ch02 C PDF
ch02 C PDF
ch02 C PDF
Chapter 2 Hydrostatics
Buoyancy, Floatation and Stability
Zerihun Alemayehu
Rm. E119B
AAiT
Hydraulics I
AAiT By Zerihun Alemayehu
1
11/6/2010
B’ D’
Fz
A’ A A’
FB = Fz’ – Fz
FB = g Vol (ABCD)
Fx Fx’
B D
C’ C’
C
Fz’
Hydraulics I
AAiT By Zerihun Alemayehu
F1 F2
F 1 + 1 V = W
F 2 + 2 V = W
V(1 - 2) = F1 – F2 1 2
W W
=W/V
Hydraulics I
AAiT By Zerihun Alemayehu
2
11/6/2010
• Buoyant force
h
A hydrometer weighs 0.0216 N and has a stem at the
upper end that is cylindrical and 2.8 mm in diameter.
1
2
How much deeper will it float in oil of S=0.78 than in
alcohol of S=0.821?
S = 0.821 S = 0.780
For position 2:
For position 1:
Whydrometer Wdisplaced water
Whydrometer Wdisplaced water
0.0216 0.821* 9810 *V1 0.0216 0.780 * 9810 * (V1 Ah )
V1 2.68 x10 6 m 3 0.780 * 9810 * [2.68 x10 6 (0.0028) 2 h]
4
AAiT Hydraulics I
By Zerihun Alemayehu
h 0.0232 m 23.2 mm
3
11/6/2010
STABILITY
AAiT
FB FB
FB
B B W W
G G
W W G, B
G G FB FB
B B
x
x
Stable Equilibrium: Unstable Equilibrium: Neutral Equilibrium:
B always above G B always below G B and G
(i) G and B must lie on the same vertical line in the undisturbed position
(ii) B must always be above G for stable equilibrium
Hydraulics I
AAiT By Zerihun Alemayehu
4
11/6/2010
M = Metacenter
AAiT Hydraulics I
By Zerihun Alemayehu
MG = Metacenteric height
Hydraulics I
AAiT By Zerihun Alemayehu
5
11/6/2010
MG = MB - GB
Hydraulics I
AAiT By Zerihun Alemayehu
RELATIVE EQUILIBRIUM
OF LIQUIDS
AAiT
6
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
z g x y z
𝜕𝑝
Which reduces to = −𝜌(𝑎𝑧 + 𝑔) x
𝜕𝑧
P xy
x
Similarly in the other direction we get
y
and
Hydraulics I
AAiT By Zerihun Alemayehu
7
11/6/2010
y Lines of constant
pressure
Hydrostatic
pressure Initial level
Hydraulics I
AAiT By Zerihun Alemayehu
ax0 and ay =0
Hydraulics I
AAiT By Zerihun Alemayehu
8
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
Hydraulics I
AAiT By Zerihun Alemayehu
9
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
Hydraulics I
AAiT By Zerihun Alemayehu
10
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
11
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
12
11/6/2010
7m
(a) BM = I/V
= [1/12 x 20 x 73/(20 x 7 x 2)] A G C
2.25m
= 2.045 m 2m B
O
OB = ½ x 2 = 1
BG = OG – OB = 2.25 – 1.0 = 1.25 m
MG = BM – BG = 2.045 – 1.25 = 0.795 m
Hydraulics I
AAiT By Zerihun Alemayehu
13
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
10m
2m ax
1m
Hydraulics I
AAiT By Zerihun Alemayehu
14
11/6/2010
h
(i) total thrust on front end AB = gh B
½ g x 22 x 3 = 58.86 kN D
10m
(ii) total thrust on rear end CD:
ax
h = 10 x tan = 10 x ax/g 2m 3m/s2
= 10 x 3/9.81 = 3.06 m
g(h+2) C
A
= 239 kN
Hydraulics I
AAiT By Zerihun Alemayehu
Hydraulics I
AAiT By Zerihun Alemayehu
15
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
Hydraulics I
AAiT By Zerihun Alemayehu
16
11/6/2010
Hydraulics I
AAiT By Zerihun Alemayehu
Hydraulics I
AAiT By Zerihun Alemayehu
17