MATERIAL APPROVAL SHEET

Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-001
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product POLYTHENE SHEET
reference
Brand/Manufactrer UNIPLAST
Supplier AL KHALILI UNITED ENTERPRISES LLC
Supplier information DILEEP
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-4
Date of material 11/19/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

1 COMPANY PROFILE

2 COMPLIANCE STATEMENT

3 DATA SHEET

4 TEST CERTIFICATE

5 PREVIOUSLY APPROVED MAS


MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-002
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product BITUMEN EMULSION PAINT
reference
Brand/Manufactrer HENKEL POLYBIT
Supplier AL KHALILI UNITED ENTERPRISES LLC
Supplier information DILEEP
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-4
Date of material 11/17/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

COMPANY PROFILE
1

COMPLIANCE STATEMENT
2

DATA SHEET
3

TEST CERTIFICATE
4

LIST OF PREVIOUS PROJECTS


5

PREVIOUSLY APPROVED MAS


6
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-003
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product CURING COMPOUND
reference
Brand/Manufactrer BASF CONSTRUCTION CHEMICALS
Supplier AL KHALILI UNITED ENTERPRISES LLC
Supplier information DILEEP
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-4
Date of material 11/22/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

COMPANY PROFILE
1

COMPLIANCE STATEMENT
2

DATA SHEET
3

TEST CERTIFICATE
4

LIST OF PREVIOUS PROJECTS


5

PREVIOUSLY APPROVED MAS


6
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-004
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product CONCRETE RCC AND PCC
reference
Brand/Manufactrer AL TASNIM CEMENT PRODUCTS LLC
Supplier AL TASNIM CEMENT PRODUCTS LLC
Supplier information DILEEP
BOQ reference
Specification
reference
Drawing reference HSBC BE 002-I-4
Date of material 11/17/2019
required at site

Notice of cost Yes No If yes please specify………………………………………..


variation
Product Omani Non-Omani
Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..
ADDITIONAL COMMENTS IF ANY
REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

1
COMPANY PROFILE

2
DATA SHEET

3
TEST CERTIFICATE

4
LIST OR PREVIOUS PROJECTS

5
CONCRETE MIX PROPORTIONS

6
AGGREGARE TEST RESULTS

7
WATER TEST RESULTS

8
CEMENT TEST CERTIFICATE

9
ADMIXTURE DATA SHEET

10
TOTAL SULPHATES AND CLORIDES IN CONCRETE
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-005
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product BACKFILLING MATERIAL
reference
Brand/Manufactrer ORIENTAL CRUSHERS
Supplier ORIENTAL CRUSHERS
Supplier information THOMAS
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-4
Date of material 11/14/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

COMPANY PROFILE
1

COMPLIANCE STATEMENT
2

TEST CERTIFICATE
3

LIST OF PREVIOUS PROJECTS


4
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-006
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product BACKFILLING MATERIAL
reference
Brand/Manufactrer KRISHI RASAYAN
Supplier MUNA NOOR
Supplier information
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-1
Date of material 11/17/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

COMPANY PROFILE
1

DATA SHEET
2

CERTIFICATES
3

LIST OF PREVIOUS PROJECTS


4
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-007
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product STEEL REBAR
reference
Brand/Manufactrer JINDAL SHADEED IRON AND STEEL
Supplier AL KHARIF INTERNATIONAL
Supplier information
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-4
Date of material 11/17/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

COMPANY PROFILE
1

COMPLIANCE STATEMENT
2

DATA SHEET
3

TEST CERTIFICATE
4
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-008
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product STRUCTURE STEEL
reference
Brand/Manufactrer MULTIPLE
Supplier DBMS
Supplier information
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-1
Date of material 11/17/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 10/22/2019 SHY ELD SE

1 10/30/2019 SHY ELD SE

2 11/11/2019 SHY ELD SE

3 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-CL-009
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product Bindig Wire
reference
Brand/Manufactrer Dingzhou City Shengxim Metal Product
Supplier Al Khalili United Enterprises LLC
Supplier information
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-4
Date of material 11/17/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 11/11/2019 SHY ELD SE

1 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS
MATERIAL APPROVAL SHEET
Engg/Supervision
Client PM Consultant Contractor Reference MAS-STR-002
Consultant
Revision 3
Date
Project Title HSBC 600 KWp SOLAR POWER PROJECT
Client HSBC
Consultant ONJP
Main Contractor BHAWAN ENTERPRISES LLC
Details of material submitted for approval (To be filled by the contractor)
Civil Structural Electrical Mechanical
Decipiline Architectural Others Please Specify………………………………………
Material
Literature Drawing Sample Certificate
Enclosure
Others Please Specify………………………………………
Specific Product STRUCTURE PAINT - PRIMER
reference
Brand/Manufactrer HEMPEL
Supplier BUILDING MATERIALS INTERNATIONAL
Supplier information VIPIN
BOQ reference
Specification reference
Drawing reference HSBC BE 002-I-2-D
Date of material 12/5/2019
required at site

Yes No If yes please specify………………………………………..


Notice of cost variation

Omani Non-Omani
Product Recommended
Remarks if any

……………………………………..... ………………………...
Bahwan Enterprises LLC Date:
Consultant Response Client Response
Additional Information required Additional Information required

Comments Comments

Approved Approved
Recommended with comments Recommended with comments

Resubmit after incorporating additional


information required Resubmit after incorporating additional information required
Rejected Rejected
Date of Issue …………………………………….. Date of Issue ……………………………………..

ADDITIONAL COMMENTS IF ANY


REVISION STATUS

SL# REV DATE PRPD BY CHKD BY APPR BY

0 11/14/2019 SHY ELD SE


SL# TABLE OF CONTENTS REMARKS

1 COMPANY PROFILE

2 DATA SHEET

3 COMPLIANCE STATEMENT

4 TEST CERTIFICATE