This document provides a list of resources, quantities, and prices for the construction project "Construction of the Lucma Communal Facility, San Marcos District - Huari". It includes items like steel rebar, scaffolding, cement, electrical cables, tools, furniture and more. The total presupuestado (budgeted amount) for all items is over 500,000 soles.
This document provides a list of resources, quantities, and prices for the construction project "Construction of the Lucma Communal Facility, San Marcos District - Huari". It includes items like steel rebar, scaffolding, cement, electrical cables, tools, furniture and more. The total presupuestado (budgeted amount) for all items is over 500,000 soles.
This document provides a list of resources, quantities, and prices for the construction project "Construction of the Lucma Communal Facility, San Marcos District - Huari". It includes items like steel rebar, scaffolding, cement, electrical cables, tools, furniture and more. The total presupuestado (budgeted amount) for all items is over 500,000 soles.
This document provides a list of resources, quantities, and prices for the construction project "Construction of the Lucma Communal Facility, San Marcos District - Huari". It includes items like steel rebar, scaffolding, cement, electrical cables, tools, furniture and more. The total presupuestado (budgeted amount) for all items is over 500,000 soles.
Obra 0301017 "CONSTRUCCION DEL LOCAL COMUNAL DE LUCMA, DISTRITO DE SAN MARCOS - HUARI" Subpresupuesto 001 LOCAL COMUNAL LUCMA Fecha 15/08/2010 Lugar 021014 ANCASH - HUARI - SAN MARCOS Código Recurso Unidad Cantidad Precio S/. Parcial S/. Presupuestado S/.
0203020006 ACERO CORRUGADO KG 23,235.5422 3.20 74,353.73 74,266.86
0147400004 ACONDICIONAMIENTO DE BOTADEROS HH 200.0000 8.48 1,696.00 1,696.00 0239050000 AGUA M3 49.5068 0.67 33.17 31.78 0202040010 ALAMBRE NEGRO N° 8 KG 212.9581 3.80 809.25 808.03 0202040009 ALAMBRE NEGRO N°16 KG 1,186.1917 3.80 4,507.52 4,527.61 0239130023 ALMACEN PROVISIONAL MES 6.0000 350.00 2,100.00 2,100.00 0147010104 ALMACENERO MES 6.0000 2,251.20 13,507.20 13,507.20 0243550001 ANDAMIO DE MADERA P2 246.4020 21.00 5,174.40 5,175.05 0348090002 ANDAMIO METAL TABLAS-ALQUILER EST 6.9803 15.00 104.70 104.70 0243980046 ARCHIVADORES UND 6.0000 457.98 2,747.88 2,747.88 0204000000 ARENA FINA M3 36.3285 117.65 4,274.22 4,276.25 0205010004 ARENA GRUESA M3 107.5784 109.24 11,752.04 11,752.51 0337620044 ARNES DE SEGURIDAD, INC. JGO 2.0000 285.00 570.00 570.00 MOSQUETON Y CUERDA 0348760056 BALANZA DIGITAL DE PLATAFORMA, UND 1.0000 504.20 504.20 504.20 HASTA 300KG 0243570056 BANCAS UND 4.0000 294.12 1,176.48 1,176.48 0227000005 BENTONITA KG 90.0000 3.00 270.00 270.00 0337010019 BOTAS DE JEBE PAR 36.0000 25.00 900.00 900.00 0210210043 BOTIQUIN CON IMPLEMENTOS UND 1.0000 150.00 150.00 150.00 0206030051 CABLE DE 25MM2 CABLEADO DESNUDO M 30.0000 1.80 54.00 54.00 DE COBRE 0207010001 CABLE TW # 12 