A B C D E F G H I J K

1771

JO003-10-LA_-MDD-IDM-001 SH2 C-1


FROM 40LAB21CP001 GENERAL NOTES
ENTHALPY
1770 CONTROL 1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.

JO003-10-LA_-MDD-IDM-001 SH2 E-1 2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001
1 FROM 40LAB44CT001 GENERAL LINE LIST.
1
FT
40LAF10CF001 SEPCO3 HORA HORA SEPCO3
3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).
SEPCO3 HORA HORA SEPCO3 HP BY-PASS HP BY-PASS
VALVE VENDOR VALVE VENDOR 4. N/A.
HP BY-PASS HP BY-PASS
VALVE VENDOR VALVE VENDOR 2oo3
40LAF10 40MAN91 40MAN91
TIX
2 BR001 L.O. BR001 2 3 BR002 SPECIFIC NOTES:
1503 NOTE 16 FC FC 40LBC30CT901
NOTE 16
JO003-10-LA_-MDD-IDM-001 SH2 I-2
2" 6A1 H 2" 6A1 H 2" 25B1 H 1.- PP TO BE LOCATED AS CLOSE AS POSSIBLE TO HRSG TERMINAL POINT.
IP FEED WATER 40LAF10 40LAF10 40LAF10 40MAN91 1oo2
XV TV
AA001 AA002 40MAN91
AT001 40LAF10 AA001 NOTE 10 2.- FLOW ELEMENT TO BE INTALLED IN A STRAIGHT SPOOL OF 1,11 M UPSTREAM AND 0,5 M
40LAF10AA201 40MAN91AA202 BS001 PIX TT
1"

SEPCO3
40LAF10 AA503 NOTE 11 40LBC30CP901 40LBC30CT001B DOWNSTREAM AT LEAST.
1"
AA501 NOTE 15
40LAF10 PT PT TT TT 3.- STRAIGHT LENGTH OF DOWNSTREAM PIPING OF 10xDN. THIS MINIMUM DISTANCE IS ALSO THE POINT
1" HP BY-PASS HP BY-PASS
AA504 40LBC30CP001A 40LBC30CP001B 40LBC30CT001A 40LBC30CT001C TO CHANGE THE PIPE SPECIFICATION.

HORA
1" 40LAF10 VALVE VENDOR TP-2 VALVE VENDOR
AA502 4.- TRANSITION PIECE IN A335-P22 (BS001) FOR DISSIMILAR WELDING BETWEEN A335-P91 AND A A106 Gr.B.
2 XV
2
C 40LBC30 40LBC30
C 40MAN91AA203 1/2" 1/2" 1" 1" 1" 5.- THE TEMPERATURE SENSORS ARE FITTED DOWNSTREAM IN THE STRAIGHT PIPING AT LEAST
AA701 AA702
FC 10xDN AFTER THE VALVE (MIN. 5 M) AND IN CASE OF HORIZONTAL PIPING APROX. 30º ROTATED OF
SEPCO3 HORA HORA SEPCO3
THE VERTICAL PIPING.
H 40LBC30 5 40LBC30
4 BR001 BR002 6.- HIGH PRESSURE MOTORIZED DRAIN VALVES WILL BE SUPPLIED WITH INTERMEDIATE
743
1% POSITION CAPABILITY.
JO003-10-LB_-MDD-IDM-001 SH3 H-2
16" 6B1 H 16" 6A1 H
TP-0 TP-3 7.- N/A.
TO COLD REHEAT
NOTE 5
40LBC30
PV BS001 8.- N/A.
40MAN91AA201 NOTE 3

NOTE 9
NOTE 4 9.- STRAIGHT LENGTH OF UPSTREAM PIPING OF 5xDN WITH A MINIMUM OF 1,7 M.

10.- THE PIPING COMING FROM THE SPRAY WATER CONTROL VALVE GOING TO THE BYPASS
VALVE SHALL BE ARRANGED BELLOW THE LEVEL OF THE WATER STUD (TP).
HP STEAM BY-PASS VALVE

11.- DISTANCE BETWEEN THE SPRAY WATER CONTROL VALVE AND THE WATER STUD (TP) SHOULD

8" 25B1 H
40LBA10
NOT EXCEED 5 M.

BR002
3 12.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.
3
HP BOILER
DRUM LEVEL CONTROL 13.- NE HRSG LOOSE ELEMENT.

14.- TRANSITION PIECE IN A335-P91 FOR DISSIMILAR PIPE THICKNESS BETWEEN NE TP-02 AND
PIPELINE40LBA10BR001.

2%
15.- TRANSITION PIECE IN A-335-P22 (BS001) FOR DISSIMILAR WELDING BETWEEN A106 Gr.B
AND A-335 P-91.

16.- COUNTER FLANGE PROVIDED BY SUPPLIER.

17.- INSTALL FLOWMETER AFTER PRESSURE TEST AND BLOW OUT. TEMPORARY PIPING
FIX
SHALL BE PROVIDED: 25B1 WELDED FOR HIGH PRESSURE.
40LBA10CF901
NOOTER HRSG NOOTER HRSG NOTE 1
JO003-10-HA_-MDD-NE-004 1oo2
1oo2
FEEDWATER FROM HRSG NOOTER HRSG PIX TIX
TP-31 40LBA10CP901 40LBA10CT901
TT
SEPCO3 40LBA12CT002
PT PT FT
4 PP
TW TE TT
40LBA10CP001A 40LBA10CP001B 40LBA12CF001 TT TT
4
40LBA12CT801 40LBA12CT001 40LBA10CT004
40LBA10CP801
6

