INPUT DATA
1 HYDRAULOGICAL DATA
High Flood Level (HFL) = 346.235 m
Low Bed Level (LBL) = 342.370 m
Design discharge in cumecs (Q) = 288 m3/sec
Vertical Clearance = 0.900 m
Afflux = 0.05 m
Freeboard = 0.950 m
Type of Soil (Hard Rock/Rock/Soil) = Soil
Silt Factor (from Soil) = 1.000
Mean Velocity of Water (Vm) (at 0.000 Chainage of River) = 1.274 m/sec
2 SUPERSTRUCTURE
Super Structure Details are addopted from Standard Drawing = 24 m RCC T BEAM
Grade of Concrete(Superstructure) = 30 (M)
skew angle = 0 ˚
Finished Road Level (FRL) = 350.288 m
Level at bottom of girder (Bearing level) = 347.785 m
Thickness of bituminous concrete wearing coat = 0.065 m
Thickness of cement concrete wearing coat 0.075 m
Unit weight of wearing course(RCC concrete) = 25 kN/m3
Effective span (c/c of bearing/cross girder/abutment) (Le) = 24.0 m
No. of Span = 3 no
Length between Expansion Gap center to center = 24.700 m
Expansion gap between Dirt wall inner face to Deck edge = 0.040 m
Expansion gap between Dirt wall outer face to Approach Slab = 0.020 m
Total length of bridge between Inner face of Dirt wall ( L total ) = 74.140 m
=
Distance between center line of Cross Girder & Deck Edge 0.330 m
Length of Approach Slab = 3.500 m
Thickness of Approach Slab = 0.300 m
Total Length of Bridge with Approach Slab = 81.980 m
Total width (W) = 16.000 m
Carriageway width = 11.000 m
Provision of Footpath = yes Area of footpath
Width of Footpath = 1.500 m 0.36
Width of Kerb (bk) = 0.500 m
Width of Crash Barrier (bc) = 0.500 m
Ht. of Kerb (hk) = 0.225 m
Ht. of Crash Barrier (hc) = 0.900 m
Area of Crash Barrier = 0.330 m2
Depth of Girder (Including Deck Slab) at mid point = 2.438
Depth of Girder (Excluding Deck Slab) = 2.051 m
Thickness of deck slab at end = 0.250 m
Thickness of deck slab at mid point = 0.388 m
Length of Cantilever portion of deck slab = 0.180 m
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
3 GIRDER DETAILS
No. of Longitudinal Girder = 5 no
No. of Cross Girder in one span = 3 no
Length of Centre line of bearing to Girder End = 0.330
Total Longitudinal Girder length end to end in one Span = 24.66
Length of the straight part of the Girder at support = 1.0 m
Length of the varying part of the Girder = 1.2 m
Length of the middle part = 20.26 m
Distance between center line of Longituding Girder = 2.900 m
Ht of Rectangle portion in Bulb = 0.25 m
Width of Rectangle portion in Bulb = 0.625 m
Ht of Trapizoidal portion in Bulb = 0.15 m
Thickness of Web of Longitudinal Girder = 0.325 m
Ht. of cross Girder = 1.650 m
Thickness of cross Girder = 0.300 m
Thickness of cross Girder(at end) = 0.300 m
Cross Sectional Area of Deck with Girder at mid portion = 8.876 m2
Cross Sectional Area of Deck with Girder at end portion = 11.317 m2
C.G. Distance of Girder Section (with Deck) from Bottom of Girder = 1.642 m
Total Dead Load of Super Structure on Pier = 6075.822 kN
Total Dead Load of Super Structure on Abutment = 3037.911 kN
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
Length of Abutment Cap (considering sq. dim.= 16.0 m) = 16.000 m
Width of Abutment cap = 1.250 m
Distance between CL of bearing & face of abt cap = 0.500 m
Height of Abutment cap trapezoidal Portion = 0.000 m
Height of Abutment cap rectangular Portion = 1.000 m
Dirt Wall & Return Wall
Thickness of Dirt Wall = 0.400 m
Length of Dirt Wall = 16.000 m
Length of Return Wall = 4.000 m
Thickness of Return Wall at Edge = 0.300 m
Thickness of Return Wall at Face = 0.700 m
Abutment Foundation
Foundation Shape (Rectangle/Tappered) = Tappered
Total Width of Abutment Foundation = 7.100 m FRL-BTFS=
Width of Abutment Foundation at Toe Side = 2.200 m 75%=
Width of Abutment Foundation at Hill Side = 3.700 m
Length of Abutment Foundation = 16.100 m
Thickness of Abutment Foundation at Abutment Face = 1.200 m
Thickness of Abutment Foundation at Edge = 0.600 m
Area of Tappered Foundation = 6.750 m2
Area of Rectangular Foundation = 0.000 m2
C.G of Trapizoidal part of Foundation from foundation bottom = 0.956 m
C.G of Rectangular part of Foundation from foundaion bottom = 0.300 m
C.G of Foundation = 0.538 m
Allowable Base Pressure at Founding Lvl. = 350 kN/m2
Pile and pile cap/Foundation Details :-
Diameter of piles = = 0.000 m
Height of pile cap/foundation slab = = 1.200 m
Length of pile cap/foundation slab = = 16.100 m
Width of pile cap/foundation slab = = 7.100 m
5
DETAILS OF BEARING AND ARRESTER BLOCK
Bearing Type ( Elastomeric/ Rocker-Roller/ Pot cum PTFE ) = Elastomeric
Bearing on Abutment ( Elastomeric/ Rocker-Roller/ Pot PTFE/Pot-Po = Elastomeric
No. of Bearing at Abutment 5 no
No. of Bearing at Pier 10 no
Height of Bearing at C/L of slab = 0.096
Hight of Pedestal below centre Bearing = 0.150
a)
For Elastomeric Bearing
Length of Bearing (along road width ) = 0.56 m
Width of Bearing (along bridge length) = 0.38 m
Height of Bearing = 0.096 m
Maximum Height of Pedestal at Bearing side = 0.15 m
Length Width
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
M X M
6 M X M
SEISMIC ZONE
Seismic Zone = III
Importance Factor = 1.2
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
RCC T BEAM
