QTY UNIT DESCRIPTION

I. Column & Footing


8 bags Portland Cement
0.5 cum Washed Sand
1 cum 3/4" Crushed Stone
2.5 kgs #16 Tie Wire
10 lgth 10mmØ x 6m Def. Bars
6 lgth 12mmØ x 6m Def. Bars
1 pcs Hacksaw Blade, Heavy Duty
2 pcs 1/4"(5mm) - 4 x 8 Marine Plywood,
4 pcs 2 x 2 x 10 G-Melina Lumber
3 pcs 4"Ø G.I. Pipe sch. 40

II. Floor Slab


51 bags Portland Cement
2.5 cum Washed Sand
5 cum 3/4" Crushed Stone
2 kgs #16 Tie Wire
33 lgth 10mmØ x 6m Def. Bars
2 pcs Hacksaw Blade, Heavy Duty

III. Roofing & Roof Framing


7 pcs (ga. 16) 2" x 6" C-Purlins
20 cum (ga. 18) 2" x 3" C-Purlins
15 cum 10mmØ x 6m Def. Bars
6 cum 1 1/2 x 1 1/2 x 3/16 < Bar
11 pcs 0.4 mm 12ft. Cor. G.I. Roofing
11 pcs 0.4 mm 10ft. Cor. G.I. Roofing
4 kgs welding rod

III. Electricals
6 pcs 10 watts light bulb
1 pcs 2 gang switch
1 pcs 1 gang switch
1 pcs 3 gang covenience oulet
70 mtrs. #14 THW Stranded Wire
UNIT COST TOTAL COST

230.00 1,840.00
800.00 400.00
1,500.00 1,500.00
75.00 187.50
170.00 1,700.00
190.00 1,140.00
75.00 75.00
350.00 700.00
120.00 480.00
8,612.00 25,836.00
Material cost - - 33,858.50

275.00 14,025.00
800.00 2,000.00
1,500.00 7,500.00
75.00 150.00
175.00 5,775.00
75.00 150.00
Material cost - - 29,600.00

800.00 5,600.00
430.00 8,600.00
170.00 2,550.00 6 pcs 10 watts li 150
550.00 3,300.00
550.00 6,050.00
450.00 4,950.00
100.00 400.00
Material cost - - 31,450.00

150.00 900.00
450.00 450.00
150.00 150.00
350.00 350.00
35.00 2450.00
Material cost - - 4,300.00
TOTAL MATERIAL COST 99,208.50
LABOR 39,683.40
TOTAL COST 138,891.90