40LBA10CT001A 40LBA10CT001B
TI
1" 15A1 H

40LBA12CT502 40LBA10 40LBA10


40LAE20

3/4" 3/4"
BR001

40LBA10 3/4" AA704 AA706


AA702
1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2"
NOOTER HRSG SEPCO3 40LBA10 40LBA10
40LBA10 3/4" 3/4"
3/4" 40LBA10 1-1/2" AA703 AA705
1 AA701
BR001 745
1%
JO003-10-HA_-MDD-NE-004 JO003-10-LB_-MDD-IDM-001 SH2 A-6 OPERATION DESIGN
12"x10" 10" 25B1 H
10"x12" 12"x10" TO MAIN STEAM HEADER STREAM Nº
MAIN STEAM FROM HRSG TP-02
40LBA10 HP P(barg) T (ºC) P(barg) T (ºC)
FE 40LBA13
BS001 ATTEMPERATOR
40LBA12CF601 BR001 1 115,2 509,3 123,8 540,6
NOTE 14 NE NE
NOTE 13 2 55,69 152,65 74 167,65
6" 25B1 H
1" 1" 3 55,69 152,65 74 540,6
6" 25B1 H
40LBA14

4 30,82 345,9 35 540,6


BR001

40LBA13 40LBA13
5 HRSG NE NOTE 2 HRSG NE AA701 AA702 5 30,82 345,9 35 361 5
NOTE 13 1" 1"
NOTE 17
LSHH
6 131,5 153,55 210,7 168,55
40LBA13 40LBA13
1" 1" 40LBA13CL301
AA705 AA706
40LBA14 40LBA14
AA701 AA702 LSH 1" 1"
1" 1" 40LBA13CL302
40LBA13 40LBA13
40LBA14 40LBA14 LSHH
40LBA14CL301 AA703 AA704
AA705 AA706 1" 1"

LSH 1" 1" 40LBA13 40LBA13


40LBA14CL302 AA707 AA708
40LBA14 40LBA14
AA703 AA704
1" 1"

40LBA14 40LBA14
6 AA707 AA708 6
40LBA13 40MAL94
BR002 M BR004
1.25% 1632
L.O. 1.25%
JO003-10-MAL-MDD-IDM-001 SH1 F-1
6" 25B1 H 1-1/2" 25B1 P
40LBA15

1-1/2" 25B1 H
BR001

40LBA13 MV TO ATMOSPHERIC DRAIN TANK


AA001 40LBA13AA101
40LBA14
BR002
1.25%
M
1.25%
40MAL94
BR003 1631 1" 1" NOTE 6
3
L.O. 40LBA13
JO003-10-MAL-MDD-IDM-001 SH1 E-2 1"
1-1/2" 25B1 H 1-1/2" 25B1 P 40LBA15 40LBA15 AA501
40LBA14 TO ATMOSPHERIC DRAIN TANK
MV AA701 AA702
AA001 1" 1"
40LBA14AA101
40LBA13
40LBA15 40LBA15 LSHH 1"
NOTE 6 AA502
40LBA14 AA705 40LBA15CL301
AA706 OWNER: OWNER'S ENGINEER:
1"
AA501

1" 1" C
LSH NOTE 12
40LBA15CL302
40LBA14
1" 40LBA15 40LBA15
7 AA502
AA703 AA704
7
1" 1" DESIGNER: EPC CONTRACTOR:
C
NOTE 12
40LBA15 40LBA15
AA707 AA708
PROJECT:
40LBA15 40MAL91
BR002
1.25% L.O.
M BR003
1.25% 1574 Samra Phase IV Add-On Combined Cycle Project
JO003-10-MAL-MDD-IDM-001 SH1 E-2
1-1/2" 25B1 H 1-1/2" 25B1 P
40LBA15 MV TO ATMOSPHERIC DRAIN TANK
AA001 40LBA15AA101
3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP
NOTE 6 28/10/2016
2 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
40LBA15
1"
AA501 1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
40LBA15
1" EPC CONT. SIGNATURE DATE
AA502 FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN
C NOTE 12
DOCUMENT NUMBER: DOCUMENT NAME:
JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 1
HIGH PRESSURE
A1 -
NEXT: 2

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K

DSP DSP
GENERAL NOTES:

1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.

1 2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001 1


GENERAL LINE LIST.

3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).

G HP PART OF IP/LP PART OF


STEAM TURBINE
4. N/A.

STEAM TURBINE
SPECIFIC NOTES:

1.- AS CLOSE AS POSSIBLE TO HP STEAM INLET.

2.- HIGH PRESSURE MOTORIZED DRAIN VALVES WILL BE SUPPLIED WITH INTERMEDIATE
POSITION CAPABILITY.

3.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.

4.- TT 40LBA10CT003 SHALL BE PLACED DIRECT UPSTREAM DRAIN POT 40LBA17BR001.


2 2
5.- PT 40LBA10CP003 SHALL BE PLACED DIRECT UPSTREAM TERMINAL POINT TP-01.

6.- TT 40LBA10CT002 TO BE CLOSE TO DRAIN POT BRANCH 40LBA17BR001.

DSP

DSP

DSP
SEPCO3 DSP

M
SEPCO3 DSP

SEPCO3
TP-62 TP-02

SEPCO3

SEPCO3
40LBC10 TP-01 TP-03
BR001 2
764

1.25%
1%

1.25%
JO003-10-LB_-MDD-IDM-001 SH3 A-3
12" 3B1 H
TO COLD REHEAT SYSTEM TP-04

DSP

1
1
3/4" 3/4"
PT

1-1/2" 25B1 H
NOTE 5

40MAL31
40LBA10CP003

BR001
1" 25B1 H
40MAL37
40LBA10 40LBA10

BR005
1" 25B1 P
40MAA10
AA708

BR010
AA707
3 3

DSP

1%
40LBA17
BR001

10" 25B1 H
DSP

NOTE 1

TV
40MAL31AA201
TT 1-1/2"
40MAL31
40LBA10CT003 NOTE 4
BR002 1735
FC L.O. 1.25%
JO003-10-MAL-MDD-IDM-001 SH1 F-1
1-1/2" 25B1 P
DSP

40MAL31 40MAL31 TO ATMOSPHERIC DRAIN TANK


1" 1" 1" AA001
4 AA501 4
40LBA17 40LBA17
1-1/2" 40MAL31
AA701 AA702 TT 1"
1" 1" 40LBA10CT002 AA502

LSHH NOTE 6
40LBA17 40LBA17
AA705 40LBA17CL301
AA706
1739
LSH
1" 1" JO003-10-MAL-MDD-IDM-001 SH1 I-2
40LBA17CL302
TO ATMOSPHERIC DRAIN TANK
40LBA17 40LBA17
1" 1" AA703 AA704