From IRC:6 (Page - 23,Clause - 211)
Type of Bridge
II 0.10
III 0.16 Normal Bridges
IV 0.24 Important Bridges
V 0.36 Large Critical Bridges
rea of footpath
m2
Wind Calculation:
Bridge Situated in
Plain Terrain Terrain with Obstruction
H (m) Vz (m/s) Pz (N/m2) Vz (m/s) Pz (N/m2)
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
Bridge Situated in
Plain Terrain Terrain with Obstruction
H (m) Vz (m/s) Pz (N/m2) Vz (m/s) Pz (N/m2)
10 32.85 647.65 21.04 266.07
Super Structure:
Gust Factor = 2.00
342.590
IRC 78,pg = 15,16) 311.823 -1.651
309.523
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
###
Tharmal Calculation:
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
>=10 1.1
single 2 1.5
>=6 1.3
two or more 1.95
single 2.2
two or more 2.1
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
Design Calculation For Bridge over Hardiya River at Chainage 32.335 Km of Draft Detailed Project Report
Road Dumka to Hansdiha upto Bihar Border(SH-17)
circle with rough surface 0.7 0.7 0.8 0.8 0.9 1 1.2
m
mm
Clint:SHAJ
Consultant:CETEST-SNBAPL JV Govt. of Jharkhand
ANALYSIS OF ABUTMENT
Basic design data:-
a) Superstructure:-
Formation level = 350.288 m
R.L. of carriageway at end long girder = 350.150 m
Overall length of Bridge= 74.940 m
Span ( c/c of expansion joint) = 24.700 m
Distance between C/L of bearing to C/L of exp. joint = 0.350 m
Effective span (C/C of bearing) = 24.000 m
Clear carraige way width = 11.000 m
Depth of girder+deck slab at CL of carraigeway = 2.438 m
Thickness of Bituminus concrete Wearing Coat = 0.065 m
Thickness of cement concrete Wearing Coat = 0.075 m
b) Sub-structure :-
Bearing and pedestal :
Level of bearings = 347.785 m.
Thickness of bearing = 0.096 m
Thickness of pedestal = 0.150 m
Maximum ht of bearing + pedestal = 0.246 m
c) Abutment cap :
Top of abutment Cap = 347.539 m
Bottom of Abutment cap = 346.539 m
Length of abutment Cap = 16.000 m
Thickness of abutment cap= 1 m
Width of abutment cap at top (including dirt wall part) = 1.250 m
Width of abutment cap at bottom = 1.250 m
abutment shaft :
Total length of abutment shaft = 16.00 m
Thickness of abutment wall = 1.200 m
Height of abutment wall = 4.400 m
Height of frame at abutment location = 5.646 m
Dirt wall :
Thikcness of Dirt wall = 0.400 m
Height of Dirt wall = 2.680 m
Length of dirt wall = 16.000 m
Return wall :
Width of Return wall = (avg.) 0.500 m
Length of return wall = 4.000 m
Height of return wall = 8.221 m
Foundation and foundation Slab :
Thickness of foundation slab at abutment face= 1.200 m
Thickness of foundation slab at edge= 0.600 m
Length of foundation slab = 16.1 m
Width of foundation slab = 7.1 m
Bottom of foundation slab = 340.939 m
Top of foundation slab = 342.139 m
Approach Slab :
Length of approach slab = 3.500 m
Thickness of approach slab = 0.438 m (At mid-section)
Thickness of approach slab = 0.300 m (At edge)
d) Material Properties :
Grade of steel = Fe 500
Grade of Concrete = M 30
Unit Weight of concrete = 25 KN/m3
Unit Weight of Cement concrete Wearing Coat = 25 KN/m3
Unit Weight of Bituminus concrete Wearing Coat = 22 KN/m3
e) Soil property:-
Density of soil = 20.00 KN/m3
Angle of Shearing resistance of backfill soil = 30o
Property of Backfill material behind Abutment and Return wall
f= 30.00 o
d= 20.00 o
a= 0.00 o
i= 0.00 o
g= 20.00 KN/m3
FRL = 350.288 m
2.680 0.5
1
1.25
4.400
CL of bearing
1.2
1.2
0.6
Bottom of foundation =340.939 m
7.10
Details of abutment
LOAD CALCULATIONS
Permanent Load :
Self Weight/Dead Load
Weight of backfill above the hill side of the abutment foundation slab=
( 15.1 m x 3.7 m x 7.6335 m x 20)-(0.05 m x 3.68 m x 15.1 m x 20)= 9465.797 KN
Distance of center of load from abutment center = 2.35 m
Earth Pressure
Calculation of Active Earth Pressure Coefficient (Static)
cos2(8-8) = 0.75
cos28 = 1.00
cos(8+8) = 0.94
cos(8-8) =1.00
sin(8+8) = 0.77
sin(8-8) =0.50
Ka = 0.279
Considering dirt wall
Height of Dirt wall = H = 2.680 m
Length of dirt wall = 16.000 m
2.680
1.126
14.95 KN/m2
Earth pressure at base due to backfill soil =0.279x20x2.68 = 14.95 KN/m2
Total load on dirt wall = 320.53 KN
This load is located 0.42 of the height of wall above base,
Lever arm = 1.126 m…..(Clause 214.1,IRC:6-2014,page-41)
Moment at dirt wall base = 360.786 KN-m
8.08
3.394
45.086 KN/m2
So,on one abutment total surfacing load or load due to wearing coat = 263.31 KN
Vehicular Live Load
114 114 68 68 68 68
1.2 4.3 3 3 3 9.83
2.9 1.8
8m eT 8 m
8 8
684
Maximum Reaction = 1338.1 kN
And transverse eccentricity, wrt deck, eT = 0.70 m
And longitudinal eccentricity, wrt abutment, eL = -0.1 m
8 8
928
Maximum Reaction for 70R Tracked = Rb = 698.3 kN
Maximum Reaction for single lane Class A = Rb = 446.0 kN
Hence,Total Reaction Rb = 1144.3 kN
8 8
568
max transverse eccentricity = eT = 1.40 m
4 Type of Loading = IRC Class SV Loading : Special Multi Axel Hydraulic Trailer Vehicle
(AMENDMENT TO IRC:6-2014, AMENDMENT NO.1_CLAUSE 204.5)
1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
180 180 180 180 180 180 180 180 180 180 180 180
0.33 24 0.33
Rb Ra
Loading= 20 nos. of wheels each 180 KN @ c/c 1.5 m for 28.5 M Span.
