Zuhai Behai 20191105
Zuhai Behai 20191105
Zuhai Behai 20191105
1
= SURVEY ITEM =
INTERMEDIATRE SURVEY -
2
DECK PARTICULARS
JMU TSU
SHIPYARD HULL
BUILDER NO.147
DELIVERY 6/29/2012
LENGTH O.A. 299.7
BREADTH MLD 50.00
DEPTH MLD 25.00
LOADED DRAFT(SUMMER) 18.23
GROSS TONNAGE 106,368
NET TONNAGE 64,032
DEAD WEIGHT 206,490
KIND OF SHIP BULK CARRIER
CREW 21
3
FWT(P) F.W. 246.00
DWT(S) D.W. 246.00
4
NO.1 F.O.T(P) F.O. 1,186.00
NO.1 F.O.T(S) " 1,155.00
NO.2 F.O.T(P) " 1,310.00
NO.2 F.O.T(S) " 1,278.00
NO.1 D.O.T(S) D.O 177.00
NO.2 D.O.T(S) D.O 125.00
5
ENGINE PARTICULARS
MAIN ENGINE
MAKER AND TYPE MITSUI MAN B&W
NO.OF CYLINDER 7CYL
BORE X STROKE 650d x 2,730mm
OUTPUT X R.P.M (MCR) 16,810kw x 86rpm
OUTPUT X R.P.M (NCR) 14,290kw x 81.5 rpm (85%)
TURBO-CHARGER TCA88
AIR COOLER Fin and Tube Type, 1990/38/20/2-NSR-SC212K
AUXILIARY BOILER
TYPE OVS 2 - 150, 110-32
STEAM PRESS. 0.7 Mpa
BURNER VOLCANO / MJ11-140-2
MAKER OSAKA BOILER
GENERATOR ENGINE
MAKER DAIHATSU
TYPE 5DK-20 x 3 set
MAKER
EMERG. GENERATOR CUMMINS 6CTA8.3DM
GPC Co.,Ltd.
SHAFTING
INTERMEDIATE SHAFT D 560mm x L 9,195 mm (KSF60)
PROPELLER
TYPE 5 BLADED SOLID KEYLESS PROPELLER TYPE (CU3)
6
D 7,900mm x PITCH 6,127.2mm
WEIGHT 32,900kg
7
OCKING INDENTS
8
= SURVEY ITEM =
9
DECK PARTICULARS
10
(NO.9 U.W.B.T (P)
(NO.9 U.W.B.T (S)
11
ENGINE PARTICULARS
12
Docking Indent Unit Qty's
(1) GENERAL SERVICE
GA Docking and Undocking
To furnish all necessary labor, materials, staging and equipment to accomplish the following
repair works on the subject vessel at your yard.
GA-1 Drydocking
1) To dock and undock vessel upon completion of all underwater works. shift
・ 1st and 2nd days
Note:
Tug, pilot, line handler for unmooring and mooring, gangway for berth shift from berth to
other berth to be required by the yard's circumstances, the cost of such works shall be
borne by the yard.
GA-3 Wharfage
The vessel is to be safety berthed at a suitable repair quay for theduration of the overhaul
period not occupied by the drydocking.
To provide safe and ready access to the vessel and to allow stores and bunker barges free
access on the outboard side.
This repair berth is to be adequate provided with crane,power and water services.
6
GA-5 Bottom drain plugs
Plugs to be removed only if required by the owners representative.
FPT x 1
NO.1 WBT (P/S) x 2
NO.2 WBT (P/S) x 2
NO.3 WBT (P/S) x 2
NO.4 WBT (P/S) x 2
NO.5 WBT (P/S) x 2
NO.6 WBT (P/S) x 2
NO.7 WBT (P/S) x 2
NO.8 WBT (P/S) x 2
NO.9 WBT (P/S) x 2
7
GB-5 Temporary lighting
Yard to be provide cables with lights to all spaces as needed during the repair period.
