Crack Width-Crm
Crack Width-Crm
3325
242430.08
492.37189
NAGARJUNA CONSTRUCTION COMPANY LIMITED
Engineering Design and Technology Department
CONSTRUCTION GROUP
2
PROJECT: DOCUMENT NO.
Tunnel 15m deep
DESIGNED CHECKED
RMHS
STRUCTURE:
< 0.555fy
Page 2
NAGARJUNA CONSTRUCTION COMPANY LIMITED
Engineering Design and Technology Department
CONSTRUCTION GROUP
3
PROJECT: DOCUMENT NO.
Tunnel 15m deep
DESIGNED CHECKED
RMHS
STRUCTURE:
< 0.333fck
e=
1
( h - x ) x fs = 8.726E-04
( d - x) x Es
Page 3
NAGARJUNA CONSTRUCTION COMPANY LIMITED
Engineering Design and Technology Department
CONSTRUCTION GROUP
4
PROJECT: DOCUMENT NO.
Tunnel 15m deep
DESIGNED CHECKED
RMHS
STRUCTURE:
Page 4
NAGARJUNA CONSTRUCTION COMPANY LIMITED
Engineering Design and Technology Department
CONSTRUCTION GROUP
5
PROJECT: DOCUMENT NO.
Tunnel 15m deep
DESIGNED CHECKED
RMHS
STRUCTURE:
Page 5
6
DATE
PAGE
mm
kNm
mm
Result On/Off
mm
mm
mm
mm
mm
mm
mm
mm
mm2
mm2
N/mm2
N/mm2
mm
mm
N/mm2
O.K.
N/mm2
Page 6
7
DATE
PAGE
O.K.
Page 7
8
DATE
PAGE
mm
mm
0.2mm Safe
Page 8
9
DATE
PAGE
Page 9