Controlling
Controlling
Controlling
Areas to be covered:
1. Cost element Accounting: To update controlling records you have to create cost
elements
Cost elements are:
a. Primary cost elements
b. Secondary cost elements
4. Profit Centre Accounting: To view profitability, product wise, product group wise
(or) location wise if business area is not activated in FI
5. Product Costing: valuation of inventories like finished goods and work in process.
Company Controlling
↓
Company code
↓
Business Areas Cost centre
1
Scenario – 1
Company
↓
Company code = Controlling Area
↓ ↓
Business Area Cost Centre
Scenario – 2
Scenario (2) is more flexible, because in this scenario when we want to view number of
cost centers data for different company codes, we have to go for 2nd scenario.
Also we want view No. of cost centers data for a particular company code we get
in 2nd scenario by creating cost center group.
Controlling area:
Company code Controlling Area: select controlling area same as company code
2
Currency type: select 10 (company code currency)
Once we select 10, your currency field, chart of accounts field, fiscal year variant field
updated automatically
Select ‘yes’ button for the message, system to create as a standard hierarchy
Press enter
3
Maintain Number ranges for controlling documents
Same path: (T. Code KANK)
3. Repost costs (RKU1): Incase split the department (or) wrong cost centre postings.
Example: Dept A Dept Z
Salaries
April 100000 20000
May 200000 50000 (Repost to cost line items)
June 200000
July 200000
August 100000
Wages: 200000
------------
Total 1000000
4
Here 200000 Salaries & Wages belongs to dept Z & 800000 belongs to dept A
Here NO FI documents
Only Co. document
Dept A Dept B
Salaries A/C
1 100000 20000
2 200000 50000 (Repost cost line items
3 300000
4 50000
5 150000
---------- --------
Total 800000 70000 (Repost Cost)
Enter
5
Maintain versions:
(Versions are nothing but budgets)
- Revised Budget – 1
- Re revised Budget – 2
Enter
Once the planning is complete select version locked check box so that no one change
planned figures
Save
1. Primary cost elements: These are nothing but G/L expenditure/ revenue
Account.
Posting to primary cost elements are possible.
6
Cost element categories:
12. Sales deductions – used for expenditure like trade discount/sales conversion etc.
31. Order/project results analysis (used for work in process calculation in product
costing)
41. Over head rates used for raw material over head/production overhead
calculation in product costing.
43. Internal activity allocation (This is used for calculation of activity like machine
hour rate/labor rate in product costing.
7
Cost Centre Accounting
This is used to view department wise costs.
a) Creation of primary cost element
Enter
Enter
Save
8
Automatic creation of primary cost element
Enter
Execute (F8)
Path: SPRO Controlling Cost element accounting Master data cost element
Automatic creation of primary and secondary cost element Execute batch input
sessions (T. Code SM35)
9
To view the cost elements created
Save
10
G/L Account: 400300 (Rent A/C)
Save
Enter
Name: Dept A
Person responsible: A
Currency: INR
11
Cost centre: Dept B
Enter
Name: Department B
Basic data
Person responsible: B
Enter
Name: Department C
Basic data
Person responsible: C
12
Creation of Cost centre group:
Enter
Save
Enter
400300 to 400399
13
Posting of transaction in FI
T. Code: F – 02
Type: SA
Posting: 40
Enter
Amount: 200000
Enter
Amount: 50000
Posting key: 50
Enter
Amount: ‘*’
14
To view cost centre wise report:
Execute
Enter
15
Repost Co. line items (RKU3)
No FI document
Report Co. line item: Accounting Controlling Cost centre accounting actual
postings report line items enter (T. Code KB61)
Execute (F8)
Amount: 75000
Cost centre: B
Amount: 25000
Save
16
Cost centre: dept A
Execute (F8)
Repost cost:
Amount: 25000
Amount: 10000
Save
17
Planning cost centre wise:
Version: 0
From period: 1
To period: 12
Free centers to choose cost Form based enter cost element list
element from drop down is available on screen plan against
menu and plan cost element
18
To view various reports cost centre wise accounting
Path: controlling cost centre accounting information system reports for cost
centre accounting plan/actual comparison cost centre actual/plan/variance (T. Code
S _ ALR _ 87013611)
From period: 7
To period: 7
Plan version: 0
Execute
To go to transactional level
Period lock:
Path: Accounting Controlling Cost centre accounting environment period
lock change (T. Code OKP1)
19
Selected button (FS) FI CO
a) Transaction
effect FI and CO (COIN) √ √
b) Transaction
Affect only Co (RKU1/RKU3) No √
c) Transaction
effect only FI balance sheet √ No
Save
20
Reconciliation Ledger
Reconciliation used when
When number of company codes having one controlling area 2nd scenario
It generates documents only in FI
It can be run at controlling area
Company code
AML Company code
ASL
Salaries A/C
100000
Out of 100000/- salaries 20000 belongs to company code ASL (Dept x) balance
80000/- belongs to company code AML
If we use the reconciliation account at cost centre level and the 20000/- is transferred to
company code ASL (Dept x) it passes the entry in Financial automatically
Here
Reports at No FI records
Co. area
In AML Books
ASL Dr 20000
To Salaries A/C 20000
In ASL Books
21
Customization at finance:
Double click on copy, delete, check company code (T. Code EC01)
Enter
Select ‘yes’ for the message (For copy the G/L Accounts)
Press enter
Go on press enter till you got the message company code AML copied to ASL with out
75 number range objects.
