Corrosion - Control
Corrosion - Control
Corrosion - Control
Click on the above link for detailed information about pressure vessel
definition, scope, and boundaries based on ASME and API codes which
specifically focus on pressure vessel inspections.
It consists of Parts UCS, UNF, UHA, UCI, UCL, UCD, UHT, ULW, and
ULT dealing with carbon and low alloy steels, nonferrous metals, high
alloy steels, cast iron, clad and lined material, cast ductile iron, ferritic
steels with properties enhanced by heat treatment, layered
construction, and low temperature materials, respectively.
Click on the above link for detailed information about ASME code
section 8, which specifically focuses on pressure vessel inspections.
ASME Code Sec VIII DIV 1 requires that materials that used for
pressure containing parts are one of the materials specified in ASME
section II, but with some restrictions which are stated in ASME Code
Sec VIII Div 1 in subsection C e.g. UCS, UHF, UNF.
For example, SA 283 plate material is listed in ASME Sec II, but when
you refer to subsection C in Sec VIII Div 1, you see it is not allowed to
be used for lethal substance services as well as for unfired steam
boilers. Also, you cannot use this material when you need your
thickness to be greater than 5/8 of an inch.
Click on the above link for detailed information about pressure vessel
plate materials which are specifically focused on pressure vessel
inspections.
They say both RT1 and RT2 are categorized in the “Full Radiography”
part in UW-11 clause. So why are some joints in RT2 radiographed in
spot? We are doing spot radiography, but it is categorized in full
radiography!!!
ASME Impact Test Requirement - You need to take care about ASME
Impact Test Requirement. Suggest you have pressure vessel in the
design process and construction has not started yet.
There are 4 steps for impact test exemption assessment. You need to
go through these steps, and you might be exempted in the first,
second or third steps, and might not be exempted in step 4;
So if you are in step 4 and you have not exempted, then you need to
carry out the test. This article explains you this assessment process.
First, you have to keep your pressure vessel design data available and
then refer to UG-20 (f), if you are exempted from this clause, you do
not need proceed anymore.
But if you are not exempted by UG-20 (f), you have to proceed to
UCS-66(a). Again if you are exempted, there is no need for more
assessment.
This test would be more costly out of the US because of the Laboratory
Accreditation requirement. The Accredited Laboratory based US
accreditation system is not used too much in Europe, the Middle East
and other locations.
Click on the above link for detailed information about the ASME Impact
Test Requirement, which specifically focuses on pressure vessel
inspections.
Weld Mismatch
Weld Reinforcement
Click on the above link for detailed information about Pressure Vessel
Dimension Inspection, which specifically focuses on pressure vessel
inspections.
As you see, the item numbers 1, 2 and 3 are really mandatory for the
full RT test;
Click on the above link for detailed information about Pressure Vessel
RT Tests which are specifically focuses on pressure vessel inspections.
Please note that performing the pneumatic test instead of the hydro-
static testing is not allowed and it can be replaced only when it is not
possible due to design and process.
Click on the above link for detailed information about pressure vessel
hydro-static testing which is specifically focuses on pressure vessel
inspections.
Click on the above link for detailed information about Pressure Vessel
Certification, which is specifically focuses on pressure vessel
inspections.
For example, if you have calculated your shell thickness under internal
pressure and obtained 12 mm, your thickness for an ellipsoidal head
will be approximately 12 mm; for a torispherical head, 20.4 mm; and
for hemispherical head, 6 mm.
Click on the above link for detailed information about Pressure Vessel
Heads, which specifically focuses on pressure vessel inspections.
Third Party Inspection for Pressure Vessel - What is the third party
inspection requirement for pressure vessel inspection in a
manufacturing shop?
Inspection and Test Plan for Pressure Vessel - The Inspection and
testing requirement is distributed in a different part of the construction
code.
The inspection and test plan have a tabulated format and collect all
these requirements in a simple table and determine the responsibly of
each party, i.e. the manufacturer, third party inspector and purchaser.
Click on the above link for detailed information about the Pressure
Vessel Handbook, which specifically focuses on pressure vessel
inspection.
Click on the above link to see the answer to the above questions,
which is specifically focuses on pressure vessel inspections.
- See more at: http://www.inspection-for-industry.com/pressure-vessel-
inspections.html#sthash.A6dpsm6t.dpuf