Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Fornolles CV

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 18

CONFIDENTIAL PROFILE

OF
FEDILINO FORNOLLES

Personal Details

Name & Surname Fedilino P. Fornolles


Date of Birth 6 November 1959
Residential /Permanent Location # 32 Saint Martin St., Dona Pilar Village, Sasa Davao City
Country of Employment Philippines
Nationality Filipino
Gender Male
Marital Status Married
Home Language Cebuano
Other Languages Tagalog & American English
Full Clean Drivers License License No. LO2- 83-082410
Health Good Health
Criminal Record None
Education & Training

 Executive Program Education In Management - Asian Institute of Management, Nov. 1997


 Bachelor of Science in Electrical Engineering -
Rizal Memorial Colleges, Magallanes St., Davao City (1975-80)
 Secondary Education Completed At - Digos National High School, Rizal Avenue Davao Del Sur
(1970-75)

Current Studies
 Master of Science in Environmental Resource Management (36-units completed) -
University of South-eastern Philippines - Thesis writing on going

Computer Literacy
 MS Office application, familiar with CAD

Professional Membership / Registration

Registration:
 Professional Electrical Engineer - Reg. No. 2343
 Associate Electrical Engineer - Reg. No. 2629

Professional Experience

 Results-oriented professional with over 20 years technical experienced in the operation, Design
maintenance and supervision for Commissioning of an Electrical & Mechanical Power Generation,
Transmission & Distribution and also in Mechanical Maintenance of Mills, Belt Conveyor and
Crushers upgrading this into maximum operating time from 85% increase to 97%production.
 Background includes developing annual work plans, distribution system expansion and rehabilitation
plan, Industrial Plants like ( Cement Manufacturing, Food Processing & Oil Mill Industry) Electrical
System Design start from their Substation until feeder lines, Load Calculation and Voltage drop
calculation and sizing of cables and protection relaying, load forecast analysis and cash operating
budget.
 Effective in communication and team building skills and maintain exceptional customer relations.
 Good working knowledge of 138/69kv transmission line, power substation operation and
underground transmission system, splicing cables and repair.
Major Achievements / Accomplishments
1.) Electrical Design, Calculation & Implementation of 5000TPD Dry Process in Cement Plant Davao
Union Cement Corporation Bo. Ilang Davao City, Philippines
2.) Solved the Excessive Overheating of Slip ring of 6000 KW/ 4.16 kV wound rotor induction motor
of Davao Union Cement Corporation, Bo. Ilang Davao City, Philippines
3.) Construction of Main Sub-station 50MVA of Klinan Substation, Klinan General Santos City
Philippines
4.) Rehabilitation of 36 KM 138 kV Transmission Line of Teresa Crew Gold Corporation (Apex Mine
Co.)
5.) Rehabilitation of 800KW and 500KW 4.16kV Wound rotor induction motor of Teresa Crew gold
Corporation (Apex Mine Co.)
6.) Electrical Design, Calculation and implementation of 10 locations in underground mining for 4.16
KV Substation...
7.) Solved the unnecessary tripping of Power Plant in Semirara Mining Corporation
8.) Construction and Commissioning of 4-units Warzila Diesel Generator 4 MW each in Semirara
Mining Corporation
9.) Design lighting system of open cut mining of Semirara Mining Corporation
10.)Design, Calculation & Implementation of Overland Conveyor System in Semirara Mining
Corporation.
11.) Applying for Direct connection of Power requirement to National Transmission Corporation with
approval of Energy Regulatory Board. In Teresa Crew Gold (Apex Mine Co.)