22
Assign company code to company
Path: SPRO enterprises structure Assignment Financial Accounting Assign
Company code to company
Document type: SA
Enter
Save
23
Use the transaction code:FS00
Enter
Save
Enter
24
Change short & long text to: Aravind steels limited
Save
Enter
Change the short text & long text to: Aravind mills limited
Save
Enter
Posted in AML
25
Company code: 2
Co. Customization:
Company code to controlling area select cross company code cost accounting
Document type: SA
Save
26
Define adjustment accounts for reconciliation posting:
Enter
Save
27
Enter
Person responsible: X
Enter
Amount: 100000
Posting key: 50
Enter
Amount: ‘*’
Text: ‘+’
28
Go and see the G/L account: (FS10N)
Execute
Execute
Execute
Execute
Amount: 20000
Save
29
Fiscal year: 2006
Execute
Execute
Execute
Execute
Period: 8
Execute
30
Cross company code postings in FI
If outstanding expenses paid by ASL on behalf of AML – Entries
Type: SA
Posting key: 50
Enter
Posting key: 40
Enter
Amount: ‘*’
Text: ‘+’
31
Double click on 3rd line item
Text: ‘+’
Text: ‘+’
In this scenario
1st Scenario
32
If bonus paid year ending
Enter
Change short text & G/L account long text: Bonus account
Save
Enter
Enter
33
Change the name to: Dept W
Enter
Enter
Credit: AML
Enter
34
Save
Save
Save
Save
35
Select back arrow
Valid to 12 2006
Save
Save
36
Salaries posting in cost centre in dept B (F – 02)
Type: SA
Posting key: 40
Enter
Posting key: 50
Enter
Amount: ‘*’
Text: ‘+’
Accrual calculation
Period: 8
37
Deselect: test run check box
Execute
Execute
Execute
Type: SA
Posting key: 40
Enter
Posting key: 50
38
Enter
Amount: ‘*’
Text: ‘+’
Execute
Method: 2 (Distribution):
39
Method: 4 (Indirect actual allocation):
Service dept: C
Salaries – 100000
Wages - 200000
Rent - 50000 Dept A: 90% (315000)
---------- Dept B: 10% (35000)
350000
Cycle: If allocation of cost elements are in different ways. We have to create No. of
segments of No. of cycles.
XYZ
↓ ↓
Seg1 Seg2
2nd Method:
XYZ XYZ
↓ ↓
Seg1 Seg2
Here to better follow 1st method because of you can make any no. of segments
automatically.
In second method we can create up to 10 methods.
- Statistical figures are used to allocation of costs from one cost centre to other costs
centers.
40
Example: No. of employees, sq. meter area etc.
- It can be fixed or total
- If you select category fixed, the values are common till the year end, if we don’t change
in between – No. of employees.
- If we select category of total, the values are to be entered each month Ex: No. of
electrical units consumed, no. of telephone calls.