40LBA17 40LBA17
AA707 AA708
DSP

3/4" 3/4"
5 PP
3/4" 3/4"
5
40LBA10CP802 PT
40LBA10 40LBA10 40LBA10CP002B
40MAL93 40LBA17 1oo2
AA710 AA709 40LBA10 40LBA10
BR002 M BR002 PIX
DSP

1577 1.25% AA711 AA712


1.25% L.O. 40LBA10CP902
JO003-10-MAL-MDD-IDM-001 SH1 F-1
2" 25B1 P 2" 25B1 H 3/4" 3/4"
TO ATMOSPHERIC DRAIN TANK MV
40LBA17AA101
40LBA17
AA001 40LBA10 40LBA10
PT
40LBA10CP002A 3
AA713 AA714
NOTE 2
40LBA17
1"
AA501

40LBA17
1"
AA502

C NOTE 3 OPERATION DESIGN


STREAM Nº
6 P(barg) T (ºC) P(barg) T (ºC) 6
1 115,2 509,3 123,8 540,6
40LBA10
745 1 BR001 1%
2 30,82 345,9 20/35 465/361
JO003-10-LB_-MDD-IDM-001 SH1 H-5
10" 25B1 H
MAIN STEAM FROM HRSG

OWNER: OWNER'S ENGINEER:

7 7
DESIGNER: EPC CONTRACTOR:

PROJECT:

Samra Phase IV Add-On Combined Cycle Project

3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP


2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 2
HIGH PRESSURE
A1 -
NEXT: 3

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K

1 1

GENERAL NOTES:

1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.


NOTE 6
2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001
DSP DSP
GENERAL LINE LIST.
40LBC12 40MAL92
BR001 M 3 BR001
2% 1629
2% TP-06 3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
TP-05
JO003-10-MAL-MDD-IDM-001 SH2 A-4 DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).
4" 3B1 H 4" 3B1 P
STEAM TURBINE HP CASING
MV 4. N/A.
EVACUATION TO SUBATMOSPHERIC
40LBC12AA101 FLASH TANK

40LBC22
BR001 SPECIFIC NOTES:
1% 854

JO003-10-LB_-MDD-IDM-001 SH6 A-4 1.- CONNECTION IN CRH LINE REQUIRED BY ST SUPPLIER (DSP), IN CASE ST DRYING PROCEDURE.
2 NOTE 2
1-1/2" 6A1 H
TO IP ADMISION VALVE
2
40LBC30 2.- CONDENSATE FROM BALANCING LINE (40LBC22BR001/2) MUST NOT BE ROUTED INTO IN VALVE CHAMBER.
BR002 2
743
40LBC10 DSP DSP 40LBC11 1% 3.- 40LBC10AA201 FLAP VALVE LOCATED NO MORE THAN 10 m FROM TP-04.
BR101 M 2 BR101 JO003-10-LB_-MDD-IDM-001 SH1 I-2
2% 2% 16" 6A1 H
FROM HRSG HP STEAM BY-PASS 4.- 40LBC10AA201 FLAP VALVE TO BE POSITIONED HORIZONTAL.
4" 3B1 H 4" 6A1 H NOTE 7 VALVE
PP TW TW 40LBC10 PT TT TP-10 TP-11 PT
10LBG10 5.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.
40LBC10CP801 40LBC10CT801 40LBC10CT802 AU001 40LBC10CP002 40LBC10CT003 MV 40LBC11CP001
BR001 1766
40LBC10AA101 1% 6.- VALVE 40LBC12AA101 SHALL BE THE HIGHEST POINT OF THE PIPELINE.
40LBC10 40LBC10 40LBC10 40LBC11 JO003-10-MAW-MDD-IDM-001 SH1
1/2" 2" 1/2" 1/2" 2" 6A1 H
AA702 AA502 AA704 AA702 CRH TO ST STEAM SEALING SYSTEM 7.- STRAIGHT LENGTH OF DOWNSTREAM PIPING OF 10xDN. THIS MINIMUM DISTANCE IS ALSO THE POINT
1-1/2" 1-1/2" TO CHANGE THE PIPE SPECIFICATION.
1-1/2"
40LBC10 2" 40LBC10 DSP DSP
40LBC10 40LBC10 40LBC11 40LBC11
1/2" 1/2" 1/2" 40LBC11 8.- INSTRUMENTATION TO BE ALLOCATED UPSTREAM THE DRAIN POT.
1 AA701 L.C. AA501 AA703 2 AA701
764 BR001 BR002 BR001 934
1% NOTE 1 NOTE 8 1% 2% 1% 2% 12"x16"
TP-08 TP-09
JO003-10-LB_-MDD-IDM-001 SH2 A-3 JO003-10-LB_-MDD-IDM-001 SH4 A-4
12" 3B1 H 12" 6A1 H 16" 6A1 H
COLD REHEAT FROM STEAM TURBINE 40LBC10 TO HRSG REHEATER
AA201
3 3
NOTE 3

NOTE 4

4 4
1772

JO003-10-LB_-MDD-IDM-001 SH4 A-5


TO 40LBC21AA201 AND 40LBC26AA201

10" 6A1 H
40LBC24
12" 3B1 H

BR001
40LBC23
BR001

5 5

1" 1"
1"
1" 1" 40LBC23 40LBC23
AA701 AA702 LSHH 1"
40LBC23CL301
40LBC24
LSHH OPERATION DESIGN
40LBC23 40LBC23
1" 1"
AA701
40LBC24CL301
STREAM Nº
6 LSH
AA705 AA706 40LBC24
1"
P(barg) T (ºC) P(barg) T (ºC) 6
40LBC23CL302 LSH AA703
1" 1" 40LBC23 40LBC23 40LBC24CL302 1 30,82 345,9 20/35 465/361
AA703 AA704 1"
40LBC23
40LBC24 2 30,82 345,9 35 361
40LBC23 AA702
AA707 AA708 40LBC24 3 30,82 345,9 20/35/FV 465/361
AA704

