Land Surveys was contracted to provide survey work for Stage 38 of Chadstone Shopping Centre's $500 million redevelopment project. The project involved adding a ten level office tower, new bus interchange, and additional car park deck. Land Surveys utilized ground penetrating radar to accurately survey existing infrastructure like cables and conduits before core holes were drilled in the car park slab. Precise surveys were also needed to position strengthening steel beneath the bus interchange that was located on a suspended slab above the functioning car park.
Land Surveys was contracted to provide survey work for Stage 38 of Chadstone Shopping Centre's $500 million redevelopment project. The project involved adding a ten level office tower, new bus interchange, and additional car park deck. Land Surveys utilized ground penetrating radar to accurately survey existing infrastructure like cables and conduits before core holes were drilled in the car park slab. Precise surveys were also needed to position strengthening steel beneath the bus interchange that was located on a suspended slab above the functioning car park.
Land Surveys was contracted to provide survey work for Stage 38 of Chadstone Shopping Centre's $500 million redevelopment project. The project involved adding a ten level office tower, new bus interchange, and additional car park deck. Land Surveys utilized ground penetrating radar to accurately survey existing infrastructure like cables and conduits before core holes were drilled in the car park slab. Precise surveys were also needed to position strengthening steel beneath the bus interchange that was located on a suspended slab above the functioning car park.
Land Surveys was contracted to provide survey work for Stage 38 of Chadstone Shopping Centre's $500 million redevelopment project. The project involved adding a ten level office tower, new bus interchange, and additional car park deck. Land Surveys utilized ground penetrating radar to accurately survey existing infrastructure like cables and conduits before core holes were drilled in the car park slab. Precise surveys were also needed to position strengthening steel beneath the bus interchange that was located on a suspended slab above the functioning car park.
STAGE 38 OF CHADSTONE SHOPPING CENTRE’S $500M Probuild REDEVELOPMENT INVOLVES THE ADDITION OF A TEN LEVEL OFFICE TOWER, A NEW BUS INTERCHANGE AND DURATION AN ADDITIONAL CAR PARK DECK. To tie into the existing Chadstone A large portion of the bus 2 years structure, a multitude of cut and interchange is located on a core holes were required to be suspended slab above the PROJECT VALUE made in the car park slab. shopping centre’s functioning car park. A significant amount $500M Land Surveys utilised a high of strengthening steel work was frequency Ground Penetrating Radar (GPR) to carry out surveys required to be fitted beneath in LOCATION order to transfer the load from the of each cut or core location prior structure above, and this required Chadstone, to the commencement of cutting works. precise survey work combined with Melbourne, Victoria accurate GPR results to allow the Successful location of in-situ post- steel work to be fitted through the pension cables and conduit were existing slab. combined with feature surveys to allow the safe and correct positioning of slab penetrations.