- Here it generates co document (Number ranges for the process (RKS – (Actual
statistical key figures)
Assessment:
(Key Figure)
Enter
Save
Assign Co No. range interval for the process of RKS (Use the Transaction code:
KANK)
41
Save (or) (ctrl + s)
Enter statistical key figures:
Total quantity: 25
Save
Enter
Save
42
Creation of assessment cycle
Cycle: AML1
Enter
Example:
Service Dept X:
200000
+ 10000 (From service dept C)
---------
210000
It allocated to Prod Dept H - 60% - 126000
Prod Dept I - 20% - 42000
Prod Dept C- 20% - 42000
42000/- allocated to service dept c will be again reallocate to various dept. up to it will
becomes zero (0)
If you select interactive check box it will allocate the costs up to zero
automatically.
Select save button (or) (ctrl + s)
43
Save in your request
Select attach segment button:
Save
44
Select origin value radio button
Save
Assign Co number range interval for the process (RKIU) (Use the transaction code
KANK)
Select Co. document number range intervals for AML check box
Execute
45
Assessment Run:
Period: 7
Execute
Execute
Internal orders:
1. Real orders
2. Statistical orders
1. Real orders: 2. Statistical orders:
46
- Settlement to G/L account – External settlement
STATISTICAL ORDERS:
a) When we post to 2 cost objects only. One object will be real and others will be
statistical.
b) At the time of creation of order, there is a check box for statistical order.
i. Real Orders:
Order – Red
47
1st Scenario (Statistical orders)
SPRO Controlling Internal orders order master data define order types (T.
Code: K0T2 _ FUNCAREA)
Enter
Save
48
Creation of field status group making cost centre and internal order mandatory:
(T. code: OBC4)
Save
Enter
49
Select create/bank/interest tab
Change the field status group to: G002
Save
Enter
Save
Enter
Save
Enter
Give the order: TEL 66626247
Company code: AML
Business area: AMH
Select control data tab
Select statistical order check box
50
Save
Creation of order group:
Enter
Save
Type: SA
Posting key: 40
Enter
Posting key: 50
Account No: 200105 (SBI Current Account)
Enter
Amount: ‘*’
Business area: AMH
Text: ‘+’
51
Document Simulate & Save
To view order wise report:
Execute
From period: 8
To period: 8
52
To variance report order wise:
From period: 8
To period: 8
Plan version: 0
Execute
Real orders:
Creation of secondary cost element called settlement cost element (T. Code: KA06)
Enter
Save
53
Creation of field status group making order required
Save
54
Save
Maintain allocation structures:
Allocation structure: A5
Select: A5
Save
Select: AML
Save
Save
55
Maintain settlement profiles:
Same path
Allocation structure: A5
Residence time: 12
56
Save (or) (ctrl + s)
Define order type: (T. code: KOT2 _ FUNCAREA)
Enter
Give the order type: AMLV (Vehicle order type for AML)
Assign Co. number range interval for the process KOAO (Actual settlement)
57
Save
Creation of vehicle order: (T. Code KOO1)
Enter
Save
Type: SA
Posting key: 40
Enter
58
Give the amount: 100000
Posting key: 50
Enter
Amount: ‘*’
Text: ‘+’
Settlement period: 8
Execute
59
Budgeting and availability control
Plan Budget
1. Plan period wise 1. Budget for year wise
Enter
Same path
60
Profile: 000001 (General budget profile)
Same path:
Same path:
61
Budgeting:
Enter
Save
Type: SA
Posting key: 40
Enter
Posting key: 50
Account No: 200105
Enter
Amount: ‘*’
Business area: AMH
Text: ‘+’
Document Simulate & Save
62
Ignore the message, press enter
To view the inbox of the budget head
Freight charges
Installation charges
Document type: AA
63
Max No. of distribution rules: 999
Residence time: 12
Save
Enter
Description: C. W. P general
Capitalization: 15.06.2006
Save
64
Machinery purchase postings: (T. Code (F – 90)
Type: KR
Posting key: 31
Enter
Posting key: 70
Enter
Enter
Amount: ‘*’
Text: ‘+’
65
Fright payment: (F -02)
Type: SA
Posting key: 70
Account: 500001 – 0
Enter
Posting key: 50
Enter
Amount: ‘*’
Text: ‘+’
66
Creation of machinery asset master (AS01)
Enter
Period: 4
Save
Asset: 500001
67
Settlement receiver: 200004 – 0
Save
Execute
Enter
Hyderabad
| | |
Cement Steels Pharma
68
Revenues – Automatic account assignment
Enter
Save
Path: SPRO controlling Profit centre accounting Master data Profit centre
create dummy profit centre (T. code: KE59)
69
Select basic data button
