contractor’s Representative 152
15.3 Contractor’s Representative 152
16.3 Language Ability of Superintending Staff of Contractor 152
16.4 Employment of Local Personnel 152
19.3 Safety Precautions 152
19.4 Lighting Works at Night 153
20.4 Procuring Entity’s Risks 153
21.1 Insurance of Works and Contractor’s Equipment 153
21.4 Exclusions 154
25.5 Insurance Company 154
31.3 Co-operation with Other Contractors 154
34.2 Rates of Wages and Conditions of Labour 154
34.3 Employment of Persons in the Service of Others 154
34.4 Housing for Labour 154
34.5 Health and Safety 155
34.6 Epidemics 155
34.7 Supply of Water 155
34.8 Alcoholic Liquor or Drugs 155
34.9 Arms and Ammunition 155
34.10 Festivals and Religious Customs 155
34.11 Disorderly Conduct 156
34.12 Compliance by Subcontractors 156
35.2 Records of Safety and Health 156
35.3 Reporting of Accidents 156
36.6 Use of Pakistani Materials and Services 156
41.1 Commencement of Works 156
47.3 Bonus for Early Completion of Works 157
48.2 Taking Over of Sections or Parts 157
51.2 Instructions for Variations 157

(71 )
TABLE OF CONTENTS

PART II - PARTICULAR CONDITIONS OF CONTRACT

Clause Title Page

52.1 Valuation of Variations 157


53.4 Failure to Comply 157
54.3 Customs Clearance 157
54.5 Conditions of Hire of Contractor’s Equipment 157
59.4 Payments to Nominated Sub-contractors 157
59.5 Evidence of Payments 158
60.1 Monthly Statements 158
60.2 Monthly Payments 158
60.10 Time for Payment 158
60.11 Secured Advance on Materials 159
60.11 Financial Assistance to Contractor 159
63.1 Default of Contractor 161
65.2 Special Risks 161
67.3 Arbitration 161
68.1 Notice to Contractor 161
68.2 Notice to Procuring Entity and Engineer 162
70.1 Increase or Decrease of Cost 162
73.1 Payment of Income Tax 163
73.2 Customs Duty & Taxes 164
74.1 Integrity Pact 164
75.1 Termination of Contract for Procuring Entity’s Convenience 164
76.1 Liability of Contractor 164
77.1 Joint and Several Liability 165
78.1 Details to be Confidential 165

(72 )
PART II - PARTICULAR CONDITIONS OF CONTRACT
(Mandatory Provisions not to be Amended / Substituted except as instructed by
KPPRA)

1.1 Definitions

(a) (i) The Procuring Entity is


........................................................ ... ....... ......
........................................................(insert name along with his full address).

(a) (iv) The Engineer is ................................................................................


.........................................................................................................(insert name of the
Firm/Company/Person nominated as Engineer alongwith his full address), or any
other competent person appointed by the Procuring Entity, and notified to the
Contractor, to act in replacement of the Engineer. Provided always that except
in cases of professional misconduct, the outgoing Engineers is to formulate his
certifications/ recommendations in relation to all outstanding matters, disputes and
claims relating to the execution of the Works during his tenure.

The following paragraph is added:

(a)(vi) “Bidder or Tenderer” means any person or persons, company, corporation, firm or
joint venture submitting a Bid or Tender.

(b)(v) The following is added at the end of the paragraph:

The word “Tender” is synonymous with “Bid” and the word “Tender Documents”
with “Bidding Documents”.

The following paragraph is added:

(b)(ix) “Program” means the program to be submitted by the Contractor in accordance


with Sub-Clause 14.1 and any approved revisions thereto.

(e)(i) The text is deleted and substituted with the following:

“Contract Price” means the sum stated in the Letter of Acceptance as payable to the
Contractor for the execution and completion of the Works subject to such additions
thereto or deductions therefrom as may be made and remedying of any defects therein
in accordance with the provisions of the Contract.

2.1 Engineer's Duties and Authority

With reference to Sub-Clause 2.1(b), the following provisions shall also apply;

The Engineer shall obtain the specific approval of the Procuring Entity before carrying
out his duties in accordance with the following Clauses:

(i) Consenting to the sub-letting of any part of the Works under Sub-Clause 4.1
“Subcontracting”.

(73 )
(ii) Certifying additional cost determined under Sub-Clause 12.2 “Not Foreseeable
Physical Obstructions or Conditions”.

(iii) Any action under Clause 10 “Performance Security” and Clauses 21,23,24 &
25 “Insurance” of sorts.
(iv) Any action under Clause 40 “Suspension”.
(v) Any action under Clause 44 “Extension of Time for Completion”.

(vi) Any action under Clause 47 “Liquidated Damages for Delay” or Payment of
Bonus for Early Completion of Works (PCC Sub-Clause 47.3).

(vii) Issuance of “Taking Over Certificate” under Clause 48.

(viii) Issuing a Variation Order under Clause 51,except:

a) in an emergency* situation, as stated here below, or

b) if such variation would increase the Contract Price by less than the
amount stated in the Appendix-A to Bid.

