Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Fiber Optic Cable /MM 6 Core

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Fiber Optic Cable /MM 6 Core

Fiber Optic
Cable

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Fiber Optic Patch Panel


25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

www.apc.com
www.apc.com

Communication Room

MCS-7825i5-K9-CMD2

System x3250 M3

MCS-7825-i5-CCE1
System x3250 M3

Cisco 2900 Series Wireless Access


Point IP Phone IP CCTV Computer
SYS ACT POE RPS PSU
Voice Gateway
AC OK

I
100-120/200-240V~
4/2A, 50-60 Hz

Ground Floor Layout

WLAN Controller
Cisco 5500 Series Wireless Controller

Model 5508

RP SP USB1 USB2 EN EN 1 2 3 4 5 6 7 8 PS1 PS2 SYS ACT

CISCO ASA 5540 series


CISCO ASA 5540 series
Adaptive Security Appliance Zone A- 5F / 26 Node Zone A- 1F / 26 Node Zone A- GF / 32 Node
Fire Wall..(1)
Adaptive Security Appliance

Fire Wall..(2) POWER STATUS ACTIVE VPN FLASH

T0100A2SW01 Sw-48 ports T0100AGSW01 Sw-48 ports


POWER STATUS ACTIVE VPN FLASH

T0100A5SW01
Sw-48 ports
Cisco 2900 Series
Cisco 2900 Series
Zone B- 5F / 26 Node Zone B- 1F / 26 Node Zone B- GF / 35 Node
WAN Router..(1)
SYS ACT POE RPS PSU

SYS ACT POE RPS PSU

WAN Router..(2) T0100B2SW01 T0100BGSW01


T0100B5SW01
Sw-48 ports Sw-48 ports Sw-48 ports
100-120/200-240V~
AC OK
4/2A, 50-60 Hz

Riser Cable – F.O MM 6 Core


100-120/200-240V~
AC OK
4/2A, 50-60 Hz
I

Riser Cable – F.O MM 6 Core


I

SWITCHED SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL / SWITCHED SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL / SWITCHED SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL / SWITCHED SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL /

Riser Cable – F.O MM 6 Core


REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED
PRIOR TO OPERATING POWER SUPPLY PRIOR TO OPERATING POWER SUPPLY PRIOR TO OPERATING POWER SUPPLY PRIOR TO OPERATING POWER SUPPLY
100-240V~ 100-240V~ 100-240V~ 100-240V~
12A 12A 12A 12A
50/60Hz 50/60Hz 50/60Hz 50/60Hz

OUTPUT FAIL OUTPUT FAIL OUTPUT FAIL OUTPUT FAIL


POE ENABLED POE ENABLED POE ENABLED POE ENABLED
FAN OK FAN OK FAN OK FAN OK

INPUT 1 INPUT 1 INPUT 1 INPUT 1


OK OK OK OK

INPUT 2 INPUT 2 INPUT 2 INPUT 2


OK OK OK OK

100-240V~
12A
50/60Hz
4200ACV
100-240V~
12A
50/60Hz
4200ACV
Cat.4500 100-240V~
12A
50/60Hz
4200ACV
100-240V~
12A
50/60Hz
4200ACV

WS-X45-SUP7L-E
USB
SECURE DIGITAL
10/100/1000
MGT
1G/10G UPLINKS (SFP/SFP+) 1G/10G

Core Switch WS-X45-SUP7L-E


USB 10/100/1000 1G/10G UPLINKS (SFP/SFP+) 1G/10G
SUPERVISOR

1-2 ACTIVE 3-4 ACTIVE


SUPERVISOR
SUPERVISOR

SUPERVISOR

SECURE DIGITAL MGT 1-2 ACTIVE 3-4 ACTIVE

Core Switch Cat.4506E..(2)


Core Switch Cat.4506E..(1)
11 RESET
ACTIVE
UTILIZATION 11
RESET UTILIZATION
SUP ACTIVE
SUP
STATUS
1% 100% STATUS
LINK 1G 10G 1G 10G 1G 1G 1% 100%

Catalyst
Catalyst Catalyst LINK 1G 10G 1G 10G 1G 1G

4506-E
4506-E WS-X4640-CSFP-E
1000 BASE-X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 “E”
SERIES
4506-E WS-X6816-GBIC
1 3 5 7 9 11 13 15
SFP/C-SFP MODULE
US
AT
22 22 ST
2 4 6 8 10 12 14 16

40-PORT
STATUS 1000 BASE-X
SFP/C-SFP MODULE LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK LINK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

WS-X4306-GB
WS-X4306-GB

33 33
STATUS
STATUS

1000 BASE-X SWITCHING MODULE


1000 BASE-X SWITCHING MODULE 1 2 3 4 5 6
1 2 3 4 5 6

44 44

WAN Router-1 WAN Router-2


55 5
5 Call Manager Voice Gateway
Core Switch Cat.4506E..(2) Core Switch Cat.4506E..(1)
FAN 6 FAN 6
STATUS 6 STATUS 6

Fire wall-1 Fire wall-2 WLAN Controller

Comm. Room Comm. Room

Owner : Tabouk Universty Date : 9/10/2012


Ministry of Higher Education Communication Room Infra Structure Solution
Project : Student Housing Project Designed by : Mohamed Abou El Hassan

You might also like