Tabel Csa Otw !!! New Kapal
Tabel Csa Otw !!! New Kapal
Tabel Csa Otw !!! New Kapal
LOA 119.04 m
LPP 112.84 m
B 13.46 m
H 5.8 m
T 3.8 m
Vs 13 knot
DWT 3280 ton
Fn 0.20
0.15<Fn<0.32
CM = 1/ (1 + (1 - CB)^3.5)
0.99
CWP = (1 + 2*CB)/3
0.84
CP = CB/CM
0.77
-57.5668
0.670115
0.713553
CB = 1.036-1.46*Fn
0.742402
CM= 0.9+0.1*CB
0.976267
CW = CB/(0.471+0.551*CB)
0.855749
Tabel Perencanaan CSA
AST ASTxFs
0.0025921053
0.0005943291
0.0005770186
CANAAN KURVA SECTIONAL AREA (CSA)
m Cb = 0.76
m Cp = 0.77
m Cm = 0.99
m Cw = 0.83
m Lcb = 0.014
m R= m
m^3 x= m
m^2 x/h =
m^2
1/3 x h x Sigma 1
m^3
igma 2 / Sigma 1) x h
m -0.05161856
50.00
40.00
20.00
10.00
0.00
-5.00 0.00 5.00
21; 23.2
Axis Title
CSA
A/2T
WPA
21; 23.29
0 20.00 25.00
Masukan :
Lpp = 112.84 m
Lwl = 116.23 m
B= 13.64 m
H= 5.80 m
T= 2.80 m
Cw = 0.83
Sudut masuk = 22.50 deg
Keluaran :
Jarak station (h) = 5.642
Luas garis air (Awl) = 1298.44
6.82
60.00
50.00 0.158
40.00 34.1
0.00
-5.00 0.00 5.00 10.00 15.00 20.00 25.00
Axis Title
Perhitungan koreksi :
Luas garis air (Awl) = { [Awl - Awl (tabel)] / Awl } x 100 %
= 0.008 % ( maksimum = 0,5 % )
Station Bwl/2 Fs As x Fs n As x Fs x n
-0.6 0.00 0.30 0 -10.50 0
-0.3 1.463 0.80 1.17 -10.25 -12.00
0 2.219 1.00 2.219 -10.00 -22.190
1 4.036 4.00 16.143 -9.00 -145.285
2 5.093 2.00 10.187 -8.00 -81.493
3 5.832 4.00 23.329 -7.00 -163.302
4 6.465 2.00 12.930 -6.00 -77.580
5 6.656 4.00 26.624 -5.00 -133.120
6 6.785 2.00 13.570 -4.00 -54.280
m 7 6.800 4.00 27.200 -3.00 -81.600
m^2 8 6.820 2.00 13.640 -2.00 -27.280
9 6.820 4.00 27.280 -1.00 -27.280
10 6.820 2.00 13.640 0.00 0.000
11 6.820 4.00 27.280 1.00 27.280
12 6.820 2.00 13.640 2.00 27.280
13 6.820 4.00 27.280 3.00 81.840
14 6.800 2.00 13.600 4.00 54.400
15 6.700 4.00 26.800 5.00 134.000
16 6.313 2.00 12.625 6.00 75.752
17 5.351 4.00 21.405 7.00 149.834
18 3.937 2.00 7.874 8.00 62.992
19 2.395 4.00 9.580 9.00 86.216
20 0.000 1.00 0.000 10.00 0.000
∑1 = 348.015 ∑2 = -125.812
50.00
40.00
20.00
10.00
0.00
-5.00 0.00 5.00
21; 23.29
Axis Title
CSA
WPA
21; 23.29
20.00 25.00