(ix) Fixing rates or prices under Clause 52.

(x) Extra payment as a result of Contractor’s claims under Clause 53.

(xi) Release of Retention Money to the Contractor under Sub-Clause 60.3


“Payment of Retention Money”.

(xii) Issuance of “Final Payment Certificate” under Sub-Clause 60.8.


(xiii) Issuance of “Defect Liability Certificate” under Sub-Clause 62.1.
(xiv) Any change in the ratios of Contract currency proportions and payments
thereof under Clause 72 “Currency and Rate of Exchange”.

(Note: Procuring Entity may further vary according to need of the project)

* (If in the opinion of the Engineer an emergency occurs affecting the safety of life or
of the Works or of adjoining property, the Engineer may, without relieving the
Contractor of any of his duties and responsibilities under the Contract, instruct the
Contractor to execute all such work or to do all such things as may, in the opinion of
the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith
comply with any such instruction of the Engineer. The Engineer shall determine an
addition to the Contract Price, in respect of such instruction, in accordance with
Clause 52 and shall notify the Contractor accordingly, with a copy to the Procuring
Entity.)

(74 )
2.2 Engineer’s Representative

The following paragraph is added:

The Procuring Entity shall ensure that the Engineer’s Representative is a


professional engineer as defined in the Pakistan Engineering Council Act 1975 (V of
1976)

The following Sub-Clauses 2.7 and 2.8 are added:

2.7 Engineer Not Liable

Approval, reviews and inspection by the Engineer of any part of the Works does not
relieve the Contractor from his sole responsibility and liability for the supply of
materials, plant and equipment for construction of the Works and their parts in
accordance with the Contract and neither the Engineer's authority to act nor any
decision made by him in good faith as provided for under the Contract whether to
exercise or not to exercise such authority shall give rise to any duty or responsibility
of the Engineer to the Contractor, any Subcontractor, any of their representatives or
employees or any other person performing any portion of the Works.

2.8 Replacement of the Engineer

“If the Procuring Entity intends to replace the Engineer, the Procuring Entity shall, not
less than 14 days before the intended date of replacement, give notice to the
Contractor, of the name, address and relevant experience of the intended
replacement Engineer. The Procuring Entity shall not replace the Engineer with a
person against whom the Contractor raises reasonable objection by notice to the
Procuring Entity, with supporting particulars.”

5.1 Language(s) and Law

(a) The Contract Documents, shall be drawn up in the English language.


(b) The Contract shall be subject to the Laws of Islamic Republic of Pakistan.

5.2 Priority of Contract Documents

The documents listed at (1) to (6) of the Sub-Clause are deleted and substituted with
the following:

(1) The Contract Agreement (if completed);


(2) The Letter of Acceptance;
(3) The completed Form of Bid;
(4) Special Stipulations (Appendix-A to Bid);
(5) The Particular Conditions of Contract – Part II;
(6) The General Conditions – Part I;
(7) The priced Bill of Quantities (Appendix-D to Bid);
(8) The completed Appendices to Bid (B, C, E to L);
(9) The Drawings;

(75 )
(10) The Specifications; and
(11) (any other).

In case of discrepancies between drawings, those of larger scale shall govern unless
they are superseded by a drawing of later date regardless of scale. All Drawings and
Specifications shall be interpreted in conformity with the Contract and these
Conditions. Addendum, if any, shall be deemed to have been incorporated at the
appropriate places in the documents forming the Contract.

The following Sub-Clauses 6.6 and 6.7 are added:

6.6 Shop Drawings

The Contractor shall submit to the Engineer for review 3 copies of all shop and
erection drawings applicable to this Contract as per provision of relevant Sub-Clause
of the Contract.

Review and approval by the Engineer shall not be construed as a complete check but
will indicate only that the general method of construction and detailing is satisfactory
and that the Engineer’s review or approval shall not relieve the Contractor of any of
his responsibilities under the Contract.

6.7 As-Built Drawings

At the completion of the Works under the Contract, the Contractor shall furnish to the
Engineer 6 copies and one reproducible of all drawings amended to conform with the
Works as built. The price of such Drawings shall be deemed to be included in the
Contract Price.

10.1 Performance Security

The text is deleted and substituted with the following:

The Contractor shall provide Performance Security to the Procuring Entity in the
prescribed form. The said Security shall be furnished or caused to be furnished by the
Contractor within 28 days after the receipt of the Letter of Acceptance. The
Performance Security shall be of an amount equal to 10% of the Contract Price
stated in the Letter of Acceptance. Such Security shall, at the option of the bidder,
be in the form of either (a) bank guarantee from any Scheduled Bank in Pakistan or
(b) bank guarantee from a bank located outside Pakistan duly counter-guaranteed
by a Scheduled Bank in Pakistan or (c) an insurance company having atleast AA
rating from PACRA/JCR.

The cost of complying with requirements of this Sub-Clause shall be borne by the
Contractor.