AWG - 4 MM2 M 252.0000 1.80 453.60 453.60 0207010000 CABLE TW # 14 AWG 2.5 MM2 M 504.0000 1.20 604.80 604.80 0207010004 CABLE TW # 6 AWG - 16 MM2. M 396.0000 5.50 2,178.00 2,178.00 0250010000 CAJA DE DESAGUE DE 12"X24" UND 2.0000 33.61 67.22 67.22 0231520002 CAJA DE REGISTRO THORGEL PZA 1.0000 39.90 39.90 39.90 0212090049 CAJA OCTOGONAL GALV. 4" X 2 1/8 " UND 88.0000 0.94 82.72 82.72 0212090004 CAJA RECTANG GALV 4"X2 1/8" UND 28.0000 0.84 23.52 23.52 0349040093 CARGADOR FRONTAL S/LLANTAS HM 0.1233 230.00 27.60 28.35 CAT-950 0239900095 CARTEL DE OBRA INC.INSTALACION Y GLB 1.0000 700.00 700.00 700.00 TRANSP 0337620038 CASCOS DE SEGURIDAD PZA 36.0000 14.00 504.00 504.00 0221000093 CEMENTO PORTLAND TIPO I (42.5KG) BOL 4,286.3645 17.65 75,654.25 75,655.88 0240130053 CERAMICO PISO ANTIDESLIZANTE - M2 178.8200 35.00 6,258.70 6,258.70 ALTO TRANSITO 0337620037 CHALECO FOSFORESCENTE PZA 36.0000 25.00 900.00 900.00 0229040001 CINTA AISLANTE RLL 8.8000 2.10 18.48 18.48 0229040005 CINTA TEFLON PZA 2.8800 0.93 2.68 2.68 0348960008 CIZALLA 18" HM 719.7113 4.10 2,950.81 2,880.45 0202100099 CLAVOS KG 45.3580 3.80 172.37 173.10 0202010063 CLAVOS 3" KG 360.4662 3.80 1,369.79 1,369.77 0239120101 COCINA - EQUIPADA GLB 1.0000 2,952.94 2,952.94 2,952.94 0272140001 CODO DE 90 PVC SAL DE 2" UND 20.0000 2.10 42.00 42.00 0272140003 CODO DE 90 PVC SAL DE 4" UND 4.0000 3.78 15.12 15.12 0272060001 CODO DE 90°C/R PVC SAP P/AGUA DE UND 13.8400 0.90 12.46 12.44 3/4" 0239020033 COLA SINTETICA KG 28.1832 33.61 947.13 946.49 0349030001 COMPACTADOR VIBR. TIPO PLANCHA 4 HM 250.5600 2.00 501.12 501.12 HP 0239100104 COMPUTADORA Y ACCESORIOS UND 7.0000 6,847.06 47,929.42 47,929.42 0206010051 CONECTOR DE COBRE DE 3/4" UND 2.0000 10.00 20.00 20.00 0272270001 CONEXION A CAJA PVC SEL P/INS UND 112.0000 0.42 47.04 47.04 ELECT 5/8" 0272250003 CURVA LIVIANO PVC SEL P/INST. ELECT UND 64.0000 2.00 128.00 128.00 1" 0272250001 CURVA LIVIANO PVC SEL P/INST. ELECT UND 168.0000 1.20 201.60 201.60 5/8" 0227010096 DEMOLICION D ESTRUCTURA GLB 1.0000 10,084.03 10,084.03 10,084.03 EXISTENTE 0239100108 EQUIPO DE SONIDO UND 2.0000 1,848.74 3,697.48 3,697.48 0243980044 ESCRITORIO UND 6.0000 319.33 1,915.98 1,915.98 0243510061 ESTACA DE MADERA P2 25.8202 0.84 21.69 21.14 0251980004 ESTRUCTURA METALICA P/COBERTURA M2 16.2400 178.20 2,893.97 2,893.97 0232000055 FLETE DEL EQUIPAMIENTO GLB 1.0000 7,142.26 7,142.26 7,142.26 0232010095 FLETE PEON Y/O ASEMILA GLB 1.0000 88,362.24 88,362.24 88,362.24 0232990002 FLETE TERRESTRE GLB 1.0000 71,087.10 71,087.10 71,087.10 0212140043 FLUORES. RECTO ISPE 2X40 W C/EQ + UND 29.0000 151.26 4,386.54 4,386.54 PANT S10 Página : 2
Precios y cantidades de recursos requeridos
Obra 0301017 "CONSTRUCCION DEL LOCAL COMUNAL DE LUCMA, DISTRITO DE SAN MARCOS - HUARI" Subpresupuesto 001 LOCAL COMUNAL LUCMA Fecha 15/08/2010 Lugar 021014 ANCASH - HUARI - SAN MARCOS Código Recurso Unidad Cantidad Precio S/. Parcial S/. Presupuestado S/.