Work History Summary

Reason for Leaving


Company Position Held Period

Giftland Power Plant April, 02,


Demerara, Georgetown, Guyana Power Plant Manager 2018-March Finish Contract
South America 15,2019
February
PT Euroasiatic Jaya 28,2017-
Electrical Design Manager Finish contract
Jakarta, Indonesia March 30,
2018
MPH Global February 16,
Lhoist Malaysia Project Electrical Manager 2016- January Finish Contract
Tapah, Perak Malaysia 30, 2017
Cabras Marine July, 2, 2014-
US- Naval Base Electrical Superintendent January, 25, No Project and Company Close
Sta. Rita, Guam USA 2016
January2,2014
MDCI Project Manager -June,15, Finish Project
Guam, USA 2015
February 16,
Silangan Mindanao Mining Technical Study Electrical 2013- Move to Guam due to the approval of
Corporation Underground Mining Consultant December my US residency
Tubod, Surigao del Norte 30,2013
February 10,
Greenstone Resources Power Plant Manager 2012- January Looking for Better Salary
Tubod, Surigao del Norte 30, 2013
Semirara Mining Corporation - Electrical & 27 Aug 2008 –
Semirara Island, Caluya, Antique, January 30, Finish Contract
Philippines Instrumentation Superintendent 2012
Teresa Crew Gold Corporation (APEX
13 Feb 2006 -
Mine Co.) Masara, Maco, Comval Electrical Manager Finish Contract
31 July 2008
Province
M.D. CRISOSTOMO, INC, Lower Feb 2004 –
Chief Engineer Finish Contract
Barrigada, Tamuning GUAM 96931 Jan 2006
National Transmission Corporation -
10 Nov 2000-
South-western Mindanao Area, Senior Engineer Finish Contract
Dec 2003
General Santos City
Legaspi Oil Corporation - Sasa Davao
Electrical Consultant 1999- 2000 Finish Contract
City
Electrical Maintenance
Resign to avail the Early Retirement
Superintendent
Davao Union Cement Corporation - Electrical Project Engineer Promoted
2 July 1984 –
Davao City Chief Electrician 31 March Promoted
Preventive Maintenance Inspector 1998 Promoted
Junior Electrical Engineer Promoted
Shift Electrician Complete
Altech Construction, Inc. - DUCC – 5 Aug 1982 –
Instrumentation Engineer Finish contract
Project 1 July 1984
Atlas Mining Consolidated & Dev. 6 Oct 1981 –
Lineman Finish Contract
Corporation - Lutopan, Toledo City 12 Feb 1982
Holy Cross College of Digos - Digos, 8 May 1980 – Looking for o Another Job fit my
Audio Visual Operator
Davao del Sur 6 April 1981 qualification

Current Employment
GIFTLAND POWER PLANT
Demerara, George Town
Guyana, South America
Position: Power Plant Manager
April, 02, 2018-March 15, 2019
 Managed the troubleshooting if any during unscheduled shutdown
 Responsible to Managed the Maintenance and operation of the Two Diesel Engine
 Responsible to Monitor the fuel consumption
 Responsible to check the request Materials and Fuel ordering
 Responsible to Monitor the Man-hour of the Labour Employee
 Analyze & Check the Engine condition after the running hours
 Weekly conducting a Meeting of all Maintenance & Operation personnel
Previous Employment
PT Euroasiatic Jaya
Jakarta, Indonesia
Position: Electrical Design Manager
February 28, 2017- March 30, 2018
Reporting directly to the Project Director
 Managed the Electrical Engineering Design and evaluate through Manual Calculation
 Managed to Design the Protection System of 69 KV Substation
 Managed the Implementation of the 69 KV Substation
 Managed the Relay Protection System of Gas Engine Generator 10 MW and 4.16 KV Generations.
 Assist the constructions group to check into actual installation to conform the design
 Check the Purchased the Purchased Material if it is conform to the required specification
 Attend Weekly meeting to the Project
 Coordinate to the site project manager in implementing the design
 Assist the Design Engineer in performing their duty
MPH Global
Lhoist Malaysia Project
Tapah, Perak Malaysia
Position: Electrical Manager
February 16, 2016- January 30, 2017
Reporting directly to the Project Director
 Directly responsible for planning/preparing all contract administration, executing and directing
project activities, and developing or maintaining client relationships.
 Responsible for leading and overseeing multiple projects consisting of onsite supervision of
general superintendent, field supervisors, lead persons crew leaders, journeypersons,
apprentices and/or helpers.
 Responsible for lay-out of project work and ensuring that materials, tools, equipment and
information are scheduled timely to meet scope and construction schedules.
 Interacts with branch manager, field manager, general superintendent, and Human
ResourceDepartment.