Save
Save
Select version: 0
Year: 2006
70
Save in your request
Define number ranges for local documents
Select actual document from direct posting with GB01 check box
Enter
Year: 2006
Select planned document from direct posting with GB01 check box
Enter
Year: 2006
71
Creation profit centre:
Person response: A
Name: Steel
Person response: B
Enter
72
Select save button
Enter
Enter
Enter
Save
73
Select AML and then double click on detail per business area/select new entries button
(1)
Hyderabad
| | |
Cement Steel Pharma
300000 – Sales
Hyderabad - cement
Bangalore – Steel
Mumbai – Pharma
Save
74
Account from: 100000 to 299999
Give the step description: Profit centre derivation for item through Business area
Save
Enter
Profit & Loss account for AML
Select insert accounts button
Give account 300000 – 499999
Save
75
Select back arrow
Enter
Save
Version: 0
Save
76
Planning for Balance sheet Accounts profit centre wise
Version: 0
Plan: 100000
Plan: 100000
Save
Type: DR
Posting key: 01
Enter
77
Give the amount: 450000
Posting key: 50
Enter
Amount: ‘*’
Text: ‘+’
Document Simulate
Document type: SA
Posting key: 40
Posting key: 50
Account No: 200105 (SBI Current account)
Enter
Amount: ‘*’
Business area: AMH
Text: ‘+’
Document Simulate & save
78
To view various reports profit centre wise for P&L items
Plan version: 0
Execute
To view variance report profit centre wise for Balance sheet accounts
Plan version: 0
Execute
79
Transfer values from one profit centre to another profit centre
Execute
Save
80
Integration
Organization structure
Company
↓
In SD: combination of sales organization, distribution channel & division they call at as
one sales area.
81
562 Reversal of 561
601 Delivery
602 Reversal of 601
Process key (Transaction key)
Valuation class:
82
Valuation grouping code/valuation modification key/ valuation modifier
Advantage is we need not create valuation group code each company code wise.
7. Services – DIEN
83
Material types – similar to account groups in G/L
- Basic data
- Purchase data
- Sales data
- MRP data
- MRP data
- Ware house
- Quality
- Accounting
- Costing
Purchase order
Price – 10
Qty – 5
Taxes 8% Cenvat
4% VAT
Other expenses 2%
Opening stock 0
Add: Purchases 63
-------
63
Less: Closing stock 10
84
------
Consumption X_
Opening stock 0
Purchases 0
-----
0
Closing stock 20
------
Consumption _X_
In SAP
Opening stock - 0
Purchases 5 -63
Consumption 3 – 37
------
Closing stock 2 – 26
(Here the price of the goods is taken from purchase order).
MM flow (Material management flow)
85
GR/IR clearing Raw material Dr – Balance current Liabilities – WRX
To party – Sundry creditors – Balance sheet current liabilities – Feam po
8. Consumption:
9. Wages payment:
Wages A/C Dr
To Bank A/C
Inventory finished goods (At product cost) Dr – Balance sheet current assets – BSX
Increase/decreased stock finished goods – P/L A/C credit – GBBAUF (Production order)
GBBZOF (NO production order)
11. Delivery:
Increase/decrease in stock finished goods – P&L credit: GBBVAY – sales (At product)
GBBVAX – Sales not revenue account
To Inventory finished goods – Balance sheet current asset – BSX
Customer A/C Dr – Sundry debtors – Balance sheet current Asset – From sale order
To sales – P&L A/C credit – ERL
(10) Increase/decrease
(8) Raw material 10 in finished goods 11
consumption 0 0
(11) Increase/decrease
(9) Wages 10 in finished goods 0
11
Surplus in Profit & Loss 40 (12) Sales 0 150
15 150
86
0
Balance Sheet
14 140
0
Po1 Po1
Movement type 101 – Debit BSX – 200121 Inventory raw materials – Qty in GRX
Rate as per PO = 100
Credit WRX – 150000 GR/IR clearing.
1st rule:
88
Price differences
Batch mode:
1 - 100 10 1000
2 - 200 40 8000
------- --------
300 9000
1 - 10 10 100
-------
8900
+ 180
--------
9080
--------
Receipt:
89
Moving average:
100 10 1000
200 40 8000
----- ----- --------
300 30 9000
Consumption 280 30 8400
----- --------
20 600
Price difference 40
----- -------
20 640
------ --------
a) Receipt:
b) Consumption:
c) Inv. Verification:
a) Receipt:
90
Inv. Raw material load Dr 1000 – BSX
To GR/IR clearing raw material 1000 – WRX
b) Consumption:
c) Inv. Verification:
SD to FI
1. Enquiry and quotation
2. Sale order: Material, qty, plant, sales organization, rate, delivery terms,
payment.