0212120026 FOCO AHORRADOR PRISMATICO DE UND 12.0000 22.60 271.20 271.20
20W 0230700086 FUENTE ORNAMENTAL, INC. GLB 1.0000 10,000.00 10,000.00 10,000.00 INSTALACION 0205360006 GRAVA M3 7.5000 100.84 756.30 756.30 0337600038 GUANTES DE CUERO DE 10 1/2" PAR 36.0000 14.00 504.00 504.00 0147010080 GUARDIAN MES 6.0000 2,035.20 12,211.20 12,211.20 0147010105 GUARDIAN NOCHE MES 6.0000 2,251.20 13,507.20 13,507.20 0337010001 HERRAMIENTAS MANUALES %MO 5,312.70 5,312.70 0239020020 HOJA DE SIERRA PZA 27.8900 2.00 55.78 55.78 0238000000 HORMIGON M3 534.2941 100.84 53,877.80 53,876.74 0229010101 IMPERMEABILIZANTE SELLADOR PISOS GLN 28.3440 48.60 1,377.32 1,377.52 0239100105 IMPRESORA PARA A-4 LASSER UND 7.0000 638.66 4,470.62 4,470.62 0147010103 INGENIERO CAPACITADOR GLB 1.0000 3,000.00 3,000.00 3,000.00 0210010067 INODORO ONE PIECE ELONGADO PZA 4.0000 532.62 2,130.48 2,130.48 EVOLUTION 0212030037 INTERRUPTOR SIMPLE BLANCO UND 56.0000 12.20 683.20 683.20 0212030036 INTERRUPTOR TERMOMAGNETIC DE UND 4.0000 100.81 403.24 403.24 3x60A 0210070000 JABONERA C/ASA P/BANO 15x15 UND 2.0000 16.81 33.62 33.62 BLANCA 0230200005 LACA DESMOLDEADORA GLN 25.2918 21.00 531.09 531.13 0217000023 LADRILLO K.K. DE ARCILLA 9X14X24 CM UND 11,842.8000 0.97 11,487.52 11,487.51 0217010004 LADRILLO P/TECHO DE 15x30x30 CM 8 UND 2,022.8565 2.20 4,450.29 4,450.28 HCOS. 0217040006 LADRILLO PASTELERO 24X 24X3 CM UND 2,409.2400 1.30 3,132.01 3,132.01 0205030078 LAJA ORNAMENTAL M2 84.2940 120.00 10,114.80 10,115.28 0230700085 LAVATORIO PEDESTAL FONTAINE PZA 4.0000 187.95 751.80 751.80 0337990100 LENTES DE PROTECCION PZA 36.0000 22.00 792.00 792.00 0243130071 MADERA CEDRO CEPILLADO P2 2,935.7500 7.22 21,196.12 21,196.12 0243010099 MADERA TORNILLO P2 7,325.4861 6.72 49,227.29 49,224.43 0230530001 MASILLA PARA VIDRIO KG 35.5320 2.60 92.38 92.38 0239500104 MATERIAL DIDACTICO GLB 1.0000 150.00 150.00 150.00 0224030004 MAYOLICA BLANCA 1ra 15cm x 15cm M2 18.4800 32.00 591.36 591.36 0349100007 MEZCLADORA CONCRETO TAMBOR HM 368.8294 24.30 8,962.57 8,964.49 18HP 11P3 0337540001 MIRAS Y JALONES HM 37.3648 1.25 46.70 46.71 0232970001 MOVILIZACION Y DESMOVILIZACION DE EST 1.0000 5,040.16 5,040.16 5,040.16 EQUIPO 0239970009 MUEBLE PARA COMPUTO UND 7.0000 294.12 2,058.84 2,058.84 0265130064 NIPLE DE Fo Go DE 1/2" x 1 1/2" UND 8.0000 8.40 67.20 67.20 0349190003 NIVEL HE 9.8688 20.25 199.87 199.84 0349890001 NIVEL TOPOGRAFICO HM 38.9995 10.00 390.00 390.00 0147010003 OFICIAL HH 2,588.4560 9.38 24,279.75 24,337.59 0229980032 OLLAS TIPO RENAWARE JGO 1.0000 2,100.84 2,100.84 2,100.84 0147000022 OPERADOR DE EQUIPO LIVIANO HH 91.0227 10.91 993.03 993.55 0147000023 OPERADOR DE EQUIPO PESADO HH 6.9803 10.91 76.15 76.12 0147010002 OPERARIO HH 5,656.1902 10.91 61,709.03 61,743.59 0244040015 PANELES DE POLICARBONATO PZA 2.0000 420.00 840.00 840.00 0239100107 PANTALLA ECRAN UND 2.0000 420.17 840.34 840.34 0210100000 PAPELERA C/EJE 15x15 BLANCA UND 2.0000 16.81 33.62 33.62 0230460038 PEGAMENTO PARA LOSETAS Y BOL 44.7050 18.00 804.60 804.69 CERAMICAS 0230460035 PEGAMENTO PARA PVC 1/4 GLN UND 5.6917 50.42 286.89 286.34 0147010004 PEON HH 10,771.0599 8.48 91,338.59 91,345.30 0147010017 PEON/MES MES 6.0000 2,035.20 12,211.20 12,211.20 0202050001 PERNO DE ANCLAJE P. ENCOF. 