 Managed the Construction of 34KV Substation and Conduct Commissioning andresponsible for
reviewing project documents; plans and specifications; directing construction activities; resolving
construction difficulties; coordinating field installations and project closings; and developing and
maintaining client relationships, all within project cost, time and quality standards and standard
operating. Reporting to the incumbent is assigned project Labour
CABRAS MARINE CORPORATION
Sta. Rita, Guam
US Naval Base Compound
Position: Electrical Superintendent
July, 2, 2015-January, 25, 2016
Reporting directly to the Project Manager
 Responsible for the operation in conducting a Maintenance activity of the Military Carrier Ship which
schedule for Maintenance.
 Responsible for the Material Procurement
 Managed the Electrician in performing repair of the Military Carrier Ship including the Sub-Marine.
 Supervise the rewinding works in the work shop
 Supervise the Maintenance of Electrical Controls

M.D. CRISOSTOMO, INC, Lower Barrigada, Tamuning GUAM 96931


Tubod, Surigao del Norte
Position: Project Manager
January 02, 2014-June, 15, 2015
Reporting directly to the Chairman of the Board
 Responsible for the operation of the whole project undertaken of the company
 Responsible for the Material Procurement
 Responsible for Billing period
 Monitor the daily accomplishment of the project
 Make a weekly accomplishment report
 Conduct weekly meeting of the Field Engineers and discuss the obstacle of the project.
 Directly report to the chairman of the Board for any unusual incident encountered of the project.

SILANGAN MINDANAO MINING CORPORATION


Tubod, Surigao del Norte
Technical Study Electrical Underground Mining Consultant
February 16, 2013- December 30,2013
Reporting directly to the Project Director
 Responsible for representing SMMCi in the various processes for the study, design, cost estimation
and recommendation covered under electrical and associated equipment;
 Performing FEA electrical field analysis studies and interpreting results to allow detailed engineering
of bushings, electrical contacts, and cable terminations.
 Provide technical leadership to the Study Team in relation to his expertise;
 Attend study team meetings and may serve as primary consultant liaison;
 Maintain current knowledge of relevant technology as assigned;
 Gather different kinds of information and uses a wide variety of sources to build a rich informational
environment in preparation for decision-making for the programs/projects handled;
 Take action to move the SMMCi Project from inception to fruition;
 Review and/or prepare engineering qualification tests procedures and associated data sheets;
 Advise Study Team of new developments which may affect scope, schedule, costs and/or
procurement;
 Conduct due diligence duties under his discipline;
 Ensure consistency in design reviews, verification and qualification efforts;
 Keep abreast and use of advancing technologies, methods and research development;
 Foster creativity and innovation in design solutions;
 Prepare progress and other reports necessary for the project;
 Ensures quality assurance and timely delivery of project tasks;
 Develop and manage engineering budgets and schedules; ssists in the solicitation, preparation,
analysis, award and management of engineering proposals and contracts
GREENSTONE RESOURCES CORPORATION a MEMBER OF RED-5 AUSTRALIA-
Tubod, Surigao del Norte
Power/Electrical & Instrumentation Manager
February 10, 2011- January 30, 2013
Reporting directly to the Project Director
 Maintains plant operations, maintenance, and supply in a safe and efficient manner to maximize
the profitability of the Generator Set
 Develops long-term asset management plans for the Plant
 Performed Maintenance activity of the Caterpillar Engine after the required running hours
 Spare parts Preparation to determine the critical, protective and common spares
 Preparation of spare parts ordering