1) Provide temporary lighting set/day
2) Lighting connection and disconnection set/time
Note:
All temporary lighting in way of repair areas shall be charged to each individual repair
item.
All temporary wiring and lights used by contractors workmen are for contractors account
and shoud be included in each item where relevant.
GB-6 Ventilation
Yard's to be provided ventilation fans for gas freeing and/or air supply for tanks and or when
oxygen contents too low, and when owner's representative required to other works also. To
note that all temporary ventilation in way of repairs shall be charged to each individual repair
item.
1) Charge per day for each unit set/day
(Power consumption shall be included in item c)
2) Allow five(5) fans units (with connection hoses or cables) being used during the entire set/day
repair period.
Note:
Yard repair manager of safety officer shall informed owner's representative daily how
many ventilation fans are use and in where compartment durng daily meeting from 0900
am time every day.
AC 440Volts / 60Hz
2) Labour for connection and disconnection the shore supply electrical cables. line/time
8
GC-4 Compressed air supply
Yard to provide compressed air manifolds on deck and engine room for general use and
control air if necessary.
1) Bilge ton 20
2) Waste Oil ton 10
3) Sludge ton 10
4) Issue Certificate pc
Note:
Certificate of landing aboves items to be issued before vessel sailes from your yard.
9
GD-7 Pressure test of piping
Pressure test of piping (F.O, BUNKER) by liquid to be provided if required by owner's
representative.
**To be quoted if any other suitable items for crew personnel against winter
GE Sea trial
Sea trial to be carried out after completion of all docking works including Scrubber installation
after discussing with our superintendent. For the above sea trial, one (1) tug boat to be
arranged for attend sea trial and owner's superintendent return from anchorage to shipyard.
GF Penalty clause
1) Please make sure the working period properly with penalty clause in case of over period day
for repairing works.
10
Docking Indent
(2) H U L L
HA Dry docking works
Quoted price shall include all necessary staging carnage, mobile crane, protection of vessel
and underwater parts like echo sounders, speed log etc against elements, removal of grit or
after blasting, cleaning of vessel in drydock including all the associated works.
2)
11
3)
12
HA-5 Scupper holes
1)
2)
3)
4)
13
5)
6)
7)
8)
9)
14
HA-7 Hull mark
The following hull marks to be scraped and repainted with 3 coats of white paint as follows.
A) Ships name 3 pcs
B) Port of registry 1 pc
C) Draft marks 6 pcs
D) Freeboard 2 pcs
E) Pilot mark (white and red) 2 pcs
F) IMO Numbers 1pc
G) Tug mark 8 pcs
H) Plimsoll Mark 2 pcs
I) Tanks & bulkhead separation marks 68 pcs
Total 93 pcs
2)
3)
4)
5)
6)
HA-10 Rudder
1)
15
2)
3)
4)
2)
3)
4)
5)
16
HA-12 Build up worned welding shim of hull
Worned welding shim to be build up by elect. Welding. Welding area to be decided by owner's
representative after bottom inspection.
1)
2)
2)
17
HB-2 Cargo Hold Painting
Rusty parts of F&A end and P&S side in All hold to be applied sand blast and touched up hold
paints.
(paints to be supplied by owner)
1)
2)
18
3)
4)
5)
6)
7)
HC Steel Work
HC-1 Install New Panama Equipment
To be install New Panama equipment according attachment Drawing
(Mooring winch, Bollard, Chock include Sheet, Jumping Stopper for Mooring Rope, Pilot
Assist Ladder arrange by owner)
(Reinforce material, Handrail, Packing etc arrange by Yard)
19
1)
1)
2)
20
Docking Indent Unit
(2) H U L L
Dry docking works
Quoted price shall include all necessary staging carnage, mobile crane, protection of vessel
and underwater parts like echo sounders, speed log etc against elements, removal of grit or
after blasting, cleaning of vessel in drydock including all the associated works.
Shell plating
Shell plating under water line to be surveyed in accordance with CLASS rule.
