Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Ardex Ra 142

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

ARDEX RA142

Super Low Viscosity Structural


Concrete Crack Injection Epoxy

Very thin liquid for superior crack penetration

100% solids, solvent free system with low VOC content

Pressure injection and gravity feed structural crack repair in


horizontal concrete, masonry for cracks from 0.05mm to 3mm

Epoxy resin binder for epoxy mortar patching and overlay of interior
surface using addition of aggregate

Shear fracture repairs on interior and exterior concrete slabs

ARDEX Australia Pty Ltd ARDEX New Zealand Ltd


20 Powers Road 32 Lane Street
Seven Hills NSW 2147 Woolston, Christchurch 8241
Phone: 1300 788 780 Phone: 0800 227 339
Fax: 1300 780 102 Fax: (03) 3849779
Email: technicalservices@ardexaustralia.com Email: info@ardexnz.com
Internet: www.ardexaustralia.com Internet: www.ardex.co.nz
ARDEX RA 142
Super Low Viscosity Structural Concrete Crack Injection Epoxy

DESCRIPTION surface. Make sure to fill all gaps between the two con-
crete surfaces.
ARDEX RA 142 is a Super Low Viscosity, two-component
epoxy adhesive perfect for gravity-feed and pressure GRAVITY FEED CRACK REPAIR FOR HORIZONTAL AP-
injection repair of hairline to fine width horizontal cracks. PLICATIONS
It can be used in temperatures between 10° to 35°C for
ARDEX RA 142 is formulated for hairline to fine cracks:
a variety of repair projects including vertical crack repair
(0.05mm to 3mm). For wider cracks (fine to medium), use
using injection ports in conjunction with a capping paste.
ARDEX RA 144. For best results, cut a groove to open up
Its bonding and sealing capabilities for interior and exterior
the crack using an abrasive or diamond blade to a width
slabs are exceptional. It can also be used as an epoxy
3mm and minimum depth 1mm. Use
mortar for spall repair when mixed with aggregate.
a wire brush to abrade and then blow out the crack
to remove all dust, dirt, grease, wax, oil or any other
INSTRUCTIONS
contaminants. Pour or inject ARDEX RA 142 into the crack
Always be sure the bonding surfaces are prepared and its self-levelling ability will fill the entire area. Repeat
in advance before starting a new cartridge or mixing prod- application if necessary to completely fill crack. Follow the
uct. If possible, schedule dispensing to consume an entire cartridge preparation set-up.
cartridge at one time with no interruption of the flow.
SPALL REPAIR
SURFACE PREPARATION
To avoid a feathered edge, cut around the spall into sound
Old concrete must be clean, profiled or textured. New concrete with a grinder or circular saw using a diamond or
concrete must be a minimum of 28 days old. Before using concrete abrasive blade. The edge cut should be equal to
ARDEX RA 142, make sure that the surfaces to be bonded the maximum depth of the spall or to at least a minimum
are sound and clean so there is no dust, dirt, grease, wax, depth 20mm. Avoid a feathered edge.
oil, or any other contaminant present. Smooth surfaces
should be mechanically roughened with a wire brush or Chip out all loose concrete within the entire spall to a
sand paper before application. minimum depth 20mm. Follow surface preparation instruc-
tions to clean the spall . Estimate the amount of product
CARTRIDGE SET-UP needed and thoroughly mix Part A and Part B at a 2:1 ratio
by volume. Slowly add 4-5 parts by volume of Kiln-dried
Whilst preparing cartridge, keep in an upright position to sand or aggregate of choice and mix well, pour and trowel
prevent material from leaking from cartridge. until smooth/level. Maximum mortar thickness is 35mm
1. Shake cartridge for 1 minute then stand cartridge per coat.
upright for 1 minute allowing bubbles to rise to top.
CRACK INJECTION SYSTEM FOR VERTICAL CRACKS
2. Place cartridge into the dispenser, and hold the dis-
penser pointing upward at about 45° angle due to the Before repairs are attempted, the crack should be
products low viscosity. Remove plastic cap and plug. analysed to determine the type of repair that is required.
Cracks in concrete and wood members are classified as
3. Dispense enough material into a disposable container either active (moving) or dormant. Dormant cracks may
until both resin and hardener flow evenly. occur with one-time overload events such as earthquakes
4. Insert the flow control port and then the nozzle to or floods. For dormant cracks in a structure that is to be
the top of the cartridge. Still holding the dispenser at rehabilitated, structural crack injection is recommended.
about a 45° angle, slowly dispense the material up By contrast, active cracks are caused by inadequate
through the nozzle and dispose of 1-2 trigger pulls. design, seasonal heaving, temperature swings or repeated
over-loading.
BONDING AGENT APPLICATIONS Preparation
For bonding fresh concrete to hardened concrete Clean the surface immediately surrounding the crack with
or when repairing concrete spalls use as a bonding a wire brush to achieve a proper bond. Remove all dust,
agent: Use a brush or roller and apply an even coat of the debris, oil and any other contaminants from the crack by
mixed ARDEX RA 142 to the clean and prepared concrete blowing out with clean, oil-free compressed air. For best
surface. While the epoxy is still tacky, place fresh concrete results crack must be dry at the time of injection. If water
over the top of the mixed epoxy. is seeping from crack, steps must be taken to stop the
flow in order to achieve desired repair.
ARDEX RA 88 is ideal to be used as capping paste
For bonding hardened concrete to hardened con- for the crack injection procedure. Place and secure
crete: Use a brush or roller and apply an even coat of the injection ports with ARDEX RA 88, taking care not to leave
mixed ARDEX RA 142 to the clean and prepared concrete
any pin-holes. Port spacing should be approximately 15 – product that is too warm will react (cure) much faster than
30cm apart (typically the width of the concrete member). normal.
Do not allow the epoxy to block the passage between
the port and the crack face. Place additional ARDEX RA CLEAN UP
88 between the ports making sure the entire face of the
Clean tools and equipment with white spirits, mineral turps
crack is sealed off and ports are securely fastened to
or aerosol dewatering agent or lubricant. Do not allow
the concrete. If the crack is evident and accessible on
epoxy to harden on equipment.
the back side of the concrete member, seal with capping
paste. See ARDEX RA 88 for cartridge set-up.
COVERAGE
Injection Please refer to the calculator on the ARDEX website. www.
ardexaustralia.com
1. Attach the tube assembly to the barbed end of nozzle.
2. Attach other end of tubing to the bottom injection PACKAGING
port. Inject epoxy into port until there is flow from
ARDEX RA 142 is sold in a 470mL dual cartridge.
adjacent port or until epoxy stops flowing. Plug the
port injecting into and attach tubing to adjacent port.
SHELF LIFE
Continue procedure until complete.
RA 142 has a shelf life of 24 months when stored in the
3. Leave the tubing attached to the last port on each
original unopened packaging in a dry place between 13°C
crack for 30 seconds under pressure to assure crack
and 27°C and 50% relative humidity. If recapped and
is completely filled.
stored properly, product may be reused.
4. Allow Injection resin to cure (at least 24 hours). Ports
and capping material can be removed with a chisel PLEASE PAY ATTENTION TO THE FOLLOWING
and/or grinder.
Do not thin with solvents, as this will prevent cure. Not
intended for repairing cracks subject with movement.
Note: Some cracks may take more time to inject, espe- Repairs should be made to the cracked member to
cially hair-line cracks. Cracks may be smaller in width (or eliminate the cause of the cracking prior to repair. It is
larger) than they appear from the surface. not designed to stop seeping or flowing water. It may be
applied in moist or damp environments as long as standing
Dispensing and Injection Tips water is removed.