so,(28.5/1.5+1)= 20
hence for, 24.33 m Sapn = 17
Left side of Ra 24.33 m Sapn = 17
Load due to ML MT
Load due to eL eT
CASE additional
main wheel (m) (m) (kN-m) (kN-m)
wheel
CLASS A
1500 0 1338.05 -0.100 0.700 -134 936.638
THREE LANE SINGLE SPAN
9.6 0.6
56 9.6
38
0.6
Force on Abutment in Non-Seismic case = (F h/2 + Vr.Itc) Where Fh = Braking Force on Pier
Hence Force on Abutment cap in Non-Seismic Condition
( Case I ) = 125/ 2 + (22166.667 x 0.608/100) = 197.273 KN
( Case III ) = 215 / 2 + (22166.667 x 0.608/100) = 242.273 KN
( Case V ) = 225 / 2 x (22166.667 + 0.608/100) = 247.273 KN
2.680
1.340
6.70 KN/m2
4.042
6.70 KN/m2
ACCIDENTAL ACTIONS
Seismic Hazards
component
vertical force
sl. No.
moment at
(KN) seismic (+1.20) at Abutment Abutment
Live Load Case force base base
2.680
1.126
5.49 KN/m2
Dynamic increment :
Earth pressure at base due to backfill = 5.49 KN/m2
Horizontal force due to backfill soil = 117.71 KN
Acting at =2.68 x 0.42= 1.126 m
(Clause-8.1.1.2,IS:1893-1984,Page-47)
Bending moment increment for dynamic condition= 132.49 KNm
Considering Abutment Shaft
Height of the abutment=Height of abutment wall+Dirt wall= 8.074 m
Length of abutment wall = 16.00 m
Height from foundation slab bottom to deck level = 9.274 m
8.074
3.39
16.540 KN/m2
Dynamic increment
Earth pressure at abutment base due to backfill = 16.540 KN/m2
Horizontal force increment due to backfill soil = 1068.35 KN (For abutment shaft)
Acting at a ht. of = 3.39 m ( from base of abutment )
Horizontal force increment due to backfill soil = 1268.36 KN (from bottom of foundation slab)
Acting at a ht. of = 3.90 m ( from bottom of foundation slab level )
Total moment increment at the base of abutment due to Earth pressure = 3622.87 KN-m
Total moment increment at the base of foundation slab due to Earth pressure = 4940.35 KN-m
2.680
1.340
2.46 KN/m2
Considering Abutment Shaft
Height of the abutment=Height of abutment wall+Dirt wall= 8.074 m
Length of abutment wall = 16.00 m
Height from foundation slab bottom to deck level = 9.274 m
Total horizontal force in longitudinal direction = 317.793 KN (For abutment)
Total horizontal force in longitudinal direction = 365.025 KN (For foundation slab bnase)
8.074
4.037
2.46 KN/m2
Load combination at abutment base:-
SL
LOAD DESCRIPTION V HL HT LA ML MT
NO
A Permanent Action
i Dead load from super-structure 3050 -305.00
ii Self weight of dirt wall 428.80 -192.960
iii Self weight of abutment cap 500.00 -12.50
iv Self weight of abutment wall 2112.00
v Self weight of return wall 822.1 -2137.46
vi Earth Pressure due to back-Fill 2914.38 3.39 9890.26
B Variable gravity treated as Permanent
i Super Imposed Dead Load 423 -42.31
ii Surfacing 263.307 -26.33
D Variable Actions
Vehicular Live Load
i CLASS A-3 LANE 1SPAN 1338.1 -133.81 936.64
ii 70R TRACKED -1LANE+ CL-A 1L 1 SPAN 1144.3 -114.43 2192.98
iii 70R WHEELED-1 LANE + CL-A 1L 1 SPAN 1366.3 -136.63 1915.20
IRC Class SV Loading : Special Multi Axel Hydraulic
iv Trailer Vehicle-1 LANE 1 SPAN 1563.3 -156.33 468.99
i Longitudinal Forces (Braking)
i CLASS A-3 LANE 1SPAN 9.7 197.27 5.646 1113.81
iii 70R TRACKED -1LANE+ CL-A 1L 1 SPAN 16.6 242.27 5.646 1367.88
v 70R WHEELED-1 LANE + CL-A 1L 1 SPAN 17.4 247.27 5.646 1396.11