Painting Area
The vessel's hull shall be prepared and painted with owner's supplied paints as follows:
Rudder: 16 pcs
Stern Frame: 16 pcs
Total 32 pcs
21
Hull anodes,echo sounder transducers, speed log and propeller to be sealed with fiber lump sum
tapes or suitable material during the entire painting period and to be removed after
completion of hull painting.
Note:
All change anodes must be completed and anodes suitably covered and protected before
painting commences. Cleaning of anodes over coated with paint will be to yard's account.
22
Scupper holes
Wooden plugs or chutes(half round pipes) to be fitted on shipside scuppers for hull must pc
be kept dry, and to be removed after completion of hull painting.
Note:
Leaky and poor fitted chutes and plugs must be rectified before the start of hull treatment
.
Cherry picker for above to be included hull HP wshing
23
Air blow to be carried out after sand blasting m2
LP washing of preoparation for painting m2
Empty paint drums disposal pc
Note:
No painting is to be performed when condensation is present or when the steel is wet or
when relative humidity is above 85%. Steel temperature should always be at least 4
degrees celsius above the dew point, failing which, painting work should stop.
In case of adverse weather conditions, starting and stopping of painting work will be
decided by owner's representative. Removal of poorly applied paint or paint applied during
adverse weather condition will be put on yard's account.
To be applied sand blast SA2.0 for newly installed seachest part on V/B for Scrubber. m2
24
Hull mark
The following hull marks to be scraped and repainted with 3 coats of white paint as follows. job
A) Ships name 3 pcs
B) Port of registry 1 pc
C) Draft marks 6 pcs
D) Freeboard 2 pcs
E) Pilot mark (white and red) 2 pcs
F) IMO Numbers 1pc
G) Tug mark 8 pcs
H) Plimsoll Mark 2 pcs
I) Tanks & bulkhead separation marks 68 pcs
Total 93 pcs
set
Anchor chain
Lower both side anchors and range-out both anchor chain for examination by NK surveyor chain
and owner
Wash down with FW by hydro jet cleaners chain
Check anchor swivel / anchor ring and shackles condition on both sides. chain
Measurement anchor chain chain
Chain locker
Both lockers to be washed down with H.P.F.W. and cleaning locker
Muddy water in both chain lockers to be taken out. To quote for per m3 of muddy water m3
Built up staging locker
Chipped, scraped locker
Painted full coat(2-coat).owner supply locker
Sounding and bilge suction pipe to be blown through with compressed air. locker
Rudder
Pintle, carrier and neck bearing to be checked, measured, surveyed and reassembled in job
good order.
25
Rudder plug to be removed if necessary after hammering, rudder to be drained and plug pc
to be refitted in good order.
Sea chests
All gratings to be removed and refitted with stopper. place
Gratings and sea chests to be scraped,cleaned,hosed down with high pressure fresh
water and to be coated with 2 (two)coats a/c and 2 (two) coats of a/f paint.
MGPS injection nozzle to be removed and cleaned in side of nozzle pipe and re- pc
assembled in good order
26
Build up worned welding shim of hull
Worned welding shim to be build up by elect. Welding. Welding area to be decided by owner's
representative after bottom inspection.
Cost per meter m
Stagings and other accessory works to accomplish above items. m3
27
Cargo Hold Painting
Rusty parts of F&A end and P&S side in All hold to be applied sand blast and touched up hold
paints.
(paints to be supplied by owner)
Note:
On completion of high pressur washing,
salt water test to be carried out by paint inspector due to check for washing condition.