40LBC23 40MAL92
BR002 3 BR002 1581 40LBC24 40MAL91
1.25% L.O. FO 1.25% BR002 BR035
1.25% 1582
JO003-10-MAL-MDD-IDM-001 SH2 G-3 1.25% L.O. FO
2" 3B1 H 2" 3B1 P JO003-10-MAL-MDD-IDM-001 SH1 I-5
40LBC23 TO SUBATMOSPHERIC FLASH TANK 2" 6A1 H 2" 6A1 P
XV
AA001 40LBC24 TO ATMOSPHERIC DRAIN TANK
40LBC23AA201 XV
AA001 OWNER: OWNER'S ENGINEER:
40LBC24AA201

40LBC23
1"
AA501 40LBC24
1"
AA501
7 7
40LBC23
1" DESIGNER: EPC CONTRACTOR:
AA502 40LBC24
1"
AA502

PROJECT:
C
NOTE 5 C
NOTE 5
Samra Phase IV Add-On Combined Cycle Project

3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP


2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 3
INTERMEDIATE PRESSURE (CRH)
A1 -
NEXT: 4

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K

1 1

GENERAL NOTES:

1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.

2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001


GENERAL LINE LIST.

3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).

4. N/A.

SPECIFIC NOTES:

1.- N/A.
2 2
2.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.

3 3

4 SEPCO3 NOOTER HRSG 4


40LBC11
934 1 BR001
1% 1% TP-04
JO003-10-LB_-MDD-IDM-001 SH3 H-3 JO003-10-HA_-MDD-NE-008
16" 6A1 H
COLD REHEAT FROM STEAM TURBINE 16"x20"
TO HRSG REHEATER
1"

1" 40LBC21
AA701 LSHH
40LBC21CL301
40LBC21
LSH 1"
AA703
40LBC21CL302
1" 40LBC21
AA702
40LBC21
AA704
1772
10" 6A1 H

JO003-10-LB_-MDD-IDM-001 SH3 H-4


40LBC26
BR001

10" 6A1 H
FROM 40LBC11CP001

40LBC21
5 5

BR001
40LBC21 40MAL94
BR002 BR012 1586
1.25% L.O. FO 1.25%
JO003-10-MAL-MDD-IDM-001 SH1 I-5
2" 6A1 H 2" 6A1 P
40LBC21 XV TO ATMOSPHERIC DRAIN TANK

1"
AA001
40LBC21AA201
3
40LBC21
1" 40LBC26 1"
LSHH AA501
AA701
40LBC26CL301
40LBC26 40LBC21
LSH 1"
AA703 1"
AA502
40LBC26CL302
1" 40LBC26
AA702
40LBC26
AA704 C NOTE 2

OPERATION DESIGN
6 STREAM Nº 6
P(barg) T (ºC) P(barg) T (ºC)
40LBC26 40MAL91 1 30,82 345,9 35 361
BR002 BR034 1584
1.25% L.O. FO 1.25%
JO003-10-MAL-MDD-IDM-001 SH1 I-5
2" 6A1 H 2" 6A1 P
40LBC26 XV TO ATMOSPHERIC DRAIN TANK
AA001 40LBC26AA201

40LBC26
1"
AA501

40LBC26
1"
AA502 OWNER: OWNER'S ENGINEER:

7 C NOTE 2 7
DESIGNER: EPC CONTRACTOR:

PROJECT:

Samra Phase IV Add-On Combined Cycle Project

3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP


2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 4
INTERMEDIATE PRESSURE (CRH)
A1 -
NEXT: 5

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K
1778 1774
JO003-10-LC_-MDD-IDM-001 SH2 JO003-10-MAG-GDD-SQX-026 SH1 B-5
FROM 40LAB45CP001 ENTHALPY FROM 40MAG10CT901 GENERAL NOTES:
CONTROL 1775 1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.
JO003-10-MAG-GDD-SQX-026 SH1 B-5
2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001
1779 FROM 40MAG10CP901
GENERAL LINE LIST.
1 JO003-10-LC_-MDD-IDM-001 SH2 1
3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
FROM 40LCA20CT002 FT
SEPCO3 HORA HORA SEPCO3 SEPCO3 HORA HORA SEPCO3 DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).
40LCE20CF001

HRH BY-PASS HRH BY-PASS HRH BY-PASS 4. N/A.


HRH BY-PASS
VALVE VENDOR VALVE VENDOR VALVE VENDOR VALVE VENDOR
40LCE20 40MAN92 2 3 40MAN92
2 BR001 L.O. BR002 2oo3 SPECIFIC NOTES:
1526 BR001
FC FC
TIX
JO003-10-LC_-MDD-IDM-001 SH2 I-6
4" 3A1 P 4" 6B1 P 40MAN94CT901
4" 3A1 P 1.- N/A.
FROM CONDENSATE SYSTEM 40LCE20 40LCE20 XV 40MAN92
40LCE20 TV 40MAN92
AA001 AA002 40LCE20 AA001 NOTE 7
AT001 40LCE20AA201 1" 40MAN92AA202 2.- STRAIGHT LENGTH OF DOWNSTREAM PIPING OF 10xDN. THIS MINIMUM DISTANCE IS ALSO THE POINT
BS001 NOTE 8 NOTE 12 1oo2
40LCE20 AA502
TO CHANGE THE PIPE SPECIFICATION.
1" AA501 PIX TT

SEPCO3
NOTE 11
40MAN94CP901 40MAN94CT001B
3.- N/A.
C VENDOR VENDOR
TP-3 PT PT TT TT
C 4.- THE TEMPERATURE SENSORS ARE FITTED DOWNSTREAM IN THE STRAIGHT PIPING AT LEAST
40MAN94CP001A 40MAN94CP001B 40MAN94CT001A 40MAN94CT001C

HORA
10xDN AFTER THE VALVE (MIN. 5 M) AND IN CASE OF HORIZONTAL PIPING APROX. 30º ROTATED OF
THE VERTICAL PIPING.
2 XV
FC 40MAN94 40MAN94
2
40MAN92AA203 1/2" 1/2" 5.- HIGH PRESSURE MOTORIZED DRAIN VALVES WILL BE SUPPLIED WITH INTERMEDIATE POSITIION CAPABILITY.
AA701 AA703
HORA SEPCO3
SEPCO3 HORA 1" 1" 1"
H 40MAN94 40MAN94 6.- STRAIGHT LENGTH OF UPSTREAM PIPING OF 5xDN WITH A MINIMUM OF 2-5 M.
4 BR001 5 BR002 802
2% 2% 7.- THE PIPING COMING FROM THE SPRAY WATER CONTROL VALVE GOING TO THE BYPASS
JO003-10-LB_-MDD-IDM-001 SH9 A-5 VALVE SHALL BE ARRANGED BELLOW THE LEVEL OF THE WATER STUD (TP).
TP-0 TP-1 28" 3B1 H 28" 1A1 P
NOTE 2 NOTE 4 TO ACC STEAM DUCT
8.- DISTANCE BETWEEN THE SPRAY WATER CONTROL VALVE AND THE WATER STUD (TP) SHOULD
PV
NOT EXCEED 5 M.
40MAN92AA201

HRH STEAM 9.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.

NOTE 6
BY-PASS VALVE 10.- NE HRSG LOOSE ELEMENT.

11.- TRANSITION PIECE IN A335-P22 (BS001) FOR DISSIMILAR WELDING BETWEEN A106 Gr.B AND A-335 P-91.

12.- FLANGED SPOOL PIPE TO BE INSTALLED AT THE ATTEMPERATION CONNECTION TO THE HRH BY-PASS
VALVE FOR MAINTENANCE OPERATION.

3 3

2%

18" 6B1 H
40LBB16
BR001
4 4

NOOTER HRSG NOOTER HRSG

1oo2 1oo2
JP003-10-HA_-MDD-NE-008
TT PIX TIX
NOOTER HRSG TP-30 40LBB31CT004
FEEDWATER FROM HRSG 40LBB10CP905 40LBB10CT905
PP TW TE
SEPCO3
40LBB10CP801 40LBB31CT801 40LBB31CT003
TT PT PT TT TT
40LBB10CT002 40LBB10CT005B
6

TI 40LBB10CP005A 40LBB10CP005B 40LBB10CT005A


40LBB10 40LBB31CT504
1" 6A1 H

3/4"
40LAF20

AA702 40LBB10
BR001

40LBB10
3/4" 3/4"
AA704 AA706
NOOTER 1-1/2" 1-1/2"
40LBB10
5 HRSG SEPCO3 3/4"
1-1/2" 1-1/2" 1-1/2" 5
AA701 40LBB10 40LBB10
40LBB10 1-1/2" 3/4" 3/4"
1 AA703 AA705
BR010 1% 798
20"x18" 18"x20" 1%
JP003-10-HA_-MDD-NE-008 JO003-10-LB_-MDD-IDM-001 SH6 A-7
18"x20" 20" 6B1 H
HOT REHEAT FROM HRSG TO STEAM TURBINE
40LBB10 TP-05
BS001 OPERATION DESIGN
HRH STREAM Nº
ATTEMPERATOR
40LBB15 P(barg) T (ºC) P(barg) T (ºC)
BR001
1 28,6 509 35 524
NOTE 10 6" 6B1 H 2 13,2 58,5 30,45 79,8
1" 1"
3 13,2 58,5 30,45 524
6" 6B1 H
40LBB12
BR001

40LBB15 40LBB15
AA701 AA702
4 5 509 7/FV 524
1" 1"
5 5 158,8 7/FV 173,8
1"
1" 40LBB15 40LBB15 LSHH
40LBB15CL301
6 55,69 152,16 74 167,05
AA705 AA706
6 40LBB12 40LBB12 6
6" 6B1 H
40LBB14
BR001

AA701 AA702
1" 1" LSH 1" 1"
40LBB15CL302
40LBB12 40LBB12 LSHH 40LBB15 40LBB15
AA705 40LBB12CL301 AA703 AA704
AA706
1" 1"
LSH
40LBB12CL302
1" 1"
1" 1" 40LBB15 40LBB15
3
40LBB12 40LBB12 AA707 AA708 40LBB15 40MAL91
AA703 AA704 40LBB14 M
40LBB14 BR002 BR022 1589
1" 1" 1.25% L.O. 1.25%
AA701 AA702
1" 1" JO003-10-MAL-MDD-IDM-001 SH1 C-2
1-1/2" 6B1 H 1-1/2" 6B1 P
40LBB15 MV TO ATMOSPHERIC DRAIN TANK
40LBB12 40LBB12 LSHH
40LBB14 40LBB14 AA001 40LBB15AA101
AA707 AA708 40LBB12 40MAL94 40LBB14CL301
M AA705 AA706
BR002 BR022 1591
OWNER: OWNER'S ENGINEER:
1.25% 1.25% NOTE 5
L.O. 40LBB15
JO003-10-MAL-MDD-IDM-001 SH1 C-3 LSH 1" 1" 1" AA501
1-1/2" 6B1 H 1-1/2" 6B1 P
40LBB12 MV TO ATMOSPHERIC DRAIN TANK 40LBB14CL302
AA001 40LBB12AA101 40LBB14 40LBB14 40LBB15
7 AA703 AA704
1"
AA502
7
NOTE 5 1" 1" DESIGNER: EPC CONTRACTOR:
40LBB12
1"
AA501 40LBB14 40LBB14
C NOTE 9
AA707 AA708
PROJECT:
40LBB12
1"
AA502 Samra Phase IV Add-On Combined Cycle Project
40LBB14 40MAL91
M
BR002 BR023 1588
1.25% L.O. 1.25%
C NOTE 9 JO003-10-MAL-MDD-IDM-001 SH1 C-2
1-1/2" 6B1 H 1-1/2" 6B1 P
40LBB14 MV TO ATMOSPHERIC DRAIN TANK 3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP
AA001 40LBB14AA101 2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
NOTE 5 1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP

40LBB14 0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP


1"
AA501 REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 40LBB14 FOR APPROVAL
FOR CONSTRUCTION 8
1" FOR OWNER REVIEW
AA502 VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


C NOTE 9
JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 5
-
INTERMEDIATE PRESSURE (HRH)
A1
NEXT: 6

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K

1 1

GENERAL NOTES:

DSP 1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.


DSP
2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001
GENERAL LINE LIST.

3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).

4. N/A.

SPECIFIC NOTES:

1.- AS CLOSE AS POSSIBLE TO HRH STEAM INLET.


2 2
G 2.- 1 m OF 6B1 (P.91) UPSTREAM TP-12.

3.- TRANSITION PIECE IN A 335-P22 (BS001) FOR DISSIMILAR WELDING BETWEEN A 106 Gr. B AND A-335 P-91.

4.- CONDENSATE FROM BALANCING LINE (40LBC21BR001/002) MUST NOT BE ROUTED INTO IP VALVE CHAMBER.
HP PART OF TURBINE IP/LP PART OF TURBINE
5.- HIGH PRESSURE MOTORIZED DRAIN VALVES WILL BE SUPPLIED WITH INTERMEDIATE POSITION CAPABILITY.

6.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.
IP VALVE
7.- PT 40LBB10CP001 SHALL BE PLACED DIRECT UPSTREAM TP.14.

8.- TT 40LBB10CT003 TO BE CLOSE TO THE DRAIN POT BRANCH 40LBB13BR001.

3 3

DSP

DSP
DSP

SEPCO3
SEPCO3
SEPCO3
TP-12 TP-14 TP-13
DSP DSP

1
3/4" 3/4"
PT

2" 6B1 H
40LBB11
40LBC22 40LBC22 40LBB10CP001

BR001
2 BR001 3 40LBB10 40LBB10
854 BR002 2%
1% 2% NOTE 4 AA707 AA708 NOTE 7
JO003-10-LB_-MDD-IDM-001 SH3 H-2

1.25%
1-1/2" 6A1 H 1-1/2" 6B1 H
FROM COLD REHEATER HEADER
40LBC22 NOTE 2
BS001
1-1/2" 6A1 H

MV
40LBC25

M
BR001

40LBB11AA101
4 4
TV
1" 40LBB11AA201
40MAL93
BR013 1592
1" 40LBC25 L.O. 1.25%
LSHH FC JO003-10-MAL-MDD-IDM-001 SH1 A-2
AA701 2" 6B1 P
40LBC25 40LBC25CL301
40MAL93 40MAL93 TO ATMOSPHERIC DRAIN TANK
LSH AA703 1"
1" AA001
40LBC25CL302 AA501
40LBB13
1" 40LBC25 BR001 40MAL93
NOTE 1
AA702 1"
40LBC25 AA502
AA704 12" 6B1 H

1" 1"

40LBB13 40LBB13
AA701 AA702
1" 1"
DSP DSP
40LBB13 40LBB13 LSHH
5 40MAL91 40LBC25 AA705 40LBB13CL301 5
AA706
1769 BR036 FO BR002 1-1/2"
1% 1% TT
L.O.
40LBB10CT001
JO003-10-MAL-MDD-IDM-001 SH1 I-5 LSH 1" 1"
1-1/2" 6A1 P 1-1/2" 6A1 H
TO ATMOSPHERIC DRAIN TANK 40LBC25 40LBB13CL302
XV
AA001 40LBB13 40LBB13
40LBC25AA201
1" 1"
AA703 AA704
3
40LBC25
1"
AA501
1-1/2" 40LBB13 40LBB13
TT
40LBB10CT003 AA707 AA708
40LBC25
1"
AA502 NOTE 8

40LBB13 40MAL93
C NOTE 6 BR002 M
1.25% BR012 1593
1.25%
L.O.
JO003-10-MAL-MDD-IDM-001 SH1 A-2
2" 6B1 H 2" 6B1 P
40LBB13 MV TO ATMOSPHERIC DRAIN TANK OPERATION DESIGN
STREAM Nº
DSP

AA001 40LBB13AA101
6 P(barg) T (ºC) P(barg) T (ºC) 6
NOTE 5 1 28,6 509 35 524
1/2" 1/2" 40LBB13
PP 1"
AA501 2 30,82 345,9 35 361
40LBB10CP802
40LBB10 40LBB10 3 30,82 345,9 35 524
40LBB13
AA710 AA709 1"
DSP

AA502
1oo2
PIX
40LBB10CP902
C
1%

NOTE 6
PT PT
40LBB10CP002A 40LBB10CP002B

40LBB10 40LBB10 OWNER: OWNER'S ENGINEER:


3/4" 3/4"
AA714 AA712

40LBB10 40LBB10
3/4" 3/4"
7 40LBB10 AA713 AA711 7
798 1 BR010
1% DESIGNER: EPC CONTRACTOR:
JO003-10-LB_-MDD-IDM-001 SH5 I-5
20" 6B1 H
HOT REHEAT FROM HRSG

PROJECT:

Samra Phase IV Add-On Combined Cycle Project

3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP


2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 6
INTERMEDIATE PRESSURE (HRH)
A1 -
NEXT: 7

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K
1782

JO003-10-MAG-GDD-SPX-026 SH1 B-5


1780
FROM 40MAG10CT901
JO003-10-LC_-MDD-IDM-001 SH2
1783
FROM 40LAB45CP001 ENTHALPY GENERAL NOTES:
JO003-10-MAG-GDD-SPX-026 SH1 B-5
CONTROL 1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.
FROM 40MAG10CP901
1781
2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001
1 JO003-10-LC_-MDD-IDM-001 SH2
GENERAL LINE LIST. 1
FROM 40LCA20CT002
3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
FT SEPCO3 HORA HORA SEPCO3 DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).
40LCE30CF001 SEPCO3 HORA HORA SEPCO3