The following Sub-Clause10.4 is added:

(76 )
10.4 Performance Security Binding on Variations and Changes

The Performance Security shall be binding irrespective of changes in the quantities or


variations in the Works or extensions in Time for Completion of the Works which are
granted or agreed upon under the provisions of the Contract.

14.1 Program to be Submitted

The program shall be submitted within 42 days from the date of receipt of Letter of
Acceptance, which shall be in the form of:

i) a Bar Chart identifying the critical activities.


ii) a CPM identifying the critical path/activities.
(Procuring Entity to select appropriate one)

14.3 Cash Flow Estimate to be Submitted

The detailed Cash Flow Estimate shall be submitted within 21 days from the date of
receipt of Letter of Acceptance

The following Sub-Clause 14.5 is added:

14.5 Detailed Program and Monthly Progress Report

a) For purposes of Sub-Clause 14.1, the Contractor shall submit to the Engineer detailed
program for the following:

(1) Execution of Works;


(2) Labour Employment;
(3) Local Material Procurement;
(4) Material Imports, if any; and
(5) Other details as required by the Engineer.

(b) During the period of the Contract, the Contractor shall submit to the Engineer not later
than the 8th day of the following month, 5 copies each of Monthly Progress Reports
covering:

(1) A Construction Schedule indicating the monthly progress in percentage;


(2) Description of all work carried out since the last report;
(3) Description of the work planned for the next 56 days sufficiently detailed to
enable the Engineer to determine his program of inspection and testing;
(4) Monthly summary of daily job record;
(5) Photographs to illustrate progress ;and
(6) Information about problems and difficulties encountered, if any, and
proposals to overcome the same.
(c) During the period of the Contract, the Contractor shall keep a daily record of the work
progress, which shall be made available to the Engineer as and when requested. The

(77 )
daily record shall include particulars of weather conditions, number of men working,
deliveries of materials, quantity, location and assignment of Contractor’s equipment.

The following Sub-Clauses 15.2 and 15.3 are added:

15.2 Language Ability of Contractor’s Representative

The Contractor’s authorized representative shall be fluent in the English language.


Alternately an interpreter with ability of English language shall be provided by the
Contractor on full time basis. The Engineer / Procuring Entity, however, may relax
conditions of the language from English to other local languages if deemed
appropriate,

15.3 Contractor’s Representative

The Contractor’s authorized representative and his other professional engineers


working at Site shall register themselves with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise
adequate administrative and financial powers on behalf of the Contractor so as to
achieve completion of the Works as per the Contract.

The following Sub-Clauses 16.3 and 16.4 are added:

16.3 Language Ability of Superintending Staff of Contractor

A reasonable proportion of the Contractor's superintending staff shall have a working


knowledge of the English language. If the Contractor’s superintending staff are not
fluent in English language, the Contractor shall make competent interpreters available
during all working hours in a number deemed sufficient by the Engineer. The Engineer
/ Procuring Entity, however, may relax conditions of the language from English to
other local languages if deemed appropriate,

16.4 Employment of Local Personnel

The Contractor is encouraged, to the extent practicable and reasonable, to employ staff
and labour from sources within KPK.

The following Sub-Clauses 19.3 and 19.4 are added:

19.3 Safety Precautions

In order to provide for the safety, health and welfare of' persons, and for prevention of
damage of any kind, all operations for the purposes of or in connection with the
Contract shall be carried out in compliance with the Safety Requirements of the
Government of Pakistan and KPK with such modifications thereto as the
Engineer may authorize or direct and the Contractor shall take or cause to be
taken such further measures and comply with such further requirements as the
Engineer may determine to be reasonably necessary for such purpose.

The Contractor shall make, maintain and submit reports to the Engineer concerning
safety, health and welfare of persons and damage to property, as the Engineer may
from time to time prescribe.
(78 )
19.4 Lighting Work at Night

In the event of work being carried out at night, the Contractor shall at his own cost,
provide and maintain such good and sufficient light as will enable the work to proceed
satisfactorily and without danger. The approaches to the Site and the Works where the
night-work is being carried out shall be sufficiently lighted. All arrangement adopted
for such lighting shall be to the satisfaction of the Engineer’s
Representative.

20.4 Procuring Entity’s Risks

The Procuring Entity’s risks are:


Delete the text and substitute with the following:

(a) insofar as they directly affect the execution of the Works in KPK

(i) war and hostilities (whether war be declared or not), invasion, act of foreign
enemies,
(ii) rebellion, revolution, insurrection, or military or usurped power, or civil war,
(iii) ionizing radiations, or contamination by radioactivity from any nuclear fuel, or
from any nuclear waste from the combustion of nuclear fuel, radioactive toxic
explosive or other hazardous properties of any explosive nuclear assembly or
nuclear component thereof,
(iv) pressure waves caused by aircraft or other aerial devices travelling at sonic or
supersonic speeds,
(v) riot, commotion or disorder, unless solely restricted to the employees of the
Contractor or of his Subcontractors and arising from the conduct of the Works;

(b) loss or damage due to the use or occupation by the Procuring Entity of any Section or
part of the Permanent Works, except as may be provided for in the Contract;

(c) loss or damage to the extent that it is due to the design of the Works, other than any
part of the design provided by the Contractor or for which the Contractor is
responsible; and

(d) any operation of the forces of nature (insofar as it occurs on the Site) which an
experienced contractor:

(i) could not have reasonably foreseen, or


(ii) could reasonably have foreseen, but against which he could not reasonably
have taken at least one of the following measures:
(a) prevent loss or damage to physical property from occurring by taking
appropriate measures, or
(b) insure against.