28
Sand blast(S.A 2.0) / 25% m2
Sand blast(S.A 1.0) / 25% m2
1st Touch Up Paint 100μ / 50% m2
2nd Touch Up Paint 100μ / 50% m2
29
No.8 Cargo Hold: 5010m2
Sand blast(S.A 2.0) / 25% m2
Sand blast(S.A 1.0) / 25% m2
1st Touch Up Paint 100μ / 50% m2
2nd Touch Up Paint 100μ / 50% m2
Steel Work
Install New Panama Equipment
To be install New Panama equipment according attachment Drawing
(Mooring winch, Bollard, Chock include Sheet, Jumping Stopper for Mooring Rope, Pilot
Assist Ladder arrange by owner)
(Reinforce material, Handrail, Packing etc arrange by Yard)
30
Brake linkages to be disassembled and made smooth working (apply grease), breake set
lining to be renewed with owner's spare lining and bolt & nut, reassembled by ship's crew.
(Spare lining to be supplied by owner)
31
Qty's
28,450
32
32
lump sum
33
22
540
540
1,620
2,160
10,800
1,110
555
2,220
2,775
5,550
5,550
1,430
1,073
2,503
3,218
7,150
1,485
990
2,723
3,218
4,950
34
28,450
28,450
1,000
51
35
by Crew
by Crew
by Crew
by Crew
by Crew
by Crew
36
5
37
83
38
44,600
1,138
1,138
2,275
2,275
1,270
1,270
2,540
2,540
1,268
1,268
2,535
2,535
39
1,260
1,260
2,520
2,520
1,260
1,260
2,520
2,520
1,263
1,263
2,525
2,525
1,265
1,265
2,530
2,530
40
1,253
1,253
2,505
2,505
1,175
1,175
2,350
2,350
41
16
42
Docking Indent Unit Qty's
〔3〕 E N G I N E
EA Dry docking works
EA-1 Propeller and propeller shaft
a) Propeller Wash Down job
Propeller to be washed down with h.p fresh water.
h) Coupling bolts for propeller shaft to be remove and shaft to be draw out job
i) Propeller and shaft to be draw out & propeller shaft to be clean, calibrated & apply job
MAGNA FLUX test for classNK survey. Propeller to be removed & refitted according to
ClassNK rules procedures.
k) Staging and other necessary works required for above item to be applied by yard. lump sum
18
EA-3 Shell Fitting valve
The following overboard valves to be opened, cleaned, face up, surveyed and to be repacked
in good order after renewal of gland,cover/joint packings and painting internal with a/c paint 2
coats.
Valve shold be surveyed by Class or Owner or Chif Engineer before fixing up.
(Packings and paints to be supplied by yard)
1) HV501V.P/ 10K-450A / Butterfly / SEA W. SUC (COOL S.W) pc 1
2) HV502V.P/ 10K-450A / Butterfly / SEA W. SUC (COOL S.W) pc 1
3) HV503V.P/ 10K-300A / Butterfly / M/E Air CLR JACKET CFW CLR OVBD pc 1
4) HV504V.P/ 10K-200A / Butterfly / G/E & M/N AIR COMP CFW CLR, ATMOS CONDR, AIR pc 1
COND CONDR, PROV CONDR, UNIT CLR
5) HV506V.P/ 10K-50A / Butterfly / MGPE INJECT pc 1
6) HV507V.P/ 16K-50A / Butterfly / MGPE INJECT pc 1
7) HV508V.P/ 10K-800A / Butterfly / SEA W SUC (BALLAST) pc 1
8) HV509V.P/ 10K-700A / Butterfly / BALLAST P'P OVBD pc 1
9) HV510V.P/ 10K-250A / Hydr Butterfly / FIRE GS & FIRE BLG PUMP OVBD pc 1
10) HV511V.P/ 10K-40A / Butterfly / OILY WATER SEP OVBD pc 1
11) HV512V.P/ 10K-80A / Glove / FWG OVBD pc 1
12) HV513V.P/ 10K-65A / Butterfly / ECO CLEAN W EDUCTOR OVBD pc 1
13) HV514V.P/ 5K-65A / Butterfly / BALLAST EDUCTOR OVBD pc 1
14) FM1P/ 10K-200A / - / EMERG FIRE PUMP SUC pc 1
15) HV521V.P/ 10K-50A / Glove / SEA CHEST SWEEPING STEAM SC (H) pc 1
16) HV522V.P/ 10K-50A / Glove / SEA CHEST SWEEPING STEAM SC (L) pc 1
17) HV524V.P/ 10K-50A / Glove / SEA CHEST SWEEPING STEAM SC (EMERG FP) pc 1
18) HV523V.P/ 10K-80A / Glove / AUX BLR BLOW OFF pc 1
19) SL401V.P/ 10K-80A / Storm / SOIL & SCUPPER OVBD pc 1
20) SD401V.P/ 20K-32A / Storm / SCUPPER OVBD (S.SIDE) pc Crew
21) KG52V.P/ 16K-15A / Glove / GRAFT GAUGE pc Crew
22) SD21MP/ 16K-15A / - / OUT DOOR SCUPPER OVBD (STBD) pc Crew
23) SD22MP/ 16K-15A / - / OUT DOOR SCUPPER OVBD (PORT) pc Crew
Note:
If clogged pipe and valve by shell or etc. we ordered chemical cleaning for clogged
portion.