SEMIRARA MINING CORPORATION - Semirara Island, Caluya, Antique, Philippines


Electrical and Instrumentation Superintendent (Consultant Basis)
27 Aug 2008 – January 23, 2011
Reporting directly to the President of the Company
 Maintains plant operations, maintenance, and supply in a safe and efficient manner to maximize the
profitability of the company including the Hospital of Mine Site
 Develops long-term asset management plans for the Plant
 Prepares the annual plant operating and maintenance budget and the annual capital appropriations
budget for the Company;
 Operates and maintains the plant within the approved annual budget;
 Responsible for the development and administration of plant personnel policies and procedures;
 Responsible for the development of plant and equipment maintenance schedules, materials required
and manpower needs on an economically justified basis;
 Coordinates with other Departments to ensure consistency of practice and application of programs
and policy across the company;
 Coordinates with the Human Resource Department in the development and administration of a
competitive wage and salary plan to promote a harmonious working organization;
 Coordinates and assures compliance of all personnel with Safety policies and procedures;
 Responsible for the direction of all Plant Personnel including evaluation of performance, hiring,
training, disciplinary actions and discharge for cause if required;
 Responsible for application, renewal and compliance of all environmental permits including meeting
and negotiating with regulatory personnel, supervising and coordinating related consulting and
analytical work
 Maintains adequate insurance coverage for protection against major losses of physical property;
 Responsible for insuring plant compliance with appropriate governmental rules and regulations;
 Administers Utility Contract (Interconnection Agreement) and planned outage coordination;
 Responsible for the Plant’s public relations in local community, negotiation and payment of property
taxes, compliance of plant operations;
 Directs responsibility for major contracts (e.g. water treatment, etc.);
 Responsible for care and custody of property;
 Maintains “bondable” status for financial responsibility for self and Plant Operations;
 Responsible for delegation of duties and activities as approved and authorized by the Management
 Produces appropriate yearly goals, objectives and plans for the plant;
 Performs and directs studies for cost reduction, efficiency gain and capacity improvement in plant
operations
 Promotes IMS/ISO Certification and embraces Continuous Improvement Practices.
 Conducts special engineering studies and develops modification packages.
 Conducts specialized analysis of system and equipment problems.
 Perform engineering studies to optimize performance of substation equipment, transmission and
distribution lines and track of maintenance and system reliability.
 Participate actively in the review of transmission and distribution project submittals and
manufacturers qualifications.
 Coordinate and participates in research and development tasks conducted internally and externally
 Prepares equipment maintenance policy and procedures including its implementation.
 Designates and assign duties or tasks to staff from time to time to hasten project implementation and
achieve technical viability and operational efficiency.
 Recommends and recruit Technical personnel necessary for the effective implementation of
decentralization of technical operation and oversee development of staff/employees in sub-offices
and required areas.
 Acts promptly on concerns that need technical and institutional expertise.
 Oversee the over-all technical, operational and institutional activities of the mining operation and
keep employees informed of management instructions.
 Provide management with the necessary information or analysis of the operational status of the
mining electrical equipment and recommends actions thereof.
 Performs other duties that maybe assigned to him/her from time to time.
 Personally undertakes the evaluation, analysis, testing, trouble-shooting, repair of some mining
electrical equipments.
TERESA CREW GOLD CORPORATION (APEX MINE CO.) Masara, Maco, Comval Province
Electrical Manager
13 Feb 2006 - 31 July 2008
The Electrical Department Manager is the chief operating officer of his Department. He shall exercise
powers and authority consistent with the responsibilities, functions and duties of every organizational unit
under his immediate jurisdiction.
 Assists the Resident Manager in terms of planning and organizing functions.
 Directs and coordinates with his section heads in the preparation of operational plans and budget of
his department including procurement programs.
 Conducts periodic evaluation of performance of personnel under his department such as two (2)
Supervisors, five (5) Section Heads, Eight (8) Foremen and Rank & File for a total of 67 personnel.
 Conducts periodic evaluation of performance of personnel under his department such as two (2)
Division Supervisors, five (5) Section Heads, Eight (8) Foremen and Rank & File for a total of 67
personnel
 Recommends technical training for the staff conducted by some electrical manufacturer & supplier
 Conducts hands-on technical training for personnel from time to time to enhance their technical
knowledge and skills.
 Implement company policies, standards and procedures as mandated.
 Review Technical specifications and standards for substations and line equipment.
 Analyze maintenance problems for substation equipment, underground and overhead power lines.
 Prepare substation maintenance plans and review maintenance practices and procedures.
 Retrieve and analyze events from different Fault Recorders type and troubleshooting problems in the
system
 Receive and release outages from and to Power Control Center.
 Assigns duties to staff and review technical work performance of the department regularly.
 Recommends hiring and recruitment of technical personnel necessary for the department and
oversee development of staff in required areas.
 Keeps employees under his department informed of management instructions, demands,
expectations and requirements. Likewise, keep management informed of the sentiments, needs and
expectations of employees.
 Monitors and evaluates accomplishment or end result of planned activities, targets and tasks
including major deviations, individually or collectively.
 Formulates and executes corrective, preventive as well as alternative action as may be deemed
necessary in consultation with the RM from time to time.
 Sees to it that pertinent laws, policies, guidelines, rules and regulations including safety habits and
measures are complied with.
 Acts promptly on all operational matters brought to his attention for appropriate action.
 Prepares plan and design, specify and recommends purchase of the power substation equipment
including modification and improvement of existing units.
 Supervises the installation and commissioning of power substations to insure that construction
standards, plans and specifications are met.
 Conducts extensive training of technical personnel for the splicing, termination, trouble-shooting and
repair of defective/damaged high voltage Submarine Power Cables.
M.D. CRISOSTOMO, INC. - Lower Barrigada, Tamuning GUAM 96931
Chief Engineer
Feb 2004 – Jan 2006

