Preamble Civil 2008
Preamble Civil 2008
Preamble Civil 2008
1. All rates shall be used and read together with the “Table of Adjustment to
Schedule of Rates for Civil Engineering Works In Sarawak 2008”.
(A) Piling
a) Rates for driving of timber piles shall include for the provision of all necessary
mechanical plant, rig, temporary works, timber etc. transporting to site,
erecting, dismantling, removal on completion and also for traveling of pile
frame about the site.
b) Rates for driving of precast concrete piles and reinforced concrete lengthened
piles shall include for the provision of all necessary mechanical plant, rig,
temporary works, etc. and for the travelling of pile frame about the site.
All rates herein shall be held to include for supply and delivery to site, waste on
materials, carriage and cartage, carrying in and return of empties, hoisting, setting,
fitting and fixing in position, making and all other labours and everything else
necessary (including any customs duty, etc.) for the proper completion of each item
and for establishment charges and profit.
a) Clearing all general vegetation, tall grass, lallang, creepers, shrubs, bushes and
all undergrowth.
b) Felling of trees of all sizes including cutting, grubbing up their stumps and
roots and dispose off site.
c) Clearing all rubbish, debris and unwanted materials.
d) Breaking up and removing disused structures, surface beds and pavings,
sewers, drains and drain pipes, manholes, underground wells, sumps, fencing,
posts, retaining walls and other such like structures, including disconnecting
and sealing off services, plugging any pipes cut off at perimeter of site.
e) Removing existing tree stumps and grubbing up their roots and disposal off
site.
f) Filling holes and voids caused by removal of trees, tree stumps, roots, existing
structures or obstructions with hardcore or suitable approved materials.
i. No allowance shall be made in the weight of steel reinforcement for rolling margin,
trying wires, spacers, chairs and weight of weld etc. Concrete shall be measured nett
without deduction for the volume of reinforcement.
ii. “Sawn formwork” shall mean formwork to produce concrete surfaces suitable for
plastering or tiling. “Wrot formwork” shall means formwork to produce fair face
concrete surfaces suitable for direct application of decorations. Formwork shall be
deducted for openings over one square metres.
(E) Rates for each item of paving shall be held to include for all rounded angles, arrises
and making good and any other sundry items of alike nature.
(F) Rates for each item of skirtings, risers, channels and the like shall be held to include
for all short lengths formed, cut and purpose made angles, junctions, ends, etc. and
making good and any other sundry items of alike nature.
(G) Rates for mild steel tubing are to include for short running lengths, sockets, backnuts,
elbows and bends.
Rates for site surface water drainage and culvert shall include:
a) Sampling and testing of aggregates and bituminous mixtures as specified.
b) Protecting mixed material in transit and while awaiting tripping.
c) Laying, rolling and consolidating sub-base, base course, binder and wearing
course in layers or sequence as required.
d) Laying by hand of narrow strips remaining alongside machine work.
e) Making joints, working around manhole covers and other like projections.
f) Finishing surfaces to gradient and falls.
g) Added filler to bituminous mixture.
h) Maintenance of surface as work progress.