EB Main Engine
EB-1 Crankpin & Bearing
1) No.1 to 7 crankpin & bearings to be opened, cleaned and measured for survey, then re- set 7
assembled in good order.
Note:
True open number to be decided by NK Surveyor.
19
Note:
True open number to be decided by NK Surveyor.
20
EB-3 Cross head pin & Bearing
1) No.1 to 7 cross head pin and bearing to be opened, cleaned and measured for survey, set 7
then re-assembled in good order.
Note:
True open number to be decided by NK Surveyor.
EB-7 Fo Pump
1) No.1to 6 F.O.pumps to be removed/ overhauled, taken ashore and reassembled after set 6
completion works Overhaul, clean and inspect F.O.pump and defective parts to be
renewed.
(Spare parts to be supplied by owner)
EC Auxiliary boiler
EC-1 HPW Washing
Smoke door, manhole & mud hole to be opened, all inside to be cleaned with high pressure
water and discharged ashore dirty water by pumping, surveyed and reclosed in good order
after renewal packing, and then if the fire bricks are found out to be damaged, the fire bricks to
be replaced.
(Packings and fire bricks to be supplied by yard)
21
1) Washed water to be disposed. ton 15
2) Firebricks/cement to be repaired. kg 100
3) Open and Close each manhole pc 8
Note:
Above cost to be include dicharge dirty water which is occurred by high pressure water
washing.
(High pressure water to be arranged by yard)
22
EC-2 Mounting Valves
1) 10K-80A / Glove / Main Steam Stop Valve pc 1
2) 16K-25A / Angle / Feed W. Stop Valve pc 1
3) 16K-25A / Angle Check / Feed W. Check Valve pc 1
4) 16K-25A / Glove / Surface Blow Down Valve pc 1
5) 16K-25A / Glove / Bottom Blow Down Valve pc 1
6) 10K-15A / Glove / Water Level Gauge Root vv pc 2
7) 10K-25A / Glove / Water Level Gauge Cylinder Drain Valve pc 2
8) 20K-6A / Glove / Air Vent Valve pc 1
9) 20K-6A / Glove / Sampling Valve pc 2
10) 20K-6A / Glove / Pressure Gauge Shut Off Valve pc 2
EF Tank
EF-1 Main Air Reservoir
Main air reservoir to be opened,cleaned and surveyed by NK surveyor and closed.
Following valves to be grounded and renewed gland packing with yard supply materials.
(Packing and necessary material to be supplied by yard)
23
EG Steel Work
EH Record
1) All measurement record to be furnished to ship's master and owner. set 2
EI Electric
EI-1 Megger test
1) Megger test on power circuit and lighting circuit to be carried out. job
EI-2 Switchboard
All bus-bars to be tightened in the following panels.
