ABSTRACT
ORDER:
2. In the reference 2nd read above, the Coordinator, DICCI, Telangana chapter has
requested for reservation of works to SC/ST Communities in Public works taken up by
Government of Telangana with certain relaxations/ exemptions in respect of
Qualification criteria, Bid capacity, Mobilization advance etc.,
3. The Engineer-in-Chief (I) in his letter 3rd read above has stated that the subject
agenda was placed before Board of Chief Engineers (BOCE’s) during its meeting held on
22.07.2017 and 24-10-2017 for its discussion and necessary recommendation in the
matter.
4. Consequent to above Board of Chief Engineers (BOCE’s) meeting and as per the
revised proposals furnished by the Coordinator, DICCI, Telangana Chapter on the subject
issue vide their letter dated 02-11-2017, it was proposed to convene Engineer-in-Chief’s
(ENC’s) level meeting with all Engineering Departments on 05.12.2017 duly
communicating draft opinion of BOCEs to finalize the deliberations and outcome of the
agenda issue.
6. After comprehensive deliberations on the subject issue duly considering all the
relevant aspects during the above Board of Chief Engineers (BOCE’s) and Engineers-in-
Chiefs (ENC’s) level meetings, the Engineer-in-Chief (Irrigation) submitted the
recommendations to the Government.
7. Government after careful examination hereby consider the recommendations of
Board of Chief Engineers (BOCE’s) and Engineers-in-Chiefs (ENC’s) Committee on certain
further relaxations / concessions in respect of reservations of works to SC / ST
communities in Public Works and hereby order as follows:
1. A pool of at least 200 SC/ST Contractors in Telangana State over a period of 5
years in their Engineering or Diploma in Civil will be selected. The
selected
(P.T.O)
// 2 //
4. For class –III, IV & V SC/ST contractors the solvency certificate is not needed.
However for Special Class, Class –I & Class-II SC/ST contractors, the solvency
certificate is required as per Departmental format. All Engineering departments
shall harmonise form in accordance with format given by Indian Bankers
Association and other Co-operative Banks.
5. Exemption of EMD shall be for the works costing up to Rs 1.00 crore (ECV) and
the same shall be recovered from respective RA bills as stipulated under
G.O.Ms.No. 29 I&CAD (Reforms) Department, Dt: 26.05.2017.
7. (i) In all Public Works Departments, the works costing up to Rupees One
crore (ECV) may be reserved for SC/STs as detailed below.
1. 15% to SCs and
2. 6 % to STs
Works for SC/STs could be pooled together. This will ensure additional pool of
contractors generated enough authentication and it should be reviewed after 6
months from the date of implementation.
(ii) While calling tenders for the SC/ST reserved works, when there is no response
up to 3rd call, it shall be considered to invite under general category.
(iii) For tenders called for on e-Procurement single Bid received for SC/ST reserved
works, even for the 1st call of tenders, shall be considered.
(iv) List of works reserved for SC/ST Contractors shall be displayed by respective
Tender inviting authority twice in a financial year.
9. The Bid Capacity for SC/ST Contractors shall be followed as per Standard Bid
document (SBD) i.e., 3AN-B.
10. The payment of Mobilization Advance is dispensed with and shall not be given again.
11. Among the ready bills for payment depending on the releases made the bills
pertaining to SC/ST contractors should be cleared on priority.
12. The Bonafideness of SC/ST Contractors shall be considered based on the SC/ST
Certificate issued by the Mandal Tahasildar.
(P.T.O)
// 3 //
13. The insisting of foundation training by the NAC to SC/ST contractors shall not be
mandatory. However the contractors with NAC Training shall be given priority.
14. The Penalty clause for reserved works shall be followed as per Standard Bid
Document. Action shall be taken against the erring contractors reported if any, as
per penalty Clause.
10. This order issued with the concurrence of Finance (EBS.IX) Department vide their
U.O.No. 18569-A/199/A1/EBS.IX/18, Dt: 07-04-2018.
To
The Engineer-In-Chief (Irrigation), I&CAD Department,
Errum Manzil,Jalsoudha Building, Hyderabad.
All Engineer-In-Chief’s and the Chief Engineers, Irrigation & CAD Department.
Copy to:-
The Accountant General /Principal Accountant General, Telangana, Hyderabad.
The Director Works & Accounts, Telangana, Hyderabad.
The Commissioner, Commissionerate of Tenders, Hyderabad.
The Engineer-in-Chief (TR&RB), Hyderabad.
The Engineer-in-Chief, PR&RD Department, Hyderabad
The Engineer-in-Chief, MA&UD Department
The Engineer-in-Chief, PH Department, Hyderabad
The Finance (EBS.IX) Department.
The LAW Department.
The Special Chief Secretary (FAC) to I& CAD Department.
The Principal Secretary, TR&RB Department.
The Principal Secretary, PR&RD Department.
The Principal Secretary MA&UD Department.
The P.S to Secretary, Law Department.
The P.S. to Hon’ble Minister, Irrigation.
The P.S. to Hon’ble Minister, R&B Department.
The P.S. to Hon’ble Minister, PR &RD Department.
The P.S. to Hon’ble Minister, MA&UD Department .
The Dy. Director Monitoring Wing, I&CAD Department.
All Sections/Offices in I& CAD Department.
SF/SC (4169/Reforms/2017).
//FORWARDED::BY ORDER//
SECTION OFFICER