Earth Surcharge due to Live Load 866.09 4.04 3500.73
E Seismic Forces
Seismic forces for dead load
a) on superstructure 422.33 500.12 500.12 2447.20 2447.20
b) Surfacing 32.02 37.92 37.92 185.53 185.53
c) on dirt wall 52.14 61.74 61.74 307.14 307.14
d) on abutment cap 60.80 72.00 72.00 305.76 305.76
e) on abutment wall 256.82 304.13 304.13 579.87 579.87
f) on return wall 99.97 118.38 118.38 424.29 424.29
vertical push-pull due to seismic at sup. 25.42
Seismic forces for Live Load
i CLASS A-3 LANE 1SPAN 14.9 22.34 9.35 208.85
iii 70R TRACKED -1LANE+ CL-A 1L 1 SPAN 13.1 19.64 9.35 183.57
v 70R WHEELED-1 LANE + CL-A 1L 1 SPAN 15.2 22.81 9.35 213.26
Wind Load
Wind Load on super-structure 191.96 26.03 104.13 4.07 106.06 424.259
Increased Earth Pressure due to seismic 1068.35 3.39 3622.87
Increased surcharge earth pressure due to
seismic 317.793 4.037 1282.93
Load combination at Bottom of foundation level (For open foundation) :-
SL
LOAD DESCRIPTION V HL HT LA ML MT
NO
A Permanent Action
i Dead load from super-structure 3050.00 -305.000
ii Self weight of dirt wall 428.80 -192.960
iii Self weight of abutment cap 500.00 -12.50
iv Self weight of abutment wall 2112.00
v Self weight of return wall 822.1 -2137.46
vi Self weight of foundation slab 2716.9
vii Back Fill weight on foundation slab 9465.8
viii Earth Pressure due to back-Fill 3844.33 3.90 14983.64
B Variable gravity treated as Permanent
i Super Imposed Dead Load 423.073 -42.31
ii Surfacing 263.307 -26.33
D Variable Actions
Vehicular Live Load
i CLASS A-3 LANE 1SPAN 1163.53 -116.35 814.47
ii 70R TRACKED -1LANE+ CL-A 1L 1 SPAN 634.83 -63.48 1216.58
iii 70R WHEELED-1 LANE + CL-A 1L 1 SPAN 800.26 -80.03 1121.74
IRC Class SV Loading : Special Multi Axel Hydraulic
iv Trailer Vehicle-1 LANE 1 SPAN 1563.30 -156.33 468.99
Longitudinal Forces (Braking)
i CLASS A-3 LANE 1SPAN 9.67 197.27 6.85 1350.53
ii 70R TRACKED -1LANE+ CL-A 1L 1 SPAN 16.63 242.27 6.85 1658.60
iii 70R WHEELED-1 LANE + CL-A 1L 1 SPAN 17.40 247.27 6.85 1692.83
Earth Surcharge due to Live Load 930.64 4.34 4041.99
E Seismic Forces
Seismic forces for dead load
a) on superstructure 527.91 625.15 625.15 1.20 3709.16 3709.16
b) Surfacing 40.02 47.40 47.40 1.20 281.21 281.21
c) on dirt wall 65.17 77.18 77.18 1.20 464.18 464.18
d) on abutment cap 76.00 90.00 90.00 1.20 475.80 475.80
e) on abutment wall 321.02 380.16 380.16 1.20 1120.20 1120.20
f) on return wall 124.96 147.98 147.98 1.20 684.27 684.27
vertical push-pull due to seismic at sup. 31.77
Seismic forces for Live Load
i CLASS A-3 LANE 1SPAN 18.62 27.92 10.55 294.58
iii 70R TRACKED -1LANE+ CL-A 1L 1 SPAN 16.36 24.54 10.55 258.92
v 70R WHEELED-1 LANE + CL-A 1L 1 SPAN 19.01 28.51 10.55 300.80
Wind Load
Wind Load on super-structure 191.96 26.03 104.13 5.27 137.30 549.21
Increased Earth Pressure due to seismic 1585.446 3.90 6175.44
Increased surcharge earth pressure seismic 456.281 4.64 2115.77
LOAD COMBINATION FOR PIER SHAFT BASE (For Ultimate Limit State)
Loads V ML MT HL HT
Dead Load 6912.90 -2647.92 0.00 0.00 0.00
SIDL 423.07 -42.31 0.00 0.00 0.00
Surfacing 263.31 -26.33 0.00 0.00 0.00
Class A(3L/1S) LL1 1338.05 -133.81 936.64 0.00 0.00
70R Tr.1L+CL-A 1L(1S) LL2 1144.33 -114.43 2192.98 0.00 0.00
