Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Organisation Chart As On 10.08.2018 (Nerldc)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

ORGANISATION CHART OF NERLDC AS ON 10-08-2018

T.S.Singh, ED,
Appellate Authority, RTI
N.R.Paul, GM V. Suresh,
Backup NERLDC, GM,NERLDC,
Guwahati.

V. Kaikhochin, DGM (SO- R.Sutradhar V.F.Desouza


M. K. Ramesh, DGM(S/L) Amaresh Mallick R Mukherjee AOT(F)
I)[OA and Outage coordinator -
CPIO CISO/IT coordinator DGM (MO and C&M) DGM (SO-II)[Reliability
Jatan Sagar, AOT(F)
Asst. GM(HR)
Market Operation coordinator]

1.S.C. De, Asst.G.M


2.Mintu Mondal, Dy.Mgr 1.Tapobrata Paul, 1. K. Sharma, Asst GM(C&M) 1. Momai Dey, Sr.Engr.
3.Pranab Debnath,Sr.Engr Engineer (Safety & IT 1. S. Shadruddin,CM. 2. Jerin Jacob, Engr B.C. Das, Sr. Astt 1.S.Chowdhury, Officer(HR)
4.Bimal Swargiary, Dy.Mgr Coordinator)) 2.Babul Roy, Mgr,Nodal 3. Subhash Kumar, Engr 2.Sumita Dey, Sr.Asst-II
5.Abhilash Das, Dy.Mgr 2. Sangita Das, AE 4.. Palash J. Borah, Eng 3.Anshuman Siddhartha, JOT
6.Kamal.K.Kumar,Sr.Engr
Officer (SC,ST) 4. Kuwoli Hazarika AOT(PR)
3. Anirban Bhattacharya, AE 5. C. B. Thapa, Engr.
7.Ankit.Jain, Sr.Engr 3. M.P. Nath, MGR.
4. Ashutosh Kumar, AE 6. Namrata Pathak, AE, 5. Himani Dutta AOT(Law)
8.S.K.Bhagat,Sr.Engr 4.Ranajit Paul ,JE-II 1. All Finance &
5. Sakal Deep, AE 7.Suvrah Das,AE Accounts Works
6. Md. Islam Khan, AOT(RB)
5.Gargi Datta, Dy.Mgr
9..P.Borkitaki,Dy.Mgr 6. G.Thapa, Sr.Op. ,(DG Set) 6. Hanna Debbarma DM.
8.Tanaya Rakshit, AE 2. Co-ordination for
10. Debashis Mondal, Engr 9. B L Blah, JE Audit
11. Sourav Mondal, Sr. Engr 7. Kritika Debnath, AE
3. UI/Reactive/OA
12.Sumit Kumar,Engr 7. payment / selttlement
13. Ratul Sarma , Engr
14. Sunil Singha, Engr 1. B. S. Roy, DGM 1.All HR , Estt function.
2.All Admn. Functions
15. Sachin.K.Singh, Engr 2. Yogendra Singh, JE 1. REA Preparation 3.Submission of Periodical
16. Amarendra Tiwari ET 3. Aswani Kumar, JE 2.SEM Data Processing 1. System Studies (TTC assessment, Tap Reports
17. T M Mathews, Sr. AE 4. Dinesh Rai , JE 3. UI/Reactive /OA Accounting Optimisation, Loss minimisation, etc.) 4. Vigilance Matters.
& settlement 2. Operating Procedure/ Power Maps / List of 5. Upkeep & Maint. Of
18.Gaurav Bhattacharjya, AE 4. Regulatory affairs. Important Grid Elements Office
19.Keshab Borah,AE 5. Weekly Reports & availability Operational Feedback to CEA and CTU
3. 6. Land line /Cell Phone
20.Bornali Nath,AE 1 All IT related issues I/C VOIP. ,VC, VoiceRecorder, certification with inputs from SO- 4. Transmission Pricing related activities 7. Vehicles
21.Utpal Das, AE surveillance, associated lease lines, etc. II 5. Reports (except Daily,Weekly & Annual) 8. Security.
22. Kishore Kalita, AET 2. SCADA/EMS Weekly/Quarterly reports, Telemetry 6. Annual Report with inputs from 6. Disturbance/Event analysis. 9. Procurement of
23. Asim Das, AET Status Report SO-II 7. Reliability Co-ordn. functions. consumables & Stationary.
24. Adarsh Jaiswal, AET 3 SCADA Database maintenance , integration of new 7. Day ahead scheduling . 8. SPS/ Islanding Schemes in association with 10. Employee Welfare
elements. 8. Fees & charges with inputs from SO-1 Matters.
25. Laxmi Prabha Das, AET SL,HR & F&A.
4. WAM/PMU,URTDSM. 9. RE Integration 11.RajBhasha
26. Subhra Ghosh, AET 5 .Auxiliary Power Supply system, UPS-Battery ,DG 9. Technical Session/ Seminars. Ready Reckoner
10. Implementation.
27. R. Kharnongrum, AET Set functioning / weekly test running, 10.Loss declaration 11. Protection Issues 12. IR / Union Matters
6. AC System of the building , Lift, 11. C&M functions 12. Outage Co-ordination 13. Protocol.
28. Abrar Ahmad, AET Building lighting system, Office telephones etc. 13. Event analysis based on PMU 14. Grievance Matters
29. P. Doungel, AET 7. ISO ,CSR & RTI &, NETeST(UCC) Meetings etc. 14. Processing of First time element charging & 15. Training/HRD
30.A.Rudra Paul, MTS 8. Coordination for URTDSM Start up power
9. SCADA,Auxilary power supply etc.of back up Real Time Security Desk:
control Centre, Guwahati. 1. TTC Assessment of region, states, control
areas in real time
2. Load Crash / Frequency Deviation /Voltage
Real Time Grid Management., Daily PSP/NPMC/ operationalreport. Deviation/System Reliability Reports
Shutdown Co-ordn.(Planned/ Emergency),RT Scheduling and Issuance Common Activities 3. Demand Forecasting
of Implemented Schedule, STOA(Processing/Scheduling)
Preparation of STOA Monthly Reports ,. STOA Curtailment/Refund 1.Relevent MOU/KPI/Audit 4. Real Time Contingency Analysis in EMS Executive – 49
5. Monitoring of system parameters from PMU
report , OCC related activities, Implementation of Software Supervisor – 05
Related activities and taking corrective action
(Scheduling /Reporting /STOA /Outage), CERC/CEA Regulatory 6. Comparison of Schedule v/s Actual Workman – 04
affairs, Updation of Restoration Procedure document, Updation of 2.Any other works assigned time to
Reactive Manual, Technical Session/ Seminars, FRC report, State
Drawl/Injection
Trainee – 15 (ET 01 + AET+AOT 13 + JOT
profile preparation. time 01) Total = Shillong – 68 & Guwahati 05
1. Real Time Grid Management.
2. Daily PSP/NPMC/ operational
report.
3. Shutdown Co-ordn.(Planned/
Emergency)
4. RT Scheduling and Issuance of
Implemented Schedule
5. STOA(Processing/Scheduling)
6. Preparation of STOA Monthly
Reports
7. STOA Curtailment/Refund report
8. OCC related activities
9. Implementation of Software
(Scheduling /Reporting /STOA /Outage)
10 CERC/CEA Regulatory affairs.
11 Updation of Restoration Procedure
document
12 Updation of Reactive Manual
13 Technical Session/ Seminars
14 FRC report, State profile preparation.

You might also like