4. N/A.
LP BY-PASS LP BY-PASS LP BY-PASS LP BY-PASS
VALVE VENDOR VALVE VENDOR VALVE VENDOR VALVE VENDOR
40LCE30 40MAN93 2 3 40MAN93
2 BR001 BR001 BR002 2oo3
1527 L.O. FC FC TIX
JO003-10-LC_-MDD-IDM-001 SH2 I-6 40MAN95CT901
1" 3A1 P 1" 3A1 P 1" 3A1 P
FROM CONDENSATE SYSTEM 40LCE30 40LCE30 40LCE30 40MAN93 SPECIFIC NOTES:
AA001 AA002 XV TV AA001 NOTE 6
AT001
40LCE30AA201 40MAN93AA202 NOTE 7 1oo2
40LCE30 1.- N/A.
1"
40LCE30 PIX TT

SEPCO3
1" AA502
AA501 40MAN95CP901 40MAN95CT001B 2.- FLOW ELEMENT TO BE INSTALLED IN A STRAIGHT SPOOL OF 5,2 M UPSTREAM AND 2,3 M
VENDOR VENDOR DOWNSTREAM AT LEAST.
1"x2" TP-3
C PT PT TT TT
C 40MAN95CP001A 40MAN95CP001B 40MAN95CT001A 40MAN95CT001C

HORA
3.- STRAIGHT LENGTH OF UPSTREAM PIPING OF 5xDN WITH A MINIMUM OF 5 M.

2 4.- STRAIGHT LENGTH OF DOWNSTREAM PIPING OF 10xDN. 2


40MAN95 40MAN95
1/2" AA701 1/2" AA703 5.- THE TEMPERATURE SENSORS ARE FITTED DOWNSTREAM IN THE STRAIGHT PIPING AT LEAST
SEPCO3 HORA HORA SEPCO3 1" 1" 1" 10xDN AFTER THE VALVE (MIN. 5 M) AND IN CASE OF HORIZONTAL PIPING APROX. 30º ROTATED OF
H 40MAN95
FC 4 THE VERTICAL PIPING.
BR001 1255
2%
TP-0 TP-1
JO003-10-LB_-MDD-IDM-001 SH9 A-6 6.- THE PIPING COMING FROM THE SPRAY WATER CONTROL VALVE GOING TO THE BYPASS
18" 1A1 P
NOTE 4 VALVE SHALL BE ARRANGED BELLOW THE LEVEL OF THE WATER STUD (TP).
TO ACC STEAM DUCT
NOTE 5
PV
7.- DISTANCE BETWEEN THE SPRAY WATER CONTROL VALVE AND THE WATER STUD (TP) SHOULD
40MAN93AA201 NOT EXCEED 5 M.

NOTE 3
LP STEAM
8.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.
BY-PASS VALVE
9.- NE HRSG LOOSE ELEMENT.

10.- INSTALL FLOWMETER AFTER PRESSURE TEST AND BLOW OUT. TEMPORARY PIPING SHALL
BE PROVIDED: 1A1 WELDED FOR LOW PRESSURE.

2%
3 3
LP BOILER
DRUM LEVEL

12" 1A1 H
40LBD18
BR002
CONTROL

FIX
40LBD10CF001

1oo2
1oo2 TIX
40LBD10CT901
PIX
40LBD10CP901
PP TW FT TT TT
40LBD10CP801 40LBD10CT801 40LBD10CF001 40LBD10CT001A 40LBD10CT001B
PT PT
40LBD10CP001A 40LBD10CP001B
4 4
40LBD10 1/2" 1/2"
1/2" 1" 1"
AA701 40LBD10 40LBD10 1"
1/2" 1/2"
AA708 AA709
NOOTER HRSG SEPCO3
40LBD10 40LBD30
1 BR001 BR001 1257
1% 1%
TP-07
JO03-10-HA_-MDD-NE-011 JO003-10-LB_-MDD-IDM-001 SH8 A-4
16" 1A1 H 16" 1A1 H
18"x16" TO LOW PRESSURE COLLECTOR
LP FROM HRSG
FE
40LBD10CF601

HRSG
HRSG
NE
NOTE 2 NE
40LBD11
NOTE 9
BR001
NOTE 10
40LBD19
6" 1A1 H OPERATION DESIGN
5 BR001
STREAM Nº 5
P(barg) T (ºC) P(barg) T (ºC)
6" 1A1 H
1 3,6 270,8 7,6 296
1" 1"
2 13,2 58,5 30,45 79,8
40LBD11 40LBD19
LSHH
1" 1"
AA701 LSHH
3 13,2 58,5 30,45 296
AA701
40LBD19CL301
40LBD11CL301
40LBD11 40LBD19 4 1,5 127,4 3,5/FV 146,8
1" 1"
AA703 LSH LSH AA703
40LBD11CL302 40LBD19CL302
40LBD11 40LBD19
1" 1"
AA702 AA702

40LBD11 40LBD19
AA704 AA704

40MAL94 40LBD11 40LBD19 40MAL91


6 1596
1.25%
BR032 FO
1.25%
BR002 BR002
1.25% L.O. FO
BR012
1.25%
1597 6
L.O.
JO003-10-MAL-MDD-IDM-001 SH1 I-3 JO003-10-MAL-MDD-IDM-001 SH1 I-4
1-1/2" 1A1 P 1-1/2" 1A1 H 1-1/2" 1A1 H 1-1/2" 1A1 P
TO ATMOSPHERIC DRAIN TANK 40LBD11 40LBD19 TO ATMOSPHERIC DRAIN TANK
XV XV
AA001 AA001
40LBD11AA201 40LBD19AA201

40LBD11
1" 1"
40LBD19
AA501 3
40LBD13

AA501
6" 1A1 H
BR001

C NOTE 8
C NOTE 8

1"
OWNER: OWNER'S ENGINEER:
40LBD13
1"
AA701 LSHH
40LBD13CL301
40LBD13
1"
LSH AA703
7 40LBD13CL302 7
1" 40LBD13
DESIGNER: EPC CONTRACTOR:
AA702
40LBD13
AA704
PROJECT:

Samra Phase IV Add-On Combined Cycle Project


40LBD13 40MAL91
BR002 BR013 1594
1.25% L.O. FO 1.25%
JO003-10-MAL-MDD-IDM-001 SH1 I-4
1-1/2" 1A1 H 1-1/2" 1A1 P 3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP
40LBD13 XV TO ATMOSPHERIC DRAIN TANK
2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
AA001 40LBD13AA201
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
40LBD13
1" REV DATE DESCRIPTION DONE CHECKED APPROVED
AA501
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
C NOTE 8 FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 7
LOW PRESSURE
A1 -
NEXT: 8

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K

1 1
GENERAL NOTES:
DSP
DSP
1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.