 Supervised all projects in GUAM POWER AUTHORITY and Directly report to the Chairman of the
Board
 Coordinate the project inspector from the Guam Power Authority
 Estimate the Associated Project more in Transmission line in Guam Power Authority.
 Costing the Labor and Materials
 Supervised some other Crew in Underground Conversion project of GPA Distribution Lines.
 Materials Preparation for the project.
 Acting as Safety Engineer for the Whole Company Project.
 Conduct Monthly Staff Meeting together with the Chairman of the Board
 Conduct weekly meeting with respective Project Engineer.
 Conduct Inspection of all Project in Andersen Air Base & Naval Base
 Coordinate and meet with OSHA representative and discuss about safety awareness.
 Supervised the erection of 138 KV transmission line from Cabras Island going to Barrigada.
 Supervised the 69KV Transmission line erection of structures and lay-outing of lines in GUAM
POWER AUTHORITY Project.
 Supervised the rehab of 13.8 KV distribution line in Dededo Area Guam Power Authority.
 Supervised in Civil Works for foundation pouring of steel tower structure
 Supervised in Concrete pouring in restoration of road

NATIONAL TRANSMISSION CORPORATION - Mindanao Area, General Santos City


Senior Engineer
10 Nov 2001- Dec 2003
 Supervise the whole expansion personnel in Klinan Substation.
 Prepare the as built drawing of schematic diagram of old Sub-station
 Supervise the one unit feeder line installation of SF6, CT, DS and prepare its individual structure.
 Supervise in wire tracing of all control wire from switch yard to Control Panel Board
 Supervised all Electricians during Maintenance in Mt. Apo Sub-station & Klinan Sub-station General
Santos City
 Supervised in installation of 69kV line from Klinan to Sea gull Line.
 Supervised the erection of 138KV Transmission Line from Mt. Apo going to General Santos City.
 Supervised the Line Hard wares installation.
 Supervised the Stringing of Power Lines 138 KV.
 Implements construction works and activities for overhead lines and substations which may be
categorized as new construction, new installation, replacement of item or accessories which are
retired from the item.
 Prepare and maintain tools and equipment to be used on the assigned job.
 Collects data of nameplates and specifications of newly installed transmission and distribution
equipment (Substations, overhead lines, underground and on any changes for central control
database.
 Visual inspection for substations, line equipment and components.
 Perform and assists in the preventive and corrective maintenance program including replacement of
defective parts/equipment on all equipments in the substation or lines.
 Monitors and evaluates accomplishment or end result of planned activities, targets and tasks
including major deviations, individually or collectively.
 Supervises and evaluates job performance of personnel and provides safe working condition and
implements safety work regulations of personnel in his division.
 Maintains reliable record of labor, materials, equipments, tools and transportation facilities utilized in
particular construction activities.
 Performs other duties that may be assigned to him by his supervisor from time to time, specifically,
the following:
o Preparation and erection of electric poles whether new or replacement.
o Installation of distribution lines whether initial or replacement.
o Installation of special equipment such as transformers, oil circuit reclosers,
Sectionalizer’s, meter sockets and metering equipment.

LEGASPI OIL CORPORATION - Sasa Davao City


Electrical Consultant
1999- 2000
 The Engineer as Electrical Consultant of the Company, will visit the plant and inspect, review and
evaluate the Electrical System of the processing facilities and to conduct test for power feeders and
circuits such as insulation, grounds, and short circuit fault test. The visit will be four times a month,
every Friday, thereof, each month.
 Make studies and prepare recommendations in improving the power factor of the plant to
minimize its power consumption and to assist the company during meetings, hearings and
conferences with power utility firm and other organization and entities either public or private.
 Shall make myself available upon call and advice from the company to attend to problems in the
electrical system of the plant, power feeders and circuits, substation transformers and controls and
other ancillary electrical gadgets and to prepare program for implementation of Total Quality
Maintenance (TQM)
 Shall affix my signature and seal on the relevant &documents presented and other requirements
emanating from the City Engineer’s Office and other government-regulating agency.
 Assist the Maintenance supervisor and his duly appointed designate in troubleshooting electrical-
related problems
DAVAO UNION CEMENT CORPORATION - Davao City
2 July 1984 – 31 March 1998