3. delivery:
With out post goods issue (With out PGI) – No transfer of ownership
With post goods issue (With PGI) – Transfer of ownership
FOB(Free on Board):
Example:
91
Billing: In SD module there is a pricing procedure
Procedure:
Billing
Basic XXX
Excise XXX
VAT XXX
--------
Bill amount XXX
Here in this case the buyer is purchasing in local state and same is exported – under
Form H
Billing is
Basic XXX
--------
Bill amount XXX
Billing is
Basic XXX
Excise XXX
CST XXX
--------
Bill amount XXX_
92
Customer – Non taxable
Material – Non taxable
Billing
Basic XXX
--------
Bill amount XXX
Assignment of Accounts:
93
goods
01 – Domestic revenues
02 – Foreign revenues
03 – Affiliated company revenue
(6) Account asset group for material
01 – Trade goods
02 – Services
03 – Finished goods
(7) Accounts key:
ERL – Sales revenue
ERF – Freight revenue
ERB – Rebate (Trade discount)
ERS – Sales deduction (Commissions)
MM – Integration step
1. Define plant
Save
Enter
Enter
94
Press enter to save in your request
Save
Enter
Save
Save
95
Save in your request
Enter
Select: AML
Enter
Plant: AMLP
Division: A1
96
SPRO enterprises structure assignment materials management assign
purchasing organization to company code
Enter
Enter
Save (or) (ctrl + s)
Save in your request
Creation of Material group:
Save
Save
97
Select position button
Enter
Enter
For AMLP: select qty updating check box & value updated check box
Save
98
Give the plant: AMLP
Enter
For AMLP: select qty updating check box & value updated check box
Save
Press enter
Select tolerance key: B1, B2, &VP for company code 1000
Enter
Enter
99
Change the company code: AML for VP
Plant parameters:
Plant parameters
Enter
100
Once again change the Co code to AML for ST
Change
Enter
Change short text & long text to: Inventory raw material local
101
Select post automatically only check box
Enter
Change short text & G/L long text to: Inventory finished goods
Save
3) G/L account No: 100510
Enter
Change short text & G/L long text to: GR/IR clearing raw material local
Save
102
Company code: AML
Enter
Change short text & G/L long text to: Increase/decrease in stocks finished goods
Enter
Change short text & G/L long text to: Raw material consumption local
Save
Enter
103
Save
Enter
Save
Save in your request
Define valuation classes:
Enter
104
Configure automatic postings:
Enter
Select valuation modifier check box
Select valuation class check box
Save
Valuation modifier: X
Valuation modified: X
Save
Save
Valuation modifier: X
105
Valuation class: AML1
Save
Valuation modifier: X
Valuation modifier: X
Valuation modifier: X
106
Account No: 300200
Valuation modifier: X
Save
107
Select details button
108
Account group: AML2
Enter
Country: In (India)
Select: purchasing
Enter
109
Base unit of measurement: Kg
Period: 8
Execute
Period: 9
Execute
110
Path: Logistics Materials management Purchasing Purchase order Create
Vendor/supplying plant known (T. Code: ME21N)
Enter
Save
Enter
111
Select accounting documents button
Invoice verification:
Amount: 7500/-
Enter
Save
112
Select follow on documents button
Plant: AMLP
Enter
Qty: 10 kegs
Save
Enter
113
Inventory RM local 750 (AMLRM1 – AML1 (BSX0
RM consumption 750 AMLRM1 – AML1 GBBVBR
Plant: AMLP
Save
114
Save (or) (Ctrl + s)
Country: IN (India)
Enter
Enter
Same path
Distribution channel: AD
Save
115
Save
Country: IN (India)
Enter
Enter
Enter
Same path
116
Give: AMLS
Enter
Select: AMLS
Same path
Give: AMLS
Enter
Select: AMLS
Give: AMLS
117
Enter
Select: AMLS
Enter
Give: AMLS
Enter
Select: AMLS
Enter
118
For AMLS select rule 001 (Business area determination from plant/division
Save
Give: AMLP
Enter
Select: AMLP
SPRO sales & distribution Basic functions pricing pricing control define
& Assign pricing procedures
119
Pricing procedure: Select RVW01 (Standard)
Save
SPRO Sales & distribution Basic functions Taxes define tax determination
rules
Enter
Change short text & G/L account long text to: Sales local own goods
Save
Enter
120
Cost element category: 11 (Revenues)
Save
Save
4 types of partners:
Path: SPRO sales & distribution Basic functions partner determination set
up partner determination
121
Select: SP (Sold to party)
Save
Select: AML
122
Select: BP (Bill to party); select mandatory function check box
Select: AML
Plant: AMLP
Proposed shipping point: AMSH
Distribution channel: AD
Division: A1
123
Enter
Country: IN (India)
Region: AP
Save
124
Press: select views button
Select: MRP
