Lampiran Contoh - Draft Curva
Lampiran Contoh - Draft Curva
Lampiran Contoh - Draft Curva
Prosentase
No. URAIAN PEKERJAAN sat Vol. Rupiah
(%)
PERSIAPAN
Pemesanan Bahan / Pabrikasi & Galvanized ls
Perijinan ls
Asuransi ( tenaga kerja dan Material ) ls
Pemeriksaan Kwalitas Barang ls
Persetujuan Pelaksanaan Pekerjaan ls
Pelaporan Pekerjaan ls
PELAKSANAAN :
SUTM
TIANG BETON bh 14 109,976,090 19.2%
POLE SUPORTER : set 7 22,165,635 3.9%
GUY WIRE MURNI 4 0.0%
HORIZONTAL GUY WIRE MURNI 1 0.0%
STRUT POLE 2 0.0%
0.0%
ANTI CLIMBING + DANGER PLATE set 0 0 0.0%
0.0%
POLE TOP ARRANGEMENT : set 15 32,387,525 5.7%
KONTRUKSI TM - 1 10 0.0%
KONTRUKSI TM - 2 1 0.0%
KONTRUKSI TM - 4 1 0.0%
KONTRUKSI TM - 8 1 0.0%
KONTRUKSI TM - 8XC ( Underbuilt ) 1 0.0%
KONTRUKSI TM - 10 1 0.0%
0.0%
KONTRUKSI GROUNDING UNTUK GW CLAMP set 7 6,866,370 1.2%
0.0%
ANTI CLIMBING + DANGER PLATE set 14 1,697,220 0.3%
0.0%
CONDUCTOR ACCESSORIES kms 0.712
AAAC - S 150 sqmm ( SPLN ) M 2,178 58,131,190 10.1%
40.4%
TRANSFORMATOR
Transformator Unit 2 121,777,260 21.3%
TIANG BETON : Bh 3 23,931,120 4.2%
POLE TOP ARRANGEMENT : set 2 4,370,053 0.8%
KONSTRUKSI TM 1 1 0.0%
KONTRUKSI TM - 12 1 0.0%
0.0%
CONDUCTOR & ACCESSORIES GARDU CANTOL 1 11,715,888 2.0%
ARRESTER & CUT OUT : set 1 0.0%
GROUNDING DALAM set 1 695,110 0.1%
0.0%
RANGKA DUDUKAN TRAFO & PHB TR 2 JURUSAN set 1 5,601,950 1.0%
DUDUKAN CUT OUT SWITCH set 1 0.0%
DUDUKAN LIGHTNING ARRESTER set 1 0.0%
DUDUKAN TRANSFORMATOR set 1 0.0%
DUDUKAN PHB TR & PIPA set 1 0.0%
DUDUKAN PHB TR set 1 0.0%
DANGER PLATE set 1 0.0%
573,045,129 100.0%
PPN 10 % 57,304,513
Jumlah 630,349,642
Dibulatkan 630,349,000
RENCANA KERJA / S - CURVA
No. Kontrak ; …............................. Tgl. ……………….
Pekerjaan Pembangunan ..............................................
Lokasi Pekerjaan : ..............................
Penunjukan ..............................
Penyerahan Pekerjaan .....................................
PERSIAPAN
Pemesanan Bahan / Pabrikasi & Galvanized ls
Perijinan ls
Asuransi ( tenaga kerja dan Material ) ls
Pemeriksaan Kwalitas Barang ls
Persetujuan Pelaksanaan Pekerjaan ls
Pelaporan Pekerjaan ls
PELAKSANAAN :
SUTM
TIANG BETON bh 14 109,976,090 19.2%
POLE SUPORTER : set 7 22,165,635 3.9%
POLE TOP ARRANGEMENT : set 15 32,387,525 5.7%
KONTRUKSI GROUNDING UNTUK GW CLAMP set 7 6,866,370 1.2%
ANTI CLIMBING + DANGER PLATE set 14 1,697,220 0.3%
CONDUCTOR ACCESSORIES kms 0.712
AAAC - S 150 sqmm ( SPLN ) M 2,178 58,131,190 10.1%
40.4%
TRANSFORMATOR
Transformator Unit 2 121,777,260 21.3%
TIANG BETON : Bh 3 23,931,120 4.2%
POLE TOP ARRANGEMENT : set 2 4,370,053 0.8%
CONDUCTOR & ACCESSORIES GARDU CANTOL 1 11,715,888 2.0%
GROUNDING DALAM set 1 695,110 0.1%
RANGKA DUDUKAN TRAFO & PHB TR 2 JURUSAN set 1 5,601,950 1.0%
PHB TR 2 JURUSAN set 1 23,058,890 4.0%
573,045,129 100.0% 0%
Sasaran
PPN 10 % 57,304,513 0.00 0.00
Mingguan
Jumlah 630,349,642 Komulative 0.00 0.00
Dibulatkan 630,349,000
CURVA
l. ……………….
...........................
.............
........
....................
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
R
No. Kontr
Pekerjaan
Lo
Penye
PERSIAPAN
Pemesanan Bahan / Pabrikasi & Galvanized ls
Perijinan ls
Asuransi ( tenaga kerja dan Material ) ls
Pemeriksaan Kwalitas Barang ls
Persetujuan Pelaksanaan Pekerjaan ls
Pelaporan Pekerjaan ls
PELAKSANAAN :
SUTM
TIANG BETON bh 14 109,976,090
POLE SUPORTER : set 7 22,165,635
POLE TOP ARRANGEMENT : set 15 32,387,525
KONTRUKSI GROUNDING UNTUK GW CLAMP set 7 6,866,370
ANTI CLIMBING + DANGER PLATE set 14 1,697,220
CONDUCTOR ACCESSORIES kms 0.712
AAAC - S 150 sqmm ( SPLN ) M 2,178 58,131,190
TRANSFORMATOR
Transformator Unit 2 121,777,260
TIANG BETON : Bh 3 23,931,120
POLE TOP ARRANGEMENT : set 2 4,370,053
CONDUCTOR & ACCESSORIES GARDU CANTOL 1 11,715,888
GROUNDING DALAM set 1 695,110
RANGKA DUDUKAN TRAFO & PHB TR 2 JURUSAN set 1 5,601,950
PHB TR 2 JURUSAN set 1 23,058,890
Finishing
(Angkutan Material, Asuransi) 3,976,364
573,045,129
PPN 10 % 57,304,513
Jumlah 630,349,642
Dibulatkan 630,349,000
RENCANA KERJA / S - CURVA
No. Kontrak ; …............................. Tgl. ……………….
Pekerjaan Pembangunan ..............................................
Lokasi Pekerjaan : ..............................
Penunjukan ..............................
Penyerahan Pekerjaan .....................................
2.4% 50%
0.3%
1.4%
2.5%
3.5%
0.7% 0.70
44.2% 253,014,908
44.2%
6.5% 6.48
0.2% 0.20
0.2% 25% 0.22
2.4% 2.40
5.5% 84,829,828
14.8% 14.8%
0.7% 0.7%
100.0% 100.0% 0%
Sasaran
0.00 0.00 9.60 13.77 10.35 5.93 8.32
Mingguan
Komulative 0.00 0.00 9.60 23.37 33.72 39.64 47.96
0.00
0.00
0.00
0.30
3.38 3.38
0.38 0.38
1.02 1.02
0.12
0.49
4.02
1.21 1.21
0.25
1.44
2.48
1.76 1.76
2.75 2.75
0.35 0.35