2.0 OBJECTIVE
3.0 SCOPE
4.0 REFERENCE
5.0 DEFINITIONS
6.0 RESPOSIBILITIES
8.0 EQUIPMENT’s
10.0 METHODOLOGY
ISSUED FOR
02 REVIEW & 01 11/06/2018 RAJASEKAR SHIJU K P JANI
COMMENTS
ISSUED FOR
01 REVIEW & 00 17/05/2018 SKD SKD KPJ
COMMENTS
S. CHECKED APPROVED
DESCRIPTIONS REVISION DATE ORIGINATOR
No. BY: BY:
The objective of this document is to perform the tube to tube sheet expansion for
providing a mechanical strength and sealed joint for the successful re-tubing of Shell
and Tube exchanger’s 25-E0609A/B/C/D & 25-E610. The procedure comply with,
01 safety procedures applicable & precaution/mitigation that need to be taken in
accordance with QG safety rules and regulations.
3.0 SCOPE:
The scope of this procedure is to describe in details of how to make the tube to tube
sheet expansion joint for the Re-Tubing of Condenser 25-E609A/B/CD & 25-E610 as
01 described in the SOW at AMC Workshop or Any AMC recommended designated area
(Sub-Contractor Premises).
4.0 REFERENCE:
5.0 DEFINITIONS:
PROJECT MANAGER
- Shall be responsible for overall work and coordinate with COMPANY & AMC
team and resolve the re-tubing issues while execution.
WORK SUPERVISOR
- Shall be responsible for overall work which allocated to him and he shall report
all job related constraints and update to designated Project Manager and
manage the work progress as per schedule.
QA/QC Inspector
Daily Tool Box Talk to be performed with all crew at Workshop with heat
mitigation, pinch point issues and scope to be performed each day. Daily
information and communication attached with a signed attendance sheet of all
attending employees there working that day. Listing specific points of interest and
available in several languages.
All jobs above height 1.2mtr must be carried out by using proper scaffolding
platform and proper tagging to be done.
All personnel who works height for the removal of nozzle blind, must wear safety
harness.
All the planned activity and duration must be communicated with all team member
to avoid confusions and loose talk.
If any change in planned activity must have to reported or intimated to COMPANY
person.
Work shop escape routes must be clearly highlighted and properly communicated
to everyone.
HSE-coordinator will monitor site safety requirements & compliance during
execution.
Appropriate PPE’s will be worn by personnel working at site.
Housekeeping will be maintained on regular basis.
8.0 EQUIPMENT’S
Sr. Exchanger Qty. Cate Tube Detail Tube Tube Tube Sheet Tube T-TS Joint
No Details & Tag gory Qty. Material Material Pitch
. No. (Nos) In Total
(Nos)
01 25- 04 O.D 19.05mm 6467 x 4 SA179 SA765-2+N 25.4 Heavy
E0609A/B/C/D A x 2.11 thk. = 25,868 Expanded
-9000L 50mm, Light
Expanded-
47mm
02 25-E0610 01 O.D 19.05mm 5912 x 1 SA179 SA765-2N 23.8 Heavy
A x 2.11 thk. = 5912 Expanded
-12000L 50mm, Light
Expanded-
82mm
Reduction range of tube wall thickness for heavy expansion shall not exceed 6% to
8% of tube thickness & % expansion shall be max 8% (heavy expansion), as
specified in the approved drawings. Light expansion % shall be max. 3%.
The reduction in thickness is controlled with the adjustment of the expansion
torque.
The expansion length is specified (Para.9, Details of Exchanger for Re-Tubing) for
each type heat exchanger.(for expansion sequence, see 10.3)
The differential expansion will be achieved by controlling the torque given by
01
wattage reading on the torque control.
Light expansion is just closing the clearance but heavy expansion is to have the
tube to forced and embedded into the tube sheet. Light expansion is normally 0-
3% (Min. 2-3% to be considered) where as heavy expansion is 6-8%.
Start at a lower testing of the torque and check inside diameter of tube for %
expansion.
Repeat the operation till the correct dimension as per approved drawing is
achieved.
The unit is now ready for complete use. This torque setting gives uniform tube
expanding.
After expanding of each tube the expander rotates in opposite direction which
facilitates easy removal of the expander.
Inspection: 01
The integrity of the expansion joint will be tested through shell side hydro test. (Refer hydro
test procedure (AMCOG-QAQC-HYDRO-18-002) for more details.)
Since the amount of wall reduction greatly determines the quality of the tube joint,
it is important to arrive the % required prior to tube rolling. This technique is used
to set torque of the rolling devices. The following % reductions are recommended
to achieve a proper tube joint (Mechanical Joint).
Check that the expansion is within the recommended range. Torque setting may be
gradually changed to achieve the proper expansion ratio. Later use the same
torque value for rolling the rest of the tubes.
Use suitable lubricant for rolling.
In case tube is under rolled i.e. tube is not expanded to fill the tube sheet hole and
proper amount of wall reduction is not obtained then reroll using the next higher
size roller. Take care not to over roll as that can do damage to T/S.
Torque Controller
Tube Expander/Roller
EXPANSION REPORT
PROJECT : RE-TUBING OF FRESH COOLING WATER EXCHANGER
REF.CODE/SPECIFICATION : ASME Sec VIII Div.1/ASME
EXCHANGER TAG. 25-E0609A/B/C/D & 25-0610 Sec IX /TEMA R, API 660
EXPANSION DETAILS :- After every 25% tube expansion (Approx. 1600 tubes) *
Name :
Designation :
Signature :