11.00 Cementis-Calcined Clay PDF
11.00 Cementis-Calcined Clay PDF
11.00 Cementis-Calcined Clay PDF
ch
1
www.LC3.ch
25.00
20.00
15.00
10.00
World average
5.00
0.00
CO2 roadmap
The ambition is to reduce CO2 intensity of cement by 2050
3
www.LC3.ch
20% 1% 1% 1%
1% 1%
1%
1% 2% 2%
1% 2% 2%
15% 1%
1%
2%
2%
2% 2%
Limestone
2% 4% 4% 4%
2%
2%
3%
4% 4% 4%
4%
Slag
3%
3%
10% 4%
2%
5% 5% 5% 5% Fly ash
2% 5% 5% 5%
1% 4% 5%
1%
4%
4%
Puzzolana
5% 4%
5% 5% 6% 6% 6% 6% 6% 7% 7% 7% Others
4%
2%
0%
1990 2000 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Non calcined Fly ash generated Slag will decrease Natural pozzolan
limestone does not in coal fired as the sector will availability and
provide additional furnaces. Coal shift from blast reactivity varies
strenght fired power plants furnace to more widely from region
are set to decrease energy efficient
in the future. scrap based
High variable electric arc
quality & max 35% furnace.
5
www.LC3.ch
Availability of SCMs
Only material really potentially available in
viable quantities is calcined clay.
6
www.LC3.ch
What is LC3
LC3 is not just a blended cement like the others
8
www.LC3.ch
9
www.LC3.ch
10
www.LC3.ch
aluminium
silicon
“Metakaolin”, sold as high purity product for paper, ceramic, refractory industries
Requirements for purity, colour, etc, mean expensive 3-4x price cement
Clays containing metakaolin available as wastes
– over or under burden NOT agricultural soil
Much much less expensive
11
www.LC3.ch
12
www.LC3.ch
13
www.LC3.ch
Building with LC3 and LC3 based building materials Pre-cast products made with LC3 in an industry in Building made with LC3 components at Swiss
in Orchha, India Noida, India Embassy, New Delhi, India
14
www.LC3.ch
15
www.LC3.ch
Chloride ingress
There is a marked
improvement of the
chloride resistance at an
early age irrespective of
the different grades of
concrete, unlike fly ash
based PPC system
which requires additional
curing at higher water-
binder ratios.
16
www.LC3.ch
20%
less
thermal
energy
needs
19
www.LC3.ch
21
www.LC3.ch
22
www.LC3.ch
Scenario 2 125 ktpa of USD 8.15 million for the USD 6.1 million for the
Calcined Clay flash calciner turn key & rotary kiln turn key &
Coal mill Coal mill
Scenario 3 125 ktpa of USD 27 million for the flash USD 26 million for the
Calcined Clay calciner, coal mill, and rotary kiln calciner, coal
grinding plant mill, and grinding plant
23
www.LC3.ch
24
www.LC3.ch
25
www.LC3.ch
IRR (in%)
Payback period (in years)
120%
8.0 98%
100% 87%
6.0 6.0 75%
6.0 80% 71%
4.4 4.4 63%
3.8 55%
3.5 60%
4.0
40% 24%
2.0
1.6 1.1 1.3 1.8 1.0 1.4
22% 17% 17%
20% 9% 9%
0.0 0%
Scenario 1.1. Scenario 1.2. Scenario 2.1. Scenario 2.2. Scenario 3.1. Scenario 3.2. Scenario 1.1. Scenario 1.2.Scenario 2.1.Scenario 2.2.Scenario 3.1.Scenario 3.2.
clay close to plant clay @ 200 km clay close to plant clay @ 200 km from plant
26
www.LC3.ch
Thank you
27