Analysis of Crash Deck Methode 1
Analysis of Crash Deck Methode 1
Analysis of Crash Deck Methode 1
Technical Data:
Loading Data : 2 Fitters = 2 x 80 kg = 160 kg
3 Small hand tools = 3 x 20 kg = 60 kg
Template, plumbing sets & others = 100 kg
Total = 320 kg
Plan Crash deck
A
3050
2650
POTONGAN A
Page 1 of 13
A. Concrete to be supported:
- Concrete Density = 2400 kg/m3
- Thickness of Slab = 300 mm
B. Plywood
- Timber Class = 2
- Mod Elastcity of Timber E= 100000 kg/cm2
- Max Tensile Strength slt = 100 kg/cm2
- Max Shear Strength ta = 12 kg/cm2
- Thickness of Plywood t= 18 mm
C. Steel Beam
1. Steel Beam 1
Data Baja yang dipakai: WF 200 x 100 x 5,5 x 8
Mod Elastsitas; E = 200000 mPa = 2000000 kg/cm2
Teg leleh; fy = 240 mPa = 2400 kg/cm2
Zx = 184 cm3
Ix = 1840 cm4
tw = 0.55 cm
t = 0.8 cm
Self Weight = 21.3 kg/m
2. Steel Beam 2
Data Baja yang dipakai: H-Beam 200 x 200 x 8 x 12
Mod Elastsitas; E = 200000 mPa = 2000000 kg/cm2
Teg leleh; fy = 240 mPa = 2400 kg/cm2
Zx = 472 cm3
Ix = 4720 cm4
tw = 0.80 cm
t = 0.12 cm
Self Weight = 49.9 kg/m
Load Combinations:
- Live Load of Constructon Works = 150 kg/m2
For Timber / Wood Constructons:
Using the Load & Resistance Factor Designs; (P.K.K.I NI - 5)
- Combo 1: qu1 = max ( (1,2 DL + 1,6 LL); (1,4 DL) ) (For Strength analysis)
- Combo 2: qu2 = 1 DL + 1 LL (For Deflecton Analysis)
- Resistance Factor for Moment; ØM = 0.85
- Resistance Factor for Shear; ØV = 0.75
Page 2 of 13
Picture 1: Timber Class strength
Page 3 of 13
Picture 2: Timber Class Modulus of Elastcity
Page 4 of 13
ANALYSIS OF TEMPORARY SUPPORTS
A. Analisa Plywood
> Loading :
DL : - 2 Fitters = 2 x 80 kg = 160 kg
- 3 Small hand tools = 3 x 20 kg = 60 kg
- Template, plumbing sets & others = 100 kg
Total = 320 kg
Mo = 1/8 PL
L
Page 5 of 13
B. Analisa Steel Beam 1
> Loading :
- CNP 150 X 50 X 20 X 3.2
Area : P = 2650 mm = 2.65 m
L = 3050 mm = 3.05 m
Jarak CNP ke CNP = 60 cm = 0.6 m
Jumlah CNP : (L/distance) + 1 = 7 buah
Berat (m) = 5.5 kg/m x 2.7 x 1 = 14.58 kg
= 5.5 kg/m x 2.7 x 7 = 102 kg
Asumsi :
Data Baja yang dipakai: WF 200 x 100 x 5,5 x 8
Mod Elastsitas; E = 200000 mPa = 2000000 kg/cm2
Teg leleh; fy = 240 mPa = 2400 kg/cm2
Zx = 184 cm3
Ix = 1840 cm4
tw = 0.55 cm
t = 0.8 cm
Self Weight = 21.3 kg/m
Page 6 of 13
2. Check terhadap geser
3 A4 = 5.06 cm2
y4 = 4.6 cm
0.8
10
Lendutan d = 1/192 . P . L3 / (E Ix )
P = 422.03 kg
Page 7 of 13
C. Analisa Beam Akibat Lif
> Loading :
- SF = 4
- a. for trak hoist and bloc stop = 20 kn = 2000 kg x 4 (SF) = 8000 kg
b. for material hoist = 10 kn = 1000 kg x 4 (SF) = 4000 kg
a b
L
Asumsi :
Data Baja yang dipakai: H-Beam 200 x 200 x 8 x 12
Mod Elastsitas; E = 200000 mPa = 2000000 kg/cm2
Teg leleh; fy = 240 mPa = 2400 kg/cm2
Zx = 472 cm3
Ix = 4720 cm4
tw = 0.80 cm
t = 0.12 cm
Self Weight = 49.9 kg/m
Page 8 of 13
1. Check terhadap lentur
3 A4 = 7.904 cm2
y4 = 4.94 cm
0.12
20
P = 4588.3 kg
Page 9 of 13
Page 10 of 13
b. for material hoist
- Span L = 3050 mm = 3.05 m
a = 1000 mm = 1 m
b = 2050 mm = 2.05 m
Mo = 2P a2b2 / L3
P
a b
L
- Max Bending Moment
Mo = 2P a2b2 / L3 = 1184.944995 kg-m = 118494.5 kg-cm
- Max Shear Load
Vo = Pb2 (3a+b) / L3 = 2991.986113 kg
Asumsi :
Data Baja yang dipakai: H-Beam 200 x 200 x 8 x 12
Mod Elastsitas; E = 200000 mPa = 2000000 kg/cm2
Teg leleh; fy = 240 mPa = 2400 kg/cm2
Zx = 472 cm3
Ix = 4720 cm4
tw = 0.80 cm
t = 0.12 cm
Self Weight = 49.9 kg/m
Page 11 of 13
0.12 I1 = 0.00288 cm4
A1 = 2.4 cm2
1 Y1 = 9.94 cm
I2 = 514.363 cm4
A2 = 15.808 cm2
Y2 = 9.94 cm
2 I3 = 0.00288 cm4
19.76 20 A3 = 2.4 cm2
Y3 = 9.94 cm
0.80
4 Igab = 2551 cm4
3 A4 = 7.904 cm2
y4 = 4.94 cm
0.12
20
P = 2992 kg
Kesimpulan
1. Menggunakan plywood (t=18 mm)
2. CNP 150 x 50 x 20 x 3,2 (jarak = 60 cm)
3. Steel Beam 1 menggunakan WF 200 x 100 x 5,5 x 8
4. Steel Beam 2 menggunakan H-Beam 200 x 200 x 8 x 12
Page 12 of 13
Page 13 of 13