70R Wh.1L+CL-A 1L(1S) LL3 1366.32 -136.63 1915.20 0.00 0.00
Class SV LL4 1563.30 -156.33 468.99 0.00 0.00
BrakingClass A(3L/1S) LL1 9.67 1113.81 0.00 197.27 0.00
Braking70R Tr.1L+CL-A
0.00 0.00
1L(1S) LL2 16.63 1367.88 242.27
Braking70R Wh.1L+CL-A
0.00 0.00
1L(1S) LL3 17.40 1396.11 247.27
Earth Pressure 0.00 9890.26 0.00 2914.38 0.00
LL surcharge on Earth Pr. 0.00 3500.73 0.00 866.09 0.00
Dead Load Seismic 949.48 4249.79 4249.79 1094.29 1094.29
Seismic Class A(3L/1S) LL1 14.89 0.00 208.85 0.00 22.34
Seismic 70R Tr.1L+CL-A 13.09 0.00 183.57 0.00 19.64
1L(1S) LL2
Seismic 70R Wh.1L+CL-A 15.21 0.00 213.26 0.00 22.81
1L(1S) LL3
Wind load 191.96 106.06 424.26 26.03 104.13
Increased Earth Pr. due to Sis. 0.00 3622.87 0.00 1068.35 0.00
Increased EP surch. due to Sis. 0.00 1282.93 0.00 317.79 0.00
NON-SEISMIC CASE
B WIND
A DL+SIDL+Surfacing+LL+Br. LL+EP+EP LL DL+SIDL+Surfacing+LL+Br. LL+EP+EP DL+/-WL
Loads FOS Loads FOS
Dead Load 1.00 Dead Load 1.00
SIDL 1.00 SIDL 1.00
Surfacing 1.00 Surfacing 1.00
LL 1.50 LL 1.50
Braking LL 1.15 Braking LL 1.15
EP 1.50 EP 1.50
EP LL surcharge 1.20 EP LL surcharge 1.20
WL 1.50
SEISMIC CASE
A C
DL+SIDL+Surfacing+LL+Br. LL+EP+EP LL+DL S+LL S+EP S+EP LL S DL+SIDL+Surfacing+EP+DL seis+EP seis
Loads FOS Loads FOS
Dead Load 1 Dead Load 1.00
SIDL 1 SIDL 1.00
Surfacing 1 Surfacing 1.00
LL 0.2 EP 1.00
Braking LL 0.2 DL sis 1.50
EP 1 EP seis 1.50
EP LL surcharge 0.2
DL sis 1.5
LL sis 1.5
EP LL sis 1.5
EP sis 1.5
Vu MLu MTu HLu Htu
1 DL+SIDL+Surfacing+LL1+Br. LL1+EP+EP LL Surcharge 9617.48 17399.87 1404.96 5637.75 0.00
2 DL+SIDL+Surfacing+LL2+Br. LL2+EP+EP LL Surcharge 9334.91 17721.10 3289.47 5689.50 0.00
3 DL+SIDL+Surfacing+LL3+Br. LL3+EP+EP LL Surcharge 9668.77 17720.27 2872.80 5695.25 0.00
NON SEISMIC
Loads V ML MT HL HT
Dead Load 6912.90 -2647.92 0.00 0.00 0.00
SIDL 423.07 -42.31 0.00 0.00 0.00
Surfacing 263.31 -26.33 0.00 0.00 0.00
Class A(3L/1S) LL1 1338.05 -133.81 936.64 0.00 0.00
1144.33 -114.43 2192.98 0.00 0.00
70R Tr.1L+CL-A 1L(1S) LL2
70R Wh.1L+CL-A 1L(1S) 1366.32 -136.63 1915.20 0.00 0.00
LL3
Class SV LL4 1563.30 -156.33 468.99 0.00 0.00
BrakingClass A(3L/1S) LL1 9.67 1113.81 0.00 197.27 0.00
Braking70R Tr.1L+CL-A 16.63 1367.88 0.00 242.27 0.00
1L(1S) LL2
Braking70R Wh.1L+CL-A 17.40 1396.11 0.00 247.27 0.00
1L(1S) LL3
Earth Pressure 0.00 9890.26 0.00 2914.38 0.00
LL surcharge on Earth Pr. 0.00 3500.73 0.00 866.09 0.00
Dead Load Seismic 949.48 4249.79 4249.79 1094.29 1094.29
Seismic Class A(3L/1S) LL1 14.89 0.00 208.85 0.00 22.34
NON-SEISMIC CASE
B WIND
A DL+SIDL+Surfacing+LL+Br. LL+EP+EP LL DL+SIDL+Surfacing+LL+Br. LL+EP+EP DL+/-WL
Loads FOS Loads FOS
Dead Load 1.00 Dead Load 1.00
SIDL 1.00 SIDL 1.00
Surfacing 1.00 Surfacing 1.00
LL 1.00 LL 1.00
Braking LL 1.00 Braking LL 1.00
EP 1.00 EP 1.00
EP LL surcharge 0.80 EP LL surcharge 0.80
WL 1.00
Grade of concrete : M 30
Grade of steel = Fe 500
Ecm of concrete = 31000 N/mm2 (From table 6.5, IRC:112-2011, page no. 38)
Es of steel = 200000 N/mm 2
(From clause6.3.5, IRC:112-2011, page no. 32)
Checking as wall:
Ref. Cl-7.6.4.1, IRC-112:2011
0.1.fcd.Ac= 25728 kN
Maximum Design verical Load= 9956.71 kN
The section is to be designed for pure bending element also.
