Gate Valve Assembly
Gate Valve Assembly
Gate Valve Assembly
Description:
2.16”-5m, flange end, TC model, GVA 6A
Material: EE-0.5 API6A PR1&2
Temperature: U PLS3 Material: AA-HH
Assembly drawing:000008
Assembly Procedure: 000009
Test Procedure: 000003
The GATE VALVE ASSEMBLY: ‘as per procedure 000009 part 3.0’
3.1 Eliminate the Body, Bonnet, Seats, Gate & Stem of soils, chips, excess grease, etc.
7. Torqueing
7.1 For size of nuts 3/4 = 40psi on the impact torqueing.
7.2 Start tightening the opposites, then a full round.
9. Drifting
9.1 Operate the hand wheel anti-clock wise till its fully open then operate it clock-wise by ¼ turn and drift.
10. Name plate
10.1 Fix nameplates in the body by means of 4 drive screws and mark as per the details provided.
Note: PLS 1&2 only requires switching the place of the bleeder and pressure gage, whereas PLS 3 requires to place the gate
valve at the opposite flange.
Sub Clause
Parameter
PSL-1 PSL-2 PLS-3
Drift Test Required Required Required
1) Hold 3 min. @7500 PSI 1) Hold 3 min. @7500 psi 1) Hold 3 min. @7500 PSI
Hydrostatic
2) Drop to zero 2) Drop to zero 2) Drop to zero
Body Test
3) Hold 3 min. @7500 PSI 3) Hold 3 min. @7500 psi 3) Hold 15 min. @7500 psi
1) Hold 3 min. @5000 psi 1) Hold 3 min. @5000 psi 1) Hold 3 min. @5000 psi
2) Drop to zero 2) Open the Valve at diff. pres. 2) Open the Valve at diff. pres.
Hydrostatic 3) Hold 3 min. @5000 psi 3) Hold 3 min. @5000 psi 3) Hold 3 min. @5000 psi
Seat Test 4) Open the Valve at diff. 4) Open the Valve at diff. pres. 4) Open the Valve at diff. pres.
pres. 5) Hold 3 min. @5000 psi 5) Hold 3 min. @5000 psi
6) Open the Valve at diff. pres. 6) Open the Valve at diff. pres.
Chart Recording Not Required Not Required Required
Tools Needed:
Spanners
Impact
Torque Range
Forklift
Spanner To Use:
Zerk: 11mm
Hex: 13mm
Lube fitting: 1”
Nuts: 32 bonnet
Nuts: 7/8 flange
Flange: 36 mm