Select: General/plant/data/storage
Select: accounting 1
Distribution channel: AD
Enter
Division: A1
125
Availability check: Select KP (No check)
Logistics sales & Distribution Master Data conditions select using condition
type Create (VK11)
Amount: 500/-
Enter
126
Give the country: IN (India)
Save
Controlling area can be equal to company code (or) above company code
127
We are using called data structure
Data structure
| |
Characteristics value fields
↓ ↓
Sales order
Customer
Product Sales
Sales organization Cost of goods sold
Plant Net profit
Sales employee
Industry
Profitability segment:
In consist of system defaulted characteristics
Client required characteristics
Example of client required characteristics:
SD to FI
128
Select costing based check box, actual based check box
Save
Enter
129
Save
Save
Ignore the warning message, press enter
Define No. ranges for actual postings:
Double click on maintain assignment of SD conditions to CO-PA value fields (T. Code:
KE41)
130
Path: SPRO controlling profitability analysis structures set operating
concern
Enter
Save
131
Double click on assignment lines folder
Save
Activate profitability analysis:
Enter
For controlling area: DRL – Active status select a4 (Component active For both types of
profitability analysis)
Save
Path: Logistics sales & distribution sales order create (T. Code: VA01)
Distribution channel: AD
Division: A1
132
Enter
Item: 10;
Order qty: 1 kg
Enter
Select item 10
Plant: AMLP
133
Enter
Qty: 20 Kegs
Save
Enter
Delivery:
Give the sales order number: 8209 (What it is created in sales order)
Enter
Select item: 10
134
From the Menu select out bound delivery display
Enter
Billing document:
Enter
Save
Define forms
135
Select two axes (Matrix) radio button
Enter
Enter
Enter
Enter
Enter
136
Enter
Enter
Save
From the menu select edit General data selection General data selection
For record type: select from column B to column select F (Billing data)
For period/year
Enter
Enter
137
Enter & Save
Same path
Select customer, product, plant, select sales organization from characteristics list
Save
To period/year: 12.2006
Execute
138
Double click on product
Product costing
This is used for valuation of inventories like work in process & finished goods.
Raw material XXX (Qty from BOM * Rate from material master
Raw material overheads XXX (10% of raw material)
Production cost XXX (hours required * machine hour rate)
---------
Cost of goods manufacturing XXX
(COGM)
Admn& selling& dist exp XXX
------
Cost of goods sold XXX
139
Sales budget Production budget
MM
Material master
Accounting view
Raw material (AMLRM1) – Moving average price – 75/-
(AMLRM2) – Moving average price – 100/-
AMLRM1 – 1kg
AMLRM2 – 1kg
Salaries – 200000
Wages - 500000
Rent - 20000
-----------
720000
140
Creation of secondary cost elements:
Enter
Save
Enter
Save
Enter
141
Name: Machine hour
Enter
Save
Enter
142
Enter
Save
Enter
SPRO Controlling product cost controlling basic settings for material costing
overhead define overhead keys
Save
143
Save in your request
Same path
Save
Base: A1
Enter
Save
144
Select back arrow 3 times
Base: A2
Save
Select: A2
Double click on details folder
Give the controlling area: AML
Enter
Select new entries button
From cost element: 400100 to 400299
: 400500
: 1200000
Save (or) (Ctrl + s)
Define percentage overhead rates:
Overhead rate: A3
Save
Select: A3
145
Overhead type: Select 2 (Planned overhead rate)
Percentage: 15%
One more:
Same path
Save
Select: A4
Enter
146
Fixed percentage: 100%
SPRO Controlling product cost controlling basic settings for material costing
overhead define costing sheets
Select: AML
147
SPRO controlling Product cost controlling product cost planning material
cost estimate with quantity structure define costing variants
Save
Select structure: 01
148
Cost component structure: 01
Save
149
One more
Path: SPRO production Basic data work centre general data determine
person responsible
Person responsible: A
Save
MRP controller: B
150
Description: Mr. B
Save
Save
SPRO production shop floor control master data define production scheduler
Plant: AMLP
Production scheduler: C
151
Version: 0
From period: 9 to 9
Next page
Save
Planning for machine hours:
Version: 0
Year: 2006
Save
152
Select cost centre group radio button
Version: 0
Execute
Enter
153
Purchasing group: AML
Price control: V
Save
Select: Basic data1, MRP1, MRP2, work scheduling, general plant data/storage1,
Accounting1, costing1.