1) No.1 generator panels. / Eng Cont Room set 1
2) No.2 generator panels. / Eng Cont Room set 1
3) No.3 generator panels. / Eng Cont Room set 1
4) Emergency Switchboard / Upper Deck Em'cy Gen Room set 1
5) Hatch Cover Swithboard / Deck Store btween No.5 and 6 CH set 1
6) Deck Mach Swithboard / Steering Room set 1
EI-4 Motor
The following Motors to disconnect and remove to workshop for servicing/overhauling. and
Stator to thoroughly clean with electrical solvent backed & varnished.
Measure clearance of bearings and bearing housing, then if necessary install bush to housing.
On completion, motors to install back in original position. and Insulation should be checked and
test for proper operation.
Final checking to be carried out by Superintendent or ship's crew.
(Spare Motor Bearing to be supplied by owner, Other parts to be supplied by yard)
1) No.1 & No.2 E/R Vent Fan/ Type: Vertival Axial Model: FA-120-2
2) No.3 E/R Vent Fan No.3 / Type: Vertical Axial Model: FA-140-2
24
3) Purifier room Exh fan / Type: Vertical Axial Model: FA-60-1
4) Accessary work for aboves
25
El-5 Pump
The following pumps remove to workshop for servicing/overhauling.
Measure clearance of bearings and bearing housing, then if necessary install bush to housing.
26
Docking Indent
〔4〕 S C R U B B E R & B W TS
SP Dry docking works
SP-1 Sox Scrubber System Retrofitting
23
Docking Indent Unit
〔4〕 S C R U B B E R & B W TS
Dry docking works
Sox Scrubber System Retrofitting
Panasia scrubber system to be installed. To be referred another drwgs, details.
BWTS Retrofitting
JFE BWTS to be installed, To be referred another drwgs, details.
24
Qty's
25
Hull
Painting Area Shell Fitting valve
Flat bottom area 10,800.0 m2 Vavle No.
Vertical bottom area 5,550.0 m2 HV501V.P
Boot top area 7,150.0 m2 HV502V.P
Top side area 4,950.0 m2 HV503V.P
HV506V.P
Anode HV507V.P
In Rudder 1 pcs HV508V.P
On Rudder 16 pcs HV509V.P
Stern frame 16 pcs HV510V.P
Total 33 pcs HV511V.P
* Anode Material is Aluminum HV512V.P
HV513V.P
Sand blast and paintin HV514V.P
1) Flat bottom area 10,800 m2 FM1P
Sand blast(S.A 2.0) 540m2 5.0% HV521V.P
Sand blast(S.A 1.0) 540m2 5.0% HV522V.P
A/C 1st T/U 100 μ 1,620m2 15.0% HV524V.P
A/C 2nd T/U 100 μ 2,160m2 20.0% HV523V.P
A/F Full Coat 110 μ ### 100.0% SL401V.P
2) Vertical bottom area 5,550 m2 SD401V.P
Sand blast(S.A 2.0) 1,110m2 20.0% KG52V.P
Sand blast(S.A 1.0) 555m2 10.0% SD21MP
A/C 1st T/U 100 μ 2,220m2 40.0% SD22MP
A/C 2nd T/U 100 μ 2,775m2 50.0%
A/F Full Coat 90 μ 5,550m2 100.0%
A/F Full Coat 90 μ 5,550m2 100.0%
3) Boot top area 7,150 m2
Sand blast(S.A 2.0) 1,430m2 20.0%
Sand blast(S.A 1.0) 1,073m2 15.0%
A/C 1st T/U 100 μ 2,503m2 35.0%
A/C 2nd T/U 100 μ 3,218m2 45.0%
A/F Full Coat 50 μ 7,150m2 100.0%
4) Top side area 4,950 m2
Sand blast(S.A 2.0) 1,485m2 30.0%
Sand blast(S.A 1.0) 990m2 20.0% ME TC
A/C 1st T/U 100 μ 2,723m2 55.0% Type: TCA88
A/C 2nd T/U 100 μ 3,218m2 65.0%
A/F Full Coat 50 μ 4,950m2 100.0% Aux Boiler Manhol
Drum Manhole
Hull Mark Hand Hole
1) Ships name Ext Gas Side Manhol
2) Port of registry
3) Draft marks Aux Boiler Mountin
4) Freeboard Vavle No.
