Tadipatri Engineering College, Tadipatri: Iii B.Tech Ii Sem I Mid-Term Examination Descriptive Branch: Civil
Tadipatri Engineering College, Tadipatri: Iii B.Tech Ii Sem I Mid-Term Examination Descriptive Branch: Civil
Tadipatri Engineering College, Tadipatri: Iii B.Tech Ii Sem I Mid-Term Examination Descriptive Branch: Civil
BRANCH: CIVIL
2.Define camber________________
4.PIEV means______________________________
(D)L = 2S/(√2H+√2h)2
(A) nl2 ,2R (B) nl2 / 2R, V/9.5 √R (C) nl2 / 2R , V/6.5 √R (D) nl2 / 2R, V2/R
14. T= √(4S/a) is ( )
(A)1in 33 to 1in 40 (B) 1in 25 to 1in 33 (C) 1in 25 to 1in 33 (D) 1in 50 to 1in 60
16.The signs which are used to warn the certain hazardous conditions are
called as
a)warning signs b)prohibitory signs c)danger signs d)accidental signs ( )
17.Draw the giveway and stop signs_________________________
BRANCH: CIVIL
2.Define camber________________
4.PIEV means______________________________
(D)L = 2S/(√2H+√2h)2
(A) nl2 ,2R (B) nl2 / 2R, V/9.5 √R (C) nl2 / 2R , V/6.5 √R (D) nl2 / 2R, V2/R
14. T= √(4S/a) is ( )
(A)1in 33 to 1in 40 (B) 1in 25 to 1in 33 (C) 1in 25 to 1in 33 (D) 1in 50 to 1in 60
16.The signs which are used to warn the certain hazardous conditions are
called as
a)warning signs b)prohibitory signs c)danger signs d)accidental signs ( )
17.Draw the giveway and stop signs_________________________