Bill of Quantities and Cost Breakdown Electrical Work: Project: Capstan Project
Bill of Quantities and Cost Breakdown Electrical Work: Project: Capstan Project
Bill of Quantities and Cost Breakdown Electrical Work: Project: Capstan Project
1380 GENERAL
1 Scaffolding
1.1 Supply, erection and dismantling scaffolding Set 1
1.2 Mobilization and transfortation Set 1
2 Cable Trench
2.1 Excavation M3 192
2.2 Sand Filling M3 119
2.3 Back Filling M3 72
2.4 Cable Protection Tile M2 240
Cable Warning Sheet M2 240
1/1