Checking for pure Bending:
Design moment = 21859.12 KN-m
Width of section = 16.00 m
Depth of section = 1.2 m
Concrete failure strain = εcu1 = 0.0035 (Table 6.5, IRC:112-2011, page-38)
Concrete limiting strain = εc2 = 0.002 (Table 6.5, IRC:112-2011, page-38)
Yield strain of steel = 0.87fy/Es = 0.00218
Limiting strain of steel = (0.87fy/Es+0.002) = 0.00418
As the ratio does not exceed 12, it is short and no secondary effect to be considered
(clause 7.6.4, IRC:112-2011, page-57)
Interaction check
Grade of concrete = M 30
Grade of steel = Fe 500
Width of section considered = 1m
Now,
(Eq. 12.6, IRC:112-2011, page-125)
Where, ssc = stress in the tension reinforcement = 172.00 Mpa
ae = Es/Ecm = 6.4516
fct.eff = mean value of tensile strength of concrete = 2.5 Mpa
rr.eff = As/Ac.eff Where, Ac.eff = Effective area of concrete in tension, surrounding
the reinforcement of depth hc.ef
Where, hc.ef = lesser of the followings
2.5(h-d);(h-x/3);or h/2
Where, A = level of steel centroid
x B = Effective tension area, Ac.eff
81,82 = greater and lesser tensile strain
h
d
hc.eff
B
So, hc.eff = 218.75 mm
Ac.eff = 218750 mm2
Now. 88.eff = As/Ac.eff = 0.01799955
kt = factor dependant on duration of the load may be taken as 0.5
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+f/2)), the maximum crack spacing,
Loads V ML MT HL HT
Dead Load 9629.77 -2647.92 0.00 0.00 0.00
Backfill weight 9465.80 0.00 0.00 0.00 0.00
SIDL 423.07313 -42.31 0.00 0.00 0.00
Surfacing 263.30715 -26.33 0.00 0.00 0.00
Class A(3L/1S) LL1 1163.53 -116.35 814.47 0.00 0.00
Loads V ML MT HL HT
Dead Load 9629.77 -2647.92 0.00 0.00 0.00
Backfill weight 9465.80 0.00 0.00 0.00 0.00
SIDL 423.07 -42.31 0.00 0.00 0.00
Surfacing 263.31 -26.33 0.00 0.00 0.00
Class A(3L/1S) LL1 1163.53 -116.35 814.47 0.00 0.00
70R Tr.1L+CL-A 1L(1S) LL2 634.83 -63.48 1216.58 0.00 0.00
NON-SEISMIC CASE
COMB V ML MT HL HT
1 DL+SIDL+Surfacing+LL1+Br. LL1+EP+EP LL Surcharge 20952.73 17205.62 814.47 4922.92 0.00
2 DL+SIDL+Surfacing+LL2+Br. LL2+EP+EP LL Surcharge 20429.26 17489.54 1216.58 4956.67 0.00
3 DL+SIDL+Surfacing+LL3+Br. LL3+EP+EP LL Surcharge 20595.26 17498.67 1121.74 4960.42 0.00
NON SEISMIC
1.2
0.6
A B
OVERTURNING CHECK
Non-Seismic
Overturning Restoring
Loads V ML LA
moment moment
Dead Load 9629.77 -2647.92 -2647.92 2.8 26963.370
Earth weight 9465.80 0.00 0.00 5.15 48748.857
SIDL 423.07 -42.31 -42.31 2.8 1184.605
Surfacing 263.31 -26.33 -26.33 2.8 737.260
70R Wh.1L+CL-A 1L(1S) LL3 800.26 -80.03 -80.03 2.8 2240.723
Braking 70R Wh.1L+CL-A
17.40 1692.83 1692.83
1L(1S) LL3 2.8 48.733
Earth pressure 0.00 14983.64 14983.64 0 0.000
Earth pressure LL Surcharge 0.00 4041.99 4041.99 0 0.000
Total 17921.88 79923.548
Overturning Restoring
Loads V ML LA
moment moment
Dead Load 9629.77 -2647.92 -2647.92 2.8 26963.37
Earth weight 9465.80 0.00 0.00 5.15 48748.86
SIDL 423.07 -42.31 -42.31 2.8 1184.60
Surfacing 263.31 -26.33 -26.33 2.8 737.26
70R Wh.1L+CL-A 1L(1S) LL3 160.05 -80.03 -80.03 2.8 448.14
Braking 70R Wh.1L+CL-A
3.48 338.57 338.57
1L(1S) LL3 2.8 9.75
Earth Pressure 0.00 14983.64 14983.64 0 0.00
LL Surcharge earth pressure 0.00 4041.99 4041.99 0 0.00
Dead Load Seismic 1186.86 6734.82 6734.82 2.8 3323.20
Increased earth due to seismic 0.00 8291.21 8291.21 0 0.00
Total 31593.64 81415.179
FOS against overturning moment= 81415.179 / 31593.641 = 2.58 OK
SLIDING CHECK
Considering frictional co-efficient; m = 0.50
Non-Seismic
Sliding Restoring
Loads V HL
force force
Dead Load 9629.77 0.00 0.000 4814.888
Earth weight 9465.80 0.00 0.000 4732.899
SIDL 423.07 0.00 0.000 211.537
Surfacing 263.31 0.00 0.000 131.654
70R Wh.1L+CL-A 1L(1S) LL3 800.26 0.00 0.000 400.129
Braking 70R Wh.1L+CL-A
17.40 247.27
1L(1S) LL3 247.273 8.702
Earth pressure 0.00 3844.33 3844.325 0.000
Earth pressure LL Surcharge 0.00 930.64 930.637 0.000
Total 5022.236 10299.808
Seismic
Sliding Restoring
Loads V HL
force force
Dead Load 9629.77 0.00 0.00 4814.888
Earth weight 9465.80 0.00 0.00 4732.899
SIDL 423.07 0.00 0.00 211.537
Surfacing 263.31 0.00 0.00 131.654