21.1 Insurance of Works and Contractor’s Equipment

(Procuring Entity may vary this Sub-clause 1.1 (b))

(79 )
21.4 Exclusions

The text is deleted and substituted with the following:

There shall be no obligation for the insurances in Sub-Clause 21.1 to include loss or
damage caused by the risks listed under Sub-Clause 20.4 para (a) (i) to (iv).

The following Sub-Clause 25.5 is added:

25.5 Insurance Company

The Contractor shall be obliged to place all insurances relating to the Contract
(including, but not limited to, the insurances referred to in Clauses 21, 23 and 24) with
either National Insurance Company of Pakistan or any other insurance company
operating in Pakistan and acceptable to the Procuring Entity.

Costs of such insurances shall be borne by the Contractor.

The following Sub-Clause 31.3 is added:

31.3 Co-operation with other Contractors

During the execution of the Works, the Contractor shall co-operate fully with other
contractors working for the Procuring Entity at and in the vicinity of the Site and
also shall provide adequate precautionary facilities not to make himself a nuisance
to local residents and other contractors.

The following Sub-Clauses 34.2 to 34.12 are added:

34.2 Rates of Wages and Conditions of Labour

The Contractor shall pay rates of' wages and observe conditions of labour not less
favourable than those established for the trade or industry where the work is carried
out. In the absence of any rates of wages or conditions of labour so established, the
Contractor shall pay rates of wages and observe conditions of labour which are not
less favourable than the general level of wages and conditions observed by other
Procuring Entities whose general circumstances in the trade or in industry in
which the Contractor is engaged are similar.

34.3 Employment of Persons in the Service of Others

The Contractor shall not recruit his staff and labour from amongst the persons in the
services of the Procuring Entity or the Engineer; except with the prior written consent
of the Procuring Entity or the Engineer, as the case may be.

34.4 Housing for Labour

Save insofar as the Contract otherwise provides, the Contractor shall provide and

(80 )
maintain such housing accommodation and amenities as he may consider necessary
for all his supervisory staff and labour, employed for the purposes of or in connection
with the Contract including all fencing, electricity supply, sanitation, cookhouses, fire
prevention, water supply and other requirements in connection with such housing
accommodation or amenities. On completion of the Contract the temporary camps or
housing provided by the Contractor shall be removed and the Site reinstated to its
original condition, all to the approval of the Engineer.

34.5 Health and Safety

Due precautions shall be taken by the Contractor, and at his own cost, to ensure the
safety of his staff and labour at all times throughout the period of the Contract. The
Contractor shall further ensure that suitable arrangements are made for the prevention
of epidemics and for all necessary welfare and hygiene requirements.

34.6 Epidemics

In the event of any outbreak of illness of an epidemic nature, the Contractor shall
comply with and carry out such regulations, orders and requirements as may be made
by the Government, or the local medical or sanitary authorities, for purpose of dealing
with and overcoming the same.

34.7 Supply of Water

The Contractor shall, so far as is reasonably practicable, having regard to local


conditions, provide on the Site, to the satisfaction of the Engineer or his
representative, adequate supply of drinking and other water for the use of his staff and
labour.

34.8 Alcoholic Liquor or Drugs

The Contractor shall not, otherwise than in accordance with the Statutes, Ordinances
and Government Regulations or Orders for the time being in force, import, sell, give,
barter or otherwise dispose of any alcoholic liquor or drugs, or permit or suffer any
such importation, sale, gift, barter or disposal by his Subcontractors, agents, staff or
labour.

34.9 Arms and Ammunition

The Contractor shall not give, or otherwise dispose of to any person or persons, any
arms or ammunition of any kind or permit or suffer the same as aforesaid.

34.10 Festivals and Religious Customs

The Contractor shall in all dealings with his staff and labour have due regard to all
recognized festivals, days of rest and religious and other customs.

(81 )
34.11 Disorderly Conduct

The Contractor shall at all times take all reasonable precautions to prevent any
unlawful, riotous or disorderly conduct by or amongst staff and labour and for the
preservation of peace and protection of persons and property in the neighbourhood of
the Works against the same.

34.12 Compliance by Subcontractors

The Contractor shall be responsible for compliance by his Subcontractors of the


provisions of this Clause.

The following Sub-Clauses 35.2 and 35.3 are added:

35.2 Records of Safety and Health

The Contractor shall maintain such records and make such reports concerning safety,
health and welfare of persons and damage to property as the Engineer may from time
to time prescribe.

35.3 Reporting of Accidents

The Contractor shall report to the Engineer details of any accident as soon as possible
after its occurrence. In the case of any fatality or serious accident, the Contractor shall,
in addition, notify the Engineer immediately by the quickest available means.

The following Sub-Clause 36.6 is added:

36.6 Use of Pakistani Materials and Services

The Contractor shall , so far as may be consistent with the Contract, make the
maximum use of materials, supplies, plant and equipment indigenous to or produced
or fabricated in Pakistan and services, available in Pakistan preferably in KPK
provided such materials, supplies, plant, equipment and services shall be of required
standard.

41.1 Commencement of Works

The text is deleted and substituted with the following:

The Contractor shall commence the Works on Site within the period named in
Appendix-A to Bid from the date of receipt by him from the Engineer of a written
Notice to Commence. Thereafter, the Contractor shall proceed with the Works with
due expedition and without delay.

The following Sub-Clause 47.3 is added:

(82 )
47.3 Bonus for Early Completion of Works

The Contractor shall in case of earlier completion for either whole or part(s) of the
Works pursuant to Sub-Clauses 48.1 and 48.2(a) respectively of the General
Conditions of Contract, be paid bonus up-to a limit and at a rate equivalent to 50% of
the relevant limit and rate of liquidated damages prescribed in Appendix-A to Bid
“Special Stipulations”.

48.2 Taking Over of Sections or Parts

For the purposes of para (a) of this Sub-Clause, separate Times for Completion shall
be provided in the Appendix-A to Bid “Special Stipulations”.

51.2 Instructions for Variations

At the end of the first sentence, after the word “Engineer", the words “in writing” are
added.

52.1 Valuation of Variations

In the tenth line, after the words “Engineer shall” the following is added:
within a period not exceeding one-eighth of the completion time subject to a
minimum of 28 days from the date of disagreement whichever is later.

53.4 Failure to Comply

This Sub-Clause is deleted in its entirety.

54.3 Customs Clearance

(Procuring Entity may vary this Sub-Clause)

54.5 Conditions of Hire of Contractor’s Equipment

The following paragraph is added:

The Contractor shall, upon request by the Engineer at any time in relation to any item
of hired Contractor’s Equipment, forthwith notify the Engineer in writing the name and address of
the Owner of the equipment and shall certify that the agreement for the hire thereof
contains a provision in accordance with the requirements set forth above.

The following Sub-Clauses 59.4 & 59.5 are added:

59.4 Payments to Nominated Subcontractors

The Contractor shall pay to the nominated Subcontractor the amounts which the
Engineer certifies to be due in accordance with the subcontract. These amounts plus
other charges shall be included in the Contract Price in accordance with Clause 58
[Provisional Sums], except as stated in Sub-Clause 59.5 [Certification of Payments].

(83 )
59.5 Certification of Payments & Nominated Subcontractors

Before issuing a Payment Certificate which includes an amount payable to a


nominated Subcontractor, the Engineer may request the Contractor to supply
reasonable evidence that the nominated Subcontractor has received all amounts due in
accordance with previous Payment Certificates, less applicable deductions for
retention or otherwise. Unless the Contractor:

a) submits reasonable evidence to the Engineer, or


b) i) satisfies the Engineer in writing that the Contractor is reasonably
entitled to withhold or refuse to pay these amounts, and
ii) submits to the Engineer reasonable evidence that the nominated
Subcontractor has been notified of the Contractor’s entitlement,

then the Procuring Entity may (at his sole discretion) pay direct to the
nominated Subcontractor, part or all of such amounts previously certified (less
applicable deductions) as are due to the nominated Subcontractor and for which the
Contractor has failed to submit the evidence described in sub-paragraphs (a) or (b)
above. The Contractor shall then repay, to the Procuring Entity, the amount
which the nominated Subcontractor was directly paid by the Procuring Entity.

60.1 Monthly Statements

In the first line after the word “shall”, the following is added:
“on the basis of the joint measurement of work done under Clause 56.1,”

In Para (c) the words “the Appendix to Tender” are deleted and substituted with the
words “ Sub-Cause 60.11 (a)(6) hereof”. (in case Clause 60.11 is applicable)

60.2 Monthly Payments

In the first line, “28” is substituted by “14”.

60.10 Time for Payment

The text is deleted and substituted with the following:

The amount due to the Contractor under any Interim Payment Certificate issued by the
Engineer pursuant to this Clause, or to any other terms of the Contract, shall , subject
to Clause 47, be paid by the Procuring Entity to the Contractor within 30 days
after such Interim Payment Certificate has been jointly verified by Procuring Entity
and Contractor, or, in the case of the Final Certificate referred to in Sub Clause 60.8,
within 60 days after such Final Payment Certificate has been jointly verified by
Procuring Entity and Contractor; Provided that the Interim Payment shall be caused
in 42 days and Final Payment in 60 days in case of foreign funded project. In the
event of the failure of the Procuring Entity to make payment within the times
stated, the Procuring Entity shall pay to the Contractor compensation at the 28
days rate of KIBOR+2% per annum for local currency and LIBOR+1% for foreign
currency, upon all sums unpaid from the date by which the same should have been
paid. The provisions of this Sub-Clause are without prejudice to the Contractor’s
entitlement under Clause 69.
(84 )
The following Sub-Clause 60.11 is added:

60.11 Secured Advance on Materials

a) The Contractor shall be entitled to receive from the Procuring Entity


Secured Advance against an indemnity bond acceptable to the Procuring Entity
of such sum as the Engineer may consider proper in respect of non-
perishable materials brought at the Site but not yet incorporated in the
Permanent Works provided that:

(1) The materials are in accordance with the Specifications for the
Permanent Works;

(2) Such materials have been delivered to the Site and are properly stored
and protected against loss or damage or deterioration to the satisfaction
of the Engineer but at the risk and cost of the Contractor;

(3) The Contractor’s records of the requirements, orders, receipts and use
of materials are kept in a form approved by the Engineer, and such
records shall be available for inspection by the Engineer;

(4) The Contractor shall submit with his monthly statement the estimated
value of the materials on Site together with such documents as may be
required by the Engineer for the purpose of valuation of materials and
providing evidence of ownership and payment therefor;

(5) Ownership of such materials shall be deemed to vest in the Procuring


Entity and these materials shall not be removed from the Site or
otherwise disposed of without written permission of the Procuring
Entity; and

(6) The sum payable for such materials on Site shall not exceed 75 %
of the (i) landed cost of imported materials, or (ii) ex-factory /
ex-warehouse price of locally manufactured or produced materials, or
(iii) market price of other materials.

(b) The recovery of Secured Advance paid to the Contractor under the above
provisions shall be effected from the monthly payments on actual consumption
basis.

60.11 Financial Assistance to Contractor

Financial assistance shall be made available to the Contractor by the Procuring


Entity by adopting any one of the following three Alternatives:

(85 )
(Appropriate alternative only to be retained)

Alternative One: Mobilization Advance

(a) An interest-free Mobilization Advance up to 15 % of the Contract Price stated in


the Letter of Acceptance shall be paid by the Procuring Entity to the Contractor in
two equal parts
(b) upon submission by the Contractor of a Mobilization Advance Guarantee/ for the
full amount of the Advance in the specified form from a Scheduled Bank in
Pakistan :

(1) First part within 14 days after signing of the Contract Agreement or
date of receipt of Engineer’s Notice to Commence, whichever is
earlier; and

(2) Second part within 42 days from the date of payment of the first part,
subject to the satisfaction of the Engineer as to the state of mobilization
of the Contractor.

(b) This Advance shall be recovered in equal installments; first installment at


the expiry of third month after the date of payment of first part of Advance and
the last installment two months before the date of completion of the Works as
per Clause 43 hereof.

Alternative Two: Mobilization/ Demobilization Cost

Mobilization Cost shall be paid to the Contractor as a part of the priced Bill of
Quantities. This cost shall not exceed 10 % of the Tender Price and shall be paid to
the Contractor as follows:

(i) 80 % of the Mobilization Cost shall be paid for mobilization at Site. This
payment shall be in three stages as follows:

Stage I: 20 % of Mobilization Cost upon obtaining and furnishing of


Performance Security and insurance policies and construction of
camp and housing facilities as required under the Contract;

Stage II: 30 % of Mobilization Cost upon providing & installing


preliminary requirements of Contractor’s Equipment, materials
and temporary structures for the commencement of Works to the
satisfaction of the Engineer and achieving 3 % value of the Works
(excluding payment under Stage-I);

Stage III: 30 % of Mobilization Cost upon providing balance Contractor’s


Equipment to complete full requirement for the entire work and
after achievement of progress to the extent of 6 % value of the
Works (excluding payments under Stages I and II); and

(ii) 20 % of Mobilization Cost shall be paid for operation and maintenance of the

(86 )
constructed facilities and for demobilization as per schedule of payment to be
submitted by the Contractor in accordance with Clause 57.2 and approved by
the Engineer.

Alternative Three: Materials Supplied by Procuring Entity

The Procuring Entity shall supply to the Contractor materials, like cement, steel,
bitumen or any other material whichever deemed necessary to complete the project;
and the cost thereof shall be recovered from the Contractor through monthly
statements on the basis of actual consumption.

The list of materials, quantities and rates to be charged to the Contractor shall be
provided along with Appendix-A to Bid “Special Stipulations”.
(Procuring Entity may opt either “Secured Advance on Materials” or “Financial
Assistance to Contractor”)

63.1 Default of Contractor

The following para is added at the end of the Sub-Clause:

Provided further that in addition to the action taken by the Procuring Entity
against the Contractor under this Clause, the Procuring Entity may also refer the case
of default of the Contractor to Pakistan Engineering Council for punitive action under
the Construction and Operation of Engineering Works Bye-Laws 1987, as amended
from time to time as well as under the prevailing rules of KPPRA.

65.2 Special Risks

The text is deleted and substituted with the following:


The Special Risks are the risks defined under Sub-Clause 20.4 sub paragraphs (a) (i)
to (a) (v).

67. 3 Arbitration

In the sixth to eight lines, the words “shall be finally settled .......... appointed under
such Rules” are deleted and substituted with the following:

shall be finally settled under the provisions of the Arbitration Act, 1940 as amended or
any statutory modification or re-enactment thereof for the time being in force.

The following paragraph is added:


The place of arbitration shall be …………………, Pakistan.

68.1 Notice to Contractor

The following paragraph is added:

For the purposes of this Sub-Clause, the Contractor shall, immediately after receipt of
Letter of Acceptance, intimate in writing to the Procuring Entity and the
Engineer by registered post, the address of his principal place of business or any
change in such address during the period of the Contract.
(87 )
68.2 Notice to Procuring Entity and Engineer

For the purposes of this Sub-Clause, the respective address are:

a) The Procuring Entity :


(to be filled in by the Procuring Entity as appropriate)

b) The Engineer:
(to be filled in by the Procuring Entity as appropriate)

70.1 Increase or Decrease of Cost

Sub-Clause 70.1 is deleted in its entirety, and substituted with the following:

The amounts payable to the Contractor, pursuant to Sub-Clause 60.1, shall be adjusted
in respect of the rise or fall in the cost of labor, materials, and other inputs to the
Works, by applying to such amount the formula prescribed in this Sub-Clause.

(a) Other Changes in Cost

To the extent that full compensation for any rise or fall in costs to the Contractor is
not covered by the provisions of this or other Clauses in the Contract, the unit rates
and prices included in the Contract shall be deemed to include amounts to cover
the contingency of such other rise or fall of costs.

(b) Adjustment Formula

The adjustment to the monthly statements in respect of changes in cost shall be


determined from the following formula:-

Ln Mn En ……………….
Pn A b c d
Lo Mo Eo
Where:

Pn is a price adjustment factor to be applied to the amount for the payment of the
work carried out in the subject month, determined in accordance with Paragraph
60.1 (a), and with Paragraphs 60.1 (b) and (e), where any variations and daywork
are not otherwise subject to adjustment;

A is a constant, specified in Appendix-C to Bid, representing the nonadjustable


portion in contractual payments;

b, c, d, etc., are weightages or coefficients representing the estimated proportion of


each cost element (labour, cement and reinforcing steel etc.) in the Works or
Sections thereof, net of Provisional Sums and Prime Cost; the sum of A, b, c, d,

(88 )
etc., shall be one;

Ln, Mn, En, etc., are the current cost indices or reference prices of the cost
elements for month “n”, determined pursuant to Sub-Clause 70.1(d), applicable to
each cost element; and

Lo, Mo, Eo, etc., are the base cost indices or reference prices corresponding to the
above cost elements at the date specified in Sub-Clause 70.1(d).

(c) Sources of Indices and Weightages

The sources of indices and weightages shall be those listed in Appendix-C to


Bid, duly filled in by the Procuring Entity /Engineer.

(d) Base, Current, and Provisional Indices

The base cost indices or prices shall be those prevailing on the day 28 days prior to
the latest date for submission of bids. Current indices or prices shall be those
prevailing on the day 28 days prior to the last day of the period to which a
particular monthly statement is related. If at any time the current indices are not
available, provisional indices as determined by the Engineer will be used, subject
to subsequent correction of the amounts paid to the Contractor when the current
indices become available.

(e) Adjustment after Completion

If the Contractor fails to complete the Works within the Time for Completion
prescribed under Clause 43, adjustment of prices thereafter until the date of
completion of the Works shall be made using either the indices or prices relating to
the prescribed time for completion, or the current indices or prices, whichever is
more favorable to the Procuring Entity, provided that if an extension of time is
granted pursuant to Clause 44, the above provision shall apply only to
adjustments made after the expiry of such extension of time.

(f) Weightages

The weightages for each of the factors of cost given in Appendix-C to Bid shall be
adjusted if, in the opinion of the Engineer, they have been rendered unreasonable,
unbalanced, or inapplicable as a result of varied or additional work executed or
instructed under Clause 51. Such adjustment(s) shall have to be agreed in the
variation order.

The following Sub-Clauses 73.1, 73.2, 74.1, 75.1, 76.1, 77.1and 78.1 are added:

73.1 Payment of Income Tax


The Contractor, Subcontractors and their employees shall be responsible for payment

(89 )
of all their income tax, super tax and other taxes on income arising out of the Contract
and the rates and prices stated in the Contract shall be deemed to cover all such taxes.

73.2 Customs Duty & Taxes

(Procuring Entity may incorporate provisions where applicable)

74.1 Integrity Pact

If the Contractor or any of his Subcontractors, agents or servants is found to have violated or
involved in violation of the Integrity Pact signed by the Contractor as Appendix-L to his Bid,
then the Procuring Entity shall be entitled to:

(a) recover from the Contractor an amount equivalent to ten times the sum of any
commission, gratification, bribe, finder’s fee or kickback given by the Contractor
or any of his Subcontractors, agents or servants;

(b) terminate the Contract; and

(c) recover from the Contractor any loss or damage to the Procuring Entity as a result
of such termination or of any other corrupt business practices of the Contractor
or any of his Subcontractors, agents or servants.