5) Pilot mark (white and red)
6) Tanks & bulkhead separation marks
7) Bulbous Bow Mark
8) Tug Pushing Mark
Hull Mark
Last record F A P S
Neck Beaing(Upper) 1.58 0.01 0.95 1.20
Neck Beaing(Lower) 0.00 1.55 1.75 0.65
Lower Pintle Bush 2.70 3.70
Switchboard
Total 44 Name
No.1 generator pane
Painting Area No.2 generator pane
No.1 Cargo Hold 4,550.0 m2 No.3 generator pane
No.2 Cargo Hold 5,080.0 m2 Emergency Switchbo
No.3 Cargo Hold 5,070.0 m2 Hatch Cover Swithbo
No.4 Cargo Hold 5,040.0 m2 Deck Mach Swithboa
No.5 Cargo Hold 5,040.0 m2
No.6 Cargo Hold 5,050.0 m2
No.7 Cargo Hold 5,060.0 m2
No.8 Cargo Hold 5,010.0 m2
No.9 Cargo Hold 4,700.0 m2
Total 44,600.0 m2 ME Aux Blower
Maker
Sand blast and paintin Type
1) No.1 Cargo Hold 4,550 m2 Spec
Sand blast(S.A 2.0) 1,138m2 25.0% Weight
Sand blast(S.A 1.0) 1,138m2 25.0%
Bearing
1st Touch Up Paint 100 μ 2,275m2 50.0%
2nd Touch Up Pain 100 μ 2,275m2 50.0%
2) No.2 Cargo Hold 5,080 m2 Motor
Sand blast(S.A 2.0) 1,270m2 25.0% Name
Sand blast(S.A 1.0) 1,270m2 25.0% Maker
1st Touch Up Paint 100 μ 2,540m2 50.0% Type
2nd Touch Up Pain 100 μ 2,540m2 50.0% Spec
3) No.3 Cargo Hold 5,070 m2 Weight
Sand blast(S.A 2.0) 1,268m2 25.0%
Bearing
Sand blast(S.A 1.0) 1,268m2 25.0%
1st Touch Up Paint 100 μ 2,535m2 50.0%
2nd Touch Up Pain 100 μ 2,535m2 50.0%
4) No.4 Cargo Hold 5,040 m2
Sand blast(S.A 2.0) 1,260m2 25.0%
Sand blast(S.A 1.0) 1,260m2 25.0%
1st Touch Up Paint 100 μ 2,520m2 50.0%
2nd Touch Up Pain 100 μ 2,520m2 50.0%
5) No.5 Cargo Hold 5,040 m2
Sand blast(S.A 2.0) 1,260m2 25.0%
Sand blast(S.A 1.0) 1,260m2 25.0%
1st Touch Up Paint 100 μ 2,520m2 50.0%
2nd Touch Up Pain 100 μ 2,520m2 50.0%
6) No.6 Cargo Hold 5,050 m2
Sand blast(S.A 2.0) 1,263m2 25.0%
Sand blast(S.A 1.0) 1,263m2 25.0%
1st Touch Up Paint 100 μ 2,525m2 50.0%
2nd Touch Up Pain 100 μ 2,525m2 50.0%
7) No.7 Cargo Hold 5,060 m2
Sand blast(S.A 2.0) 1,265m2 25.0%
Sand blast(S.A 1.0) 1,265m2 25.0%
1st Touch Up Paint 100 μ 2,530m2 50.0%
2nd Touch Up Pain 100 μ 2,530m2 50.0%
8) No.8 Cargo Hold 5,010 m2
Sand blast(S.A 2.0) 1,253m2 25.0%
Sand blast(S.A 1.0) 1,253m2 25.0%
1st Touch Up Paint 100 μ 2,505m2 50.0%
2nd Touch Up Pain 100 μ 2,505m2 50.0%
9) No.9 Cargo Hold 4,700 m2
Sand blast(S.A 2.0) 1,175m2 25.0%
Sand blast(S.A 1.0) 1,175m2 25.0%