70R Wh.1L+CL-A 1L(1S) LL3 160.05 0.00 0.00 80.026
Braking 70R Wh.1L+CL-A
3.48 49.45 49.45
1L(1S) LL3 1.740
Earth pressure 0.00 3844.33 3844.33 0.000
Earth pressure LL Surcharge 0.00 930.64 930.64 0.000
Dead Load Seismic 1186.86 1367.86 1367.86 593.428
Increased earth due to seismic 0.00 2041.73 2041.73 0.000
Total 8234.005 10566.171
16.1 T
C 7.1 B
C B
b
Foundation center line from B = 3.55 m
Load center line from B = 2.8 m
Unfactored load only due to foundation wt. = 2716.88 KN
Base Base
V Net ML MT Base pressure pressure Base
Load
pressure (Corner (Corner pressure Remarks
Case
(Corner A) B) C) (Corner D)
KN KN-m KN-m KN/m2 KN/m2 KN/m2 KN/m2
MLmax 1 20791.58 65386.096 1670.95 249.612 238.717 114.163 125.058
Considering Wind
Vmax 2 21537.22 69243.017 1018.20 245.062 238.423 131.759 138.398
MLmax 3 20599.62 64985.903 1121.74 244.063 236.749 116.354 123.668
Normal Case
Vmax 4 21345.25 68842.824 468.99 239.513 236.455 133.949 137.007
Unloaded (Non-
MLmax 5 19781.95 83334.885 0.000 76.144 76.144 269.967 269.967
seismic)
ML
C D
2.20
2.588 1.113 1.088
B
A
MT
16.1
A B
C D
7.1
1.2 0.6
A B
3.70 1.2
Resistive Resultant
Moment Overturnin Net Moment reaction Base
g Moment Eccentricity
COMB V WRT point B ML (M ) (MR-MO) from B; x = (e) = b/2-x Base pressure
(MR) O
(MR-MO)/V pressure (Heel
(Toe side) side)
KN KN-m KN-m KN-m m m KN/m2 KN/m2
11 25536.91 109040.988 34359.819 74681.169 2.924 0.626 341.499 105.302
4 30575.78 123149.821 23413.470 99736.352 3.262 0.288 332.594 202.368
14 25278.21 108316.640 30671.137 77645.503 3.072 0.478 310.532 131.743
105.302 228.391 268.311 341.499
Grade of concrete = M 30
Grade of steel = Fe 500
Width of section considered = 1m
2.2
1.2
0.6
1.0875
Shear force
at "d"
Load Case Total Load (KN/m) Lever arm Moment distance
(m) (KN-m) from face
(KN)
The design shear resistance of the member without shear reinforcement, V Rd.c =
=[0.12K(80r1.fck)0.33+0.15scp]bw.d
Where, K = 1+√(200/d)<=2.0
So, K = 1.424
81 = Asl/bw.d
Where Asl = Area of steel provided = 5397 mm2
bw = Width of section = 1000 mm
d= 809 mm
81 = 0.0067
8cp = NEd/Ac < 0.2fcd, where, NEd = Axial compressive force = 0
Ac = Cross Sectional area of concrete
8cp = 0
So,VRd.c = 345.22 KN
Load Case Total Load (KN/m) Lever arm Moment Shear force
(m) (KN-m) at face (KN)
CHECK FOR SHEAR IN FOUNDATION HEEL SIDE (Clause 10.3.2, IRC:112-2011, page-88)
3.7
1.115
Shear force
Lever arm at "d"
Load Case Total Load (KN/m) distance
(m) from face
(KN)
Where, K = 1+√(200/d)<=2.0
So, K = 1.463
81 = Asl/bw.d
Where Asl = Area of steel provided = 3140 mm2
bw = Width of section = 1000 mm
d= 931.5 mm
81 = 0.0034
8cp = NEd/Ac < 0.2fcd, where, NEd = Axial compressive force = 0
Ac = Cross Sectional area of concrete
8cp = 0
So,VRd.c = 326.09 KN
As the basic control perimeter is exceeding the foundation dimension, we will check the
punching shear at reduced control perimeter.
b
a
a= 16.1 m
b= 5.65 m OK, Shear check at basic control perimeter
Now, b = 1+1.8√((el/a)2+(et/b)2) (8 = Factors accounting for effects of bending
= 1.230 moment and axial load acting on loaded area)
Now, reduced control perimeter, u = 50 m
So, total load for punching shear = Load from abutment shaft+ Wt. within reduced control perimeter
VEd = 12003.425 KN
Shear stress, ƬEd = 8VEd/ud = 0.365 Mpa
a= 16.10 m
b= 1.2 m
Now, 8 = 1+1.8√((el/a)2+(et/b)2) (8 = Factors accounting for effects of bending
= 1.566 moment and axial load acting on loaded area)
Now, reduced control perimeter, u = 34.600 m
So, total load for punching shear = Load from abutment shaft
VEd = 9956.71 KN
Shear stress,ƬEd = 8VEd/ud = 0.557 Mpa
COMB LOAD CASE Vu (KN) MLu (KN-m) MTu (KN-m) HLu (KN) HTu(KN)
11 MLmax 20787.227 17635.974 1670.951 4986.449 104.125
4 Vmax 21345.253 16152.743 468.990 4774.962 0.000
14 Vmin 20237.297 17352.240 667.372 4930.636 -104.125
Area
x of foundation base = 114.31 m2
Section modulus longitudinal direction; ZL = 135.267 m3
Section modulus longitudinal direction; ZT = 306.732 m3
ML D
2.5875 C A B 1.1125 1.0875
2=0
16.100
MT
.