 Electrical Maintenance Superintendent: 20 Sept 1996 – 31 March 1998


 Electrical Project Engineer: 12 Feb 1989 – 19 Sept 1996
 Chief Electrician: 4 July 1988 - 11 Feb 1989
 Preventive Maintenance Inspector: Aug 1987 - 17 Sept 1988
 Junior Electrical Engineer: 13 May 1986 – 2 Aug 1987
 Shift Electrician: 2 July 1984 – 12 May 1986

Electrical Maintenance Superintendent: 20 Sept 1996 – 31 March 1998


 Responsible for maintenance of all electrical equipment like
o Squirrel Cage Induction Motors, 1Hp-150Hp, 440V, 3phase, Siemens brand.
o Wound Rotor Induction Motor raging from 600-6000Hp, 4.16KV, Helmke brand made in
Germany
o Direct Current Motor, 250-750Hp, 440V.
o Vacuum Circuit Breaker from medium voltage, which is 4.16KV, Siemens brand.
o SFG Gas outdoor type circuit breaker, dead tank type, and Siemens brand.
o 2 unit 15MVA transformer 69KV, EAG brand.
o 8 unit 100KVA distribution Transformer 4.16 / 440V.
o 4 units 2MVA Generator separately excited, ALCO brand, and maximize its run factor into
85%
o Low Voltage Circuit Breakers, Square D brand.
o Low Voltage Magnetic Contactor, Telemecanique brand. The above mention equipment’s are
to be found separately starting from Crusher, Raw Mill, Kiln, Finish Mill, and Pack House Area.
o In charge in Maintenance of all different types of Frequency Inverters.
o Capital expenditures preparation like budget in maintenance for every equipment, their
operating life; and present to the management regarding the return of investment versus
unscheduled breakdown which is costly especially clinker burning.
o In-charge in maintenance of Centralized Air-conditioning and all package type/window type Air
conditioning
 Supervising all electrical maintenance crews and monitors each individual man-hour:
o 4 Shift Electrical Engineers
o 8 Electricians
o 10 Helpers
 Attend weekly meeting like: Staff and Operation meeting, we discuss regarding the equipment status
and its operating cost and targeted run factor to 90%. We also include in discussion the volume of
production target for monthly basis.
 Active in participation in company activities like: Quality Circle, TQM (Total Quality Management)
and most especially in ISO 9002.
 Render Night Superintendent once a week. I am responsible all plant crew like production personnel,
maintenance personnel both mechanical and electrical, and see to it to have a smooth operation of
the plant. All problems arises during night-time of my duty, I will responsible and make decision for
the good of the company.

Electrical Project Engineer: 12 Feb 1989 – 19 Sept 1996


Scope of Work: During Expansion of Dry Process Cement Plant with a Budgeted of PHP 800,000,000 for
Electrical Equipments
 Responsible for the design of all electrical equipment like:
o Sizing of motors suited to certain equipment.
o Determining the size of controllers like circuit breakers, magnetic starter and its overload
relay protector.
o Determining the size of wires suited for every motor needed in the equipment.
o Size of conduit pipe.
o Automation diagramming like logic control circuit, ladder diagram, interlocking diagramming
o Single line diagramming and design.
 In charge in electrical construction installation of the ff.:
o Sub-station transformer 2 units 15MVA and 2 units 10MVA
o SFC Gas outdoor type 5 units from plant side and 2 units at quarry sub-station.
o Transmission line construction 69KV.
o Installation of motor control Centre, 440V.
o Installation of direct current controller.
o PLC- Installation.
o Installation of Medium Voltage motor 4.16 KV, wound rotor induction motor type,
crusher area, raw mill area, cable belt conveyor, finish mill area and packing plant.
o Installation of medium voltage vacuum circuit breaker.
o Supervising 12 JR. Electrical engineers, 20 Electricians and 15 helpers and 20 several
contractors.

Chief Electrician: 4 July 1988 - 11 Feb 1989


 Scheduling of works and technical reports during shutdown.
 Preparation of spare parts needed during maintenance from Quarry up to packing plant.
 Assist shift Electrician in trouble shooting.
 Carry out applied research in fields of electrical and electronic Engineering and physics under the
direction of engineers.
 Conduct or supervise the installation, commissioning, and operation of electrical and electronic
equipment and systems other than aircraft electronics or instruments.
 Calibrate electrical or electronic equipment and instruments according to technical manuals and
written instructions.
 Install, operate and maintain electrical and electronic equipment and system
 Supervising 4 shift Electricians, 4 helpers, 1 rewinder and 1 air-con Technician.

Preventive Maintenance Inspector: Aug 1987 - 17 Sept 1988


 Daily inspection of all Electrical Equipment and perform Preventive measures if there are
abnormalities
 Preparation of work orders prioritizing of activities during Shutdown.
 Perform monitoring of all work accomplishments being done by maintenance personnel.
 Conduct life tests (burn-ins) on assemblies and record, analyze the results.
 Supervising 15-20 casual employees during shutdown of the plant.
 Periodic Megger Testing of all motors like: Squirrel Cage Induction Motors and DC Motor.
 Replace defective bearings of motors.
 Supervising 3-Electricians and 4 helpers.

Junior Electrical Engineer: 13 May 1986 – 2 Aug 1987


 Assist the Electrical Maintenance Engineer in the preparation of Activities at plant wide in day to day
activities.
 Monitor energy consumption and make a monthly report.
 Assist Chief Electrician during shutdown and handle 10 Personnel to conduct repair like:
replacement of bearings for motors. Replaced damage magnetic contactor and retighten the terminal
blocks.
 Set up and operate specialized and standard test equipment to Diagnose, test and analyze the
performance of Electrical and electronic components, assemblies and systems.
 Make a bar chart or pert CPM network activities and present to my immediate superior before
shutdown activities to be perform.
 Supervising 5 Electrician and 3 helpers.

Shift Electrician: 2 July 1984 – 12 May 1986


 Responsible in maintaining of all electrical equipment in the Plant being assigned by immediate
supervisor.
 Wiring of controls like Single Push Button, Forward- Reverse Star-Delta and Auto -Transformers.
 Lay-outing of conduit pipes / cables including termination of Lines in medium voltage.
 Troubleshoot, maintain and repair industrial electrical and electronic control systems and devices.
 Maintain, repair, install and test switch gears, transformers, Switchboard meters, regulators, and
reactors.
 Maintain, repair, test and install electrical motors, Generators industrial storage batteries and
hydraulic and pneumatic electrical control systems.
 Read and interpret drawings and electrical code specifications to determine layout of industrial
electrical equipment installations

ALTECH CONSTRUCTION, Inc. - DUCC – Project


Instrumentation Engineer
5 Aug 1982 – 1 July 1984
 In charge of installation of all instruments like P1-controller, Pressure Transmitter, Thermocouple,
Curve-recorder, Level Sensor, Inductive Sensors.
 Install, examine, replace or repair electrical wiring, Receptacles, switch boxes, conduits, feeders,
cable assemblies, lighting fixtures and other electrical components.
 Test electrical and electronic equipment and components for Continuity, current, voltage and
resistance.
 Supervise 10-instrument Technicians and 5-helpers.

ATLAS MINING CONSOLIDATED & DEV. CORPORATION - Lutopan, Toledo City


Lineman
6 Oct 1981 – 12 Feb 1982
 Installation of ACSR (Aluminium Cable Steel Reinforce).
 Installation of Electric post from 10 feet to 60 feet.
 Installation of Pole line hardware like: suspension insulator, Pin type insulator.
 In charge in armoring of ACSR.
 Stringing and terminating of ACSR conductor.
HOLY CROSS COLLEGE OF DIGOS - Digos, Davao Del Sur
Audio Visual Operator
8 May 1980 – 6 April 1981
 Operate amplifier sound system during flag ceremony and if there will be an affair in he school.
 Operate audiovisual equipment.
 Maintenance and make a minor repair of sound system or audiovisual equipment.
 Perform main repair of microphone and sound box.

PART TIME WORK

UNIVERSITY OF SOUTH-EASTERN PHILIPPINES - Bo. Obrero Davao Campus


Associate Professor

 Handling the following subjects: E AC Machinery, DC Machinery, Power System Design, Illumination
and Wiring Design, Motor Controllers, Rewinding, and Mathematics

Seminars & Training


 Comprehensive Training Program (Module 1) Introduction to Drilling Technology (Asia
Pacific Well Drilling Specialists, Inc)
 IADC Rig Pass Orientation & Safety Awareness (Asia Pacific Well Drilling Specialists, Inc.,
Junquera St. Cor. P. Del Rosario St., Cebu City)
 Hydrogen Sulphide (H2s) Training (Module 3)
(Asia Pacific Well Drilling Specialists, Inc., Cor. P. Del Rosario St., Cebu City)
 Basic First Aid (Module 4) (Asia
Pacific Well Drilling Specialists, Inc., cor. P. Del Rosario St., Cebu City)
 The New Technology of Drives Seminar (Conference Room ABB Industry, Inc, Davao City (March
20, 1998)
 Low Voltage products Seminar (Conference Room ABB Industry, Inc, Davao City (Apr 1998)
 National Building Code (P. D. No. 1096) - R. A. 7920 (The New Electrical Engineering Law
Paternos Restaurant, Davao City, April 23, 1998)
 Medium Voltage Motor and Liquid Starter Training
(Helmke GMBH, Hannover West Germany, (Aug 20-26, 1997)
 Medium Voltage Frequency Inverter Training
(Asea Brown Bovery, Ltd, Baden, Switzerland, Aug 28- Sept 02, 1997)
 Basic Management Program (Asian Institute of Management, Metro Manila, Nov 1996)
 20th Mid-Year General Membership Meeting IIEE (APO View Hotel, Davao City, July 6-8, 1995)
 Advance Cement Plant Maintenance – Electrical - Supervisory Technical Skills Training Program)
(Antipolo City, March 21-25, 1994)
 Quality Management System (Course 1 – An Introduction to ISO 9000)
(Tibungco, Davao City, Feb 09, 1993)
 Total Quality Control Seminar (Davao Union Cement Corp, Tibungco, Davao City, March 1993)
 Introductory Course on Environmental Self-Monitoring and Regulation
(DBP Training Room, Makati City, Metro Manila, Sept 6-8, 1993)
 Basic Cement Plant Maintenance Course
(Philippine Investment Management Consultant, Inc., Antipolo City, Nov 8-26, 1992)
 Effective Business Communication Seminar
(Philippine Investment Consultants, Inc, Davao City, April 15, 1991)
 PERT / CPM Technique Seminar - Makati City (May 28-30, 1991)
 Maintenance Planning - Makati City (Nov 21-24, 1990)
 Effective Leadership Course (Managerial Grid Approach) (Philippine Investment Management
Consultant, Inc, Antipolo City, May 22-27, 1989)
 Analytical Troubleshooting (Kepner and Trego Approach, Davao City, Feb 8-11, 1988)
 Trainer’s Training (JIT) (Davao City, Feb 12, 1988)
 Applied Behavioural Skills (Davao Union Cement Corp., Davao City, May 25-26, 1988)
 Power Distribution System for industrial and Commercial Electrical Structure
(National Manpower and Youth Council Training, Tibungco, Davao City)
 Basic Supervisory Development Course
(Philippine Investment Management Consultant, Inc Davao City, Feb 10-12, 1987)
 Conveyor Belt, Conveyor Belt Splicing and Pulley (Lagging Technology, Davao City, Aug 1986)
 FESTO DIDACTIC Seminar P11 (Introduction to Pneumatics) (Tibungco, Davao City, Aug 1985)
 National Manpower and Youth Council Trainers Training Course
(Techniques of Instruction) (Tibungco, Davao City Feb 22, 1984)
 Shell Lubricant Seminar (Davao City, July 26-27, 1984)
 Productivity Improvement Circle (Circle Leader’s Training) (Davao City, Dec 1-3, 1983)
Character Reference:
Dr. Lyndon Roble College Dean
University of Southeastern Philippines
Bo. Obrero, Davao City, Philippines
Contact No. +639327432817
Engr. Jake Raymund Foronda- Residence Manager
Mindoro Resources Limited
Cabadbaran City
Contact No.+6391894520
Arch. Vicente Yambao Ship Repair Facilities
Naval Base, Guam USA
Contact Number 567434

PREPARED BY:

ENGR. FEDILINO FORNOLLES, PEE

You might also like