Asasded: Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
Asasded: Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
Asasded: Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
Asasded
1
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
2
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
3
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
4
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
5
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
6
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
2. You are plotting a control chart and the last two of three parts are greater than 2 ,
four out of the last five point are beyond readings are beyond 1o and eight
successive points are on one side of the center line ; you should
a. 6R/d2
b. 2xA2R
c. R/d2
d. D4
7
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
7. An X- bar and R chart was prepared for an operation using twenty samples with
five pieces in each sample X-bar was found to be 33.6 and R-bar was 6.20.
During production, a sample of five was taken and the pieces measured 36, 43,
37, 25, and 38. At the time, this sample was taken:
8. Calculate the standard deviation of the population for the following set of five
sample observation:
1.5, 1.2, 1.1, 1.0, 1.6
a. 1.280
b. 0.259
c. 0.231
d. 0.518
9 Variance is:
a. The total variation of all activities of a mold, cavities of a die cast machine
or spindles of an automatic assembly line.
b. The inherent variation of the machine
c. The total variation over a shift.
d. The variation in a short run of consecutively produced parts
8
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
Ccc
2. You are plotting a control chart and the last two of three parts are greater than 2 ,
four out of the last five point are beyond readings are beyond 1o and eight
successive points are on one side of the center line ; you should
9
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
a. 6R/d2
b. 2xA2R
c. R/d2
d. D4
7. An X- bar and R chart was prepared for an operation using twenty samples with
five pieces in each sample X-bar was found to be 33.6 and R-bar was 6.20.
During production, a sample of five was taken and the pieces measured 36, 43,
37, 25, and 38. At the time, this sample was taken:
8. Calculate the standard deviation of the population for the following set of five
sample observation:
1.5, 1.2, 1.1, 1.0, 1.6
e. 1.280
f. 0.259
g. 0.231
h. 0.518
9 Variance is:
d. The total variation of all activities of a mold, cavities of a die cast machine
or spindles of an automatic assembly line.
e. The inherent variation of the machine
f. The total variation over a shift.
d. The variation in a short run of consecutively produced parts
sdcsd
2. You are plotting a control chart and the last two of three parts are greater than 2 ,
four out of the last five point are beyond readings are beyond 1o and eight
successive points are on one side of the center line ; you should
11
Dr. Abdulaziz A Bubshait, Department of Construction Engineering & Management
a. 6R/d2
b. 2xA2R
c. R/d2
d. D4
7. An X- bar and R chart was prepared for an operation using twenty samples with
five pieces in each sample X-bar was found to be 33.6 and R-bar was 6.20.
During production, a sample of five was taken and the pieces measured 36, 43,
37, 25, and 38. At the time, this sample was taken:
8. Calculate the standard deviation of the population for the following set of five
sample observation:
1.5, 1.2, 1.1, 1.0, 1.6
i. 1.280
j. 0.259
k. 0.231
l. 0.518
9 Variance is:
g. The total variation of all activities of a mold, cavities of a die cast machine
or spindles of an automatic assembly line.
h. The inherent variation of the machine
i. The total variation over a shift.
d. The variation in a short run of consecutively produced parts
13