Fornolles CV
Fornolles CV
Fornolles CV
OF
FEDILINO FORNOLLES
Personal Details
Current Studies
Master of Science in Environmental Resource Management (36-units completed) -
University of South-eastern Philippines - Thesis writing on going
Computer Literacy
MS Office application, familiar with CAD
Registration:
Professional Electrical Engineer - Reg. No. 2343
Associate Electrical Engineer - Reg. No. 2629
Professional Experience
Results-oriented professional with over 20 years technical experienced in the operation, Design
maintenance and supervision for Commissioning of an Electrical & Mechanical Power Generation,
Transmission & Distribution and also in Mechanical Maintenance of Mills, Belt Conveyor and
Crushers upgrading this into maximum operating time from 85% increase to 97%production.
Background includes developing annual work plans, distribution system expansion and rehabilitation
plan, Industrial Plants like ( Cement Manufacturing, Food Processing & Oil Mill Industry) Electrical
System Design start from their Substation until feeder lines, Load Calculation and Voltage drop
calculation and sizing of cables and protection relaying, load forecast analysis and cash operating
budget.
Effective in communication and team building skills and maintain exceptional customer relations.
Good working knowledge of 138/69kv transmission line, power substation operation and
underground transmission system, splicing cables and repair.
Major Achievements / Accomplishments
1.) Electrical Design, Calculation & Implementation of 5000TPD Dry Process in Cement Plant Davao
Union Cement Corporation Bo. Ilang Davao City, Philippines
2.) Solved the Excessive Overheating of Slip ring of 6000 KW/ 4.16 kV wound rotor induction motor
of Davao Union Cement Corporation, Bo. Ilang Davao City, Philippines
3.) Construction of Main Sub-station 50MVA of Klinan Substation, Klinan General Santos City
Philippines
4.) Rehabilitation of 36 KM 138 kV Transmission Line of Teresa Crew Gold Corporation (Apex Mine
Co.)
5.) Rehabilitation of 800KW and 500KW 4.16kV Wound rotor induction motor of Teresa Crew gold
Corporation (Apex Mine Co.)
6.) Electrical Design, Calculation and implementation of 10 locations in underground mining for 4.16
KV Substation...
7.) Solved the unnecessary tripping of Power Plant in Semirara Mining Corporation
8.) Construction and Commissioning of 4-units Warzila Diesel Generator 4 MW each in Semirara
Mining Corporation
9.) Design lighting system of open cut mining of Semirara Mining Corporation
10.)Design, Calculation & Implementation of Overland Conveyor System in Semirara Mining
Corporation.
11.) Applying for Direct connection of Power requirement to National Transmission Corporation with
approval of Energy Regulatory Board. In Teresa Crew Gold (Apex Mine Co.)
Current Employment
GIFTLAND POWER PLANT
Demerara, George Town
Guyana, South America
Position: Power Plant Manager
April, 02, 2018-March 15, 2019
Managed the troubleshooting if any during unscheduled shutdown
Responsible to Managed the Maintenance and operation of the Two Diesel Engine
Responsible to Monitor the fuel consumption
Responsible to check the request Materials and Fuel ordering
Responsible to Monitor the Man-hour of the Labour Employee
Analyze & Check the Engine condition after the running hours
Weekly conducting a Meeting of all Maintenance & Operation personnel
Previous Employment
PT Euroasiatic Jaya
Jakarta, Indonesia
Position: Electrical Design Manager
February 28, 2017- March 30, 2018
Reporting directly to the Project Director
Managed the Electrical Engineering Design and evaluate through Manual Calculation
Managed to Design the Protection System of 69 KV Substation
Managed the Implementation of the 69 KV Substation
Managed the Relay Protection System of Gas Engine Generator 10 MW and 4.16 KV Generations.
Assist the constructions group to check into actual installation to conform the design
Check the Purchased the Purchased Material if it is conform to the required specification
Attend Weekly meeting to the Project
Coordinate to the site project manager in implementing the design
Assist the Design Engineer in performing their duty
MPH Global
Lhoist Malaysia Project
Tapah, Perak Malaysia
Position: Electrical Manager
February 16, 2016- January 30, 2017
Reporting directly to the Project Director
Directly responsible for planning/preparing all contract administration, executing and directing
project activities, and developing or maintaining client relationships.
Responsible for leading and overseeing multiple projects consisting of onsite supervision of
general superintendent, field supervisors, lead persons crew leaders, journeypersons,
apprentices and/or helpers.
Responsible for lay-out of project work and ensuring that materials, tools, equipment and
information are scheduled timely to meet scope and construction schedules.
Interacts with branch manager, field manager, general superintendent, and Human
ResourceDepartment.
Managed the Construction of 34KV Substation and Conduct Commissioning andresponsible for
reviewing project documents; plans and specifications; directing construction activities; resolving
construction difficulties; coordinating field installations and project closings; and developing and
maintaining client relationships, all within project cost, time and quality standards and standard
operating. Reporting to the incumbent is assigned project Labour
CABRAS MARINE CORPORATION
Sta. Rita, Guam
US Naval Base Compound
Position: Electrical Superintendent
July, 2, 2015-January, 25, 2016
Reporting directly to the Project Manager
Responsible for the operation in conducting a Maintenance activity of the Military Carrier Ship which
schedule for Maintenance.
Responsible for the Material Procurement
Managed the Electrician in performing repair of the Military Carrier Ship including the Sub-Marine.
Supervise the rewinding works in the work shop
Supervise the Maintenance of Electrical Controls
Supervised all projects in GUAM POWER AUTHORITY and Directly report to the Chairman of the
Board
Coordinate the project inspector from the Guam Power Authority
Estimate the Associated Project more in Transmission line in Guam Power Authority.
Costing the Labor and Materials
Supervised some other Crew in Underground Conversion project of GPA Distribution Lines.
Materials Preparation for the project.
Acting as Safety Engineer for the Whole Company Project.
Conduct Monthly Staff Meeting together with the Chairman of the Board
Conduct weekly meeting with respective Project Engineer.
Conduct Inspection of all Project in Andersen Air Base & Naval Base
Coordinate and meet with OSHA representative and discuss about safety awareness.
Supervised the erection of 138 KV transmission line from Cabras Island going to Barrigada.
Supervised the 69KV Transmission line erection of structures and lay-outing of lines in GUAM
POWER AUTHORITY Project.
Supervised the rehab of 13.8 KV distribution line in Dededo Area Guam Power Authority.
Supervised in Civil Works for foundation pouring of steel tower structure
Supervised in Concrete pouring in restoration of road
Handling the following subjects: E AC Machinery, DC Machinery, Power System Design, Illumination
and Wiring Design, Motor Controllers, Rewinding, and Mathematics
PREPARED BY: