JSA For Bolt Tightening, Grating Removal
JSA For Bolt Tightening, Grating Removal
JSA For Bolt Tightening, Grating Removal
2. Selecting Closer & Safe Fire, Explosion, Toxic gas leak, Slips, trips, Identify the nearest Muster Point.
Muster Point / Emergency Falls, Unsafe selection of muster point. Ensure all personnel are aware of Safe & nearest Muster Supervisor
Response / Evacuation Evacuation access route blocked. Point. Workers
Route. M
Change in wind direction. Emergency Contact No. 02378738541
Poor communication with ERT Plant Telephone: 6700 / 6701
Obstruction in access for ERT Wind direction to be monitored from the nearest visible
wind sock.
1
Nghi Son Refinery and Petrochemical Limited Liability Company
8. Manual Handling
Ergonomic Problems.
Supervisor /
Pinch point and obstructions. Follow NSRP manual handling procedure. Workers
L L L Use Buddy system for manual lifting.
Physical Injuries. Follow safe manual handling Technique.
Slips/trips/falls hazard. Keep the load close to the body as much as possible.
Improper handling of Load. Keep the body in a comfortable/correct position
Don’t place fingers in a pinch point.
Use Specific PPE’s.
Ensure access & egress are clear from obstructions.
Remarks:
P: Person, E: Environment, A: Assets, R: Reputation, L: Likelihood, S: Severity, RC: Record.
JSA Prepared by JSA Reviewed by JSA Verified by
Name: Name: Name:
Signature: Signature: Signature:
JSA Checklist
2
Nghi Son Refinery and Petrochemical Limited Liability Company
JSA Work Details and checklists
Date: Job Title: Manual Bolt tightening JSA Ref #
Description of Work: Manual bolt tightening Permit # (If applicable):
Originator:
(A) Identify Potential Hazards for The JOB
Hazard Prompt List (Review the job steps and identify if any of the following hazards are applicable) Potential Hazard Exposure Mechanisms
□ Electricity X Weather □ Excavations/ Earthworks □ Struck – by, against
□ Hot/ Cold Objects □ Insect/ Animal Bites □ Fire □ Contact with
□ Rotating Equipment □ Lighting □ Introduction of Non Native Species □ Contacted by
□ Vehicles □ Driving Hazards □ Harm to Flora/ fauna □ Caught – in, on, Under, between, against
□ Muscular Stress X Falling Objects □ Historical Sites □ Exposure – temperature, chemicals, noise, dust
□ Mental Stress X Noise □ Vegetation Clearing X Slip, Trip or Fall – from heights, same level
□ Repetitive Work □ Radiation □ Spills/ Leaks □ Complete Manual Handling Risk Assessment attached
X Heights □ Hydrocarbon/ Gas Release □ Other Mobile/ Stationary Equipment □ Overexertion/ excessive force – lifting, pushing, pulling,
□ Lone Worker □ Surfaces □ Pressure (Stored Energy) □ Escape of Material – oil spill, gas release, light spill
□ Vibration X Tools/ Equipment □ Fumes/ Vapour/Dust X Human Factors
□ Moving Objects □ Human Factors □ Light Spill
□ Confined Spaces □ Off Road □ Depths
□ Asbestos □ Chemicals □ Other (List additional Hazards below)
Personal Protective Equipment
X Eye/Face protection □ Hearing protection □ Respiratory protection X Weather conditions
X Head protection □ Safety/Rescue line X Safety harness •hot/dry
X Foot protection X Hand protection □ Gas detector •wet
X Body protection □ Spill prevention and clean up □ Light shields •windy
• cold
□ Other
A. Subject Discussed
1 Adjacent works
2 Work at Height
3 Manual Handling.
4 Bolt Tightening
5 Housekeeping
6
B. Attendance List
Name Div./ Section Position Signature
1
2
3
4
5
6
7
8
C. Feedback
1. Adjacent activities to be considered.
2. Conflicting activities to be discussed & Prioritized.
Safe Work Method Statement No. TITLE: Manual Bolt tightening. DATE:
Apply Permit to Work with Relevant attachments & certificates.
1.0 Scope 1.1
To complete the activity of bolt tightening.
4
Nghi Son Refinery and Petrochemical Limited Liability Company
8.0 Safety 8.1 et Valid permit, JSA and attachments, 100% tie of to modify scaffolding and WAH.
9.0 Attachments 9.1 etc Permit, JSA, Attachments, Plot Plan, etc.
Maintenance Section Approval
Prepared by: (Contractor) Checked by: (Maintenance)
Permit Requester Section Manager
Name
Signature
Date