1/2"x0.50 PZA 34.5690 1.20 41.48 40.84 m. 0205000034 PIEDRA CANTO RODADO 1/2 A 3/4" M3 3.0000 109.24 327.72 327.72 0205000010 PIEDRA MEDIANA DE 4" M3 16.3380 42.02 686.61 686.58 0205000011 PIEDRA MEDIANA DE 6" M3 253.0360 42.02 10,632.74 10,632.68 0205030070 PIEDRA PARA PISO M2 34.5135 80.00 2,760.80 2,761.08 0205000025 PIEDRA SELECCIONADA M3 170.4005 109.24 18,614.50 18,613.89 0254830001 PINTURA IMPRIMANTE GLN 147.7749 1.26 186.19 181.88 0254010051 PINTURA LATEX GLN 56.8365 26.50 1,506.26 1,511.85 0243980048 PIZARRA ACRILICA UND 2.0000 42.02 84.04 84.04 0212220067 PLACA PVC BLANCO PARA TOMAS DE UND 88.0000 20.20 1,777.60 1,777.60 LUZ Y FUERZA 0230150016 PORCELANA KG 79.2519 2.50 198.13 201.86 0239100106 PROYECTOR MULTIMEDIA UND 2.0000 4,517.65 9,035.30 9,035.30 0239100109 PROYECTOR MULTIMEDIA H 15.0000 78.00 1,170.00 1,170.00 S10 Página : 3
Precios y cantidades de recursos requeridos
Obra 0301017 "CONSTRUCCION DEL LOCAL COMUNAL DE LUCMA, DISTRITO DE SAN MARCOS - HUARI" Subpresupuesto 001 LOCAL COMUNAL LUCMA Fecha 15/08/2010 Lugar 021014 ANCASH - HUARI - SAN MARCOS Código Recurso Unidad Cantidad Precio S/. Parcial S/. Presupuestado S/.
0243130118 PUERTA 1.80 X 2.10M. Ang.= 1 1/2", T=1", UND 1.0000 1,000.00 1,000.00 1,000.00 Cuadr 1/2", Plancha 1/20, inc. chapa 0272160001 RAMAL TEE SIMPLE PVC SAL DE 2" UND 4.0000 5.88 23.52 23.52 0147400006 REACONDICIONAMIENTO DE HH 80.0000 8.48 678.40 678.40 CAMPAMENTOS 0147400007 REACONDICIONAMIENTO DE ZONAS HH 144.0000 8.48 1,221.12 1,221.12 OCUPADAS POR MAQUINARIA 0273180011 REDUCCION PVC P/AGUA S/PRESION PZA 16.0000 1.80 28.80 28.80 3/4" A ½" 0211010100 REFLECTOR EMPOTRABLE PISO, UND 13.0000 129.90 1,688.70 1,688.70 HALOGURO METALICO 150W 0239080037 REFRIGERADORA UND 1.0000 2,361.34 2,361.34 2,361.34 0239120102 REFRIGERIO UND 120.0000 6.00 720.00 720.00 0243160052 REGLA DE MADERA P2 60.5144 5.04 304.97 305.00 0239900101 REJA METALICA DE H=2M, SEGUN M 9.7650 220.00 2,149.40 2,148.30 DISENO 0251990005 REJILLA METALICA ANCHO 0.20 MTS, M 9.9000 80.00 792.00 792.00 SEGUN DISENO 0243980049 REPOSTERO GLB 1.0000 504.20 504.20 504.20 0337620035 RESPIRADOR CONTRA POLVO UND 36.0000 12.00 432.00 432.00 0147400005 RIEGO PARA MITIGAR EL POLVO HH 80.0000 8.48 678.40 678.40 0254610001 SELLADOR GLN 37.8531 25.00 946.25 943.49 0239500103 SEPARATAS DE CAPACITACION GLB 1.0000 150.00 150.00 150.00 0243980047 SILLAS UND 120.0000 21.01 2,521.20 2,521.20 0243980045 SILLAS PARA ESCRITORIO UND 20.0000 96.94 1,938.80 1,938.80 0268040000 SUMIDERO DE BRONCE DE 2" UND 5.6800 