Project
LINDE ENGINEERING
Unit(s): ASU
PCWBS: Z
QATAR SHELL GTL PROJECT (PEARL)
C2 AIR SEPARATION UNITS CONSTRUCTION
Document Title:
TABLE OF CONTENTS
1. SCOPE ________________________________________________________________________ 5
2. PURPOSE _____________________________________________________________________ 5
3. HSSE _________________________________________________________________________ 5
4. REFERENCE __________________________________________________________________ 5
5. DEFINITIONS _________________________________________________________________ 6
6. RESPONSIBILITIES ____________________________________________________________ 6
7. GENERAL _____________________________________________________________________ 7
8. SAFETY REQUIREMENTS _______________________________________________________ 7
9. PROCEDURE __________________________________________________________________ 7
10. QUALITY ASSURANCE ________________________________________________________ 8
11. ATTACHMENTS ______________________________________________________________ 8
T-4.250.929 REV-F
Page 4 of 9
Doc. Title :
PROCEDURE FOR EQUIPMENT NITROGEN PURGING
Q A T A R Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08
1. SCOPE
This procedure applies to the Preservation by Nitrogen purging of equipments to be
installed in C2 ASU PEARL GTL PROJECT by Gama Qatar
2. PURPOSE
The main purpose of this procedure is to describe the minimum requirements applicable
to the Preservation of equipments by Nitrogen purging and to determine the
preservation activities in compliance with the contract and manufacturer/Vendor
requirements.
3. HSSE
All works shall be in compliance with the State of Qatar laws and regulations, Ras Laffan
Industrial City and International standards, codes, LINDE ENGINEERING AG and QSGTL
and/or its PMC requirements and instructions.
In addition all employees and GAMA subcontractor employees on site will have through
LINDE ENGINEERING AG Site Safety Induction and GAMA Qatar Safety induction for site
safety, health, environmental and security prior to work activities. Other training courses will
be attended as required by LINDE ENGINEERING AG or QSGTL and/or its PMC as
required.
4. REFERENCE
DEP 70.10.70.11 the preservation of Old and New Equipment and Pipe
Standing Idle
T-4.250.929 REV-F
Page 5 of 9
Doc. Title :
PROCEDURE FOR EQUIPMENT NITROGEN PURGING
Q A T A R Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08
5. DEFINITIONS
Company : QSGTL/or its PMC
6. RESPONSIBILITIES
3. HSSE Engineer- shall be responsible for monitoring safety performance & where
necessary Initiating corrective action through line management.
T-4.250.929 REV-F
Page 6 of 9
Doc. Title :
PROCEDURE FOR EQUIPMENT NITROGEN PURGING
Q A T A R Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08
7. GENERAL
Source of Nitrogen.
8. SAFETY REQUIREMENTS
Nitrogen cylinders shall be secured to a wall or post so they will not tip over or fall.
Gas regulators and cylinder must be checked for damaged threads, dirt, dust, oil or
grease. Dust and dirt must be removed with a clean cloth, while regulators/cylinder with
damage thread replaced.
9. PROCEDURE
Upon receipt from Contractor the Quality Control Inspector shall check the
equipment for nitrogen purging requirement and prepare the Nitrogen purging
report (Attachment ).
The shell side and tube side of the equipment shall be filled with nitrogen at
high purity grade (99.9) and pressurized at a 0.2 barg or as specified by
manufacturer / Vendor.
The equipment shall be protected to avoid damage to the valves, gauges, etc. as
specified by the equipment Manufacturer.
The nitrogen pressure shall be checked once a month and pressure of shell side
shall be recorded on the report.
In case of pressure loss the nitrogen pressure shall be restored using the
nitrogen bottle attached to the equipment.
T-4.250.929 REV-F
Page 7 of 9
Doc. Title :
PROCEDURE FOR EQUIPMENT NITROGEN PURGING
Q A T A R Doc No : GAM-PRO-QAC-GTL-036 Rev. F DATE: 09.10.08
If any leaks are found, the inspector shall inform the supervisor / Contractor to
take corrective action and shall investigate cause of leaks. The pressure restored
immediately.
The leaks shall be eliminated in accordance with the disposition of Contractor and
the pressure restored with nitrogen at the value of a minimum 0.2 barg and as
specified by manufacturer / Vendor.
If a small drop in nitrogen pressure is noticed, connect the nitrogen hose and the
equipment, open nitrogen regulator and pressure up the equipment as per the
vendor instruction manual.
11. ATTACHMENTS
GAM-QCR-QAC-GTL-069
T-4.250.929 REV-F
Page 8 of 9
FORM NO:
STORAGE, PRESERVATION AND NITROGEN PURGING REPORT
SHT:
MONTH 1 2 3 4 5 6 7 8 9 10 11 12
ACTIVITY Month
Date Checked
GAM-QCR-QAC-GTL-069