Pneumatic Dispenser: SAFETY PRECAUTION


Must be used with an air pressure regulator. Start at a
low setting and gradually increase pressure as needed This product is considered hazardous. Avoid contact
until desired epoxy flow. Use maximum 275 kPa (40 psi) with skin and eyes. Wear suitable gloves and eye/face
air pressure. Excessive pressure may result in cartridge protection. Avoid exposure - obtain special instructions
plunger leakage. before use. Do not empty into drains. This material and its
container must be disposed of in a safe way. Harmful in
For basement walls (where back side of concrete is not contact with skin and if swallowed. Causes burns. Risk of
accessible) inject with slightly higher viscosity, ARDEX serious damage to eyes. SENSITISATION by skin contact.
RA 146. This is a unique thixotropic gel that will feed into Toxic to aquatic organisms, may cause long-term adverse
small cracks and bridge the back side without runoff. effects in the aquatic environment. Store as per Material
Safety Data Sheet. In case of accident or if you feel un-
Do not dispense epoxy through gelled mixer nozzle. If well, IMMEDIATELY contact Doctor or Poisons Information
epoxy gels in nozzle, replace nozzle before continuing. Centre. Refer to special instructions / safety data sheet.

CURING FIRST AID

ARDEX RA 142 is fully cured in 24 hours. After such time, If swallowed, drink plenty of water in small portions, do not
ports and capping material can be removed with a chisel induce vomiting and seek medical advice. In case of eye
and/or grinder. contact, rinse with plenty of clean water for at least 15
minutes and seek medical advice. If skin contact occurs,
APPLICATION TEMPERATURE wipe off and wash skin with running water and soap. In
case of inhalation, supply fresh air. In case of any symp-
Substrate and ambient air temperature should be between toms, see a doctor.
10°C and 35°C. When the work environment or substrate
falls below 21°C, condition the product to 21°C – 24°C
prior to use. Cold product will react (cure) slower and
TECHNICAL DATA DISCLAIMER
Colour: Amber tint The technical details, recommendations and other information contained in this
data sheet are given in good faith and represent the best of our knowledge and
experience at the time of printing. It is your responsibility to ensure that our
Mixed Viscosity: 190 cps products are used and handled correctly and in accordance with any applicable
Australian Standard, our instructions and recommendations and only for the
Gel Time (+24°C): 20 minutes uses they are intended. We also reserve the right to update information without
prior notice to you to reflect our ongoing research and development program.
Compressive Strength Country specific recommendations, depending on local standards, codes
7 days: 70 MPa of practice, building regulations or industry guidelines, may effect specific
installation recommendations. The supply of our products and services is also
subject to certain terms, warranties and exclusions, which may have already
Tensile Strength been disclosed to you in prior dealings or are otherwise available to you on
7 days: 50 MPa request. You should make yourself familiar with them.

Shear Bond Strength © ARDEX Australia Pty Ltd 2015.


2 days: 8 MPa
All aforementioned products are the trade marks of ARDEX Australia Pty Ltd,
its licensors and affiliates.
Shear Bond Strength
7 days: 11 MPa

Elongation at break
7 days: 1.8%

Water Absorption
24 hours: ~0.2%

ARDEX Australia Pty Ltd


Phone: 1300 788 780
Fax: 1300 780 102

Toll Free Technical Services:


1800 224 070 (Australia)

ARDEX New Zealand Ltd


Phone: 0800 227 339
Fax: (03) 3849779

March 2016

You might also like