1st Touch Up Paint 100 μ 2,350m2 50.0%
2nd Touch Up Pain 100 μ 2,350m2 50.0%
Mooring Winch
DM1 (Fore Stb Side) 2 set
DM2 (Fore Port Side) 2 set
DM3 (Fore Center) 2 set
DM4 (Between No.1 to 2 2 set
DM5 (Between No.8 to 9 2 set
DM6 (Aft Center) 2 set
DM7 (Aft Stb Side) 2 set
DM8 (Aft Port Side) 2 set
Total 16 set
Eng
Shell Fitting valve
Size Kind Name Fr Side
10K - 450A Butterfly SEA W. SUC (COOL S.W) 36-37 Port
10K - 450A Butterfly SEA W. SUC (COOL S.W) 36-37 Stb
10K - 300A Butterfly M/E Air CLR JACKET CFW CLR OVBD 32-33 Port
Total
ME TC
Type: TCA88
Aux Boiler Manhole
Drum Manhole 305 x 405 1 pcs
Hand Hole OD203 5 pcs
Ext Gas Side Manhole 500 x 500 2 pcs
Total 14
Switchboard
Name Place Amount
No.1 generator panels. Eng Cont Room 1 No.1 generator panels. / Eng C
No.2 generator panels. Eng Cont Room 1 No.2 generator panels. / Eng C
No.3 generator panels. Eng Cont Room 1 No.3 generator panels. / Eng C
Emergency Switchboard Upper Deck Em'cy Gen Room 1 Emergency Switchboard / Upp
Hatch Cover Swithboard Deck Store btween No.5 and 6 CH 1 Hatch Cover Swithboard / Deck
Deck Mach Swithboard Steering Room 1 Deck Mach Swithboard / Steer
ME Aux Blower
Osaka Blower Mfg. Co., Ltd
TBMS - 7538
440 V, 3 PHASE, 115 A, 60 HZ, 75 KW
Fan-1100 kgs, Motor: 357 kgs
No.6314C3 x 2pcs
No. 6216C3 x 2 pcs
Motor
No.1 and 2 Main Cooling S.W. PP Motor
Amount
1 HV501V.P/ 10K-450A / Butterfly / SEA W. SUC (COOL S.W)
1 HV502V.P/ 10K-450A / Butterfly / SEA W. SUC (COOL S.W)
1 HV503V.P/ 10K-300A / Butterfly / M/E Air CLR JACKET CFW CLR OVBD
1 HV504V.P/ 10K-200A / Butterfly / G/E & M/N AIR COMP CFW CLR, ATMOS CONDR, AIR COND
23
10K-80A / Glove / Main Steam Stop Valve
16K-25A / Angle / Feed W. Stop Valve
16K-25A / Angle Check / Feed W. Check Valve
16K-25A / Glove / Surface Blow Down Valve
16K-25A / Glove / Bottom Blow Down Valve
10K-15A / Glove / Water Level Gauge Root vv
10K-25A / Glove / Water Level Gauge Cylinder Drain Valve
20K-6A / Glove / Air Vent Valve
20K-6A / Glove / Sampling Valve
20K-6A / Glove / Pressure Gauge Shut Off Valve
100mm
125A
250A
250A
125A 175mm 120mm 160mm
1170 mm
250A
3055mm
24
2) FIRE & BILGE PUMP / FIRE & GS PUMP ( OUTLET
25
2400mm
1900mm
26
FLANGE ( 10K 150A)
( 10K 250A)
428mm
27
UMP ( OUTLET PIPE)
28
FLANGE ( 5K 500A)
29