2.94 16.70 16.72 0212000049 TABLERO METALICO EMPOTRADO TIPO UND 4.0000 100.81 403.24 403.24 ENGRAMPE 0250060010 TAPA C/MARCO FºFº DE DESAGUE 12" X PZA 2.0000 12.60 25.20 25.20 24" 0272070001 TEE PVC SAP 3/4" C/R P/AGUA UND 6.0600 2.10 12.73 12.72 0272070000 TEE PVC SAP DE 1/2" C/R PARA AGUA UND 50.5000 1.10 55.55 55.50 0272170019 TEE SANITARIA SIMP C/REDUC PVC SAL UND 4.0000 2.80 11.20 11.20 4"A2" 0272170003 TEE SANITARIA SIMPLE PVC SAL DE 4" UND 8.0000 3.78 30.24 30.24 0349190001 TEODOLITO HM 47.2336 10.00 472.30 472.33 0212310079 TOMACORRIENTE DOBLE BLANCO UND 32.0000 11.70 374.40 374.40 0147000032 TOPOGRAFO HH 59.6807 10.52 627.83 626.73 0244030006 TRIPLAY LUPUNA DE 4'x8'x 6 mm PLN 73.4064 25.21 1,850.67 1,850.63 0272130009 TUB. PVC SAL P/DESAGUE DE 2" M 22.8000 2.94 67.03 67.04 0272130011 TUB. PVC SAL P/DESAGUE DE 4" M 10.0000 5.88 58.80 58.80 0272000030 TUB. PVC SAP PRESION C-10 C/R. 3/4" x UND 6.3000 25.50 160.65 160.68 5m 0272000081 TUB. PVC SAP PRESION P/AGUA C-10 R. M 60.1800 1.26 75.83 75.92 1/2" 0272000082 TUB. PVC SAP PRESION P/AGUA C-10 R. M 30.1123 5.10 153.56 153.36 3/4" 0272240003 TUB. PVC SEL P/INST. ELECT. DE 1" x 3m UND 38.4000 2.20 84.48 84.48 0272240008 TUB. PVC SEL P/INST. ELECT. DE 5/8" PZA 84.0000 2.35 197.40 197.68 0272730002 TUBERIA PERFORADA UPVC D=8" M 175.7595 29.60 5,202.50 5,202.48 0273010026 TUBERIA PVC SAL 2" M 8.0000 2.52 20.16 20.16 0273010035 TUBERIA PVC SAL 6" M 33.8100 16.20 547.72 547.72 0273010007 TUBO PVC SAL 2" X 3M PZA 11.2000 7.56 84.67 84.80 0273010009 TUBO PVC SAL 4" X 3M PZA 6.3000 17.64 111.13 111.06 0265050011 UNION UNIVERSAL DE Fo. GALV. DE 1/2" UND 8.0000 15.13 121.04 121.04 0277030003 VALVULA CHECK DE BRONCE DE 3/4" UND 4.0000 23.53 94.12 94.12 0277000002 VALVULA COMPUERTA DE BRONCE DE UND 4.0000 21.00 84.00 84.00 1/2" 0229080071 VARILLA DE COBRE 3/4" X 2.40M PZA 1.0000 239.90 239.90 239.90 0349070004 VIBRADOR DE CONCRETO 4 HP 2.40" HM 191.5684 20.25 3,879.29 3,879.20 0279000007 VIDRIO TRANSPARENTE INCOLORO P2 746.1720 2.80 2,089.28 2,089.28 CRUDO MEDIODOBLE 0348110004 VOLQUETE DE 10 M3 HM 146.0185 230.00 33,584.60 33,589.18 0212080062 WALL SOCKET DE ROSCA UND 12.0000 5.90 70.80 70.80 0349180024 WINCHE DE DOS BALDES (350KG)M.E. HM 27.0001 2.00 54.00 53.99 3.6HP 0272810001 YEE PVC C/REDUCCION 4" X 2" PZA 8.0000 3.78 30.24 30.24 0229030002 YESO EN BOLSAS DE 25 KG. BOL 4.2695 4.23 18.06 16.62 0337620040 ZAPATOS PUNTA ACERO PAR 36.0000 200.00 7,200.00 7,200.00 S10 Página : 4
Precios y cantidades de recursos requeridos
Obra 0301017 "CONSTRUCCION DEL LOCAL COMUNAL DE LUCMA, DISTRITO DE SAN MARCOS - HUARI" Subpresupuesto 001 LOCAL COMUNAL LUCMA Fecha 15/08/2010 Lugar 021014 ANCASH - HUARI - SAN MARCOS Código Recurso Unidad Cantidad Precio S/. Parcial S/. Presupuestado S/.
S/. 1,006,791.83 1,006,757.20
Total S/. 1,006,757.20
La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está utilizando