Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
20 views1 page

Fiberc M: SEE SHEET 7/135

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

SEE SHEET 7/135

44m
NPT

7
OC

BRIDGE

JUSTIN ANGELO
CAR AIRCON

32m
PROP.216 FOC
CABLE
D-NPT
OC

PROP.72 FOC CABLE


RUSI

JOLLIBEE

70m
K SERVICO

DOC-NPT

FOTON

PROPOSE
D LOOP
MC DONALDS
BATAAN TRANSIT

30m

40m
GOLDEN BAY HARDWARE NW/PDAT Pole
osed
Prop

TIRES

33m
T GENESIS
DO-CNP TRANSIT

SEE SHEET 7/135


.
CALERO ST

INSTALLATION OF 216f FIGURE 8. FOC FOR CONTRACTOR PLDT REVISION:0


Balanga Bataan - Dinalupihan DESIGNED BY: CHECKED BY: APPROVED BY: CHECKED BY: REVIEWED BY: ACKNOWLEDGED BY:

AS PLAN
Fiberc m
TELECOM PHILIPPINES INC. COPPLER LEVIN ENRICO ALDAS RAYMOND ESTUISTA GLAYZA O. BAYOG JOSEPH C. DIQUIATCO
7
135
DANILO A. ALTAREJOS JR
SCALE:NTS
FOC NETWORK ENGINEER SR. FOC NETWORK ENGINEER DIVISION HEAD
(GEOGRAPHICAL PLAN) DESIGN ENGINEER TEAMLEADER PROJECT MANAGER
LUZON FIBER ENGINEERING LUZON FIBER ENGINEERING LUZON FIBER ENGINEERING DATE:

You might also like