As well as building relationships in multidisciplinary teams I have also built relationships with
Example 1
LY
■■
T C ON
■■ Charity partners when completing a secondment with XXXX
■■ The Environment Agency when working in the regulation team
When flooding occurred in Carlisle, I worked for a week with electricity supply colleagues
Y
visiting customers to advise them on electricity supply cut offs. This required me to show
NO CE
empathy and resolve conflict with customers who had been badly affected. After completing
OP
the carbon saving technologies study described in question Aiii I realised there was the potential
to develop the company’s use of heat pumps which would result in opex and carbon savings.
I needed colleagues in different areas of the business including engineering, asset strategy,
and operations to work together. I arranged and facilitated a brain storming session with
N
these parties and we put together an action plan. This resulted in several applications for the
technology being identified and the initiation of an R&D project.
RE
Following this I have become a focal point for applications of the technology, bringing teams
working on different aspects together to share experience. For example an electrical engineering
colleague working on an air pump heating system which uses heat from an electrical control
room to heat other areas of a building approached me for advice. I also have met with a
FE
geotechnical engineer to understand their capabilities for designing ground heat systems. I have
also built relationships with external suppliers of the technology.
To facilitate knowledge sharing in my discipline team I maintain and promote the use of a
RE
During my PhD, a colleague and I were awarded a travel scholarship of £3k each, to undertake
Example 2
work at a research centre in Germany. I suggested that we attend the centre together and
manage our funds jointly to enable us achieve savings. Due to the remote location of the
research centre, public transport was limited. We arranged to live in the same neighbourhood
and contributed towards the costs of a car and fuel for commuting and living purposes. The
financial benefits of our decision to share our funds allowed us to extend our stay, thereby
performing additional research work at a world-class facility, which was important to
successfully completing my PhD.
Get Chartered – professional experience
Section Ci
I was responsible for collecting and editing articles for inclusion in the site Environment, Health
Example 3
–
& Safety newsletter each month at a previous company. This involved liasing with staff from
different departments and varying backgrounds and providing them with my professional
advice in order to produce an outstanding article. I devised various means of communicating
LY
the newsletter to the whole site, via internal post to departments in order to be posted on
their noticeboards, by liasing with IT to obtain via the site email system for all staff with access
to computers and by ensuring content of newsletter are being discussed at departmental
T C ON
meetings.
I led the selection of a suitable training provider for training automation engineers. I
investigated if a recommended company was suitable for training the group I was responsible
to look after, i.e. Automation IT department. I invited the company along for an interview
and asked a rep from the group, an automation engineer along to the interview session. We
Y
asked for examples of reports they have produced and also provided them information on
NO CE
what we wanted and asked if they could meet our needs. The company has now agreed to
OP
use them based on our recommendations, even though they were not on our approved list of
suppliers. A 4 day training course on work equipment safety and CE Marking was aranged. 13
Automation Engineers attended the course and I also attended in order to be able to assess
N
whether other engineers will benefit from a similar course.
I was responsible for interviewing 3 contracting companies in order to find the most suitable
RE
contractor for carrying out the project on refurbishing the multi-storey car park. Other
members of the interview panel were: the project manager, procurement specialist and civil
engineer. The right company that achieved the refurbishment project was carefully selected,
based on the scoring system used.
FE
I supported and worked with the engineering department to lead them through the compliance
with the relevant statutory and corporate legislation. This has proven difficult at times and
excellent working relations need to be maintained for positive results to be achieved. I worked
RE
I have regular contact with site senior production, engineering and quality management. For
Example 4
0639_12