Plant: AMLP
Enter
154
MRP type: select PD (MRP)
Production: Scheduler C
Save
Plant: AMLP
Enter
155
Give the component
Save
Logistics production master data work centers work centre create (CR01)
Person responsible: A
Save
Creation of routing:
156
Give the material No: AMLFG1
Plant: AMLP
Enter
Plant: AMLP
Enter
Enter
Cost sheet
RM – AMLRM1 – 75
- AMLRM2 - 100
157
------
175.00
RM overhead 15% 26.25
Production costs
(5*10) machine hours 50.00
---------
251.25
Enter
Enter
Use of marking & Releasing is for the next month if the product
Value is increased it is estimated in the current month and applicable in the next month
158
Path for Marking & Releasing:
Plant: AMLP
Material: AMLFG1
Save
Execute
Select: AMLFG1
Executes
Select: AMLFG1
159
SPRO controlling product cost controlling cost object controlling product
cost by order manufacturing orders check costing variants for manufacturing orders
(PP) (T. Code: OPL1)
In Plant: AMLP
Save
Save
160
Select overhead tab
Save
Save
Save
Save
161
Same path
Enter
Save
162
Enter & Save
Give the G/L account No: 200121 (Inv. Raw material local)
Enter
Save
163
Give the G/L account No: 300201
Enter
Save
Select: AML
Save
Same path
164
Result analysis key: FERT
Enter
Save
Same path
Select line ID: ABR, EK, EL, & FK for controlling area 1000
Enter
165
Masked cost element: enter 00004001 + +
Enter
Enter
Version: 0
Results: 1300002
Version: 0
166
Category: K (Costs)
WIP: 1300003
Results: 1300004
Version: 0
Line ID – ABR
Save
Save in your request
Define posting rules: for settling work in process:
Save
167
Select details button
Same path
Enter
Save
168
Enter & Save
Allocation structure: A4
Text: overheads
Save
Select: AML
Save
169
Save
Same path
Allocation structure: A4
Save
170
From the menu select edit Assign element group
Save
M – Average rate
P – Cost planning
To currency: EURO
Save
Exchange rate: P
171
Select with template button
Enter
Change short text & G/L text to: production order differences
Save
Enter
Change short text & G/L text to: stock taking account
Save
172
Company code: AML
Save
Enter
Save
Save
Valuation modifier: X
Save
Valuation modifier: X
173
Valuation class AML2
Valuation modifier: X
Save
SPRO production shop floor control master data order define order type
dependant parameters (T. Code: OPL8)
174
Save in your request
175
Order type: PP01 (Standard production order)
Enter
Plant: AMLP
Enter
Save
Enter
176
89 - 200121 – Inventory RM local -10000 – AMLRM2 – AML – BSX
91 – 100599 – Stock taking A/C – 10000 – AMLRM2 – AML – AMLTGBB BSX
Enter
Save
Enter
Execute
177
Select back arrow and deselect check run and execute
Settlement period: 9
Execute
Execute
Period: 9
178
Select test run check box
Execute
Execute
Operation: 10
Yield: 10kgs
Unit of measurement: H
Save
Plant: AMLP
179
Storage location: Hyd
Save
Enter
Plant: AMLP
Enter
Save
Calculation of variances:
180
Period: 9
Execute
Execute
Open one more session with (T. Code: CO03) (Order display)
WIP period: 9
RA version: 0
Execute
Execute
Settlement period: 9
181
Select test run check box
Execute
182