A B
C D
7.1
3.70 1.2 2.20
1.2
0.6
Grade of concrete = M 30
Grade of steel = Fe 500
Width of section considered = 1m
Now,
B
Where, A = level of steel centroid
B = Effective tension area, Ac.eff
d 81,82 = greater and lesser tensile strain
hc.eff
Shear
force at
Moment Shear force "d"
Load Case Total Load (KN/m) Lever arm (m)
(KN-m) at face (KN) distance
from face
(KN)
A
Stress level check:
Now,
hc.eff
1
B
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+8/2)), the maximum crack spacing,
Grade of concrete = M 30
Grade of steel = Fe 500
Width of section considered = 1m
Where, K = 1+√(200/d)<=2.0
So, K = 1.762
r1 = Asl/bw.d
Where Asl = Area of steel provided = 1130 mm2
bw = Width of section = 1000 mm
d= 344 mm
r1 = 0.0033
scp = NEd/Ac < 0.2fcd, where, NEd = Axial compressive force = 0
Ac = Cross Sectional area of concrete
scp = 0
So,VRd.c = 143.83 KN
Now,
B
rr.eff = As/Ac.eff Where, Ac.eff = Effective area of concrete in tension, surrounding
the reinforcement of depth hc.eff
Where, hc.eff = lesser of the followings
2.5(h-d);(h-x/3);or h/2
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+φ/2)), the maximum crack spacing,
0 0.3
8.889
heel side
toe side
1.2
Horizontal Force
Earth Pressure due to surcharge = 63.43 4.4445 281.90
Active earth Pressure = 234.92 3.7 877.05
Moment Moment
due to due to
Lever arm upward downward
Upward Downward from the force (kN- force (kN-
SL Details force force section m) m)
Moment Moment
due to due to
Lever arm upward downward
Upward Downward from the force (kN- force (kN-
SL Details force force section m) m)
Now,
hc.eff
1
SECTION 1 2 3
So, hc.eff = 212.5 212.5 212.5 in mm
Ac.eff = 212500 212500 212500 in mm2
Now. ρr.eff = As/Ac.eff = 0.008 0.008 0.008
kt = factor dependant on duration of the load may be taken as 0.5
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+φ/2)), the maximum crack spacing,
SECTION 1 2 3
Where,φ = diameter of bar = 20 20 20 in mm
c = clear cover = 75 mm
k1 = co-efficient taking acount of bond properties of reinforcement = 0.8
k2 = co- efficient taking account of distribution of strain = 0.5
SECTION 1 2 3
So,Sr.max = 657.463 657.463 657.463 in mm
And, εsm-εcm = 0.0037 0.0037 0.0037
Minimum value of εsm - εcm = 0.0026879 0.0013873 0.0005963
So, governing value of εsm - εcm = 0.0037009 0.0037009 0.0037009
So, crack width, Wk = Sr.max(εsm-εcm) = 2.433 2.433 2.433 in mm
Maximum crack width = 0.3 mm (Table 12.1, IRC:112-2011, page-122)
Revise
CHECK FOR MINIMUM REINFORCEMENT: (According to chapter 16, IRC:112-2011, page-171)
MINMUM VERTICAL REINFORCEMENT PROVIDE
SECTION - 1 20 mm dia 175 mm c/c spacing
SECTION - 2 20 mm dia 175 mm c/c spacing
SECTION - 3 20 mm dia 175 mm c/c spacing
S-1 S-2 S-3
Total vertical reinforcement provided = mm2 1795.196 1795.196 1795.196
Concrete area, Ac = mm2 570737.417 512212.251 391474.83
Now, 0.0024Ac = mm2 1369.770 1229.309 939.540
check OK OK OK
and 0.04Ac = mm2 22829.5 20488.5 15659.0
check OK OK OK
min. reinforcement shall be .13% of concrete c/s area at the top of slab = 600000 mm2
required reinforcement = 780 mm2
reinforcement provided = 804.247719 mm2
OK
minimum distribution bar shall be 20% of the main reinforcement = 160.849544 mm2
Provide 12 mm dia 250 mm c/c spacing
reinforcement provided = 452.389342 mm2
OK
RETURN WALL DESIGN
4m
0.7 m
Grade of concrete = M 30
Grade of steel = Fe 500
Width of section considered = 1m
The design shear resistance of the member without shear reinforcement, V Rd.c =
=[0.12K(80r1.fck)0.33+0.15scp]bw.d
Where, K = 1+√(200/d)<=2.0
So, K = 1.560
81 = Asl/bw.d
Where Asl = Area of steel provided = 4416 mm2
bw = Width of section = 1000 mm
d= A 637.5 mm
81 = 0.0069
8cp = NEd/Ac < 0.2fcd, where, NEd = Axial compressive force = 0
Ac = Cross Sectional area of concrete
8cp = 0
So,VRd.c = 301.76 KN
Now,
B
Where, A = level of steel centroid
B = Effective tension area, Ac.eff
d 81,82 = greater and lesser tensile strain
hc.eff
Where,
So, vv.req = -0.0061862
So, vvd = 0.12 < provided, OK
Buckling of longitudinal compression reinforcement
FOUNDATION SLAB
Reinforcement of toe slab
Main reinforcement provided 25 mm dia. 100 mm c/c
Steel in 1m strip = 4906.25 mm2
As.min =( 0.26fctm/fyk)btd= 1446.25 mm2 OK
or, 0.0013btd = 1446.25 mm 2
OK
Reinforcement of heel slab
Main reinforcement provided 20 mm dia. 100 mm c/c
Steel in 1m strip = 3140 mm 2
OK
Provide surface reinforcement 16 mm dia. 2 Nos. each face
RETURN WALL
Main reinforcement provided 25 mm dia. 125 mm c/c
Distributor reinforcement 16 mm dia. 125 mm c/c
OK
DIRT WALL
Provide main reinforcement 12 mm dia. 100 mm c/c
Distributor reinforcement 10 mm dia. 125 mm c/c
OK