UL CIG 024 The Conduct of Factory Inspections
UL CIG 024 The Conduct of Factory Inspections
UL CIG 024 The Conduct of Factory Inspections
WARNING:
THIS DOCUMENT IS ONLY VALID IF USED BY ECS MEMBERS
AND THEIR AUTHORISED AGENTS
Approved by: ECS General Meeting 8-9 April 2014 No. of pages: 18
Date of issue: May 2014
Supersedes: PD CIG 024 – May 2009 Page 1 of 18
NOTE:
The “Factory Inspection Procedures Harmonized Requirements” are referred to as PD CIG 021 in this
document.
B.1.5 Section B.1 of this document shall be verified and signed by an authorised
management representative of the Licence Holder.
NOTE:
The “Factory Inspection Procedures Harmonized Requirements” are referred to as PD CIG 021 in this
document.
B.2.5 Specify the materials, components and sub-assemblies which are critical/have a
safety implication on the finished product:
– specify the supplier(s) of these materials and/or components,
– indicate which components are certified and bear which Certification Mark(s),
– specify which sub-assemblies are received from which sub-contractor(s).
B.2.6 Complete and accurate information is needed for all products intended to be
certified.
This is to allow the Inspector to satisfy himself with the Manufacturer’s quality
system, as:
a) if written or documented procedures exists, it may prove helpful to attach
copies of the relevant procedures.
b) if no written or documented procedures exists, or cannot be made available to
the requesting Certification Body, then the various stages of control, inspection
and testing shall be described in chronological order.
Information should be detailed under the following headings:
Incoming Inspection and Testing
describe visual checks, tests, sampling procedures, acceptance criteria and/or
all other verification methods (e.g. Certificate of Conformity).
B.2.8 Details shall include type of standard, scope, name of certifier and expiry date of
certificate or provide a copy of appropriate certificate.
B.2.9 Self-explanatory
B.2.10 Section B.2 of this document shall be verified and signed by an authorised
management representative at the factory where the product is or will be
produced.
PRE-LICENCE INSPECTION
Completion of the report serves as a proof that the information given in PD CIG 022 Section
B.1 and B.2 is correct and that the quality system and the testing procedures as applied by
the Manufacturer will ensure the compliance with the requirements of the requesting
Certification Body(ies).
The visit has to be pre-announced to ensure that the contact person, knowledgeable of the
quality system is available.
The Manufacturer shall be made aware that at the time of the visit all relevant
documentation and test equipment shall be available and ready for inspection.
ROUTINE INSPECTION
Completion of the report serves as a proof that the quality system and test procedures, as
found during the Pre-Licence Inspection, are still maintained and are in compliance with the
current requirements of the requesting Certification Body(ies).
“Inspection carried out by (Inspection Body) ...…”: Enter name of your inspection
organisation.
Reference number of the body carrying out the inspection: Enter the reference number used
by your organisation. This reference number shall be a unique reference number. In the
case the reference number is based on the file number of the Manufacturer e.g. a year/date
code of the inspection visit is to be added
The reference number has to be indicated at each single page.
Be sure to:
a) tick the boxes as appropriate;
b) explain clearly, and in each case, why you consider a question as ‘N/A’;
c) explain all ‘NO’ answers on the Inspector’s Findings page.
Records
The records need to be carefully reviewed
The minimum period the Manufacturer has to keep records shall not be less than the period
between two inspections. The Manufacturer shall state the retention period.
1 GENERAL INFORMATION
1.1 The address the Inspector should visit is given in PD CIG 022 Section B.2 under
B.2.1.
Enter the actual name and manufacturing address. Give enough information to
identify the Manufacturer.
1.2 Enter name and function of the Manufacturer's representative; also when the
Manufacturer’s representative was not present during the inspection.
The Manufacturer’s representative is the person to whom correspondence on
items related to factory inspections is to be send.
Certification
Inspection File Reference
Body requesting Category Product
X of Y No.
inspection
DEKRA 1 of 1 54818 HOUS Hair Dryer
VDE 1 of 1 30004711/5158297 TOOL Hand Held Drilling
Machine
NOTE:
Current list of abbreviations of Product Categories to be used to complete this table (and
other locations within the PD CIG 023 Factory Inspection Report) can be found under the
following path: www.eepca.eu Document Server OSM-FIP Public Documents
Decisions.
Basic insulation 100 % 1 000 V a.c. 2s 30 mA (max.) Instrument, Lamp Buzzer Manual reset needed W
Supplementary
n/a V s mA (max.)
insulation
2
Microwave leakage 100 % 230 V a.c. 50 W /m W
e Indicate method used (hot/cold, at mains voltage, low voltage resistance check, etc.).
f Are all controls and components checked during the test?
W = Test witnessed by the Inspector; R = according to records
6.5 Self-explanatory
6.6 Self-explanatory
8.1 Describe on the TEST DATA SHEET (PVT) what tests the Manufacturer is
performing in order to verify continuous compliance of the certified products with
the relevant standard(s). Copy of the manufactures PVT record is also sufficient
8.2 Self-explanatory
8.3 Verify if specific equipment required by any Certification Body is available and tick
the relevant box. If the equipment could not be seen, for example because it was
located elsewhere than at the factory, then this shall be noted on the Inspector’s
Information page.
8.4 Self-explanatory
8.5 Verify that a procedure exist to take corrective actions if deviations are found.
Check if these corrective actions are sufficient.
In case no actions are taken or if you are in doubt about the actions taken, specify
on Inspector’s Findings page.
8.6 Self-explanatory
8.7 Self-explanatory
9 VOID
13 VOID
14 TECHNICAL COMPLAINTS
14.1 Self-explanatory
14.2 Check if the management reviews technical complaints.
14.3 The records need to be carefully reviewed.
14.4 Self-explanatory
14.5 Self-explanatory
14.6 Self-explanatory
All comments related to the selected sample(s) shall be stated in the table
“Identification of selected samples” This may include information about changes
made to the product, suspected misuse of the Certification Mark, etc..
16.1 If no sample selection is made explain the reason why by using the tick box.
16.2 When a sample not bearing the Certification Mark is selected, explain why the
sample was selected by using the tick boxes. At least get Manufacturers
confirmation that the selected sample is identical to the certified product.
Care is to be taken when products are not marked but references are given in
sales pamphlets, installation instructions, manuals, etc. Follow the individual
Certification Bodies guideline if in such cases samples without any Certification
Mark applied need to be selected.
17 INSPECTOR’S EVALUATION
17.1 All unsatisfactory findings shall be recorded. The Manufacturer may propose
suggestions as to how he intends to correct the non-compliances identified. Please
note also such commitments. Where appropriate, the Licence Holder shall also
confirm the proposed corrective actions he intends to take to the requesting
Certification Body in writing.
Report the findings requiring corrective actions on the ‘Inspector’s
Findings page’.
Report general matters such as change of address, name change, etc. on the
page entitled ‘Inspector’s Information page’.
NOTE:
Use separate Inspector’s Findings and/or Information Pages for different Certification Bodies and/or
Licence Holders if necessary; e.g. for reasons of confidentiality.