The termination under Sub-Para (b) of this Sub-Clause shall proceed in the manner
prescribed under Sub-Clauses 63.1 to 63.4 and the payment under Sub-Clause 63.3 shall
be made after having deducted the amounts due to the Procuring Entity under Sub-Para
(a) and (c) of this Sub-Clause.

75.1 Termination of Contract for Procuring Entity's Convenience

The Procuring Entity shall be entitled to terminate the Contract at any time for the
Procuring Entity's convenience after giving 56 days prior notice to the Contractor, with a
copy to the Engineer. In the event of such termination, the Contractor :

(a) shall proceed as provided in Sub-Clause 65.7 hereof; and

(b) shall be paid by the Procuring Entity as provided in Sub-Clause 65.8 hereof.

76.1 Liability of Contractor

The Contractor or his Subcontractors or assigns shall follow strictly, all relevant

(90 )
labour laws including the Workmen's Compensation Act and the Procuring Entity
shall be fully indemnified for all claims, damages etc. arising out of any dispute
between the Contractor, his Subcontractors or assigns and the labour employed by
them.

77.1 Joint and Several Liability

If the Contractor is a joint venture of two or more persons, all such persons shall be
jointly and severally bound to the Procuring Entity for the fulfillment of the terms
of the Contract and shall designate one of such persons to act as leader with authority
to bind the joint venture. The composition or the constitution of the joint venture
shall not be altered without the prior consent of the Procuring Entity.

78.1 Details to be Confidential

The Contractor shall treat the details of the Contract as private and confidential, save
in so far as may be necessary for the purposes thereof, and shall not publish or
disclose the same or any particulars thereof in any trade or technical paper or
elsewhere without the prior consent in writing of the Procuring Entity or the Engineer.
If any dispute arises as to the necessity of any publication or disclosure for the purpose
of the Contract, the same shall be referred to the decision of the Engineer whose
award shall be final.

(91 )
PART II –PARTICULAR CONDITIONS OF CONTRACT

Index Clause

Alcoholic Liquor or Drugs 34.8


Arbitration 67.3
Arms and Ammunition 34.9
As-Built Drawings 6.7
Bonus for Early Completion of Works 47.3
Cash Flow Estimate to be Submitted 14.3
Commencement of Works 41.1
Compliance by Sub-Contractors 34.12
Conditions of Hire of Contractor’s Equipment 54.5
Contractor’s Representative 15.3
Co-operation with Other Contractors 31.3
Customs Clearance 54.3
Customs Duty and Taxes 73.2
Default of Contractor 63.1
Definitions 1.1
Detailed Program and Monthly Progress Report 14.5
Details to be Confidential 78.1
Disorderly Conduct 34.11
Procuring Entity’s Risks 20.4
Local Personnel 16.4
Employment of Persons in the Service of Others 34.3
Engineer Not Liable 2.7
Employment of Engineer’s Duties and Authority 2.1
Engineer’s Representative 2.2
Epidemics 34.6
Exclusions 21.4
Failure to Comply 53.4
Festivals and Religious Customs 34.10
Financial Assistance to Contractor 60.11
Health and Safety 34.5
Housing for Labour 34.4
Increase or Decrease of Cost 70.1
Instructions for Variations 51.2
Insurance of Works and Contractor’s Equipment 21.1
Insurance Company 25.5
Integrity Pact 74.1
Joint and Several Liability 77.1
Language Ability of Contractor’s Representative 15.2
Language Ability of Superintending Staff of Contractor 16.3
Language(s) and Law 5.1
Liability of Contractor 76.1

(166
)
Index Clause

Lighting Work at Night 19.4


Monthly Payments 60.2
Monthly Statements 60.1
Notice to Contractor 68.1
Notice to Procuring Entity and Engineer 68.2
Payment of Income Tax 73.1
Payments of Nominated Subcontractors 59.4
Performance Security 10.1
Performance Security Binding on Variation and Changes 10.4
Priority of Contract Documents 5.2
Program to be Submitted 14.1
Rates of Wages and Conditions of Labour 34.2
Records of Safety and Health 35.2
Replacement of the Engineer 2.8
Reporting of Accidents 35.3
Safety Precautions 19.3
Secured Advance on Materials 60.11
Shop Drawings 6.6
Special Risks 65.2
Supply of Water 34.7
Taking Over of Sections or Parts 48.2
Termination of Contract for Procuring Entity’s Convenience 75.1
Time for Payment 60.10
Use of Pakistani Materials and Services 36.6
Valuation of Variations 52.1

(167
)
SPECIFICATIONS-
SPECIAL PROVISIONS

(168
)
SPECIFICATIONS-
TECHNICAL PROVISIONS

(169
)
DRAWINGS

(170
)
(174)

You might also like