2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001


GENERAL LINE LIST.

3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).

4. N/A.

SPECIFIC NOTES:

1.- AS CLOSE AS POSSIBLE TO LP STEAM INLET.

G
2.- TERMINAL POINT FOR WASTE WATER REMOVAL DURING PIPELINES CLEANING.
2 2

HP PART OF TURBINE IP/LP PART OF TURBINE

LP VALVE

DSP
TP-15
3 3

SEPCO3

2%
DSP DSP
NOTE 1
DSP DSP
PT TW TW PP PT TT
40LBD30CP001 40LBD30CT801 40LBD30CT802 40LBD30CP801 40LBD30CP002 40LBD30CT001

1" 1" 40LBD30


40LBD30
40LBD30 1/2" 1/2" AA704 1"
1/2" AA703
AA705
4 40LBD30 4

10" 1A1 H
40LBD31
1

BR001
1257 BR001 1%
JO003-10-LB_-MDD-IDM-001 SH7 I-4
16" 1A1 H
LOW PRESSURE STEAM FROM HRSG

1"

40LBD31
1" AA701 LSHH
40LBD31CL301
40LBD31 1"
LSH AA703
40LBD31CL302 40LBD31
5 1"
AA702 5
40LBD31
AA704

40LBD31 40MAL93
BR002
1.25% L.O. FO
BR022
1.25%
1633 3
JO003-10-MAL-MDD-IDM-001 SH1 F-4
1-1/2" 1A1 H 1-1/2" 1A1 P
40LBD31 XV TO ATMOSPHERIC DRAIN TANK
AA001 40LBD31AA201

40LBD31
1"
AA501

C NOTE 2
OPERATION DESIGN
6 STREAM Nº 6
P(barg) T (ºC) P(barg) T (ºC)
1 3,6 270,8 7,6 296

OWNER: OWNER'S ENGINEER:

7 7
DESIGNER: EPC CONTRACTOR:

PROJECT:

Samra Phase IV Add-On Combined Cycle Project

3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP


2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 8
LOW PRESSURE
A1 -
NEXT: 9

A B C D E F G H I J K
CODIF-PLAN
A B C D E F G H I J K

1 1
GENERAL NOTES:

1.- FOR SYMBOLOGY, PLEASE REFER TO JO003-10-YDS-MDB-IDM-001 P&ID SYMBOLOGY.

2.- OPERATING AND DESIGN PROCESS CONDITIONS ARE SHOWN ON JO003-10-YM_-MLL-IDM-001


GENERAL LINE LIST.

SPX
3. FOR THE GOOD UNDERSTANDING OF THE P&ID, IT IS NECESSARY TO READ THE FUNCTIONAL
DESCRIPTION ASSOCIATED TO THIS SYSTEM (JO003-10-LB_-MRS-IDM-001).

4. N/A.

SPECIFIC NOTES:
DSP DSP 1.- N/A.

2.- N/A.

2 3.- DUMP TUBE IN BY-PASS VALVES SUPPLIER SCOPE. 2

G ACC MAIN HEADER

IP/LP PART OF TURBINE


HP PART OF TURBINE

3 3

40MAN92 40MAN93
BP001 BP001

SPX
SPX
SPX
TP-10 TP-11 TP-12

DUMP
SEPCO3

DUMP

SEPCO3

TUBE
TUBE
SEPCO3

SPX
NOTE 3 NOTE 3

4 4

40MAL92
1599 1 BR551

JO003-10-MAL-MDD-IDM-001 SH2 G-2


18" 1A1 P
FROM SUBATMOSPHERIC
FLASH TANK VENT

5 5

40MAN94
802 2 BR002
2% 3
JO003-10-LB_-MDD-IDM-001 SH5 I-2
28" 1A1 P
FROM HRH BY-PASS VALVE

OPERATION DESIGN
STREAM Nº
P(barg) T (ºC) P(barg) T (ºC)
40MAN95
1 -0,82 37,8 3,5/FV 130
6 1255 3 BR001
2% 6
JO003-10-LB_-MDD-IDM-001 SH7 I-2
2 5 158,8 7/FV 173,8
18" 1A1 P
FROM LP BY-PASS VALVE 3 1,5 127,4 3,5/FV 146,8

OWNER: OWNER'S ENGINEER:

7 7
DESIGNER: EPC CONTRACTOR:

PROJECT:

Samra Phase IV Add-On Combined Cycle Project

3 03/04/2017 FOR OWNER REVIEW (DETAIL ENGINEERING) MHR MHR DSP


2 28/10/2016 FOR DESIGN (BASIC ENGINEERING) MHR MHR DSP
1 28/09/2016 FOR OWNER REVIEW MHR MHR DSP
0 14/07/2016 FOR OWNER REVIEW JGG MHR DSP
REV DATE DESCRIPTION DONE CHECKED APPROVED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR APPROVAL
FOR CONSTRUCTION 8
FOR OWNER REVIEW
VALID FOR PURCHASE
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:


JO003-10-LB_-MDD-IDM-001
P&ID STEAM & BYPASS SYSTEM
SIZE: SCALE: SHEET: 9
VACUUM PRESSURE
A1 -
NEXT: -